Nam Theun 2 | |
---|---|
Location | Bolikhamsai and Khammouane Provinces, Laos |
Coordinates | 17°59′49″N104°57′10″E / 17.99694°N 104.95278°E |
Construction began | 2005 |
Opening date | December 2010 (Inauguration) [1] |
Dam and spillways | |
Type of dam | Gravity dam |
Impounds | Nam Theun |
Height | 39 m (128 ft) |
Length | 436 m (1,430 ft) |
Reservoir | |
Total capacity | 3.53 km3 (2,860,000 acre⋅ft) |
Catchment area | 4,039 km2 (1,559 sq mi) |
Surface area | 450 km2 (170 sq mi) |
Power Station | |
Operator(s) | Nam Theun 2 Power Company |
Commission date | April 2010 [1] |
Turbines | EDL: 2 × 37.5 MW Pelton turbine EGAT: 4 × 250 MW Francis turbine [2] |
Installed capacity | 1,075 MW |
The Nam Theun 2 Hydropower Project, or simply NT2, is a hydroelectric dam on the Nam Theun River in Laos. Commercial operation of the plant began in April 2010. [1] The scheme diverts water from the Nam Theun, a tributary of the Mekong River, to the Xe Bang Fai River, enabling a generation capacity of 1,075 MW , from a 350 m (1,148 ft) difference in elevation between the reservoir and the power station.
It is the largest hydroelectric project so far in Laos, exporting power to Thailand as well as supplying the local area with electricity. At the time of signing in 2005, NT2 was the largest foreign investment in Laos, the world's largest private sector cross-border power project financing, the largest private sector hydroelectric project financing, and one of the largest internationally financed IPP projects in Southeast Asia. The dam also marked a return by the World Bank to funding large-scale infrastructure, after a decade-long hiatus.
According to the government of Laos, "the project is an essential part of the country's development framework and the project's implementation is likely to be the first real possibility for (Laos) to reduce gradually its dependence on Official Development Assistance". [3]
The project has significant environmental and social impacts, and comprehensive measures have been designed to mitigate these. According to a group of social and environmental experts who advise on the project, these measures could become a global model. Although Newsweek referred to it as a "kinder and gentler dam", [4] the project has also attracted criticism. [5]
By 2015, it was possible to see the effect of the dam and criticism mounted. A group of non-governmental organisations said: "Ten years after the start of the construction of the Nam Theun 2 Dam in Central Laos, it is clear that this mega project has disastrous impacts on people and their environment." [6]
The Nam Theun 2 project was identified in the 1980s and a concession was awarded in 1993. It was subjected to a long anti-dam campaign. The project was frozen after the 1997 Asian financial crisis, but preparation resumed in 1999. In October 2002 a concession contract between the Nam Theun 2 Power Company (NTPC) and the government of Laos was signed, followed by the signing of power purchase agreements (PPA) in November 2003 between NTPC on the one hand and, Electricity Generating Authority of Thailand (EGAT) and the Laotian state-owned power company Electricite du Laos (EDL) on the other. Financial closing was reached in June 2005. The Nam Theun River diversion was begun in March 2006 and then closed in April 2008 following completion of the Nakai Dam wall. Impoundment of the Nakai Reservoir occurred over the 2008 wet season and the reservoir was close to full supply level by the end of 2008. Test hydro power generation began in mid-2009 and the commercial operation date was achieved in April 2010. [7]
NT2 enables Laos to export 995 MW of electrical energy to the EGAT. The project also supplies 75 MW of capacity for domestic use in Laos.
Nam Theun 2 is a trans-basin diversion power plant that uses water from the Nam Theun River and releases the water into the Xe Bang Fai River. The project site is in Khammouane and Bolikhamxay Provinces in central Laos, about 250 kilometers east of Vientiane. It stretches from the Nakai Plateau to the lower Xe Bang Fai River confluence with the Mekong.
The main features of the project include:
The project is structured as a build-operate-transfer (BOT) project. It has a concession period of 31 years, of which the operating period is 25 years. At the end of the concession period, the project facilities will be transferred to the government free of charge.
