- INS Shivalik undergoing replenishment from Stalwart during a Malabar exercise.
Stalwart in Cockburn Sound, December 2021 | |
Class overview | |
---|---|
Name | Supply class |
Builders | Navantia, Ferrol |
Operators | Royal Australian Navy |
Preceded by | HMAS Sirius, HMAS Success |
Cost | |
Built | 2018–present |
Planned | 2 |
Completed | 2 |
Active | 2 |
General characteristics | |
Type | Replenishment oiler |
Displacement | 19,500 tonnes |
Length | 173.9 m (570 ft 6 in) |
Beam | 23.0 m (75 ft 6 in) |
Draught | 8.0 m (26 ft 3 in) |
Propulsion |
|
Speed | 20 knots (37 km/h; 23 mph) |
Range | 6,000 nmi (11,000 km; 6,900 mi) at 13 knots (24 km/h; 15 mph) |
Complement | 122 |
Armament |
|
Aircraft carried | 1 helicopter |
The Supply class is a class of replenishment oilers of the Royal Australian Navy, a role that combines the missions of a tanker and stores supply ship. As such they are designated auxiliary oiler replenisher (AOR). They are tasked with providing ammunition, fuel, food and other supplies to Royal Australian Navy vessels around the world. There are two ships in the class, Supply and Stalwart. [2] The project is expected to cost anywhere between $1 and $2 billion. Navantia were selected to build a design based on the Spanish Navy's current replenishment vessel Cantabria, which entered service in 2011. [3]
A number of designs were considered by the Australian Government for their replacement tankers, with Navantia competing against the Aegir variant of the Tide-class tanker built by South Korea's DSME in a restricted tender competition. [4] [5] Navantia's proposal based on Cantabria was announced as the successful design in the Australian tender in March 2016, with an expected in service date for the first of two vessels of late 2019. [6]
The class of ships based on Navantia's replenishment oiler were built at the Navantia shipyard in Ferrol, Spain. The first ship, Supply, arrived at Fleet Base West in October 2020 to begin fitting Australia-specific equipment prior to her service entry in April 2021. [7] [8]
The second ship, Stalwart, departed for Australia in May 2021 and arrived in late June. [9] [10]
HMAS Supply commissioned at Fleet Base East on 10 April 2021. [11]
HMAS Stalwart commissioned at Fleet Base West on 13 November 2021. [12]
Name | Pennant number | Builder | Laid down | Launched | Commissioned | Status |
---|---|---|---|---|---|---|
Supply | A195 | Navantia, Ferrol | 18 November 2017 | 24 November 2018 | 10 April 2021 | Active |
Stalwart | A304 | 25 November 2018 | 30 August 2019 | 13 November 2021 [13] | Active |
HMAS Success was a Durance-class multi-product replenishment oiler that previously served in the Royal Australian Navy (RAN). Built by Cockatoo Docks & Engineering Company in Sydney, Australia, during the 1980s, she is the only ship of the class to be constructed outside France, and the only one to not originally serve in the Marine Nationale. The ship was part of the Australian contribution to the 1991 Gulf War, and was deployed to East Timor in response to incidents in 1999 and 2006. The ship was fitted with a double hull during the first half of 2011, to meet International Maritime Organization standards.
HMAS Supply was a Tide-class replenishment oiler of the Royal Fleet Auxiliary (RFA) and the Royal Australian Navy (RAN). Originally named Tide Austral and intended to be the first ship of a post-World War II Royal Australian Fleet Auxiliary, manpower and financial shortages meant that when the Belfast-built ship was launched in 1955, she could not be accepted into Australian service. Instead, she was loaned to the RFA, operating RFA Tide Austral (A99). In August 1962, the ship was commissioned directly into the RAN, then renamed a month later to HMAS Supply. Supply operated as part of the RAN until her decommissioning at the end of 1985.
Navantia is a Spanish state-owned shipbuilding company that builds vessels for the military and civil sectors. It is the fifth-largest shipbuilder in Europe and the ninth-largest in the world. The company is the result of the segregation of the military assets of the IZAR Group in 2005. The company designs, builds, and supports all types of surface vessels, submarines, and systems. In addition, it is diversifying into new markets such as renewable energy, the offshore industry, and naval services.
The Durance class is a series of multi-product replenishment oilers, originally designed and built for service in the French Navy. Besides the five ships built for the French Navy, a sixth was built for the Royal Australian Navy, while the lead ship of the class currently serves with the Argentine Navy. Two ships of a similar but smaller design are in service with the Royal Saudi Navy as the Boraida-class replenishment oilers.
A replenishment oiler or replenishment tanker is a naval auxiliary ship with fuel tanks and dry cargo holds which can supply both fuel and dry stores during underway replenishment (UNREP) at sea. Many countries have used replenishment oilers.
The Balikpapan class is a ship class of eight heavy landing craft. All eight were originally laid down by Walkers Limited for the Australian Army in the early 1970s. A reorganisation of watercraft responsibilities in the Australian military meant the landing craft were to be operated by the Royal Australian Navy (RAN), with seven commissioned directly into RAN service during 1973 and 1974, and lead ship Balikpapan transferred from the army to the navy. During the leadup to the independence of Papua New Guinea in 1975, two of the vessels were transferred to the new Papua New Guinea Defence Force (PNGDF).
