This article needs to be updated.(December 2020) |
Location in Kent | |
Location | Kent, England, UK |
---|---|
Coordinates | 51°05′33″N1°05′33″E / 51.0926°N 1.0924°E |
Grid reference | TR169374 |
Operation Stack was a procedure used by Kent Police and the Port of Dover in England to park (or "stack") lorries on the M20 motorway in Kent when services across the English Channel, such as those through the Channel Tunnel or from the Port of Dover, are disrupted, for example by bad weather, industrial action, fire, or derailments in the tunnel. Since 2019, it has been superseded by the Operation Brock contraflow system.
Operation Stack was managed by Kent Police using powers under the Civil Contingencies Act 2004 and coordinated by a multi-agency group known as Operation Fennel. [1]
According to Damian Green MP, by 2007 the system had been implemented 74 times in the 20 years since it was first introduced. [2]
Operation Stack is implemented whenever there is an urgent need to inhibit the flow of traffic to the Channel Tunnel and the Port of Dover, which handle 90% of freight traffic between the United Kingdom and mainland Europe. There are officially only 550 parking spaces for HGVs in Kent, so if access to cross-channel services is restricted, congestion would quickly spread across the county. [3]
The most common causes of Operation Stack are severe weather that either cancels or restricts ferry services, industrial action at the French ports of Calais, Dunkirk, and Boulogne, and electrical failures in the Channel Tunnel. [3]
The M20 is the main road from the London Orbital Motorway (the M25), the world's largest and busiest ring road, [4] to the Port of Dover, the busiest ferry terminal in Europe, [5] and the Channel Tunnel. It runs south-east from the M25 near Swanley through Kent via the county town Maidstone, Ashford, and Folkestone to Dover. Most of the road is three lanes in each direction as far Folkestone, then two lanes to Dover. [6]
Lorries are parked on the carriageways as below, with all other traffic diverted onto the parallel A20 road:
If congestion reaches from Junction 8 to Junction 11 (22.9 miles (36.9 km)), traffic for the Port of Dover is diverted to Manston Airfield while traffic for the Channel Tunnel remains on the M20. [9]
By stacking lorries along the motorway, up to 3,000 additional parking spaces for freight can be created. The decision to implement each phase of the programme is taken in conjunction with Kent Police, the Port of Dover, and National Highways. Local traffic often uses the parallel A20 (the old turnpike road from Maidstone to Folkestone) or the A2 (the historic Roman Road from London to Dover via Canterbury), though neither offers the same capacity as the M20. [3]
The road can be closed for days at a time, [10] and as a result Operation Stack has been controversial. [11]
Operation Stack was first introduced in February 1988, because of a strike called by the National Union of Seamen in Folkestone Docks, which was then an important ferry terminal, that began on 31 January. Though the strike stopped after three days, there was still a tailback and local protests and struggle between Folkestone and Dover. The whole of the M20 between Ashford and Folkestone was closed; at the time, the motorway was incomplete between junctions 8 at Leeds Castle and 9 at Ashford. [12]
In 1999, Parliamentary Under Secretary for Transport Keith Hill commissioned a study by the Channel Road transport Group to look at alternatives. [13] The following year, Michael Howard asked Secretary of State for the Environment, Transport and the Regions John Prescott about alternative methods to Operation Stack. Prescott replied that he would investigate matters but defended the status quo, saying "Management schemes can make traffic flows much better, and they are almost inevitable in difficult circumstances." [14]
In early 2005, Kent Police implemented Operation Stack several times within a few weeks due to bad weather (snow), a strike and a damaged berth in Calais, which limited the number of ferries which could cross the channel. By the end of June 2005, Operation Stack was implemented a total of 18 times in the first half of the year and cost Kent Police £123,000 in overtime. [15]
At the end of January 2007, local Members of Parliament Damian Green of Ashford and Stephen Ladyman of Thanet were involved in a debate covering Operation Stack in the House of Commons. Everyone agreed that stacking was a problem, but there were no firm decisions as to any alternatives. [16]
On 5 March 2008 industrial action that had begun in late February by French workers operating SeaFrance cross-channel ferries resulted in Kent Police initiating phase 2 of Operation Stack. [17] The industrial action lasted for a number of days, with the backlog on the M20 causing significant disruption. The MEP for South East England, Richard Ashworth, and the leader of Kent County Council, Paul Carter, urged French president Nicolas Sarkozy to step in and resolve the dispute because of the resulting difficulties. [18] [19] This was the first time in the 20-year history of Operation Stack that the M20 was closed for more than three days; businesses in nearby towns reported trade down by up to 50%. [20]
