B61 | |
---|---|
Type | Nuclear bomb |
Service history | |
Used by | United States |
Production history | |
Designer | Los Alamos National Laboratory |
Designed | 1963 |
Manufacturer | Pantex Plant |
Produced | 1968 (full production) |
No. built | 3,155 |
Variants | 13 |
Specifications | |
Mass | 715 pounds (324 kg) [1] |
Length | 141.6 inches (3.60 m) [1] |
Diameter | 13.3 inches (34 cm) [1] |
Blast yield | Believed to be either 0.3–340 kt (1.25-1,422 TJ) [2] or 0.3–400 kt (1.25-1,673 TJ) [3] in the weapon's various mods. |
The B61 nuclear bomb is the primary thermonuclear gravity bomb in the United States Enduring Stockpile following the end of the Cold War. It is a low-to-intermediate yield strategic and tactical nuclear weapon featuring a two-stage radiation implosion design. [4]
The B61 is of the variable yield ("dial-a-yield" in informal military jargon) design with a yield of 0.3 to 340 kilotons in its various mods ("modifications"). It is a Full Fuzing Option (FUFO) weapon, meaning it is equipped with the full range of fuzing and delivery options, including air and ground burst fuzing, and free-fall, retarded free-fall and laydown delivery. [1] It has a streamlined casing capable of withstanding supersonic flight and is 11 ft 8 in (3.56 m) long, with a diameter of about 13 inches (33 cm). The basic weight of the B-61 is about 700 pounds (320 kg), although the weights of individual weapons may vary depending on version and fuze/retardation configuration. As of 2020, the weapon was undergoing a 12th modification. According to the Federation of American Scientists in 2012, the roughly 400 B61-12s will each cost "more than its weight in gold" - $28 million apiece. [5] [6]
In 1961 a report was issued indicating Navy and Air Force interest in a lightweight bomb to replace existing weapons, but that both services had considerably different military requirements for such a weapon.[ citation needed ] However, the authors[ who? ] of the report[ which? ] believed that due to advances in technology it was possible for a single weapon to fulfill both requirements. This was followed by a report from Sandia in mid-1962, that believed that a lightweight nuclear bomb with full fuzing option was possible and that such a program could be completed in a short time-span, possibly by 1965 or 1966. [1]
Development of the weapon that would become the B61 was authorized in December 1962. The justification for the program was that the new weapon would modernize the nuclear arsenal, improve the capability of aircraft and simplify the nuclear weapons inventory by replacing lower-yield versions of the B28 and B43 nuclear bombs. The desired production date was June 1965. [1]
The weapon was designated the TX-61 in January 1963. Due to the short time-scales, it was decided to make maximum use of off-the-shelf components such as those developed for the B57 nuclear bomb. Environmental conditions specified included an indefinite temperature range of −60 °F (−51 °C) to 160 °F (71 °C), shocks of up to 40g, and in flight temperatures of up to 275 °F (135 °C) for up to 40 minutes. Parachute deployment was specified to produce a maximum load of 255 g (2,500 m/s2). [1]
The weapon was designed and built by the Los Alamos National Laboratory in New Mexico. Production engineering began in 1965, with the first war-reserve B61-0 weapon accepted by the AEC in December 1966. However production was halted in May 1967 for design modifications to be made before resuming in January 1968. [1] Shot Flintlock Halfbeak in June 1966 may have been a full yield test of the weapon with other tests conducted between 1963 and 1968 at the Nevada Test Site. [7]
During testing, spin motors were added to the weapon to produce a spin of 5 revolutions per second. This was to improve stability and decoupling during high speed delivery. Three alternatives to the weapon were also explored for still-classified reasons. The first alternative was halted due to its similarity to the original TX-61 design, and the Department of Defense was unfavorable to the second option which halted its exploration. The TX-61 design was ordered to "proceed along the lines" of the third alternative in May 1964, though it is unclear what that means. [1]
Total production of all versions was approximately 3,155, of which approximately 540 remain in active service, 415 in inactive service and 520 are awaiting dismantlement as of 2012 [update] . [8]
13 versions of the B61 have been designed, known as Mod 0 through Mod 12. Of these, nine have entered production. Each shares the same physics package, with different yield options. The newest variant is the Mod 11, deployed in 1997, which is a ground-penetrating bunker busting weapon. The Russian Continuity of Government facility at Kosvinsky Kamen, finished in early 1996, was designed to resist US earth-penetrating warheads and serves a similar role as the American Cheyenne Mountain Complex. [9] [10] The timing of the Kosvinsky completion date is regarded as one explanation for U.S. interest in a new nuclear bunker buster and the declaration of the deployment of the Mod 11 in 1997: Kosvinsky is protected by about 1,000 feet (300 m) of granite. [11]
The B61 unguided bomb should not be confused with the MGM-1 Matador cruise missile, which was originally developed under the bomber designation B-61.
