Operation Stack

Last updated

Operation Stack
Operation Stack.jpg
Operation Stack being implemented in March 2008
Kent UK location map.svg
Red pog.svg
Location in Kent
Location Kent, England, UK
Coordinates 51°05′33″N1°05′33″E / 51.0926°N 1.0924°E / 51.0926; 1.0924
Grid reference TR169374

Operation Stack was a procedure used by Kent Police and the Port of Dover in England to park (or "stack") lorries on the M20 motorway in Kent when services across the English Channel, such as those through the Channel Tunnel or from the Port of Dover, are disrupted, for example by bad weather, industrial action, fire or derailments in the tunnel.

Contents

Operation Stack is managed by Kent Police using powers under the Civil Contingencies Act 2004 and coordinated by a multi-agency group known as Operation Fennel. [1]

According to Damian Green MP, by 2007 the system had been implemented 74 times in the 20 years since it was first introduced. [2]

Causes

Operation Stack is implemented whenever there is an urgent need to inhibit the flow of traffic to the Channel Tunnel and the Port of Dover, which handle 90% of freight traffic between the United Kingdom and mainland Europe. There are officially only 550 parking spaces for HGVs in Kent, so if access to cross-channel services is restricted, congestion would quickly spread across the county. [3]

The most common causes of Operation Stack are severe weather that either cancels or restricts ferry services, industrial action at the French ports of Calais, Dunkirk and Boulogne, and electrical failures in the Channel Tunnel. [3]

Procedure

A map of the phases of Operation Stack Operation Stack map.jpg
A map of the phases of Operation Stack

The M20 is the main road from the London Orbital Motorway (the M25), the world's largest and busiest ring road, [4] to the Port of Dover, the busiest ferry terminal in Europe, [5] and the Channel Tunnel. It runs south-east from the M25 near Swanley through Kent via the county town Maidstone, Ashford and Folkestone to Dover. Most of the road is three lanes in each direction as far Folkestone, then two lanes to Dover. [6]

Lorries are parked on the carriageways as below, with all other traffic diverted onto the parallel A20 road:

If congestion reaches from Junction 8 to Junction 11 (22.9 miles (36.9 km)), traffic for the Port of Dover is diverted to Manston Airfield while traffic for the Channel Tunnel remains on the M20. [9]

By stacking lorries along the motorway, up to 3,000 additional parking spaces for freight can be created. The decision to implement each phase of the programme is taken in conjunction with Kent Police, the Port of Dover and National Highways. Local traffic often uses the parallel A20 (the old turnpike road from Maidstone to Folkestone) or the A2 (the historic Roman Road from London to Dover via Canterbury) though neither offers the same capacity as the M20. [3]

The road can be closed for days at a time, [10] and as a result Operation Stack has been controversial. [11]

History

1988

Operation Stack was first introduced in February 1988, because of a strike called by the National Union of Seamen in Folkestone Docks, which was then an important ferry terminal, that began on 31 January. Though the strike stopped after three days, there was still a tailback and local protests and struggle between Folkestone and Dover. The whole of the M20 between Ashford and Folkestone was closed; at the time, the motorway was incomplete between junctions 8 at Leeds Castle and 9 at Ashford. [12]

1999–2000

In 1999, Parliamentary Under Secretary for Transport Keith Hill commissioned a study by the Channel Road transport Group to look at alternatives. [13] The following year, Michael Howard asked Secretary of State for the Environment, Transport and the Regions John Prescott about alternative methods to Operation Stack. Prescott replied that he would investigate matters but defended the status quo, saying "Management schemes can make traffic flows much better, and they are almost inevitable in difficult circumstances." [14]

2005

In early 2005, Kent Police implemented Operation Stack several times within a few weeks due to bad weather (snow), a strike and a damaged berth in Calais, which limited the number of ferries which could cross the channel. By the end of June 2005, Operation Stack was implemented a total of 18 times in the first half of the year and cost Kent Police £123,000 in overtime. [15]

2007

At the end of January 2007, local Members of Parliament Damian Green of Ashford and Stephen Ladyman of Thanet were involved in a debate covering Operation Stack in the House of Commons. Everyone agreed that stacking was a problem, but there were no firm decisions as to any alternatives. [16]

