ASEAN Power Grid

Last updated
A map of Southeast Asia, depicting existing and proposed electric power connections for a unified ASEAN Power Grid from 2011. Proposed ASEAN Power Grid by HAPUA in 2011.png
A map of Southeast Asia, depicting existing and proposed electric power connections for a unified ASEAN Power Grid from 2011.

The ASEAN Power Grid (APG) is a key initiative under the ASEAN Vision 2020 and has the goal of achieving regional interconnection for energy security, accessibility, affordability and sustainability. The APG is a regional power interconnection initiative aiming to connect the electricity infrastructure of the member states of the Association of Southeast Asian Nations (ASEAN). [1] [2] [3] [4]

Contents

The main goal of the ASEAN Power Grid is to ensure energy security in the ASEAN region by integrating the power infrastructure across different countries. This includes the construction of cross-border power interconnections, which would allow the sharing of excess power capacity among ASEAN countries. The APG initiative is expected to enhance electricity trade across borders, meet the rising electricity demand, and improve access to energy services in the region. It is also seen as a way to promote the use of renewable energy sources within the region. [1] [2] [3] [4] [5]

History

In 1981, the first official discussions on the state of electricity grids within ASEAN began. This resulted in the creation of the "Heads of ASEAN Power Utilities/Authorities" group, otherwise known as HAPUA. However, it wasn't until 1996 that a Memorandum of Understanding (MoU) was signed by members of ASEAN to give HAPUA 10 overarching goals, with one being power interconnectivity within each member state. [6]

The first discussions on inter-border energy trading took place during the Agreement on ASEAN Energy Cooperation in Manila, on June 24, 1986. This conference and the ensuing agreement highlighted the importance of cooperation among ASEAN members to develop energy resources and improve the economic integration of ASEAN collectively. [1] [4]

During the Second ASEAN Informal Summit in Kuala Lumpur, on December 15, 1997, the "ASEAN Power Grid" was first mentioned in official documents as part of the ASEAN Vision 2020. This event also marked the first time the organisation articulated the APG as the end goal for a unified energy market. [1] [4]

A roadmap for the APG was first mentioned during the "17th ASEAN Ministers on Energy Meeting" (AMEM) in Bangkok on July 3, 1999. The meeting established the "ASEAN Plan of Action for Energy Cooperation" (APAEC) for the years 2004–2009. A subsequent APAEC plan, covering 2004 to 2009, was adopted at the 22nd AMEM in Makati City on June 9, 2004. Both plans promoted the development of a policy framework that would guide legal and technical implementation methods. The ultimate goal of these plans was to establish an “Interconnection Master Plan” to help achieve the objectives outlined in the ASEAN Vision 2020. [1] [4]

The legal aspect of this "Master Plan" was agreed as the "ASEAN Power Grid’s Roadmap for Integration" at the 20th AMEM Meeting in Bali on July 5, 2002. A final report entitled the "ASEAN Interconnection Master Plan Study (AIMS)" was approved by the 21st AMEM in Langkawi on July 3, 2003, to serve as the guiding document for the implementation of power interconnection projects. [1] [4]

The full technical specifications of the project were initially agreed upon during the Tenth ASEAN Summit in Vientiane on November 29, 2004, and named the "Vientiane Action Programme (VAP) 2004-2010". The plan agreed upon a policy framework for power interconnection and trade, alongside the improvement of energy infrastructure in ASEAN. Again, there was a specific focus on interconnection projects between individual member states, as highlighted during the 2002 meeting. [1] [4]

In 2007, the APGCC (ASEAN Power Grid Consultative Committee) was established under HAPUA and is an advice committee dedicated to creating and maintaining a framework to create the APG. [7]

In 2012, HAPUA was reorganised into 5 working groups, with one focused solely on inter-member transmission and the APG. [6]

In 2015, the 31st meeting of HAPUA took place, discussing the goal of achieving a 25% renewable energy mix by 2020 for the ASEAN power grid and reviewing funding proposals for the APG. The implementation of the Lao PDRThailandMalaysiaSingapore Power Integration Project (LTMS-PIP) was slated for 2018, with the expectation that insights gained would aid in addressing legal and tax harmonisation issues pertinent to establishing the ASEAN Electricity Regulator, APG Transmission System Operator (ATSO), and APG Generation & Transmission Planning (AGTP) institutions. [8]

Implementation

The implementation of the APG is expected to be carried out in stages, starting with bilateral agreements between neighbouring countries. These are then gradually to be expanded to sub-regional bases, eventually leading to a fully integrated power grid system in Southeast Asia.

