The Electricity Act, 2003

Last updated

Electricity Act, 2003
Emblem of India.svg
Parliament of India
  • An Act to consolidate the laws relating to generation, transmission, distribution, trading and use of electricity and generally for taking measures conducive to development of electricity industry, promoting competition therein, protecting interest of consumers and supply of electricity to all areas, rationalization of electricity tariff, ensuring transparent policies regarding subsidies, promotion of efficient and environmentally benign policies, constitution of Central Electricity Authority, Regulatory Commissions and establishment of Appellate Tribunal and for matters connected therewith or incidental thereto.
Citation Act No. 36 of 2003
Territorial extent India
Assented to26 May 2003
Commenced10 June 2003 [1]
Amended by
2003 and 2007
Status: In force

The Electricity Act, 2003 is an Act of the Parliament of India enacted to transform the power sector in India.

Contents

The act covers major issues involving generation, distribution, transmission and trading in power. While some of the sections have already been enacted and are yielding benefits, there are a few other sections that are yet to be fully enforced till date.

Background

Before Electricity Act, 2003, the Indian Electricity sector was guided by The Indian Electricity Act, 1910 and The Electricity (Supply) Act, 1948 and the Electricity Regulatory Commission Act, 1998. The generation, distribution and transmission were carried out mainly by the State Electricity Boards in various States. Due to politico-economic situation, the cross-subsidies reached at an unsustainable level. For the purpose of distancing state governments from tariff determination, The Electricity Regulatory Commissions Act was enacted in 1998. So as to reform electricity sector further by participation of private sector and to bring in competition, Electricity Act was enacted in 2003.

With effect from 2 June 2003 India has adopted a new legislation called the Electricity Act 2003, to replace some age-old existing legislation operating in the country. The new act consolidates the position for existing laws and aims to provide for measures conducive to the development of electricity industry in the country. The act has attempted to address certain issues that have slowed reform in the country and consequently has generated new hopes for the electricity industry. This paper reviews the Electricity Act 2003, to highlight how the new features are different from the existing legal provisions and whether these measures have economic rationale.

An act to consolidate the laws relating to generation, transmission, distribution, trading and use of electricity for taking measures conducive to development of electricity industry, promoting competition therein, protecting interest of consumers and supply of electricity to all areas, rationalisation of electricity tariff, ensuring transparent policies regarding subsidies, promotion of efficient and environmentally benign policies, constitution of Central Electricity Authority Regulatory Commissions and establients of Appellate Tribunal for matters therewith or incident thereto.

Generation

The Act delicenses power generation completely (except for all nuclear and hydro-power projects over a certain size). As per the Act, 10 per cent of the power supplied by suppliers and distributors to the consumers has to be generated using renewable and non-conventional sources of energy so that the energy is reliable.

Electricity generation has been made a non-licensed activity and the techno-economic clearance from the Central Electricity Authority (CEA) has been done away with for any power plant, except for hydro-electric power stations above a certain amount of capital investment. This has been provided in section 7 and 8 of the Electricity Act 2003. The generators can sell electricity to any licensees or where allowed by the state regulatory commissions, to consumers directly. The provision of direct sale of electricity by the generators, when and where allowed, would promote more IPP participation in the power generation, as these consumers are more creditworthy and bankable compared to many SEB’s. However the act provides for imposition of a surcharge by the regulatory body to compensate for some loss in cross-subsidy revenue to the SEB’s due to this direct sale of electricity by generators to the consumers.

Distribution

The Act delicenses distribution in rural areas and brings in a licensing regime for distribution in urban areas.

However, as per the Act, only 16 states in India have notified what constitutes as rural areas and therefore the rural distribution is yet to be freed up in nearly one third of the country.

Key features

The main features of the act are as follows:

  1. Generation is being de-licensed and captive generation freely permitted, i.e. any generating company may establish, operate and maintain a generating station without obtaining a licence under this Act with the only exception that it should comply with the technical standards relating to connectivity with the grid referred to in clause (b) of section 73.
    Note: Hydro-projects, however, need concurrence from the Central Electricity Authority.
  2. No person shall
    (a)transmit electricity; or
    (b)distribute electricity; or
    (c)undertake trading in electricity,
    unless he is authorised to do so by a licence issued, exceptions are informed by authorised commissions through notifications.
  3. Central Government may, make region-wise demarcation of the country, and, from time to time, make such modifications therein as it may consider necessary for the efficient, economical and integrated transmission and supply of electricity, and in particular to facilitate voluntary inter-connections and co-ordination of facilities for the inter-State, regional and inter-regional generation and transmission of electricity.
    Transmission utility at the central and state level to be a government company with responsibility of planned and coordinated development of transmission network.
  4. Open access in transmission with provision for surcharge for taking care of current level of cross-subsidy, with the surcharge being gradually phased out.
  5. The state governments are required to unbundle State Electricity Boards. However they may continue with them as distribution licensees and state transmission utilities.
  6. Setting up State Electricity Regulatory Commission (SERC) has been made mandatory.
  7. An appellate tribunal to hear appeals against the decision of (CERC's) and SERC's.
  8. Metering of electricity supplied made mandatory.
  9. Provisions related to thefts of electricity made more stringent.
  10. Trading as a distinct activity recognised with the safeguard of Regulatory commissions being authorised to fix ceiling on trading margins.
  11. For rural and remote areas, stand-alone system for generation and distribution is permitted.
  12. Thrust to complete rural electrification and provide for management of rural distribution by panchayat, cooperative societies, NGOs, franchisees etc.
  13. Central government to prepare National Electricity Policy and Tariff Policy.
  14. Central Electricity Authority (CEA) to prepare National Electricity Plan.