The project was developed by NTPC, which is owned by a consortium composed of EDF (40%), Electricity Generating PCL (EGCO) of Thailand (35%), [8] and the Government of Laos (25%). Governments and government-owned enterprises own a majority of NTPC. This arrangement is atypical of an IPP. Normally the power generating company is privately owned.
Laos is a People's Democratic Republic (PDR) with a one-party system under the Lao People's Revolutionary Party. It is one of the few communist states in the world.
The government has multiple roles related to NT2, some of which may be conflicting: It partially owns NTPC and thus has an interest in the financial profitability of the project; it is supposed to monitor compliance with environmental and social safeguards under the concession contract; and it buys some of the electricity generated from the project through the state-owned power company EDL and thus has an interest in low electricity prices.
Some of the owners of NTPC are also contractors engaged in the construction of the dam. For example, EDF International is the lead contractor for the project under a turnkey contract. It has engaged various sub-contractors for specific parts of the project.
Construction costs were initially estimated at US$1,250 million plus US$331.5 million for contingencies. More recently construction costs have been given as US$1.3 billion. [9] [ unreliable source? ]
The project base cost is funded through US$330 million of equity and US$920 million of debt. It is financed through equity, loans and guarantees from 26 financial institutions, including
All financing in hard currencies is guaranteed through political risk insurance provided by the above-mentioned three export credit agencies, the ADB (US$50 million), the International Development Association (IDA) of the World Bank Group (US$50 million), and the Multilateral Investment Guarantee Agency (MIGA) of the World Bank Group (US$91 million). Specifically, MIGA has provided a US$86 million guarantee to Fortis Bank of Belgium against the risks of expropriation, breach of contract, war and civil disturbance, as well as transfer inconvertibility in both Laos and Thailand. [10] According to MIGA, its guarantee "was key to lowering the project's risk profile, which in turn enabled the government and developers to attract commercial financing at better rates and gave the investor the assurance needed to go ahead with the deal".
The government's initial equity contribution of US$83 million (25%) was largely funded by donors, including a US$20 million grant from the International Development Association of the World Bank Group, the ADB (US$20 million), France, and the EIB.
According to the government "the Project is an essential part of the country's development framework and the Project's implementation is likely to be the first real possibility for (Laos) to reduce gradually its dependence on Official Development Assistance." In the same vein, the then Managing Director of the World Bank, Shengman Zhang, said in 2003 "We see Nam Theun 2 not as a project per se, but as a vehicle through which to make a considerable progress in the effort of poverty reduction." [3]
The project generates three forms of revenue:
Government revenue is estimated at US$1.9bn to US$2bn in nominal terms over 25 years. It has been estimated that at a 10% discount rate the net present value of the revenues will be six times higher than the net present value from the debt service, if all government equity was funded through concessionary lending. Revenues are expected to increase progressively from approximately US$10M in 2009 to US$110 to 150M per year at the end of the concession period in 2033. Thereafter the government will receive all revenues accruing to the project.
The power purchase agreement (PPA) between EGAT and NTPC was designed as to stabilize the cash flow despite hydrological variation and consequently variation in power output. Revenues will be partially in USD and partially in Thai baht. Power demand from Thailand is expected to be strong. In December 2007, Thailand and Laos signed an agreement increasing the total power to be supplied by Laos to Thailand from all sources in 2015 from 5,000 MW to 7,000 MW. [11]
The World Bank works with the Lao government to improve public financial management practices and increase transparency in order to increase the likelihood that revenues will be used to benefit the poor, including through investment in health and education. The government has agreed with the World Bank to implement a Poverty Reduction Fund that is being initially sourced from International Development Association funds, and then from the government's taxes, royalties, and dividends once the project commences operation. Special administrative units are being established to deal with the effective management and allocation of the funds earned by the project. [3]
In 2007 Laos was ranked on the Corruption Perception Index by Transparency International 168 out of 179 countries assessed, making it one of the most corrupt countries on the index.[ citation needed ]
Environmental and social impacts of the project include downstream impacts, impacts on biodiversity, resettlement, and reservoir sedimentation. More details can be found in the Environmental and Social Impact assessment, [12] and in the summary provided for the various impacts below.