As of now, several bilateral cross-border interconnections have been established, such as those between Thailand, Laos, Singapore, and Malaysia. [9]

The APGCC, the current technical committee leading development, has made a goal to create 16 interconnection projects with 27 physical links. Thirteen links are currently operating with a total capacity of 5.212 MW. [7]

Current system

(Source: [10] )
YearEnergy Production by Nation (EJ)
BruneiCambodiaIndonesiaLao PDRMalaysiaMyanmarPhilippinesSingaporeThailandVietnam
20200.20.310.00.23.81.02.61.45.83.8
20150.10.38.60.23.60.82.21.35.73.1
20100.10.28.50.13.00.61.71.04.92.5
20050.10.27.50.12.70.61.60.94.21.7
20000.10.16.50.12.00.51.60.83.01.2

The current combined ASEAN grid is quickly growing, with particular increases in generation within Indonesia and Vietnam. [10]

Current HVDC Connection Projects within the ASEAN Power Grid
NameConverter

station 1

Converter

station 2

Additional stationsTotal Length (Cable/Pole)

(km)

Nominal

Voltage (kV)

Power (MW)YearTypeRemarksRef
Peninsular Malaysia – Singapore Plentong, Malaysia Woodlands, Singapore230450EE [11] [12] [13]
Peninsular Malaysia – Sumatra Melaka Pekan Baru 600PP: SM->PM & EEUnder Construction [11]
Thailand - Peninsular Malaysia Sadao, Thailand Bukit Keteri, Malaysia132/11580EE [11] [12] [13]
Thailand - Peninsular Malaysia Su-ngai kolok Rantau Panjang 132/115100EEUnder Construction [11]
Thailand - Malaysia Khlong Ngae, Thailand

6°42′56″N100°27′8″E / 6.71556°N 100.45222°E / 6.71556; 100.45222 (Thailand-Malaysia Transmission - Khlong Ngae Static Inverter Plant)

Gurun, Malaysia

5°48′45″N100°32′6″E / 5.81250°N 100.53500°E / 5.81250; 100.53500 (Thailand-Malaysia Transmission - Gurun Static Inverter Plant)

110

(0/110)

3003002001ThyrSupplier: Siemens [11] [13] [14]
Sarawak – West Kalimantan Mambong, Malaysia Bengkayang, Indonesia27570 − 230EE [11] [12] [13]
Sarawak – Sabah – BruneiSarawakBrunei2752×100EEUnder Construction [11]
Thailand – Lao PDR Nakhon Phanom, Thailand Thakhek, Laos Hinboun, Laos230220PP: La->Th [11] [12] [13]
Thailand – Lao PDR Ubon Ratchathani 2, Thailand Houay Ho, Laos230126PP: La->Th [11] [12] [13]
Thailand – Lao PDR Roi Et 2, Thailand Nam Theun 2, Laos230948PP: La->Th [11] [12] [13]
Thailand – Lao PDR Udon Thani 3 Na Bong Nam Ngum 2 500597PP: La->Th [11] [12] [13]
Thailand – Lao PDR Nakhon Phanom 2 Thakhek Theun Hinboun (Expansion)230220PP: La->Th [11] [12] [13]
Thailand – Lao PDR Mae Moh 3 Nan 2 Hong Sa # 1, 2, 35001473PP: La->Th [11] [12] [13]
Thailand – Lao PDRUdon Thani 3Na BongNam Ngiep 1500269PP: La->ThUnder Construction [11]
Thailand – Lao PDRUbon Ratchathani 3 Pakse Xe Pien Xe Namnoi500390PP: La->ThUnder Construction [11]
Thailand – Lao PDRKhon Kaen 4Loei 2, Xayaburi 5001220PP: La->ThUnder Construction [11]
Lao PDR – Vietnam Xekaman 3 Thanhmy 200PP: La->Vn [11] [12] [13]
Lao PDR – VietnamXekaman 1Ban Hat San Pleiku 5001000PP: La->VnUnder Construction [11]
Lao PDR – VietnamNam MoBan Ve230100PP: La->VnUnder Construction [11]
Lao PDR – Vietnam Luang Prabang Nho Quan 5001410PP: La->VnUnder Construction [11]
Lao PDR – CambodiaBan Hat Stung Treng 230300PP: La->KhUnder Construction [11]
Vietnam – Cambodia Chau Doc Takeo Phnom Penh 230200PP: Vn->Kh [11] [12] [13]
Thailand – Cambodia Aranyaprathet Bantey Meanchey 115100PP: Vn->Kh [11] [12] [13]