According to Kent Police logs, one, two, or three phases of Operation Stack were implemented for at least part of each day between 28 February and 15 March 2008. [21] The Freight Transport Association estimated the cost of disruption to be between £4m-£5m at 9 March 2008. [22] Kent County Council later announced progress with plans to construct a lorry park for temporary use to mitigate the effects of Operation Stack. This has met with opposition from the borough councilor for Saxon Shore ward where it would be sited; he accused the county council of "not thinking strategically", not considering the environmental impact properly, and of siting it too close to a National Grid facility, where he expects the fuel in vehicles to be a danger to a "facility of strategic national importance." [23]
On 24 June 2015, Operation Stack was implemented due to industrial action taken by French employees of the MyFerryLink company, as a result of disagreements regarding the imminent takeover of the company by DFDS. This has been the first ever incident which has seen the implementation of Phase 4 of Operation Stack, which involves closing the M20 from Junctions 9 to 11 coast-bound, meaning that continent-bound HGV traffic was stacked all the way from Junction 8 at Hollingbourne, southeast of Maidstone, to Junction 12 at Cheriton, near Folkestone. Operation Stack began to be removed from 3 July onwards, with more than 30 miles of parked HGVs needing to be cleared. The cost to the United Kingdom economy was estimated at around £250 million. [24]
Over 4,600 HGVs were eventually cleared from the M20 by 4 July, [24] however soon afterwards Phase 2 was implemented again for Eurotunnel freight traffic, due to over 150 migrants storming the Calais tunnel portal. This was as a result of the ongoing migrant crisis in Calais. The incident demonstrated that insufficient organisation and security at Eurotunnel, and port facilities throughout Calais was present to keep the desperate migrants under foot. [25] Operation Stack resumed later during the month. Damian Collins, MP for Folkestone and Hythe complained the problem was too large for Kent County Council to deal with and met with the Home Secretary, Theresa May for discussion. [26]
In December 2020, France closed its borders with the UK during the COVID-19 pandemic due to concerns about the spread of a new variant of coronavirus. [27] This caused major disruptions in ferry and Eurotunnel train traffic. [28]
On 28 October 2019, the Operation Brock traffic management plan became live. Operation Brock, in effect supersedes Operation Stack as a contingency allowing the M20 to be kept "open in both directions for all other traffic, minimising any impacts on local residents, businesses and public services". [29] Work began in May 2018 on this scheme managed by National Highways (then Highways England), originally designed as a temporary solution to manage lorry queueing and traffic flow at the Port of Dover after Brexit. [30]
In September 2018, National Highways (then Highways England) revealed in a freedom of information request that "Operation Brock, the code name for the management of freight in a no-deal scenario, would not be automatic and would require steel barriers to make a planned contraflow system on the M20 safe for ordinary vehicles" and that "£30m has been allocated to cover the design, build and initial operation of the scheme for up to six months." [31]
As of March 2022, Operation Brock remains the traffic management plan for the Port of Dover and the Eurotunnel. National Highways says, "the Operation Brock contraflow system is designed to keep traffic on the M20 and other roads in Kent moving when there is disruption to travel across the English Channel". [32]
Several other options have been considered:
When the port of Felixstowe is closed, lorries are parked on the old A45 at Levington. They used to be parked on the A14 but this was deemed to be too dangerous for other road users. [45] This is implemented when winds exceed 45 miles per hour (72 km/h) as the cranes cannot be operated due to Health and Safety regulations. [46]
When the ports of Cairnryan and Stranraer are closed, lorries are parked on the closed A751.
The Channel Tunnel, sometimes referred to informally as the Chunnel, is a 50.46-kilometre (31.35 mi) undersea railway tunnel, opened in 1994, that connects Folkestone with Coquelles beneath the English Channel at the Strait of Dover. It is the only fixed link between the island of Great Britain and the European mainland. At its lowest point, it is 75 metres (246 ft) below the sea bed and 115 metres (377 ft) below sea level. At 37.9 kilometres (23.5 mi), it has the longest underwater section of any tunnel in the world and is the third-longest railway tunnel in the world. The speed limit for trains through the tunnel is 160 kilometres per hour (99 mph). The tunnel is owned and operated by Getlink, formerly Groupe Eurotunnel.
Kent is a county in the South East England region, the closest county to continental Europe. It borders Essex across the entire estuary of the River Thames to the north; the French department of Pas-de-Calais across the Strait of Dover to the south-east; East Sussex to the south-west; Surrey to the west and Greater London to the north-west. The county town is Maidstone.
Dover is a town and major ferry port in Kent, South East England. It faces France across the Strait of Dover, the narrowest part of the English Channel at 33 kilometres (21 mi) from Cap Gris Nez in France. It lies south-east of Canterbury and east of Maidstone. The town is the administrative centre of the Dover District and home of the Port of Dover.