Monitoring and Evaluation NT2 has a multi-layer environmental and social monitoring and evaluation mechanism consisting of the following elements:
The comprehensive environmental and social measures designed to mitigate potential environmental and social impacts could become a "global model", according to a group of social and environmental experts who advise on the project. [4]
According to the NGO International Rivers, there have been substantial shortcomings in the mitigation of impacts. According to the organization, compensation payments and replacement land for villagers affected by construction activities have been "inadequate, unfair or non-existent". Poor resettlement planning has led to housing and infrastructure delays. Plans to restore the livelihoods of villagers on the Nakai Plateau and along the Xe Bang Fai have yet to be finalized. And the budget for the downstream program in particular is said to be inadequate. [14]
Bruce Shoemaker, editor of Dead in the Water, [15] claims that the scientific consensus is that the dam's costs outweigh its benefits and that the dam represents a "complete failure of water governance in [the] Mekong region." [16]
According to data in the World Bank publication "Good dams, bad dams", the ratio of area flooded and people resettled per megawatt of installed electricity generating capacity (flooded area of 41 hectare per MW and five persons resettled per MW) is neither very high nor very low, compared to 48 other large dams analyzed. [17] Using this specific analytical framework, Nam Theun 2 could neither be considered a "good" or a "bad" dam.
The flow of water in the Xe Bang Fai (XBF), which received the water diverted through NT2, increased significantly, thus affecting the population living downstream of the release point.
The exact number of people affected is disputed. While NTPC speaks of 40,000 affected people, the NGO Environmental Defense speaks of up to 150,000 people. The impacts have been widely studied and have been discussed with local communities. Negative impacts on the downstream population include the washing away of river bank gardens, changes in water quality, and impacts on fisheries.
NTPC promised to stop power production when floods occur on the Xe Bang Fai. However, it is as yet unknown exactly how long this flooding period will last for each year. The length of the period affects the project's profitability.
Water quality is negatively impacted through fouling of biomass in the reservoir. Because the impacts are unknown, monitoring systems are included and a commitment has been made to "adaptive management".
Livelihood development programs were put in place for the villagers living downstream on the Xe Bang Fai, in districts such as Mahaxai. The programs are focused on agriculture, fish ponds, and handicrafts to help them generate income beyond that derived from fishing. The objective is to help villagers generate money from a variety of different sources to compensate for any changes in fishing catches after the river diversion. Affected communities receive irrigation systems to allow for a second, dry season rice crop, drinking water systems, and access to electricity. The provision of this infrastructure is not the responsibility of NTPC, but of the government. [18]
According to a joint progress report issued by the World Bank and the ADB in December 2007, implementation of the downstream program – particularly on implementing livelihood programs – was a challenge. Lessons from the 20 villages where the programs have been piloted in a participatory manner are being applied as other villages were included. Micro-credit schemes that are being developed were not yet on a sustainable financial footing. [19]
There is relatively little information on downstream impacts on the Nam Theun River, where water flows will be significantly reduced. No permanent villages lie along the Nam Theun some 50 km downstream below the dam. Fishermen and hunters, however, do use this stretch of the river. Fish diversity and abundance is expected to be affected by reduced water flows and sediment content. [20] Monitoring of the villages along the river conducted by NTPC has not yet detected any significant impacts to the fishery. [21]
Three existing protected areas on the Nakai plateau (the Nakai-Nam Theun, the Hin Nam Nor, and the Phou Hin Poun National Biodiversity Conservation Areas), together nine times larger (4,106 km2) than the flooded area, are expected to be better managed through significant resources made available under the project – more than 60 times what the government has spent on its entire national parks system so far. The flooded areas are not considered critical natural habitat. Formerly there was significant illegal logging in the protected areas, which the government claims has now been largely brought under control despite growing evidence that villagers are using logging to supplement falling incomes. [22]
Detailed fish surveys showed that there are no fish species living only in the stretch of the river that will be inundated. A management plan for the Asian elephants in the area has been drawn up. A Watershed Management Protection Authority (WMPA) has been established with the specific purpose of protecting the watershed of the reservoir and the protected areas in it. WPMA will receive US$1M annually from NTPC through the concession period.