Brunei

Brunei, along with Indonesia, Malaysia, and the Philippines, has initiated a pilot project known as the Brunei Darussalam-Indonesia-Malaysia-Philippines Power Integration Project (BIMP-PIP). This project aims to study cross-border power trade among these countries. [15]

Indonesia

Indonesia is set to launch the Nusantara Grid Project in 2025, which will connect the power networks among Indonesian islands, optimizing the use of renewable energy resources across the archipelago. [16]

Laos

The Lao PDR–Thailand–Malaysia–Singapore Power Integration Project serves as ASEAN's pilot in addressing technical, legal, and financial issues of multilateral electricity trade. [9]

Malaysia

Malaysia is part of several cross-border power interconnections, including with Singapore and Thailand. [2] It has also agreed to purchase 100MW of electricity from Laos, utilizing the transmission grid of Thailand. [9]

Philippines

The Philippines, along with Brunei, Indonesia, and Malaysia, has initiated the BIMP-PIP to study cross-border power trade among these countries. [15]

Singapore

Singapore has started importing renewable energy from Laos through Thailand and Malaysia as part of the Lao PDR–Thailand–Malaysia–Singapore Power Integration Project. The city-state is also planning to import up to 4 gigawatts of low-carbon electricity by 2035. [9]

Thailand

It is part of several cross-border power interconnections, including those with Malaysia, Cambodia, Laos, and Vietnam. [2]

Challenges and opportunities

While the APG holds great potential for the ASEAN region, its implementation faces several challenges. These include the lack of a regional regulatory framework, differing national energy policies, and technical issues related to grid compatibility and synchronization.[ citation needed ]

Despite these challenges, the APG presents several opportunities. It could potentially lead to more efficient use of energy resources within the region, reduce the cost of electricity supply, and promote the use of renewable energy. Several leaders have highlighted the prospect of using renewable energy resources in countries such as Indonesia to make the APG green. [5] [17] During the 31st HAPUA meeting, it was discussed that the ASEAN's power grid should be 25% green by 2020. [8]

Future expansions

The ASEAN Power Grid could be connected to the Asian Super Grid in the future, a proposed mega grid that stretches from India, to China, to Russia, and then to Japan. [18] [19] It is currently unknown how the APG would connect to this plan.

There is a proposal by Australian company Sun Cable, called the Australia-Asia Power Link to connect the Singaporean and Australian power grids. Originally called the Australia–Singapore Power Link, then Australia-ASEAN, and finally to Australia-Asia, the idea is to physically connect the Northern Territory to Singapore, with a possible connection to Indonesia as well. [20] The Sun Cable company was placed in administration in early 2023 due to funding issues, but was bought by a consortium led by Grok Ventures and Quinbrook Infrastructure Partners in May 2023. The project aims to supply electricity to Darwin by 2030 and to Singapore a few years later. [21] [22]

Related Research Articles

<span class="mw-page-title-main">ASEAN</span> International organization of Southeast Asian countries

The Association of Southeast Asian Nations, commonly abbreviated as ASEAN, is a political and economic union of 10 states in Southeast Asia. Together, its member states represent a population of more than 600 million people and land area of over 4.5 million km2 (1.7 million sq mi). The bloc generated a purchasing power parity (PPP) gross domestic product (GDP) of around US$10.2 trillion in 2022, constituting approximately 6.5% of global GDP (PPP). ASEAN member states include some of the fastest growing economies in the world, and the institution plays an integral role in East Asian regionalism.

