USNS Sgt. George Peterson

Last updated
History
US flag 48 stars.svgUnited States
Name
  • Coastal Guide
  • Washtenaw
Namesake Washtenaw County, Michigan
Orderedas type (C1-M-AV1) hull, MC hull 2172 [1]
Builder Leathem D. Smith Shipbuilding Company, Sturgeon Bay, Wisconsin
Yard number338 [1]
Laid down9 March 1945
Launched13 May 1945
Sponsored byMrs. L. R. Sanford
CommissionedDelivered to the War Shipping Administration (WSA) prior to commissioning, 16 July 1945
Identification US Official Number: 248,682 [2]
US flag 48 stars.svgUnited States
NameCoastal Guide
OwnerMARCOM
Operator
Acquired16 July 1945
In service17 December 1945
Out of service22 June 1948
FateDelivered to the Army Transport Service (ATS), 23 June 1948
US flag 48 stars.svgUnited States
NameSgt. George Peterson
Namesake George Peterson (Medal of Honor), awarded Medal of Honor
OperatorATS
Acquired23 June 1948
Out of service1 March 1950
Identification Hull symbol: AK-248
FateTransferred to the US Navy, 1 March 1950
US flag 49 stars.svgUnited States
NameSgt. George Peterson
OperatorMSTS
Acquired1 March 1950
In service1 March 1950
Out of service27 March 1959
Stricken1966
Identification Hull symbol: T-AK-248
FateSold, 15 December 1971
Flag of the United States.svgUnited States
NameMarsha Lynn
OwnerJohn E. Marsh, Brooksville, Florida
Acquired17 February 1972
FateSold, 1979
Flag of the United States.svgUnited States
NameAl-Ind-Esk-A Sea
Owner TransAlaska Fisheries Corp., The 13th Regional Corporation
Acquired1979
Refitconverted to Fish Factory Ship
Identification IMO number:  7947386
FateDestroyed by fire, 20 October 1982
General characteristics [3]
Class and type Alamosa-class cargo ship
Type C1-M-AV1
Tonnage5,032 long tons deadweight (DWT) [1]
Displacement
  • 2,382 long tons (2,420 t) (standard)
  • 7,450 long tons (7,570 t) (full load)
Length388 ft 8 in (118.47 m)
Beam50 ft (15 m)
Draft21 ft 1 in (6.43 m)
Installed power
Propulsion1 × propeller
Speed11.5  kn (21.3 km/h; 13.2 mph)
Capacity
  • 3,945 t (3,883 long tons) DWT
  • 9,830 cu ft (278 m3) (refrigerated)
  • 227,730 cu ft (6,449 m3) (non-refrigerated)
Complement
  • 15 Officers
  • 70 Enlisted

USNS Sgt. George Peterson (T-AK-248) was a US Maritime Administration (MARCOM) C1-M-AV1 type coastal cargo ship, originally planned as an Alamosa-class cargo ship. The contract for building was canceled by the Navy in August 1945. The ship, however, was completed as SS Coastal Guide. She was later acquired by the US Army, in 1948, and renamed USAT Sgt. George Peterson. She was reacquired by the Navy, in 1950, and placed in service by the Military Sea Transportation Service (MSTS) as USNS Sgt. George Peterson (T-AK-248). She remained with the Navy until struck in 1966. She was sold in 1971.

Contents

Construction

Sgt. George Peterson, originally projected as USS Washtenaw (AK-218), but built as Coastal Guide, was laid down under a MARCOM contract, MC hull 2172, on 9 March 1945 by the Leathem D. Smith Shipbuilding Company, Sturgeon Bay, Wisconsin; launched on 13 May 1945; sponsored by Mrs. L. R. Sanford; and delivered to the War Shipping Administration on 16 July 1945. [4]

Service history

Subsequently, operated by the United Fruit Company and the Polaris Steamship Company, Inc., Coastal Guide was transferred to the US Army on 23 June 1948; renamed Sgt. George Peterson (AK-248). and operated by the Army Transportation Service (ATS). [4]

She was transferred to the Navy in July 1950 and placed in service as USNS Sgt. George Peterson (T-AK-248). The cargo ship then commenced eight years of operations in the Gulf of Mexico, in the Caribbean, and along the southeastern seaboard of the United States for the Military Sea Transportation Service (MSTS). During that period, she interrupted her regular service only once—to carry supplies north to arctic stations in the summer of 1955. [4]

Early in 1959, the AK was ordered inactivated; and, in March, she was placed out of service at New Orleans, Louisiana. At mid-month, she was towed to Mobile, Alabama, where, on the 27th, she was transferred to the US Maritime Administration (MARAD) and berthed with the National Defense Reserve Fleet. She remained in reserve at Mobile until sold for non-transportation use in December 1971. [4]

Private service

On 15 December 1971, she was sold to John E. Marsh, Brooksville, Florida, for $41,000. She was sold under the condition that she wouldn't be used for transportation. She was converted into a private yacht and renamed Marsha Lynn. [2]