Folkestone is a port town on the English Channel, in Kent, south-east England. The town lies on the southern edge of the North Downs at a valley between two cliffs. It was an important harbour, shipping port, and fashionable coastal resort for most of the 19th and mid-20th centuries.
The M2 is a 26-mile-long (42 km) long motorway in Kent, England, and was built to bypass a section of the A2 road in Kent, which goes through the Medway Towns, Sittingbourne, and Faversham. It provides an alternative route to the Port of Dover, which supplements the M20 motorway located further to the south. The terminal junctions of the M2 intersect with the A2, which come together to form a 62-mile-long (100 km) long trunk road from London to Dover.
The M20 is a motorway in Kent, England. It follows on from the A20 at Swanley, meeting the M25, and continuing on to Folkestone, providing a link to the Channel Tunnel and the ports at Dover. It is 50.6 miles (81.4 km) long. Although not signposted in England, this road is part of the European route E15. It is also used as a holding area for goods traffic when traffic across the English Channel is disrupted, such as Operation Stack and Operation Brock.
The A20 is a major road in south-east England, carrying traffic from London to Dover in Kent. Parts of the route date back to turnpikes established in the early part of the 18th century. The line of the road throughout Kent runs closely in parallel with the M20 motorway.
Ashford is a town in the Ashford district, in the county of Kent, England. It lies on the River Great Stour at the southern or scarp edge of the North Downs, about 61 miles (98 km) by road southeast of central London and 15 miles (24 km) northwest of Folkestone by road. At the 2021 census, it had a population of 83,213. The name comes from the Old English æscet, indicating a ford near a clump of ash trees. It has been a market town since the Middle Ages, and a regular market continues to be held.
Folkestone and Hythe is a local government district in Kent, England. It lies in the south-east of the county, on the coast of the English Channel. The district was formed in 1974 and was originally named Shepway after one of the ancient lathes of Kent, which had covered a similar area. The district was renamed in 2018. The council is based in Folkestone, the district's largest town. The district also includes the towns of Hawkinge, Hythe, Lydd and New Romney, along with numerous villages and surrounding rural areas.
The South Eastern Main Line is a major long-distance railway route in South East England, UK, one of the three main routes crossing the county of Kent, going via Sevenoaks, Tonbridge, Ashford and Folkestone to Dover. The other routes are the Chatham Main Line which runs along the north Kent coast to Ramsgate or Dover via Chatham and High Speed 1 which runs through the centre of Kent to the coast at Folkestone where it joins the Channel Tunnel.
The A249 is a road in Kent, England, running from Maidstone to Sheerness on the Isle of Sheppey. It mainly functions as a link between the M2 and M20 motorways, and for goods vehicle traffic to the port at Sheerness.
Kent Police is the territorial police force responsible for policing the 1,433 sq mi (3,710 km2) and approximately 1.8 million inhabitants of Kent, a county in South East England.
The Port of Dover is a cross-channel ferry, cruise terminal, maritime cargo and marina facility situated in Dover, Kent, south-east England. It is the nearest English port to France, at just 34 kilometres (21 mi) away, and is one of the world's busiest maritime passenger ports, with 11.7 million passengers, 2.6 million lorries, 2.2 million cars and motorcycles and 80,000 coaches passing through it in 2017, and with an annual turnover of £58.5 million a year. This contrasts with the nearby Channel Tunnel, the only fixed link between the island of Great Britain and the European mainland, which now handles an estimated 20 million passengers and 1.6 million trucks per year.
Sevington is a village in the civil parish of Sevington with Finberry, in the Ashford district, in Kent, England.
Ashford is a town in Kent, England, which lies on several major transport routes.
Transportation needs within the county of Kent in South East England has been served by both historical and current transport systems.
Folkestone services is a motorway service station on the M20 motorway at Westenhanger, seven miles from Folkestone in Kent, England. They are the second to be built on the motorway and were opened on 9 January 2008. The services are found off Junction 11. They contain a petrol station, parking for both cars and lorries, and a number of shops.
Folkestone Harbour is the main harbour of the town of Folkestone in Kent, England.
MyFerryLink was an English Channel passenger and freight ferry company which began operating between Dover and Calais in August 2012. The MyFerryLink fleet consisted of two modern ferries – sister ships the MS Rodin and the MS Berlioz – that carried passengers and freight, and one dedicated freight ship, the MS Nord Pas-de-Calais. It was formed following the liquidation of SeaFrance. MyFerryLink offered passengers up to sixteen sailings between Dover and Calais every day, and additional services for freight.
Operation Brock is the traffic management system in Kent, England, used to supplement Operation Stack during cross-Channel traffic problems. It was originally developed for use in the event of a no-deal Brexit and the name is derived from Brexit Operations across Kent.
{{cite web}}
: CS1 maint: bot: original URL status unknown (link), Highways Agency