Role of CEA

The role of CEA is limited to policy recommendations, monitoring electricity sector performance, advising the Ministry of power on technical issues, data management/dissemination of the power sector, etc.

Preparation of technical standards for construction of electrical plants, electric lines and connectivity to the grid is the responsibility of CEA as per section 73 (b) of the Electricity Act, 2003. [2] However, as per section 7 of this Act, a generating company may establish, operate and maintain a generating station if it complies with the technical standards only relating to connectivity to the grid as given in clause (b) of section 73. This implies that generating stations need not follow compulsory the CEA technical standards specified for construction of electrical plants and electric lines. Similarly, transmission / distribution licensees need not implement compulsory the standards for construction of electric lines except the Grid Code/ Grid Standards for the operation and maintenance of transmission lines specified by CEA under clause 73 (d) of this Act. Many times, these CEA standards are conservative compromising optimum design features /cost/ utility and also do not give full clarity in selection of the system / sub system capabilities of electrical plants and electric line.

Left parties opposition

Left parties opposed the clauses related to competition in electricity market such as unbundling of Electricity Boards and open access and also had strong objection regarding elimination of cross subsidies. UPA government, in its first tenure agreed for some of the amendments and according clause regarding cross subsidies are amended. In its second tenure, UPA government published a draft amendment of The Electricity Act 2003 with the main intention of separation of retail sale of electricity from distribution business.

Amendments

Several amendments were made after 2003 in the Act. The amendments proposed during 2015 is to make major changes. The important provision is to introduce electricity supply companies who will not own electric lines. The Government says it would attract competition and therefore will cause reduction in price. But those oppose these amendments say that in Indian situation competition can not bring down the cost. Some electricity finance experts are of the opinion that it will weaken the public sector discoms and can damage power sector industry in the country. [3]

Section 25 of the electricity act, 2003 authorises the central government to demarcate the country into regions necessary for the efficient, economical and integrated transmission and supply of electricity, and in particular to facilitate voluntary interconnections and co-ordination of facilities for the inter-State, regional and interregional generation and transmission of electricity. Electricity is listed in the concurrent list (entry 38 of list III). The traditional and unscientific demarcation of the country into five regions (north, south, east, west and north east regions) without giving any valid justification and applying one set of rules for intra region and different set of rules for inter regions in sharing electricity transmission system and transmission losses, etc. is considered discriminating one state from another state. Without the public interest, Constitution does not recognise different set of rules applicable for a group of states except ratified by each of the concerned state under Article 252 of the constitution.

The concept of dividing the country in to regions by clubbing few states, emerged in seventies to envisage pit head super thermal power stations nearer to coal mines and to supply the generated power to far flung areas by high voltage transmission lines. In last forty years, electricity sector in India has grown many folds and the present power consumption in many big states has exceeded the regional level power consumption at that time. Moreover, the electricity generation from other sources such as natural gas, hydro, nuclear, wind, solar, imported coal, etc. has increased substantially and country has achieved decentralisation and diversification with respect to electricity generation and its consumption. The concept of regions is no more useful by treating the states in a region at par and outside the region differently. Many states forming boundary of a region are unable to draw/export cheaper power from adjoining regions/states due to regional bias / differentiation. Also, the electricity grid has transformed into one national grid and the emergence of single grid operation has made practically regional grids obsolete. Each state should be considered as one administrative entity/region/area for power transmission and its losses accounting and its commercial settlement as a part of national grid. Section 25 (provision to create regions) and other related sections of the Electricity Act 2003 & proposed Electricity Bill 2014 are unconstitutional in the absence of its ratification by each state. [4]

Electricity is also being transmitted in circuitous path (ex: north-eastern region exports power to eastern region, eastern region exports power to northern and western regions, western region exports power to northern region and power from northern region is exported back to north-eastern region. Similarly eastern region exports power to western region and western region exports to southern region instead of eastern region directly export all the net power needed by the southern, northern and north-eastern regions.) on daily basis without any economic sense by the central transmission company. [5] Thus regional concept for power generation and transmission has become counter productive.