<span class="mw-page-title-main">Tenaga Nasional</span> Malaysian electricity company

Tenaga Nasional Berhad, also known as Tenaga Nasional or simply Tenaga, is the Malaysian multinational electricity company and is the only electric utility company in Peninsular Malaysia and also the largest publicly listed power company in Southeast Asia with MYR 204.74 billion worth of assets. It serves over 10.16 million customers throughout Peninsular Malaysia and the East Malaysian state of Sabah through Sabah Electricity.

The HVDC Thailand–Malaysia is a 110 kilometer long HVDC powerline between Khlong Ngae in Thailand at 6°42′56″N100°27′08″E and Gurun in Malaysia. The HVDC Thailand–Malaysia, which crosses the border between Malaysia and Thailand at 6°31′47″N100°24′11″E, serves for the coupling of the asynchronously operated power grids of Thailand and Malaysia and went in service in June 2002. The HVDC connection Thailand–Malaysia is a monopolar 300 kV overhead line with a maximum transmission rate of 300 megawatts. The terminal of the HVDC is situated east of Gurun at 5°48′45″N100°32′06″E. The inverter hall is designed as Chinese style building.

<span class="mw-page-title-main">National Grid (Malaysia)</span>

National Grid, Malaysia is the high-voltage electric power transmission network in Peninsular Malaysia. It is operated and owned by Tenaga Nasional Berhad (TNB) by its Transmission Division. There are two other electrical grids in Sabah and Sarawak operated by Sabah Electricity Sdn Bhd (SESB) and Sarawak Energy Berhad (SEB).

The following are international rankings of Thailand.

For solar power, South Asia has the ideal combination of both high solar insolation and a high density of potential customers.

<span class="mw-page-title-main">Brunei Darussalam–Indonesia–Malaysia–Philippines East ASEAN Growth Area</span>

The Brunei Darussalam–Indonesia–Malaysia–Philippines East ASEAN Growth Area (BIMP-EAGA) is a cooperation initiative established in 1994 to spur development in remote and less developed areas in the four participating Southeast Asian countries.

<span class="mw-page-title-main">Economic Research Institute for ASEAN and East Asia</span>

The Economic Research Institute for ASEAN and East Asia or ERIA is an international organization established in Jakarta, Indonesia in 2008 by a formal agreement among Leaders of 16 countries in the East Asian region to conduct research activities and make policy recommendations for further economic integration in the East Asia. ERIA works very closely with both the ASEAN Secretariat and 16 Research Institutes to undertake and disseminate policy research under the three pillars, namely “Deepening Economic Integration”, ”Narrowing Development Gaps”, and “Sustainable Development” and provide analytical policy recommendations to Leaders and Ministers at their regional meetings. ERIA provides intellectual contributions to East Asian Community building and serves as a Sherpa international organization. ERIA Ranks 9th among the world's "Top International Economics Think Tanks" according to the 2020 Global Go To Think Tanks Index Report conducted by the University of Pennsylvania.

<span class="mw-page-title-main">PJM Interconnection</span> Major electric grid coordinator in northeastern USA

PJM Interconnection LLC (PJM) is a regional transmission organization (RTO) in the United States. It is part of the Eastern Interconnection grid operating an electric transmission system serving all or parts of Delaware, Illinois, Indiana, Kentucky, Maryland, Michigan, New Jersey, North Carolina, Ohio, Pennsylvania, Tennessee, Virginia, West Virginia, and the District of Columbia.

The Indonesia–Malaysia–Thailand Growth Triangle (IMT-GT) started as an early attempt at economic liberalisation & integration in ASEAN. It was formally endorsed by Indonesia’s President Suharto, Malaysia’s Prime Minister Tun Dr. Mahathir Mohammad and Thailand’s Prime Minister Chuan Leekpai in 1993.