2008

On 5 March 2008 industrial action that had begun in late February by French workers operating SeaFrance cross-channel ferries resulted in Kent Police initiating phase 2 of Operation Stack. [17] The industrial action lasted for a number of days, with the backlog on the M20 causing significant disruption. The MEP for South East England, Richard Ashworth, and the leader of Kent County Council, Paul Carter, urged French president Nicolas Sarkozy to step in and resolve the dispute because of the resulting difficulties. [18] [19] This was the first time in the 20-year history of Operation Stack that the M20 was closed for more than three days; businesses in nearby towns reported trade down by up to 50%. [20]

According to Kent Police logs, one, two or three phases of Operation Stack were implemented for at least part of each day between 28 February and 15 March 2008. [21] The Freight Transport Association estimated the cost of disruption to be between £4m-£5m at 9 March 2008. [22] Kent County Council later announced progress with plans to construct a lorry park for temporary use to mitigate the effects of Operation Stack. This has met with opposition from the borough councilor for Saxon Shore ward where it would be sited; he accused the county council of "not thinking strategically", not considering the environmental impact properly, and of siting it too close to a National Grid facility, where he expects the fuel in vehicles to be a danger to a "facility of strategic national importance." [23]

2015

On 24 June 2015 Operation Stack was implemented due to industrial action taken by French employees of the MyFerryLink company, as a result of disagreements regarding the imminent takeover of the company by DFDS. This has been the first ever incident which has seen the implementation of Phase 4 of Operation Stack, which involves closing the M20 from Junctions 9 to 11 coast-bound, meaning that continent-bound HGV traffic was stacked all the way from Junction 8 at Hollingbourne, southeast of Maidstone, to Junction 12 at Cheriton, near Folkestone. Operation Stack began to be removed from 3 July onwards, with more than 30 miles of parked HGVs needing to be cleared. The cost to the United Kingdom economy was estimated at around £250 million. [24]

Over 4,600 HGVs were eventually cleared from the M20 by 4 July, [24] however soon afterwards Phase 2 was implemented again for Eurotunnel freight traffic, due to over 150 migrants storming the Calais tunnel portal. This was as a result of the ongoing migrant crisis in Calais. The incident demonstrated that insufficient organisation and security at Eurotunnel, and port facilities throughout Calais was present to keep the desperate migrants under foot. [25] Operation Stack resumed later during the month. Damian Collins, MP for Folkestone and Hythe complained the problem was too large for Kent County Council to deal with and met with the Home Secretary, Theresa May for discussion. [26]

2020

In December 2020, France closed its borders with the UK during the COVID-19 pandemic due to concerns about the spread of a new variant of coronavirus. [27] This caused major disruptions in ferry and Eurotunnel train traffic. [28]

Operation Brock

On 28 October 2019 the Operation Brock traffic management plan became live. Operation Brock, in effect supersedes Operation Stack as a contingency allowing the M20 to be kept "open in both directions for all other traffic, minimising any impacts on local residents, businesses and public services." [29] . Work began in May 2018 on this scheme managed by National Highways (then Highways England), originally designed as a temporary solution to manage lorry queueing and traffic flow at the Port of Dover after Brexit. [30]

In September 2018, National Highways (then Highways England) revealed in a freedom of information request that "Operation Brock, the code name for the management of freight in a no-deal scenario, would not be automatic and would require steel barriers to make a planned contraflow system on the M20 safe for ordinary vehicles" and that "£30m has been allocated to cover the design, build and initial operation of the scheme for up to six months." [31]

As of March 2022 Operation Brock remains the traffic management plan for the Port of Dover and the Eurotunnel. National Highways describes "The Operation Brock contraflow system is designed to keep traffic on the M20 and other roads in Kent moving when there is disruption to travel across the English Channel" [32]

Alternatives

Several other options have been considered:

Other ports

Felixstowe

When the port of Felixstowe is closed, lorries are parked on the old A45 at Levington. They used to be parked on the A14 but this was deemed to be too dangerous for other road users. [45] This is implemented when winds exceed 45 miles per hour (72 km/h) as the cranes cannot be operated due to Health and Safety regulations. [46]

Stranraer

When the ports of Cairnryan and Stranraer are closed, lorries are parked on the closed A751.