The B61 has been deployed by a variety of US military aircraft. US aircraft cleared for its use have included the B-1 Lancer, B-2 Spirit, B-52 Stratofortress, F/A-18 Hornet, A-6 Intruder, A-4 Skyhawk, F-111, F-15E Strike Eagle and F-16 Fighting Falcon and the F-35A. As part of NATO Nuclear Weapons Sharing, German and Italian Panavia Tornado aircraft can also carry B61s. [2] The B61 can fit inside the F-22 Raptor's weapons bays and will also be carried by the Lockheed Martin F-35 Lightning II. [12]
B61 tactical variants are deployed with NATO allies in Europe as part of the NATO Nuclear Weapons Sharing Program. [13] About 150 bombs are stored at six bases: Kleine Brogel in Belgium, Büchel Air Base in Germany, Aviano and Ghedi Air Base in Italy, Volkel Air Base in the Netherlands and Incirlik in Turkey. [14] In 2012, NATO agreed to improve the capabilities of this force with the increased accuracy of the Mod 12 upgrade and the delivery of the F-35 aircraft. [15] [16] This added a modest standoff capability to the B61. [17] The F-35A was certified to carry the B61-12 in October 2023, marking the first time a fifth generation fighter has been nuclear capable, and the first new platform in the NATO inventory to achieve such status since the early 1990s. [18]
The B61 is a variable yield ("dial-a-yield" colloquially) dual use tactical and strategic bomb equipped with Full Fuzing Option (FUFO) [1] designed for external carriage by high-speed aircraft. It has a streamlined casing capable of withstanding supersonic flight. The original B61-0 weapon was 141.6 inches (3.60 m) long, with a diameter of 13.3 inches (340 mm) and a basic weight of 715 pounds (324 kg) [1] with most later weapons having approximately the same dimensions and weight, [2] except for the Mod 11 version which has a weight of approximately 1,200 pounds (540 kg). [19]
The B61 is armed by ground-based personnel via an access panel located on the side of the bomb, which opens to reveal nine dials, two sockets, and a T-handle which manually triggers the "command disable" function. One of the sockets is for a MC4142 "strike enable" plug which must be inserted in order to complete critical circuits in the safety/arming and firing mechanisms. The other socket is the PAL connector, which has 23 pins marked with alphabetic letter codes. [20]
The B61 "command disable" mechanism functions as follows: after entering the correct three-digit numeric code it is then possible to turn a dial to "DI" and pull back a T-shaped handle which comes away in the user's hand. This action releases a spring-loaded firing pin which fires the percussion cap on an MC4246A thermal battery, powering it up. Electrical power from the thermal battery is sufficient to "fry" the internal circuitry of the bomb, destroying critical mechanisms without causing detonation. This makes the bomb incapable of being used. Any B61 which has had the command disable facility activated must be returned to Pantex for repair. [20]
The B61 can be set for airburst or groundburst detonation, and by free fall, retarded free fall or laydown delivery through the use of a parachute to slow down the weapon during release from the delivery aircraft. [1] Only the Mod 0 to 10 versions of the B61 are equipped with a parachute retarder (currently a 24-ft (7.3 m) diameter nylon/Kevlar chute). This offers the aircraft a chance to escape the blast in its retarded delivery modes, or allows the weapon to survive impact with the ground in laydown delivery mode. Contact preclusion can also be selected by the pilot. The weapon can be released at speeds up to Mach 2 and altitudes as low as 50 feet (15 m). In one of the weapon's laydown modes, it detonates 31 seconds after weapon release. [21]
The Mod 11 is a hardened penetration bomb with a reinforced casing and a delayed-action fuze; this allows the weapon to penetrate several metres into the ground before detonating, damaging fortified structures further underground. Developed from 1994, the Mod 11 went into service in 1997 replacing the older megaton-yield B53 bomb. About 50 Mod 11 bombs have been produced, their warheads converted from Mod 7 bombs. At present,[ when? ] the primary carrier for the Mod 11 is the B-2 Spirit. [19]
As of 2023, the B61 has 13 variants, referred to as Mod 0 through Mod 12.
