Aigrette, date unknown | |
Class overview | |
---|---|
Name | Aigrette class |
Operators | French Navy |
Preceded by | Naïade class |
Succeeded by | Émeraude class |
Built | 1903 - 1905 |
In service | 1905 - 1919 |
Planned | 13 |
Completed | 2 |
Cancelled | 11 |
Retired | 2 |
General characteristics | |
Type | Submarine |
Displacement | |
Length | 35.9 m (117 ft 9 in) |
Beam | 4.04 m (13 ft 3 in) |
Draught | 2.63 m (8 ft 8 in) |
Propulsion |
|
Speed |
|
Range |
|
Complement | 14 men |
Armament |
|
The Aigrette-class submarines were a class of two submarines built for the French Navy between 1903 and 1905. They were essentially experimental submarines, and although in service during World War I, saw no action. The class was designed by Maxime Laubeuf and used Drzewiecki drop collar launchers and external cradles to launch torpedoes.
The submarines had a surfaced displacement of 178 long tons (181 tonnes ) and a submerged displacement of 253 long tons (257 t). The dimensions were 35.9 metres (117 feet 9 inches ) long, with a beam of 4.04 m (13 ft 3 in) and a draught of 2.63 m (8 ft 8 in). They had a single shaft powered by one diesel engine for surface running of 150 hp (112 kW) and an electric motor which produced 130 horsepower (97 kilowatts ) for submerged propulsion. The maximum speed was 9.3 knots (17.2 kilometres per hour ; 10.7 miles per hour ) on the surface and 6.2 knots (11.5 km/h; 7.1 mph) while submerged with a surfaced range of 1,300 nautical miles (2,400 kilometres ; 1,500 miles ) at 8 knots (15 km/h) and a submerged range of 65 nautical miles (120 km) at 3.8 knots (7.0 km/h). Their complement was 14 men. [1] [2] [3]
Their armament comprised two 450 mm (17.7 in) Drzewiecki drop collar torpedo launchers and two 450 mm (17.7 in) external cradles. [1] [2]
Aigrette-class submarines | ||||
Name | laid down | launched | commissioned | fate |
---|---|---|---|---|
Aigrette | 13 May 1902 | 23 February 1904 | 1905 | Disarmed and sold for scrap on 14 April 1920 at Toulon [3] |
Cigogne | 13 May 1902 | 8 November 1904 | 18 July 1906 | Disarmed and sold for scrap on 14 April 1920 at Toulon [4] |
Pluviôse (Q51) was the name ship of her class of 18 submarines built for the French Navy in the first decade of the 20th century.
The Circé-class submarines consisted of a pair of submarines built for the French Navy during the first decade of the 20th century. One boat was sunk in a collision before the First World War and the other was torpedoed and sunk by a German submarine in the last year of the war.
The Naïade-class submarines, sometimes referred to as the Perle class were a group of submarines built for the French Navy at the beginning of the 20th century. There were twenty vessels in this class, which was designed by Gaston Romazotti. The class introduced internal combustion engines into French submarine design. They remained in service until just prior to the outbreak of the First World War.
The Farfadet class consisted of four submarines built for the French Navy at the beginning of the 20th century designed by Gabriel Maugas. Two boats were lost in diving accidents. All were disposed of prior to the outbreak of the First World War.
Aigrette was the lead boat of the Aigrette-class submarines built for the French Navy between 1902 and 1905. Laid down in May 1902, she was launched in February 1904 and commissioned in 1908. She was essentially an experimental submarine, and although in service during World War I, saw no action. The class was designed by Maxime Laubeuf and used Drzewiecki drop collar launchers and external cradles to launch torpedoes.
Cigogne was the second of two Aigrette-class submarines built for the French Navy between 1903 and 1905. Laid down in May 1902, she was launched in November 1904 and commissioned in July 1906. She was an essentially experimental submarine, and although in service during World War I, saw no action. The class was designed by Maxime Laubeuf and used Drzewiecki drop collar launchers and external cradles to launch torpedoes.