<span class="mw-page-title-main">Wide area synchronous grid</span> Regional electrical grid

A wide area synchronous grid is a three-phase electric power grid that has regional scale or greater that operates at a synchronized utility frequency and is electrically tied together during normal system conditions. Also known as synchronous zones, the most powerful is the Northern Chinese State Grid with 1,700 gigawatts (GW) of generation capacity, while the widest region served is that of the IPS/UPS system serving most countries of the former Soviet Union. Synchronous grids with ample capacity facilitate electricity trading across wide areas. In the ENTSO-E in 2008, over 350,000 megawatt hours were sold per day on the European Energy Exchange (EEX).

<span class="mw-page-title-main">Super grid</span> Wide-area electricity transmission network

A super grid or supergrid is a wide-area transmission network, generally trans-continental or multinational, that is intended to make possible the trade of high volumes of electricity across great distances. It is sometimes also referred to as a "mega grid". Super grids typically are proposed to use high-voltage direct current (HVDC) to transmit electricity long distances. The latest generation of HVDC power lines can transmit energy with losses of only 1.6% per 1,000 km.

The electricity sectors of the Republic of Ireland and Northern Ireland are integrated and supply 2.5 million customers from a combination of coal, peat, natural gas, wind and hydropower. In 2022, 34 TWh were generated. In 2018 natural gas produced 51.8%, while wind turbines generated 28.1%, coal 7%, and peat 6.8% of Ireland's average electricity demand. In 2020 wind turbines generated 36.3% of Ireland's electrical demand, one of the highest wind power proportions in the world. While the United Kingdom was one of the first countries in the world to deploy commercial nuclear power plants, the island of Ireland has never had a nuclear power plant built on either side of the Irish border. Nuclear power in Ireland was discussed in the 1960s and 1970s but ultimately never phased in, with legislation now in place explicitly forbidding its introduction.

Singapore International Energy Week (SIEW), formerly called the International Energy Week, is an annual week-long energy conference comprising several exhibitions, workshops, and networking sessions focused on fundamental issues within the energy industry. Held since 2008, it is organized by the Energy Market Authority.

<span class="mw-page-title-main">Energy in Singapore</span>

Energy in Singapore is critically influenced by its strategic position in maritime Southeast Asia, nestled between Malaysia and the Singapore Strait, near essential maritime routes like the Straits of Malacca and the South China Sea. This location has established Singapore as a central hub for the global petroleum, petrochemical, and chemical industries, with Jurong Island serving as a key base for over 100 international companies in these sectors. The majority of Singapore's energy consumption is derived from petroleum and other liquids, accounting for 86% of its total energy use, while natural gas represents 13%, and coal and renewable resources make up the remaining 1%.

Romeo Mencidor Montenegro devoted most of his career in pursuing sustainable peace and economic development in the island-region of Mindanao in Southern Philippines. He is currently serving as Director for Investment Promotion and Public Affairs Office of the Mindanao Development Authority (MinDA), a government body with principal mandate to integrate the socioeconomic development of Mindanao and serves as the Philippine Coordinating Office for the Brunei Darussalam-Indonesia-Malaysia-the Philippines-East ASEAN Growth Area BIMP-EAGA. He is married to Venus Alcomendras, with whom he has a son named Juan Carlos.

<span class="mw-page-title-main">Sarawak Energy</span> Electric utility company in Sarawak, Malaysia

Sarawak Energy Berhad is the state owned electric utility company of the State of Sarawak. It is one of Malaysia's three electrical companies, the other two being Tenaga Nasional serving Peninsular Malaysia, and Sabah Electricity which serves the state of Sabah and territory of Labuan.

<span class="mw-page-title-main">Australia-Asia Power Link</span> Electricity infrastructure project

The Australia–Asia Power Link (AAPowerLink) is a proposed electricity infrastructure project that is planned to include the world's largest solar plant, the world's largest battery, and the world's longest submarine power cable.

ASEAN Center for Energy (ACE) is an intergovernmental organisation within the structure of the Association of Southeast Asian Nations (ASEAN).  Its mission is to 'accelerate the integration of energy strategies within ASEAN by providing relevant information and expertise to ensure the necessary energy policies and programmes are in harmony with the region’s economic growth and environmental sustainability.' Dr. Nuki Agya Utama serves as Executive Director.