Mod | Status | Date [Note 1] | Number produced | Role | Yields | PAL type | Notes |
---|---|---|---|---|---|---|---|
0 | Retired | 1/67 to 9/93 [22] | 500 [3] | Tactical [23] | 10 to 300 kt [3] | Cat B [7] | First production weapons |
1 | Retired | 2/69 to 9/89 [22] | 700 [3] | Strategic [23] | 10 to 340 kt [3] | None [7] [3] | |
2 | Retired | 6/75 to 9/94 [22] | 235 [3] | Tactical [23] | 10 to 150 kt [3] | Cat D [3] | |
3 | Active | 10/79 to present [22] | 545 [3] | Tactical [3] | 0.3, 1.5, 60, or 170 kt [2] | Cat F [3] | |
4 | Active | 8/79 to present [22] | 695 [3] | Tactical [3] | 0.3, 1.5, 10, or 45 kt [2] | Cat F [3] | |
5 | Retired | 6/77 to 9/93 [22] | 265 [3] | Tactical [24] [23] | 10 to 150 kt [7] | Cat D [3] | |
6 | Never entered production | 10 to 150 kt [3] | Cat D [3] | Conversion of Mod 0. [7] Cancelled February 1992. [22] | |||
7 | Active | 9/85 to present [22] | 600 [3] | Strategic | Allegedly 4 yield settings, including 10, or 340 kt. [2] | Cat D [3] | Conversion of Mod 1, conversion completed by April 1990 [7] |
8 | Never entered production | 10 to 150 kt [3] | Cat D [3] | Conversion of Mod 2 and Mod 5. [7] Cancelled February 1992. [22] | |||
9 | Never entered production | 10 to 300 kt [3] | Cat F [3] | Conversion of Mod 0. [7] Cancelled September 1991. [22] | |||
10 | Inactive stockpile | 8/90 to present [22] | 215 [3] | Tactical | 0.3, 5, 10, or 80 kt [2] | Cat F [3] | Remanufactured from retired Pershing II W85 warheads. [7] |
11 | Active | 12/96 to present [22] | 50 [3] | Strategic | Disputed, either same as Mod 7 [2] or 400 kt [3] | Cat F [3] | Conversion of Mod 7, earth penetrating weapon. [7] |
12 | Active | First production unit 11/21 [25] | 400 to 500 weapons planned | Tactical/Strategic [26] [27] [28] | 0.3, 1.5, 10, or 50 kt [3] [29] | Cat F [3] | Conversion of Mod 4. [3] To replace the Mods 3, 4 and 7. [25] |
13 | "a few dozen" | Tactical/Strategic | Allegedly 4 yield settings, including 10, or 340 kt. | Conversion of Mod 7, earth penetrating weapon. [7] |
A Sandia document on the dates of the development phases of the US nuclear stockpile describes the B61-3 as an "improved Mod 2 w/IHE" and the B61-4 as "same as Mod 3 ex. Hi-Y". [22]
A 1978 report on reducing or substituting beryllium in nuclear weapons noted that the B61-5 contained beryllium and that if the use of beryllium were to be restricted, the B61-5 could probably be replaced by the B61 Mod 3. [30]
The B61 Mod 6 and Mod 8 bombs were developed for use by the US Navy beginning in March 1987 [31] and cancelled at the end of the Cold War. [3] The weapons weighed 350 kilograms (770 lb), had a length of 3,597 millimetres (141.6 in) and a diameter of 338 millimetres (13.3 in), and were one-point safe, used insensitive high explosives (IHE) in their primary stages and utilized enhanced electrical safety (EES). [32]
The weapons were to be built by converting existing B61-0, −2 and −5 weapons into Mod 6 and 8 weapons and the weapons were to use B61-7 weapon parts where possible. [33] By mass, the largest deviations from the B61-7 were the Acorn assembly, MC4137 TSSG (trajectory sensing signal generator) and the JTA (described as "ballast for WR"). [34]
The weapon's computer was the MC4139 Programmer, two of which are used on independent channels, and is identical to the programmer used on the B61-7. [35] The MC3656 Main Battery is identical to the battery used on the B61-7 and is thermally operated, providing 120 seconds of power for the weapon, [36] but initial power is supplied by the MC2238 Pulse Batteries which are activated by the weapon's pullout switches during separation from the aircraft. [37]
The weapon contained two neutron generators for initiation, [38] used a 2400 volt 0.6 μF capacitor for neutron generator firing and a 3300 volt 2.0 μF capacitor for the firing set. [39] If neither the radar fuze or the contact crystals actuated, the weapon would detonate at 120 seconds from arming. [40]
