History | |
---|---|
United States | |
Name |
|
Namesake | Marengo County, Alabama |
Ordered | as type (C1-M-AV1) hull, MC hull 2125 [1] |
Builder | Walter Butler Shipbuilders, Inc., Superior, Wisconsin |
Yard number | 43 [1] |
Laid down | 4 July 1944 |
Launched | 4 December 1944 |
Sponsored by | Mrs. R. W. Higgins |
Acquired | 24 August 1945 |
Commissioned | 21 September 1945 |
Decommissioned | 23 November 1945 |
Stricken | date unknown |
Identification |
|
Fate | Returned to Maritime Commission, 23 November 1945 |
United States | |
Name | Coastal Spartan |
Owner | Maritime Commission |
Operator |
|
Acquired | 23 November 1945 |
In service | 23 November 1945 |
Out of service | 22 April 1948 |
Fate | Sold, 19 July 1965 |
Notes | sold for non-transportation use |
United States | |
Name | Coastal Spartan |
Owner | Boston Metals, Company |
Acquired | 19 July 1965 |
Fate | Sold |
United States | |
Name |
|
Owner | Storm Drilling Company |
In service | December 1971 |
Refit |
|
Fate | Sold late 1989 |
United States | |
Name | Northern Victor |
Owner | Seafoods Wholesalers, Inc. |
Acquired | 1989 |
In service | 19 October 1990 |
Out of service | 1999 |
Refit | converted to fish processing vessel, 1989–1990 |
Fate | Sold |
United States | |
Name | Northern Victor |
Owner | Icicle Seafoods Inc. |
Acquired | 1999 |
Identification |
|
General characteristics [2] | |
Class and type | Alamosa-class cargo ship |
Type | C1-M-AV1 |
Tonnage | 5,032 long tons deadweight (DWT) [1] |
Displacement |
|
Length | 388 ft 8 in (118.47 m) |
Beam | 50 ft (15 m) |
Draft | 21 ft 1 in (6.43 m) |
Installed power |
|
Propulsion | 1 × propeller |
Speed | 11.5 kn (21.3 km/h; 13.2 mph) |
Capacity |
|
Complement |
|
Armament |
|
USS Marengo (AK-194) was an Alamosa-class cargo ship that was constructed by the US Navy during the closing period of World War II. She was declared excess-to-needs and returned to the US Maritime Commission shortly after commissioning.
Marengo (AK 194) was laid down under a Maritime Commission contract, MC hull 2125, by Walter Butler Shipbuilders Inc., Superior, Wisconsin, 4 July 1944; launched 4 December 1944; sponsored by Mrs. R. W. Higgins; acquired by the Navy at New Orleans, Louisiana, 24 August 1945; placed in service the same day she was acquired, and was used for ferrying from Beaumont, Texas, to Galveston, Texas. She was placed out of service on arrival the 29 August; and commissioned 21 September. [3]
The end of World War Il reduced the need for cargo ships, so Marengo decommissioned 23 November and was transferred to War Shipping Administration (WSA) the same day. The ship was subsequently operated by North Atlantic & Gulf Steamship Co., under the name Coastal Spartan. [3]
Coastal Spartan was contracted to North Atlantic & Gulf SS Company and South Atlantic SS Line until being laid up in the reserve fleet in Wilmington, North Carolina, on 22 April 1948. [2]
She was sold to Boston Metals, Company, on 19 July 1965, for non-transportation use. [2]
In December 1971, she was sold to Storm Drilling Company, and converted to a drilling ship. She was renamed Cyclone on 30 December 1971. She was again converted in 1975, to a crane ship and renamed Ocean Cyclone. [2]
She was sold in 1989, converted by the Eastern Shipbuilding Company, Panama City, Florida, to a fish processing vessel in 1989–1990. [2] [4]
In late 1999, she was acquired by Icicle Seafoods, Inc. [2]
Online resources
USS Lebanon (AK-191) was a Alamosa-class cargo ship constructed for the US Navy during the end of World War II. However, as the war was ending, the need for additional cargo ships was found not necessary and Lebanon was sold for commercial service.
USS Pontotoc (AK-206/AG-94/AVS-7) was an Alamosa-class cargo ship acquired by the US Navy shortly before the end of World War II. She was converted into a Gwinnett-class aviation stores issue ship to carry aviation parts and spares, and to issue them to the US Pacific Fleet and activities as needed.