Seventeen villages and their 6,300 inhabitants moved from the area that became the NT2 reservoir on the Nakai Plateau to custom-built villages built in consultation with the resettled communities. NTPC and the Lao Government have committed to doubling the income of resettled villagers, through livelihood programs, five years after they have been relocated. This means that people who used to make US$410 per household a year in 2005 should make at least US$820 per household a year by 2012.
Construction of the villages and major facilities (new roads, water pumps, toilets, schools, mills, and electricity) was completed by mid-2008. [23] Consultations on house design, location, and construction materials were held and continue to ensure the outcomes reflect the needs of the local people. According to a World Bank report, the health of villagers who have already been resettled has significantly improved due to better water and sanitation, regular health check-ups and the provision of mosquito nets, as documented by various assessments. Experts are helping the resettled villagers to adopt improved practices to increase agricultural and income productivity. The report stresses that the pace of the development of the livelihood activities must be accelerated including engaging additional technical assistance to help villagers develop the most effective cropping systems possible. [24]
At current sedimentation rates, the reservoir has a lifetime of more than five centuries. If substantial logging occurred in the upstream basin, the lifetime would be accordingly reduced and could affect the financial and economic viability of the project. This would especially be the case if sediments remained in the active storage area in the upper part of the reservoir instead of being washed into the dead storage area closer to the dam in the lower part of the reservoir. The establishment of the relatively well-funded Watershed Management Protection Authority is expected to protect forest cover and thus limit erosion in the watershed of the reservoir.[ citation needed ]
The Mekong or Mekong River is a trans-boundary river in East Asia and Southeast Asia. It is the world's twelfth-longest river and the third-longest in Asia with an estimated length of 4,909 km (3,050 mi) and a drainage area of 795,000 km2 (307,000 sq mi), discharging 475 km3 (114 cu mi) of water annually. From its headwaters in the Tibetan Plateau, the river runs through Southwest China, Myanmar, Laos, Thailand, Cambodia, and southern Vietnam. The extreme seasonal variations in flow and the presence of rapids and waterfalls in the Mekong make navigation difficult. Even so, the river is a major trade route between Tibet and Southeast Asia. The construction of hydroelectric dams along the Mekong in the 2000s through the 2020s has caused serious problems for the river's ecosystem, including the exacerbation of drought.
Dams and reservoirs in Laos are the cornerstone of the Lao government's goal of becoming the "battery of Asia".
A National Biodiversity Conservation Area (NBCA) is an environmentally protected area in Laos. There are all together 21 different NBCAs in Laos, protecting 29,775 square kilometers. Another 10 NBCAs have been proposed, many of them being treated by authorities as though they were already officially protected.
The Nam Ngum Dam is a hydroelectric dam on the Nam Ngum River, a major tributary of the Mekong River in Laos. It was the first hydropower dam built in the Lao PDR.
The Bui Dam is a 400-megawatt (540,000 hp) hydroelectric project in Ghana. It is built on the Black Volta river at the Bui Gorge, at the southern end of Bui National Park. The project was a collaboration between the government of Ghana and Sino Hydro, a Chinese construction company. Construction on the main dam began in December 2009. Its first generator was commissioned on 3 May 2013, and the dam was inaugurated in December of the same year.
The Nam Theun 2 Power Company Limited (NTPC) is a company set up to build and operate the Nam Theun 2 Multi-Purpose Project in Khammouane Province in Laos.
The estimated hydropower potential of Mekong River Basin about 58,930 Megawatts (MW). As of February 2024, there are an estimated 167 Hydropower Plants (HPPs) in the Mekong, with a combined installed capacity of some 36,376.3 MW. An additional 20 HPPs are currently under construction and at various stages of completion. These have a combined installed capacity of an additional 4,535.5 MW.
The Sirindhorn Dam is in Sirindhorn District, Ubon Ratchatani, Thailand. It impounds the Lam Dom Noi River, and its reservoir is the province's largest water resource. The dam was commissioned in 1971 to serve as a hydropower facility as well as to supply irrigation water. The dam was named after Princess Royal Sirindhorn. All of the electricity generated by the dam is destined for domestic markets. The dam was constructed and is owned and operated by the Electricity Generating Authority of Thailand and is located in the Mekong River Basin, just upstream from the controversial Pak Mun Dam.