The weapons were to initially use the MC4175 Trajectory Sensing Signal Generators which are identical to the TSSG found in the B61-7, but starting from 1991, the Mod 6 was to get a new MC4137 Trajectory Sensing Signal Generator. The MC4175 stored the arming signal for the trajectory stronglink in its memory, so it featured a pair of rolamite acceleration switches designed to prevent the possibility of the signal being transferred to the stronglink before the rolamites were actuated by the spinning of the weapon in flight. [41] The MC4137 instead is provided the unique signal from the MC4139 Programmer, which stores it in a volatile memory that erases after approximately seven seconds of lost power, meaning that without intent from the MC4139 and continuously applied power the MC4137 does not know how to arm the safelink. [42]
The weapon was to feature a number of weapon stronglinks. Stronglinks are part of the weapon's safety systems and are designed to be robust enough that they can survive abnormal environments long enough for the weapon's weaklinks to fail. This requires weak and stronglinks to be colocated so they are exposed to the same environmental conditions in an accident. [43]
The first stronglink was the MC2969 Intent Stronglink Switch which was also used on the B61-3, −4 and −7, W78, W80 and B83 weapons. The MC2969 consisted of a 14-pin ceramic-insulated bank of switches that would close upon the receipt of the proper intent unique signal (IUQS) to its electromechanical decoder. Receipt of the wrong signal would lock the MC2969 in the open position until a specific unlock signal was received. [44]
The second stronglink was the MC2935 Trajectory Stronglink Switch of which there were two, one for each channel of the weapon's firing set. Like the MC2969, it mechanically locked if it received the wrong input signals, but unlike the MC2969 it could only be manually unlocked, which could only take place at the factory. [45] Signals for the MC2935 come from either of the two MC4175s or the MC4137 Trajectory Sensing Signal Generators. [38]
A third stronglink existed inside the first exclusion region of the weapon and was involved in weapon arming. Details of the system are still classified. [46]
As of 2013 the Pentagon saw the B83 nuclear bomb as a "relic of the Cold War," believing that deploying a megaton-yield gravity bomb, the highest level nuclear weapon left in the U.S. inventory, to Europe was "inconceivable" at this point. It can also only be carried by the B-2 bomber, and integrating it onto additional aircraft would be costly. The Mod 12 upgrade is being pursued as a forward-deployed tactical/strategic nuclear weapon to protect NATO and Asian allies since it can be used from dual-capable fighter aircraft, as well as planned to arm the F-35 and B-21 Raider, and its lower yield options make it more flexible with less collateral effects. Recapitalizing the B61 is hoped to lead to the retirement of the B83, resulting in the elimination of the last megaton-yield U.S. bomb and leave the B61-series as the only U.S. gravity nuclear bomb. [47]
In 2013, the Pentagon and NNSA stated that if B61 refurbishment did not begin by 2019, components in the existing weapons could begin to fail. [48] In 2013 Tom Collina of the Arms Control Association said that the new development could complicate arms control efforts with Russia. [49]
In 2014, Congress slashed funding for the project and called for alternates to be studied. [50] In January 2014, former Air Force Chief of Staff Norton A. Schwartz stated that the Mod 12 nuclear bomb upgrade would have enhanced accuracy and a lower yield with less fallout compared to previous versions of the weapon. Accuracy has not been a guarantee for air-dropped nuclear weapons, so consequently large warheads were needed to effectively impact a target; the Mod 11 nuclear earth-penetrator is accurate to 110–170 meters from the desired detonation location, so it requires a 400-kiloton warhead. The Mod 12 is accurate to 30 meters from a target and only requires a 50-kiloton warhead. Schwartz believes that greater accuracy would both improve the weapon and create a different target set it can be useful against. An example is the higher-yield Mod 11's role of attacking underground bunkers that need a ground burst to create a crater and destroy it through the shockwave. A 50-kiloton yield detonating on the ground produces a crater with a radius of 30–68 meters, depending on the density of the surface, effectively putting the bunker within the circular error probability. [51]