The Lagrange-class submarines were a class of four submarines built for the French Navy during World War I and the interwar period. Three ships of this type were built in the Arsenal de Toulon from 1913 to 1924, and one was built at the Arsenal de Rochefort shipyard. Entering the French Marine Nationale from 1918 to 1924, the submarines served until the mid-1930s.
The French submarine Laplace (Q111) was a Lagrange-class submarine built for the French Navy built between 1913 and 1919. It was laid down in the Arsenal de Rochefort shipyards and launched on 12 August 1919. Laplace was completed in 1921 and served in the French Marine Nationale until 1935.
The French submarine Lagrange (Q112) was a Lagrange-class submarine built for the French Navy built between 1913 and 1918. It was laid down in the Arsenal de Toulon shipyards and launched on August 12, 1919. Lagrange was completed in 1918 but saw no action during World War I and served in the French Marine Nationale until 1935.
The French submarine Regnault (Q113) was a Lagrange-class submarine built for the French Navy built between 1913 and 1924. It was laid down in the Arsenal de Toulon shipyards and launched on June 25, 1924. Regnault was completed in 1924 and served in the French Marine Nationale until 1937.
The French submarine Romazotti (Q114) was a Lagrange-class submarine built for the French Navy built between 1914 and 1918, during World War I. It was laid down in the Arsenal de Toulon shipyards and launched on March 31, 1918. Romazotti was completed in 1918 and served in the French Marine Nationale until 1937.
The Joessel-class submarines were a class of two diesel-electric submarines built for the French Navy laid down before the start of World War I and completed after. They were built in the Arsenal de Cherbourg from 1913 to 1920, before entering the French Marine Nationale in 1920 and serving until 1936.
The French submarine Joessel was a Joessel-class diesel-electric attack submarine built for the French Navy between 1913 and 1919. Joessel was built in the Arsenal de Cherbourg from 1913 to 1917, entered the French Marine Nationale in February 1920 and served until 1936.
The French submarine Fulton was a Joessel-class diesel-electric attack submarine built for the French Navy between 1913 and 1919. Fulton was built in the Arsenal de Cherbourg from 1913 to 1920, entered the French Marine Nationale in July 1920 and served until May 1936.
The Armide-class submarines were a class of three diesel-electric submarines built for the Greek and Japanese Navies before and during World War I. They were built in the Schneider-Creusot shipyards 1913 to 1918, but were seized during the war by the French government before they could be sold. The Armide class ships operated in the Mediterranean during the course of World War I and were stricken from the Navy list between 1928 and 1935.
X was a steel single hull submarine built for the French Navy between 1904 and 1905. She was launched in November 1904 and commissioned in 1905. Gaston Romazzotti modified the design of Farfadet to create an experimental submarine which was the first with twin shafts.
The French submarine Z was an experimental submarine built for the French Navy between 1902 and 1905. It was laid down in April 1902, launched in March 1904 and completed in 1905. Designed by Gabriel Maugas, Z was essentially an experimental submarine and it was the first French submarine to be commissioned with a diesel engine although Aigrette was the first to be launched.
The French submarine Y was a single-hull experimental submarine designed by Louis-Émile Bertin for the French Navy. She was launched in July 1905 but was never commissioned and remained in experimental status. A planned refit, which included adding an electric motor for underwater propulsion in 1907 was cancelled. Y was disarmed and stricken on 1 March 1909.
The French submarine Argonaute was an experimental attack submarine built for the French Navy between 1903 and 1911. Initially named Omega, Argonaute was laid down in January 1903, launched in November 1905 and commissioned in 1911. She was essentially an experimental submarine, and although in service during World War I, saw no action. Argonaute was decommissioned in 1919.
The Guêpe-class submarines were a planned class of submarines to be built for the French Navy ordered in 1904. Ten of the class were projected but only two were laid down before the whole project was cancelled. Construction of the two vessels that were laid down began in 1906, but it was stopped in 1908 before they could be completed.