Related Research Articles

<span class="mw-page-title-main">Channel Tunnel</span> Undersea rail tunnel linking France and England

The Channel Tunnel, sometimes referred to informally as the Chunnel, is a 50.46-kilometre (31.35 mi) undersea railway tunnel, opened in 1994, that connects Folkestone with Coquelles beneath the English Channel at the Strait of Dover. It is the only fixed link between the island of Great Britain and the European mainland. At its lowest point, it is 75 metres (246 ft) below the sea bed and 115 metres (377 ft) below sea level. At 37.9 kilometres (23.5 mi), it has the longest underwater section of any tunnel in the world and is the third-longest railway tunnel in the world. The speed limit for trains through the tunnel is 160 kilometres per hour (99 mph). The tunnel is owned and operated by Getlink, formerly Groupe Eurotunnel.

<span class="mw-page-title-main">Kent</span> County of England

Kent is a county in the South East England region, the closest county to continental Europe. It borders Essex across the entire estuary of the River Thames to the north; the French department of Pas-de-Calais across the Strait of Dover to the south-east; East Sussex to the south-west; Surrey to the west and Greater London to the north-west. The county town is Maidstone.

<span class="mw-page-title-main">Dover</span> Town and major ferry port in England

Dover is a town and major ferry port in Kent, South East England. It faces France across the Strait of Dover, the narrowest part of the English Channel at 33 kilometres (21 mi) from Cap Gris Nez in France. It lies south-east of Canterbury and east of Maidstone. The town is the administrative centre of the Dover District and home of the Port of Dover.

<span class="mw-page-title-main">Folkestone</span> Town in Kent, England

Folkestone is a port town on the English Channel, in Kent, south-east England. The town lies on the southern edge of the North Downs at a valley between two cliffs. It was an important harbour, shipping port and fashionable coastal resort for most part of the 19th and mid 20th centuries.

<span class="mw-page-title-main">M2 motorway (Great Britain)</span> Road in Kent, England

The M2 is a 26-mile (42 km) long motorway in Kent, England, and was built to bypass a section of the A2 road in Kent, which goes through the Medway Towns, Sittingbourne, and Faversham. It provides an alternative route to the Port of Dover, which supplements the M20 motorway located further to the south. The terminal junctions of the M2 intersect with the A2, which come together to form a 62-mile (100 km) long trunk road from London to Dover.

<span class="mw-page-title-main">M20 motorway</span> Motorway in Kent, England

The M20 is a motorway in Kent, England. It follows on from the A20 at Swanley, meeting the M25, and continuing on to Folkestone, providing a link to the Channel Tunnel and the ports at Dover. It is 50.6 miles (81.4 km) long. Although not signposted in England, this road is part of the European route E15. It is also used as a holding area for goods traffic when traffic across the English Channel is disrupted, such as Operation Stack and Operation Brock.

<span class="mw-page-title-main">A20 road (England)</span> Road in England

The A20 is a major road in south-east England, carrying traffic from London to Dover in Kent. Parts of the route date back to turnpikes established in the early part of the 18th century. The line of the road throughout Kent runs closely in parallel with the M20 motorway.

<span class="mw-page-title-main">Ashford, Kent</span> Town in Kent, England

Ashford is a town in the Ashford district, in the county of Kent, England. It lies on the River Great Stour at the southern or scarp edge of the North Downs, about 61 miles (98 km) by road southeast of central London and 15 miles (24 km) northwest of Folkestone by road. At the 2021 census, it had a population of 83,213. The name comes from the Old English æscet, indicating a ford near a clump of ash trees. It has been a market town since the Middle Ages, and a regular market continues to be held.

Getlink, formerly Groupe Eurotunnel, is a European public company based in Paris that manages and operates the infrastructure of the Channel Tunnel between England and France, operates the LeShuttle railway service, and earns revenue on other trains that operate through the tunnel.

<span class="mw-page-title-main">Folkestone and Hythe District</span> Non-metropolitan district in England

Folkestone and Hythe is a local government district in Kent, England, in the south-east of the county. Its council is based in the town of Folkestone. The authority was renamed from Shepway in April 2018, and therefore has the same name as the Folkestone and Hythe parliamentary constituency, although a somewhat narrower area is covered by the district.

<span class="mw-page-title-main">South Eastern Main Line</span> Major long-distance railway line in south-east England

The South Eastern Main Line is a major long-distance railway route in South East England, UK, one of the three main routes crossing the county of Kent, going via Sevenoaks, Tonbridge, Ashford and Folkestone to Dover. The other routes are the Chatham Main Line which runs along the north Kent coast to Ramsgate or Dover via Chatham and High Speed 1 which runs through the centre of Kent to the coast at Folkestone where it joins the Channel Tunnel.