In 2014 critics said that a more accurate and less destructive nuclear weapon would make leaders less cautious about deploying it, while Schwartz said it would deter adversaries more because the U.S. would be more willing to use it in situations where necessary. The improved accuracy would make it more effective than the previous Mod 3/4 currently deployed to the continent. F-16 and Panavia Tornado aircraft cannot interface with the new bomb due to electronic differences, but NATO countries buying the F-35 would be able to utilize it. [51] The first flight test for an inert Mod 12 was conducted in 2015, with a second successful test in August 2017. [52] [53]
Despite claims the Mod 12 has an earth penetrating capability, [54] the weapon does not have the reinforced structure like that of the Mod 11, which is required to function as an earth penetrating weapon. The Mod 11 will be retained in service for the ground penetrating mission. [55]
The Mod 12 Life Extension Program continued in 2018 and on 29 June 2018 two successful non-nuclear system qualification flight tests at Tonopah Test Range were reported. [56] In October 2018, the Mod 12 guided tail-kit assembly received Milestone C approval to enter the production phase; the TKA went through the traditional test program in under 11 months, achieving a 100% success rate for all 31 bomb drops. [57] The B61-12 nuclear bomb completed its successful flight tests with the US Air Force's F-15E in June 2020. It was dropped from above 25,000ft and was in the air for approximately 55 seconds before hitting the target. [58]
The first B61-12 bomb was produced in November 2021. The weapon replaces the B61 mod 3, mod 4 and mod 7 bombs while the B61-11 will be retained in the stockpile. It is expected that the LEP will extend the B61's life by at least 20 years. [25] Politico reported in October 2022 that the US military planned to accelerate the deployment of the Mod 12 in Europe. [59] This drew criticism from the Russian Deputy Minister of Foreign Affairs Alexander Grushko, who accused the US government of "reducing the nuclear threshold" with the weapon's increased accuracy. [59]
The F/A-18E/F Super Hornet is not listed as a future platform. [60]
Initially, the NNSA Stockpile Stewardship and Management Plan anticipated Phase 1 development for the B61 Mod 13 Life Extension Program (LEP) beginning in 2037 with first production of the weapon in 2050, [22] but in 2023 plans were announced to produce a new gravity bomb similar to that of the B61-12, but having a high yield similar to that of the B61-7, named the B61 Mod 13. [61] This discards plans for the Mod 13 to be a future Mod 12 LEP. [62] It is planned that for each B61-13 produced, one fewer B61-12 is to be produced, therefore not increasing the planned number of new B61 bombs; [63] defense officials indicated only "a few dozen" B61-13s may be produced. The new bomb will be carried by the B-21 Raider, but it is not planned to be deployed on the F-35. [64]
The Federation of American Scientists have accused the weapon of being a "political bomb", introduced to finally retire the B83-1 nuclear bomb, whose retirement has been blocked by hardliners. [62]
A W61 Earth Penetrator Warhead (EPW) with a yield of 340 kilotonnes of TNT (1,400 TJ) was developed for the AGM-129 Advanced Cruise Missile and the MGM-134 Midgetman small ICBM. The weapon entered Phase 1 initial development in January 1985 and phase 4 production engineering in September 1992 before being cancelled in December of that year. [3] [22] [65]