Exceptions

The Act extends to the whole of India except the state of Jammu and Kashmir. However, Jammu and Kashmir is part of the northern region for sharing the transmission network and the electricity generated from the central power generating stations located in the Northern region. As of now above rule may not be applicable as article 370, a special status for Jammu and Kashmir had been ruled out.

See also

Related Research Articles

Electric power industry Industry that provides the production and delivery of electric energy

The electric power industry covers the generation, transmission, distribution and sale of electric power to the general public and industry. The commercial distribution of electric power started in 1882 when electricity was produced for electric lighting. In the 1880s and 1890s, growing economic and safety concerns lead to the regulation of the industry. What was once an expensive novelty limited to the most densely populated areas, reliable and economical electric power has become an essential aspect for normal operation of all elements of developed economies.

Electricity sector in India Electricity generation and distribution in India

India is the third largest producer of electricity in the world. The national electric grid in India has an installed capacity of 393.389 GW as of 31 December 2021. Renewable power plants, which also include large hydroelectric plants, constitute 37% of India's total installed capacity. During the fiscal year (FY) 2019-20, the gross electricity generated by utilities in India was 1,383.5 TWh and the total electricity generation in the country was 1,598 TWh. The gross electricity consumption in FY2019 was 1,208 kWh per capita. In FY2015, electric energy consumption in agriculture was recorded as being the highest (17.89%) worldwide. The per capita electricity consumption is low compared to most other countries despite India having a low electricity tariff.

Electricity sector in Canada

The electricity sector in Canada has played a significant role in the economic and political life of the country since the late 19th century. The sector is organized along provincial and territorial lines. In a majority of provinces, large government-owned integrated public utilities play a leading role in the generation, transmission, and distribution of electricity. Ontario and Alberta have created electricity markets in the last decade in order to increase investment and competition in this sector of the economy.

Power Grid Corporation of India Limited is an Indian statutory corporation under the jurisdiction of Ministry of Power, Government of India and is headquartered in Gurugram, India and engaged mainly in transmission of bulk power across different states of India. Power Grid transmits about 50% of the total power generated in India on its transmission network. It is also certified for PAS 99:.

TANESCO

The Tanzania Electric Supply Company Limited (TANESCO) is a Tanzanian parastatal organisation established in 1964. It is wholly owned by the government of Tanzania. The Ministry of Energy and Minerals regulates the operations of TANESCO.

Kerala State Electricity Board

Kerala State Electricity Board Ltd (KSEBLtd) is a public sector undertaking under the Government of Kerala, India, that generates, transmits and distributes electricity in the state. Established in 1957, the agency comes under the authority of the Department of Power. It has been registered under Indian companies act during January 2011.

The Central Electricity Authority of India (CEA) advises the government on policy matters and formulates plans for the development of electricity systems. It is a statutory organisation constituted under section 3(1) of Electricity Supply Act 1948, which has been superseded by section 70(1) of the Electricity Act 2003.

The electricity sector in Honduras has been shaped by the dominance of a vertically integrated utility ; an incomplete attempt in the early 1990s to reform the sector; the increasing share of thermal generation over the past two decades; the poor financial health of the state utility Empresa Nacional de Energía Eléctrica (ENEE); the high technical and commercial losses in transmission and distribution; and the low electric coverage in rural areas.

The electricity sector in Colombia is dominated by large hydropower generation (65%) and thermal generation (35%). Despite the country's large potential in new renewable energy technologies, this potential has been barely tapped. A 2001 law designed to promote alternative energies lacks certain key provisions to achieve this objective, such as feed-in tariffs, and has had little impact so far. Large hydropower and thermal plants dominate the current expansion plans. The construction of a transmission line with Panama, which will link Colombia with Central America, is underway.

As of August 2020 Chile had diverse sources of electric power: for the National Electric System, providing over 99% of the county's electric power, hydropower represented around 26.7% of its installed capacity, biomass 1.8%, wind power 8.8%, solar 12.1%, geothermal 0.2%, natural gas 18.9%, coal 20.3%, and petroleum-based capacity 11.3%. Prior to that time, faced with natural gas shortages, Chile began in 2007 to build its first liquefied natural gas terminal and re-gasification plant at Quintero near the capital city of Santiago to secure supply for its existing and upcoming gas-fired thermal plants. In addition, it had engaged in the construction of several new hydropower and coal-fired thermal plants. But by July 2020 91% of the new capacity under construction was of renewable power, 46.8% of the total solar and 25.6% wind, with most of the remainder hydro.