<span class="mw-page-title-main">A249 road</span> Road in Kent, England

The A249 is a road in Kent, England, running from Maidstone to Sheerness on the Isle of Sheppey. It mainly functions as a link between the M2 and M20 motorways, and for goods vehicle traffic to the port at Sheerness.

<span class="mw-page-title-main">Kent Police</span> English territorial police force

Kent Police is the territorial police force responsible for policing the 1,433 sq mi (3,710 km2) and approximately 1.8 million inhabitants of Kent, a county in South East England.

<span class="mw-page-title-main">Port of Dover</span> Cross-channel port situated in Dover, Kent, south-east England

The Port of Dover is a cross-channel ferry, cruise terminal, maritime cargo and marina facility situated in Dover, Kent, south-east England. It is the nearest English port to France, at just 34 kilometres (21 mi) away, and is one of the world's busiest maritime passenger ports, with 11.7 million passengers, 2.6 million lorries, 2.2 million cars and motorcycles and 80,000 coaches passing through it in 2017, and with an annual turnover of £58.5 million a year. This contrasts with the nearby Channel Tunnel, the only fixed link between the island of Great Britain and the European mainland, which now handles an estimated 20 million passengers and 1.6 million trucks per year.

<span class="mw-page-title-main">Sevington</span> Suburb of Ashford, Kent, England

Sevington is a village in the civil parish of Sevington with Finberry, in the Ashford district, in Kent, England.

Ashford is a town in Kent, England, which lies on several major transport routes.

Transportation needs within the county of Kent in South East England has been served by both historical and current transport systems.

<span class="mw-page-title-main">Folkestone services</span> Service station

Folkestone services is a motorway service station on the M20 motorway at Westenhanger, seven miles from Folkestone in Kent, England. They are the second to be built on the motorway and were opened on 9 January 2008.

<span class="mw-page-title-main">MyFerryLink</span> English channel ferry company

MyFerryLink was an English Channel passenger and freight ferry company which began operating between Dover and Calais in August 2012. The MyFerryLink fleet consisted of two modern ferries – sister ships the MS Rodin and the MS Berlioz – that carried passengers and freight, and one dedicated freight ship, the MS Nord Pas-de-Calais. It was formed following the liquidation of SeaFrance. MyFerryLink offered passengers up to sixteen sailings between Dover and Calais every day, and additional services for freight.

<span class="mw-page-title-main">Operation Brock</span> Traffic management system to mitigate the effects of Brexit

Operation Brock is the traffic management system in Kent, England, used to supplement Operation Stack during cross-Channel traffic problems. It was originally developed for use in the event of a no-deal Brexit and the name is derived from Brexit Operations across Kent.