USNS Coastal Crusader (AK-220/ORV-16/T-AGM-16/AGS-36) was an Alamosa-class cargo ship that was constructed for the US Navy during the closing period of World War II. She was later acquired by the US Army in 1946 and the US Air Force in 1957 before being reacquired by the USN in 1964 and as a missile range instrumentation ship.
USS Glacier (AK-183) was an Alamosa-class cargo ship acquired by the U.S. Navy during the final months of World War II. She served in the Pacific Ocean theatre of operations for a short period of time before being decommissioned and returned to the U.S. Maritime Administration for dispositioning.
USS Kenosha (AK-190) was an Alamosa-class cargo ship that served the US Navy during the clean-up phase of World War II. When her service was no longer required in 1946, she was decommissioned and returned to the U.S. Maritime Commission where she was sold to the Kingdom of Norway in 1947.
USS Lehigh (AK-192) was an Alamosa class cargo ship that was constructed by the United States Navy during the closing period of World War II. She was declared excess-to-needs and returned to the United States Maritime Commission shortly after commissioning.
USS Lancaster (AK-193) was an Alamosa-class cargo ship that was constructed by the US Navy during the closing period of World War II. She was declared excess-to-needs and returned to the US Maritime Commission shortly after commissioning.
USS Midland (AK-195) was an Alamosa-class cargo ship that was constructed by the US Navy during the closing period of World War II. She was declared excess-to-needs and returned to the US Maritime Commission shortly after being in commission for only a short period of time.
USS Minidoka (AK-196) was an Alamosa-class cargo ship that was constructed for the US Navy during the closing period of World War II. She was declared excess-to-needs and returned to the US Maritime Commission.
USS Hidalgo (AK-189) was an Alamosa-class cargo ship that was constructed for the U.S. Navy during the closing period of World War II. She was declared excess-to-needs and returned to the U.S. Maritime Commission.
USS Pemiscot (AK-201) was an Alamosa-class cargo ship that was constructed for the US Navy during the closing period of World War II. By the time she was scheduled for commissioning, the war's end caused her to be declared “excess to needs” and she was returned to the US Government and struck by the Navy.
USS Pinellas (AK-202) was an Alamosa-class cargo ship that was constructed for the U.S. Navy during the closing period of World War II. By the time she was scheduled for commissioning, the war's end caused her to be declared "excess to needs" and she was returned to the U.S. Government and struck by the Navy.
USS Pipestone (AK-203) was an Alamosa-class cargo ship that was constructed for the US Navy during the closing period of World War II. By the time she was scheduled for commissioning, the war’s end caused her to be declared “excess to needs” and she was returned to the US Government and struck by the Navy.
USS Pitkin (AK-204) was an Alamosa-class cargo ship that was constructed for the US Navy during the closing period of World War II. By the time she was scheduled for commissioning, the war's end caused her to be declared “excess to needs” and she was returned to the US Government and struck by the Navy.
USS Screven (AK-210) was an Alamosa-class cargo ship that was constructed for the US Navy during the closing period of World War II. She served in the Pacific Ocean theatre of operations and returned home in 1946 to be placed into the "mothball fleet" where she remained until sold in 1947 for commercial maritime service.
USS Sebastian (AK-211) was an Alamosa-class cargo ship that was constructed for the US Navy during the closing period of World War II. She was retained by the Navy for only a short period of service before being inactivated as "excess to needs."
USS Tarrant (AK-214) was an Alamosa-class cargo ship that was constructed for the US Navy during the closing period of World War II. She was commissioned; however, the war ended and she was returned to the War Shipping Administration in November 1945 for disposal.
USS Tipton (AK-215) was an Alamosa-class cargo ship that was constructed for the US Navy during the closing period of World War II. She was commissioned; however, the war ended and she was declared "excess to needs." She was then transferred to the US Coast Guard in 1946.
USNS Sgt. George Peterson (T-AK-248) was a US Maritime Administration (MARCOM) C1-M-AV1 type coastal cargo ship, originally planned as an Alamosa-class cargo ship. The contract for building was canceled by the Navy in August 1945. The ship, however, was completed as SS Coastal Guide. She was later acquired by the US Army, in 1948, and renamed USAT Sgt. George Peterson. She was reacquired by the Navy, in 1950, and placed in service by the Military Sea Transportation Service (MSTS) as USNS Sgt. George Peterson (T-AK-248). She remained with the Navy until struck in 1966. She was sold in 1971.
USS Alcor, AK-259, was a Greenville Victory-class cargo ship in service with the United States Navy from 1952 to 1968. She was originally built in 1944 as SS Rockland Victory, a World War II era Victory ship. She was sold for scrap in 1970.