In the Advanced Cruise Missile role, the weapon was to replace aging B53 bombs, but after the W61 cancellation the role was filled by the B61-11 bomb. [65]
A declassified technical report on the automation of pit handling at Pantex indicates that the B61-2 and B61-5 share a common pit design, as do the B61-3, B61-10 and W85. The B61-0 and B61-4 do not share a pit with any other weapon. As the B61-7 was a retrofit of the B61-1 and the B61-11 was a retrofit of the B61-7, they presumably share a common pit. [66]
In May 2010 the National Nuclear Security Administration asked Congress for $40 million to redesign the bomb to enable the Lockheed Martin F-35 Lightning II to carry the weapon internally by 2017. [67] This version is designated Mod 12. [68] The four hundred Mod 12 bombs will be used by both tactical aircraft (such as the F-35) and strategic aircraft (such as the B-2) and the Tail Subassembly (TSA) will give them Joint Direct Attack Munition levels of accuracy, allowing the fifty kiloton warhead to have strategic effects from all carrying aircraft. [69] However, refitting the 400 weapons is now expected to cost over $10 billion. [70] The Mod 12 tail assembly contract was awarded to Boeing on November 27, 2012 for $178 million. [71] Boeing will use their experience with the Joint Direct Attack Munition to yield JDAM-equivalent accuracy in a nuclear bomb. [72] This contract is only the first part of the billion-dollar expense of producing and applying the tail kits, over and above the $10 billion cost to refurbish the warheads. [73] The Mod 12 uses an internal guidance system and can glide to its target. On 1 July 2015, the National Nuclear Security Administration (NNSA) conducted the first of three flight tests of the Mod 12 tail kit assembly. [53]
According to the Federation of American Scientists in 2012, the roughly 400 B61-12s will cost $28 million apiece. [6]
A warhead is the section of a device that contains the explosive agent or toxic material that is delivered by a missile, rocket, torpedo, or bomb.
A nuclear bunker buster, also known as an earth-penetrating weapon (EPW), is the nuclear equivalent of the conventional bunker buster. The non-nuclear component of the weapon is designed to penetrate soil, rock, or concrete to deliver a nuclear warhead to an underground target. These weapons would be used to destroy hardened, underground military bunkers or other below-ground facilities. An underground explosion releases a larger fraction of its energy into the ground, compared to a surface burst or air burst explosion at or above the surface, and so can destroy an underground target using a lower explosive yield. This in turn could lead to a reduced amount of radioactive fallout. However, it is unlikely that the explosion would be completely contained underground. As a result, significant amounts of rock and soil would be rendered radioactive and lofted as dust or vapor into the atmosphere, generating significant fallout.
A bunker buster is a type of munition that is designed to penetrate hardened targets or targets buried deep underground, such as military bunkers.
The B83 is a variable-yield thermonuclear gravity bomb developed by the United States in the late 1970s that entered service in 1983. With a maximum yield of 1.2 megatonnes of TNT (5.0 PJ), it has been the most powerful nuclear weapon in the United States nuclear arsenal since October 25, 2011 after retirement of the B53. It was designed by Lawrence Livermore National Laboratory.
The B43 was a United States air-dropped variable yield thermonuclear weapon used by a wide variety of fighter bomber and bomber aircraft.
The Mk/B53 was a high-yield bunker buster thermonuclear weapon developed by the United States during the Cold War. Deployed on Strategic Air Command bombers, the B53, with a yield of 9 megatons, was the most powerful weapon in the U.S. nuclear arsenal after the last B41 nuclear bombs were retired in 1976.