References

  1. Parliamentary Select Committee
  2. Hansard (1 February 2007). "Operation Stack Debate House of Commons". parliament.uk. pp. column 465. Retrieved 24 August 2015.
  3. 1 2 3 "Essential Guide to Operation Stack". Kent News. 30 June 2015. Retrieved 22 July 2015.
  4. Moran, Joe (16 November 2005). Reading the Everyday. Routledge. p. 95. ISBN   978-1-134-37216-4.
  5. "Port of Dover is Busiest Ferry Port in Europe". World Maritime News. 2 April 2014. Retrieved 22 July 2015.
  6. "M20 - London to Folkestone". The Motorway Archive. Chartered Institute of Highway Engineers. Archived from the original on 24 October 2014. Retrieved 22 July 2015.
  7. 1 2 "French Strike hits Dover services". BBC News. BBC. 22 March 2005. Retrieved 3 January 2010.
  8. "Phase 4 is the closure of the coastbound M20 between J8 & J12, in addition to the current London bound closure of M20 J9 – J8". Kent County Council. Retrieved 7 January 2015.
  9. "Operation Stack". Kent Police. Archived from the original on 19 July 2018. Retrieved 19 July 2018.
  10. "Police call off Operation Stack". BBC News. BBC. 6 March 2005. Retrieved 1 January 2008.
  11. "Call for Operation Stack to end". BBC News. BBC. 18 March 2005. Retrieved 1 January 2008.
  12. Lennon, Sam (22 January 2015). "Operation Stack: How a seamen's strike led to the introduction of the M20 'lorry park'". Kent Online. Retrieved 22 July 2015.
  13. "Operation Stack". Parliamentary Debates (Hansard) . 7 November 2000. Retrieved 22 July 2015.
  14. "Transport Ten Year Plan". Parliamentary Debates (Hansard) . 20 July 2000. Retrieved 22 July 2015.
  15. "Costs for Operation Stack mounting up". Kent Online. 9 June 2005. Retrieved 22 July 2015.
  16. "Operation Stack raised in Commons". BBC News. BBC. 1 February 2007. Retrieved 1 January 2008.
  17. "Ferry action brings M20 closures". BBC News. 5 March 2008. Retrieved 3 January 2010.
  18. "Protest to Sarkozy over M20 chaos". BBC News. 6 March 2008. Retrieved 3 January 2010.
  19. "MEP seeks to resolve ferry strike". BBC News. 8 March 2008. Retrieved 3 January 2010.
  20. "Police in appeal over M20 chaos". BBC News. 7 March 2008. Retrieved 3 January 2010.
  21. "Response to Freedom of Information Request Received 15 March 2010" (PDF). Kent Police. Archived from the original (PDF) on 12 August 2014. Retrieved 12 August 2014.
  22. "M20 chaos ends after Stack lifted". BBC News. 9 March 2008. Retrieved 12 August 2014.
  23. "Plans for M20 lorry park revealed". BBC News. 12 March 2008. Retrieved 3 January 2010.
  24. 1 2 Gupta, Tanya (9 July 2015). "How do you solve a problem like Operation Stack?". BBC News. Retrieved 9 July 2015.
  25. "Eurotunnel increases security over migrant activity". BBC News. 4 July 2015. Retrieved 22 July 2015.
  26. "Kent M20 Operation Stack: Government 'should take lead'". BBC News. 22 July 2015. Retrieved 22 July 2015.
  27. "Covid-19: Boris Johnson to chair emergency meeting amid travel bans". BBC News. 21 December 2020. Retrieved 21 December 2020.
  28. Shaw, Neil (21 December 2020). "Operation Stack activated turning M20 to car park as ports closed". WalesOnline. Retrieved 21 December 2020.
  29. https://www.gov.uk/government/news/kent-roads-ready-for-brexit-as-hauliers-gear-up-for-31-october
  30. New Civil Engineer: NAO warns 'considerable' infrastructure work needed at UK border
  31. Guardian: "Brexit lorry scheme would leave Kent in chaos for weeks".
  32. https://nationalhighways.co.uk/travel-updates/operation-brock/
  33. "Showground considered for lorries". BBC News. BBC. 14 May 2005. Retrieved 1 January 2008.
  34. "Lorry park plan for Channel port". BBC News. BBC. 10 November 2005. Retrieved 1 January 2008.
  35. "Port to build four ferry berths". BBC News. BBC. 9 March 2006. Retrieved 1 March 2010.
  36. "Kent looks at permanent site for Operation Stack". Roadtransport.com. Reed Business Information Limited. 1 February 2007. Retrieved 1 January 2008.[ permanent dead link ]
  37. "Cabinet Committee Minutes October 2005" (PDF). Kent County Council. 24 October 2005. Archived from the original (PDF) on 8 March 2007. Retrieved 25 December 2006.
  38. "Changes to Operation Stack system". BBC News. BBC. 24 March 2005. Retrieved 1 January 2008.
  39. "Quick Moveable Barrier (QMB) Machine". Highways Agency. Archived from the original on 10 August 2012.
  40. "Barrier to solve Operation Stack". BBC News. 25 June 2007. Retrieved 14 March 2008.
  41. "QMB to improve Operation Stack". Archived from the original on 27 September 2007. Retrieved 25 June 2007.{{cite web}}: CS1 maint: bot: original URL status unknown (link), Highways Agency
  42. "Operation Stack: 'Disneyland-sized' lorry park to be built at Standford West". BBC News. 6 July 2016. Retrieved 6 July 2016.
  43. Travis, Alan (16 November 2017). "Ministers warned about repeat of Dover lorry queues after Brexit". The Guardian . p. 13. Retrieved 16 November 2017.
  44. "Brexit: Manston Airport to host lorry park trial". BBC News . Retrieved 4 January 2019.
  45. "Operation Stack" (PDF). Retrieved 15 September 2008.
  46. "Port Prepared For More High Winds". Felixstow TV. 6 December 2006. Archived from the original on 28 September 2007. Retrieved 25 December 2006.