As required by the Constitution, the electricity sector is federally owned, with the Federal Electricity Commission essentially controlling the whole sector; private participation and foreign companies are allowed to operate in the country only through specific service contracts. Attempts to reform the sector have traditionally faced strong political and social resistance in Mexico, where subsidies for residential consumers absorb substantial fiscal resources.

Electricity sector in Nicaragua

Nicaragua is the country in Central America with the lowest electricity generation, as well as the lowest percentage of population with access to electricity. The unbundling and privatization process of the 1990s did not achieve the expected objectives, resulting in very little generation capacity added to the system. This, together with its high dependence on oil for electricity generation, led to an energy crisis in 2006 from which the country has not fully recovered yet.

Electricity sector in the Dominican Republic

The power sector in the Dominican Republic has traditionally been, and still is, a bottleneck to the country's economic growth. A prolonged electricity crisis and ineffective remedial measures have led to a vicious cycle of regular blackouts, high operating costs of the distribution companies, large losses including electricity theft through illegal connections, high retail tariffs to cover these inefficiencies, low bill collection rates, a significant fiscal burden for the government through direct and indirect subsidies, and very high costs for consumers as many of them have to rely on expensive alternative self-generated electricity. According to the World Bank, the revitalization of the Dominican economy depends greatly on a sound reform of the sector.

Availability-based tariff

Availability Based Tariff (ABT) is a frequency based pricing mechanism applicable in India for unscheduled electric power transactions. The ABT falls under electricity market mechanisms to charge and regulate power to achieve short term and long term network stability as well as incentives and dis-incentives to grid participants against deviations in committed supplies as the case may be.

Delhi Transco Limited

Delhi Transco Limited (DTL), formerly Delhi Power Supply Company Limited (DPSCL) is the State Transmission Utility for the National Capital Territory of Delhi. It is responsible for the transmission of power at 220 kV and 400 kV level and for upgrading, operating and maintaining the high voltage network.

National Grid (New Zealand)

The National Grid is the nationwide system of electric power transmission in New Zealand. The national electricity transmission grid is owned, operated, and maintained by state-owned enterprise Transpower New Zealand, although some lines are owned by local distribution companies and leased to Transpower. In total, the national grid contains 11,803 kilometres (7,334 mi) of high-voltage lines and 178 substations.

The electricity sector of the United States includes a large array of stakeholders that provide services through electricity generation, transmission, distribution and marketing for industrial, commercial, public and residential customers. It also includes many public institutions that regulate the sector. In 1996, there were 3,195 electric utilities in the United States, of which fewer than 1,000 were engaged in power generation. This leaves a large number of mostly smaller utilities engaged only in power distribution. There were also 65 power marketers. Of all utilities, 2,020 were publicly owned, 932 were rural electric cooperatives, and 243 were investor-owned utilities. The electricity transmission network is controlled by Independent System Operators or Regional Transmission Organizations, which are not-for-profit organizations that are obliged to provide indiscriminate access to various suppliers in order to promote competition.

Central Electricity Regulatory Commission (CERC), a key regulator of power sector in India, is a statutory body functioning with quasi-judicial status under sec – 76 of the Electricity Act 2003. CERC was initially constituted on 24 July 1998 under the Ministry of Power's Electricity Regulatory Commissions Act, 1998 for rationalization of electricity tariffs, transparent policies regarding subsidies, promotion of efficient and environmentally benign policies, and for matters connected Electricity Tariff regulation. CERC was instituted primarily to regulate the tariff of Power Generating companies owned or controlled by the government of India, and any other generating company which has a composite scheme for power generation and interstate transmission of energy, including tariffs of generating companies.

Electricity sector in Russia Overview of the electricity sector in Russia

Russia is the fourth largest generator and consumer of electricity in the world. Its 440 power stations have a combined installed generation capacity of 220 GW.

Electricity Act 1989 United Kingdom legislation

The Electricity Act 1989 provided for the privatisation of the electricity supply industry in Great Britain, by replacing the Central Electricity Generating Board in England and Wales and by restructuring the South of Scotland Electricity Board and the North of Scotland Hydro-Electric Board. The Act also established a licensing regime and a regulator for the industry called the Office of Electricity Regulation (OFFER), which has since become the Office of Gas and Electricity Markets (OFGEM).

References

  1. http://powermin.nic.in/sites/default/files/uploads/523.pdf [ dead link ]
  2. "The Electricity Act, 2003" (PDF). Archived from the original (PDF) on 23 September 2013. Retrieved 21 September 2013.
  3. Amendment to Act will change power sector
  4. "The electricity bill, 2014" (PDF). Retrieved 21 March 2015.
  5. "Daily nation wise Power Supply Position". Archived from the original on 24 June 2013. Retrieved 21 November 2015.