In 1979 she was sold to TransAlaska Fisheries Corporation, a subsidiary of The 13th Regional Corporation, and renamed Al-Ind-Esk-A Sea. She was converted into a Fish Factory Ship. On 20 October 1982, she caught fire while undergoing repairs in Port Gardner, Everett, Washington. She burned for two days before rolling over at 10:14 am, 22 October 1982, and sinking in 240 ft (73 m) of water. [3] The owners collected a $14 million insurance claim. [5]

The wreck is located at: 47°59.032′N122°14.772′W / 47.983867°N 122.246200°W / 47.983867; -122.246200 [6]

Notes

    Citations
    1. 1 2 3 C1 Cargo Ships 2009.
    2. 1 2 MARAD.
    3. 1 2 Navsource 2016.
    4. 1 2 3 4 DANFS 2015.
    5. Muhlstein 2012.
    6. Boyd.

    Bibliography

    Online resources


    Related Research Articles

    <span class="mw-page-title-main">Type C1 ship</span> Class of American cargo ships

    Type C1 was a designation for cargo ships built for the United States Maritime Commission before and during World War II. Total production was 493 ships built from 1940 to 1945. The first C1 types were the smallest of the three original Maritime Commission designs, meant for shorter routes where high speed and capacity were less important. Only a handful were delivered prior to Pearl Harbor. But many C1-A and C1-B ships were already in the works and were delivered during 1942. Many were converted to military purposes including troop transports during the war.

    USNS <i>Sgt. Jonah E. Kelley</i>

    USNS Sgt. Jonah E. Kelley (T-APC-116), was originally built as Link Splice under a United States Maritime Commission contract and was laid down on 29 January 1945 by the Southeastern Shipbuilding Corporation in Savannah, Georgia. She was launched on 17 March 1945, sponsored by Mrs. L. W. Grothaus and delivered to the War Shipping Administration for operation by the Moore McCormack Lines on 28 August 1945.

    USNS <i>Sgt. George D. Keathley</i>

    USNS Sgt. George D. Keathley, was a World War II United States cargo vessel that was used for troop transport and later converted to a survey vessel. She was laid down and launched as MS Alexander R. Nininger, Jr., then renamed MS Acorn Knot. She was put into US Army service as USAT Acorn Knot, then renamed USAT Sgt. George D. Keathley. She was transferred to the US Navy and became USNS Sgt. George D. Keathley (T-APC-117), but was later re-designated T-AGS-35. She was leased to the Republic of China, where she served as Chu Hwa (AGS-564). Both Nininger and Keathley were posthumous Medal of Honor recipients.

    USS Somerset (AK-212) was an Alamosa-class cargo ship that was constructed for the US Navy during the closing period of World War II. She was later acquired by the US Army in 1946 and the US Air Force in 1957 before being reacquired by the USN as the USNS Coastal Sentry (T-AGM-15), a missile range instrumentation ship.

    USNS <i>Coastal Crusader</i> Cargo ship of the United States Navy

    USNS Coastal Crusader (AK-220/ORV-16/T-AGM-16/AGS-36) was an Alamosa-class cargo ship that was constructed for the US Navy during the closing period of World War II. She was later acquired by the US Army in 1946 and the US Air Force in 1957 before being reacquired by the USN in 1964 and as a missile range instrumentation ship.

    USNS Lt. James E. Robinson (T-AKV-3/T-AG-170/T-AK-274) was a Lt. James E. Robinson-class cargo ship, which was launched as a World War II commercial Victory cargo ship SS Czechoslovakia Victory under the Emergency Shipbuilding program. She had earlier been the U.S. Army's USAT LT. James E. Robinson before being acquired by the U.S. Navy.

    USNS <i>Sgt. Curtis F. Shoup</i> American C1-M-AV1 coastal freighter

    USNS Sgt. Curtis F. Shoup (T-AG-175) was a C1-M-AV1 coastal freighter. Built as Spindle Eye, one of the many named for knots. The ship, modified to be a "news transmission ship" for the press during the planned invasion of Japan, was completed 9 July 1945, delivered to the War Shipping Administration and placed under its agent Lykes Brothers Steamship Company the same day. Days later, on 26 July, Spindle Eye was bareboat chartered to the War Department for operation by the Army. The ship was renamed November 1947 by the Army, after serving as a radio relay ship at the Operation Crossroads atomic bomb tests and conversion to an Army passenger-cargo vessel, Sgt. Curtis F. Shoup in honor Sergeant Curtis F. Shoup who had been awarded the Medal of Honor.

    USS Muskingum (AK-198/T-AK-198) was an Alamosa-class cargo ship that was constructed for the US Navy under a US Maritime Commission (MARCOM) contract during the closing period of World War II. She supported the end-of-war Navy effort. On 7 March 1946 Muskingum was placed in service under bareboat charter with the US Army under the Shipping Control Authority for the Japanese Merchant Marine with a Japanese crew. In 1950, she was reactivated and placed into service with the Military Sea Transportation Service as USNS Muskingum (T-AK-198) until being struck from the Navy list in 1973. She was ultimately transferred to the Trust Territory of the Pacific Islands (TTPI) and the Republic of Palau.