The Malaysia Green Transition refers to the sustainable development strategy implemented by the Malaysian government to combat climate change, stimulate economic growth, and improve societal well-being. The shift towards a greener economy began in earnest in the early 2020s, with ambitious targets set to drastically reduce greenhouse gas emissions and incorporate renewable energy sources into the national grid.

References

  1. 1 2 3 4 5 6 7 "Memorandum of Understanding on the ASEAN Power Grid". asean.org. Archived from the original on 2014-07-22. Retrieved 2024-05-25.
  2. 1 2 3 4 "ASEAN Power Grid - Enhancing Electricity Interconnectedness" (PDF). 2015.
  3. 1 2 "ASEAN Power Grid". ASEAN Centre for Energy. Retrieved 2024-05-25.
  4. 1 2 3 4 5 6 7 "MEMORANDUM OF UNDERSTANDING ON THE ASEAN POWER GRID" (PDF). 2014.
  5. 1 2 "Clean Energy and Power Trade Development in Southeast Asia". ASEAN Centre for Energy. Retrieved 2024-05-25.
  6. 1 2 "History Of Hapua – Hapua" . Retrieved 2024-05-25.
  7. 1 2 "About APGCC – Hapua" . Retrieved 2024-05-25.
  8. 1 2 "31th MEETING OF THE HEADS OF ASEAN POWER UTILITIES/AUTHORITIES COUNCIL (HAPUA XXXI) MELAKA, MALAYSIA, MAY 22, 2015". 2015. Archived from the original on 2016-03-13.
  9. 1 2 3 4 "Building the ASEAN Power Grid: Opportunities and Challenges". SEADS. Retrieved 2024-05-25.
  10. 1 2 "Key findings – Southeast Asia Energy Outlook 2022 – Analysis". IEA. Retrieved 2024-05-25.
  11. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Ahmed a, Tofael; Mekhilef, Saad; Shah, Rakibuzzaman; Mithulananthan, N.; Seyedmahmoudian, Mehdi; Horan, Ben (January 2017). "ASEAN power grid: A secure transmission infrastructure for clean and sustainable energy for South-East Asia".
  12. 1 2 3 4 5 6 7 8 9 10 11 12 Suryadi, Beni (4 June 2021). "Regional Power Grid Connectivity: The ASEAN Power Grid (APG)" (PDF).
  13. 1 2 3 4 5 6 7 8 9 10 11 12 13 ASEAN Center for Energy (16 Oct 2023). "Status of Southeast Asia Interconnectivity under ASEAN Power Grid" (PDF).
  14. HVDC Projects List, March 2012 - Existing or Under Construction (PDF) Archived 2014-02-01 at the Wayback Machine , Ece.uidaho.edu, accessed in February 2014
  15. 1 2 "Joint Statement of Brunei Darussalam, Indonesia, Malaysia and the Philippines Power Integration Project (BIMP-PIP)". asean.org. Retrieved 2024-05-25.
  16. IBP, Journalist (2023-10-12). "Indonesia pledges participation in ASEAN Power Grid to establish integrated renewable electricity network | INSIDER". Indonesia Business Post. Retrieved 2024-05-25.
  17. "ASEAN AIPF Opened by President, PLN Presents Green Enabling Supergrid". www.jcnnewswire.com. Retrieved 2024-05-25.
  18. "An Asia Super Grid Would Be a Boon for Clean Energy—If It Gets Built". Council on Foreign Relations. Retrieved 2024-05-25.
  19. "A Green Super Grid for Asia—Renewable Energy Without Borders - AIIB Blog - AIIB". www.aiib.org. Retrieved 2024-05-25.
  20. "World's biggest clean energy project to power Singapore from Australia". New Atlas. 2021-09-28. Retrieved 2024-05-25.
  21. Hannam, Peter (2023-09-07). "Sun Cable: Mike Cannon-Brookes takes charge of 'world-changing' solar project". The Guardian. ISSN   0261-3077 . Retrieved 2024-05-25.
  22. Morton, Adam (2023-05-26). "Mike Cannon-Brookes wins control of Sun Cable solar project from Andrew Forrest". The Guardian. ISSN   0261-3077 . Retrieved 2024-05-25.