The Lower Se San 2 Dam is a hydroelectric dam under development on the Se San River in Stung Treng Province, northeastern Cambodia. The Se San River is a major tributary of the Mekong River. The dam site is located 25 kilometres (16 mi) east of the provincial capital, also named Stung Treng. The first turbine began producing electricity in November 2017. The dam was officially opened on December 18, 2018.
The Xayaburi Dam is a run-of-river hydroelectric dam on the Lower Mekong River, approximately 30 kilometres (19 mi) east of Sainyabuli (Xayaburi) town in northern Laos. Commercial operation of the dam started in October 2019. The main purpose of the dam is to produce hydroelectric power, 95% of which is to be purchased by the Electricity Generating Authority of Thailand (EGAT). The project is surrounded in controversy due to complaints from downstream riparians and environmentalists. Preliminary construction began in early-2012, but work on the dam itself was suspended shortly thereafter due to complaints from Cambodia and Vietnam downstream. After making modifications to the dam's design, Laos started construction with a ceremony on 7 November 2012. The Xayaburi Dam is the first of the 11 dams planned on the lower Mekong.
The Zimapán Dam, also known as Fernando Hiriart Balderrama Dam, is an arch dam on the Moctezuma River about 15 km (9 mi) southwest of Zimapán in Hidalgo state, Mexico. The primary purpose of the dam is hydroelectric power production and it services a 292 MW power station with water.
The Houay Ho is a dam located in Samakkhixay District of Attapeu Province, Laos, 160 km (99 mi) east of Pakse and 30 km (19 mi) northwest of Attapeu. The project is considered the first privately financed joint venture 'build-operate-transfer' (BOT) hydropower project in Laos. It has installed capacity of 152.1 megawatts (204,000 hp), almost all of which is exported to Thailand.
This page describes energy and electricity production, consumption and import in Laos.
Bolikhamsai is a province of Laos. Pakxan, Thaphabat, Pakkading, Borikhane, Viengthong, and Khamkeut are its districts and Pakxan is its capital city. The province is the site of the Nam Theun 2 Dam, the country's largest hydroelectric project.
Khammouane province (Khammouan) is a province in the center of Laos. Its capital lies at Thakhek.
The Panel of Environmental and Social Experts (POE) is an advisory body made up of western academics which reports on the social and environmental costs of the Nam Theun 2 Dam, a hydroelectric project on the Nam Theun River in Laos. In its yearly to biyearly reports, the panel makes recommendations to minimize the project's negative impacts and maximize the positive effect. The panel also provided the initial social and environmental justification for the dam's creation. Despite its stated aims, the body has received numerous criticisms from scholars and NGOs regarding its efficacy. Allegations involve a neocolonial mindset and the suppression of negative findings for financial gain.
The 2018 Laos dam collapse was the collapse of Saddle Dam D, part of a larger hydroelectric dam system under construction in southeast Laos's Champasak Province, on 23 July 2018. The dam collapse lead to widespread destruction and homelessness among the local population in neighbouring Attapeu Province. As of 25 September, 40 people were confirmed dead, at least 98 more were missing, and 6,600 others were displaced.
Laos is a nation with plentiful surface water and broad rivers, but outside of cities there is little infrastructure to make that water clean and accessible. Very little improvement has been made since the end of the Laotian Civil War in 1975, especially compared to peer nations such as Thailand. By 2015, 76% of Laotians nationwide were estimated to have access to “improved” water, while 71% were estimated to have access to “improved” sanitation.
The Nam Ou cascade hydropower project is a series of seven hydroelectric dams along the Nam Ou river which are located in the provinces of Phongsaly and Luang Prabang in northern Laos. The project is managed by the Power Construction Corporation of China (PowerChina) and the Lao government. The project is the series of dams include seven levels of reservoirs in an attempt to mitigate ecological deterioration. The construction of the hydropower project is being completed in two phases. Phase I of the dams, including Nam Ou 2, Nam Ou 5, and Nam Ou 6 began operating on May 12, 2016. Phase II of the dams, including Nam Ou 1, 3, 4, and 7 is expected to be completed in 2020.
Vietic peoples refers to a group of ethnic groups of Southeast Asia.