    USS <i>Pembina</i> (AK-200) Cargo ship of the United States Navy

    USS Pembina (AK-200) – later known as USNS Pembina (T-AK-200) -- was an Alamosa-class cargo ship that was constructed for the U.S. Navy during the closing period of World War II. She supported the end-of-war Navy effort and was subsequently placed in service with the US Army under the Shipping Control Authority for the Japanese Merchant Marine with a Japanese crew in Yokosuka, Japan.

    USS Pemiscot (AK-201) was an Alamosa-class cargo ship that was constructed for the US Navy during the closing period of World War II. By the time she was scheduled for commissioning, the war's end caused her to be declared “excess to needs” and she was returned to the US Government and struck by the Navy.

    USS Pipestone (AK-203) was an Alamosa-class cargo ship that was constructed for the US Navy during the closing period of World War II. By the time she was scheduled for commissioning, the war’s end caused her to be declared “excess to needs” and she was returned to the US Government and struck by the Navy.

    USS Pitkin (AK-204) was an Alamosa-class cargo ship that was constructed for the US Navy during the closing period of World War II. By the time she was scheduled for commissioning, the war's end caused her to be declared “excess to needs” and she was returned to the US Government and struck by the Navy.

    USS Sebastian (AK-211) was an Alamosa-class cargo ship that was constructed for the US Navy during the closing period of World War II. She was retained by the Navy for only a short period of service before being inactivated as "excess to needs."

    USNS <i>Sgt. Andrew Miller</i> Cargo ship of the United States Navy

    USNS Sgt. Andrew Miller (T-AK-242) was built as Victory ship SS Radcliffe Victory, a Boulder Victory-class cargo ship, built at the end of World War II. She served during the war and its demilitarization as a commercial cargo vessel operated by American West African Lines under charter with the Maritime Commission and War Shipping Administration. From 1946 to 1950, she served the US Army as a transport named USAT Sgt. Andrew Miller. In 1950, she was acquired by the US Navy and assigned to the Military Sea Transportation Service (MSTS). In 1981 she ended her career and was placed into reserve.

    USNS <i>Sgt. Archer T. Gammon</i> Cargo ship of the United States Navy

    USNS Sgt. Archer T. Gammon (T-AK-243) was a Boulder Victory-class cargo ship built at the end of World War II and served the war and its demilitarization as a commercial cargo vessel. From 1946 to 1950 she served the U.S. Army as a transport named USAT Sgt. Archer T. Gammon. In 1950 she was acquired by the United States Navy and assigned to the Military Sea Transportation Service. In 1973 she ended her career and was struck and scrapped.

    USNS <i>Colonel William J. OBrien</i> Cargo ship of the United States Navy

    USNS Colonel William J. O’Brien (T-AK-246) was a US Maritime Administration (MARCOM) C1-M-AV1 type coastal cargo ship, originally planned as an Alamosa-class cargo ship. Constructed as Maiden's Eye for the MARCOM, completed in August 1945 and placed in operation by the War Shipping Administration (WSA). After the war Maiden's Eye was transferred to the US Army and renamed USAT Colonel William J. O’Brien who kept her in service until transferred to the US Navy in 1950 for operation as USNS Colonel William J. O’Brien (T-AK-246) by the Military Sea Transportation Service (MSTS) until 1973.

    USNS Private John F. Thorson (T-AK-247) was a US Maritime Administration (MARCOM) C1-M-AV1 type coastal cargo ship, originally planned as an Alamosa-class cargo ship. Constructed as Becket Bend for MARCOM, completed in August 1945 and placed in operation by the War Shipping Administration. However, the war ended, and she was transferred to the US Army as USAT Private John F. Thorson who kept her in service until transferred to the US Navy in 1950. She was struck in 1960, ending her military career.

    USNS Short Splice (T-AK-249) was a US Maritime Administration (MARCOM) C1-M-AV1type coastal cargo ship, originally planned as an Alamosa-class cargo ship. Constructed as Short Splice for MARCOM, completed in August 1945 and placed in operation by the War Shipping Administration during the closing period of World War II. However, the war ended, and she was transferred to the US Army as USAT Short Splice who kept her in service until transferred to the US Navy in 1950.

    USNS <i>Private Frank J. Petrarca</i> Cargo ship of the United States Navy

    USNS Private Frank J. Petrarca (T-AK-250) was a US Maritime Administration (MARCOM) C1-M-AV1 type coastal cargo ship, originally planned as an Alamosa-class cargo ship. Constructed as Long Splice for MARCOM, completed in September 1945 and placed in operation by the War Shipping Administration (WSA) during the closing period of World War II. However, the war ended, and she was transferred to the US Army as USAT Private Frank J. Petrarca who kept her in service until transferred to the US Navy in 1950.

    USNS <i>Sgt. Truman Kimbro</i> Cargo ship of the United States Navy

    USNS Sgt. Truman Kimbro (T-AK-254) was a Boulder Victory-class cargo ship built for the U.S. Maritime Commission during the final months of World War II as the SS Hastings Victory.