A joint support ship (JSS) is a multi-role naval vessel capable of launching and supporting joint amphibious and airlift operations. It can also provide command and control, sealift and seabasing, underway replenishment, disaster relief and logistics capabilities for combined land and sea operations.
The Royal Australian Navy, although a significant force in the Asia-Pacific region, is nonetheless classed as a medium-sized navy. Its fleet is based around two main types of surface combatant, with limited global deployment and air power capability. However, in 2009, a white paper, Defending Australia in the Asia Pacific Century: Force 2030, was produced by the Australian government which set out a programme of defence spending that will see significant improvements to the RAN's fleet and capabilities.
The Canberra class is a ship class of two landing helicopter dock (LHD) ships built for the Royal Australian Navy (RAN). Planning to upgrade the navy's amphibious fleet began in 2000, based on Australian experiences leading the International Force for East Timor peacekeeping operation. With a new climate for growing Australian Navy spending, a desire existed for forward defence capability for landing and supporting troops on Asian territory, that had never existed in Australian history, even with the old Majestic-class light fleet carriers, HMAS Melbourne and HMAS Sydney in the 1970s. In 2004, French company Direction des Constructions Navales (DCN) and Spanish company Navantia were invited to tender proposals, with DCN offering the Mistral-class amphibious assault ship and Navantia proposing the "Buque de Proyección Estratégica" design. The Spanish design was selected in 2007, with Navantia responsible for construction of the ships from the keel to the flight deck, and BAE Systems Australia handling the fabrication of the combat and communications systems. Finally, Siemens (Germany) supplied and fitted the azimuth thrusters.
HMAS Westralia was a modified Leaf-class replenishment oiler which served with the Royal Australian Navy (RAN) from 1989 to 2006. Formerly RFA Appleleaf (A79), she served in with the British Royal Fleet Auxiliary (RFA) from 1975 to 1989. The ship was initially leased to the RAN, then purchased outright in 1994. In 1998, a fire onboard resulted in the deaths of four sailors. Westralia was decommissioned in 2006, and the ship was sold into civilian service for use as a Floating Production Storage and Offloading vessel, under the name Shiraz. However, the ship was laid up in Indonesia until late 2009, when she was sold to a Turkish ship breaking company. Arriving in January 2010, the vessel was scrapped.
HMAS Sirius was a commercial tanker purchased by the Royal Australian Navy and converted into a fleet replenishment vessel to replace HMAS Westralia. She was named in honour of HMS Sirius of the First Fleet. Launched in South Korea on 2004, and converted in Western Australia, Sirius was commissioned in 2006; three years before a purpose-built vessel would have been built, and at half the cost. The tanker was decommissioned in 2021 and subsequently scrapped.
HMAS Canberra (L02) is the first ship of the Canberra-class landing helicopter dock in service with the Royal Australian Navy (RAN) and is the second largest in the Navy, succeeded by its sister ship HMAS Adelaide (L01). Construction of the ship started in Spain in 2008, with the hull launched by Navantia in 2011. The hull was then transported to Australia in late 2012 for completion by BAE Systems Australia. Canberra was commissioned on 28 November 2014.
The Tide-class tanker (formerly the Military Afloat Reach and Sustainability (MARS) project) is a class of four fast fleet tankers that entered service with the British Royal Fleet Auxiliary from 2017. The 37,000 t ships provide fuel, food, fresh water, ammunition and other supplies to Royal Navy vessels around the world. Norway ordered a similar 26,000 t version with a 48-bed hospital and greater solid stores capacity, but reduced liquid capacity; it was delivered in November 2018 as HNoMS Maud two years after originally planned. The two classes are very similar but are not directly comparable due to large variance in capabilities delivered.
Cantabria (A15) is a Replenishment oiler operated by the Spanish Navy. Acquired to provide logistical support for the Spanish fleet, Cantabria was commissioned in 2010. Cantabria is the second-largest naval ship currently operated by the Spanish, behind Juan Carlos I.
MV Asterix is a Canadian commercial container ship. It was purchased by Federal Fleet Services as part of Project Resolve, and was later converted into a supply ship for the Royal Canadian Navy (RCN). She is intended to act as an interim replacement between the out of service Protecteur-class replenishment oiler and the future Protecteur-class auxiliary vessel. Originally launched in Germany in 2010 as Cynthia, the ship was converted and delivered to the RCN in December 2017 when she will be leased to the navy with a merchant navy crew, complemented by RCN personnel. Asterix will be in Canadian service well into the 2020s.
The Type 901 is a class of fast combat support ship of the Chinese People's Liberation Army Navy.
Two ships of the Royal Australian Navy (RAN) have been named HMAS Supply. Named for HMS Supply armed tender that was part of First Fleet.
HMAS Supply (A195), named after the Royal Navy ship HMS Supply, is the lead ship of the Supply-class replenishment oilers built for the Royal Australian Navy by Navantia at their yard in Ferrol, Spain. The Australian Supply-class ships are based on the Spanish Navy's replenishment oiler Cantabria. The vessel was launched on 18 November 2017 and commissioned on 10 April 2021.
HMAS Stalwart is the second of the Navantia built Supply-class replenishment oiler for the Royal Australian Navy. It had its keel laid in November 2018 as a part of the SEA 1654 Phase 3 project. HMAS Stalwart (III) and her sister ship HMAS Supply (II) replace HMAS Success and HMAS Sirius with a single class of two auxiliary oiler replenisher (AOR) ships to sustain deployed maritime forces.