The B28, originally Mark 28, was a thermonuclear bomb carried by U.S. tactical fighter bombers, attack aircraft and bomber aircraft. From 1962 to 1972 under the NATO nuclear weapons sharing program, American B28s also equipped six Europe-based Canadian CF-104 squadrons known as the RCAF Nuclear Strike Force. It was also supplied for delivery by UK-based Royal Air Force Valiant and Canberra aircraft assigned to NATO under the command of SACEUR. In addition, certain U.S. Navy carrier based attack aircraft such as the A3D Skywarrior, A4D Skyhawk, and A3J Vigilante were equipped to carry the B28.
The B-41 was a thermonuclear weapon deployed by the United States Strategic Air Command in the early 1960s. It was the most powerful nuclear bomb ever developed by the United States, with a maximum yield of 25 megatons of TNT. A top secret document, states “The US has stockpiled bombs of 9 MT and 23 MT...” which would likely be referring to the B-41's actual yield(s). The B-41 was the only three-stage thermonuclear weapon fielded by the U.S.
Laydown delivery is a mode of delivery found in some nuclear gravity bombs: the bomb's descent to the target is slowed by parachute so that it lands on the ground without detonating. The bomb then detonates by timer some time later. Laydown delivery requires the weapon to be reinforced so that it can survive the force of impact.
The W54 was a tactical nuclear warhead developed by the United States in the late 1950s. The weapon is notable for being the smallest nuclear weapon in both weight and yield to have entered US service. It was a compact implosion device containing plutonium-239 as its fissile material, and in its various versions and mods it had a yield of 10 to 1,000 tons of TNT.
The W80 is a low to intermediate yield two-stage thermonuclear warhead deployed by the U.S. enduring stockpile with a variable yield ("dial-a-yield") of 5 or 150 kilotonnes of TNT.
The W76 is an American thermonuclear warhead, designed for use on the UGM-96 Trident I submarine-launched ballistic missiles (SLBMs) and subsequently moved to the UGM-133 Trident II as Trident I was phased out of service. The first variant, the W76 mod 0 (W76-0) was manufactured from 1978 to 1987, and was gradually replaced by the W76 mod 1 (W76-1) between 2008 and 2018, completely replacing the Mod 0 in the active stockpile. In 2018 it was announced that some Mod 1 warheads would be converted to a new low-yield W76 mod 2 (W76-2) version. The first Mod 2 warheads were deployed in late 2019.
The W85 was a thermonuclear warhead developed by the United States of America to arm the Pershing II missile. It was a variable yield device with a selectable yield of 0.3, 5, 10 or 80 kilotonnes of TNT.
The MGM-134A Midgetman, also known as the Small Intercontinental Ballistic Missile, was an intercontinental ballistic missile developed by the United States Air Force. The system was mobile and could be set up rapidly, allowing it to move to a new firing location after learning of an enemy missile launch. To attack the weapon, the enemy would have to blanket the area around its last known location with multiple warheads, using up a large percentage of their force for limited gains and no guarantee that all of the missiles would be destroyed. In such a scenario, the U.S. would retain enough of their forces for a successful counterstrike, thereby maintaining deterrence.
A tactical nuclear weapon (TNW) or non-strategic nuclear weapon (NSNW) is a nuclear weapon that is designed to be used on a battlefield in military situations, mostly with friendly forces in proximity and perhaps even on contested friendly territory. Generally smaller in explosive power, they are defined in contrast to strategic nuclear weapons, which are designed mostly to be targeted at the enemy interior far away from the war front against military bases, cities, towns, arms industries, and other hardened or larger-area targets to damage the enemy's ability to wage war. As of 2024, no tactical nuclear weapons have ever been used in combat.
The Mark 4 nuclear bomb was an American implosion-type nuclear bomb based on the earlier Mark 3 Fat Man design, used in the Trinity test and the bombing of Nagasaki. With the Mark 3 needing each individual component to be hand-assembled by only highly trained technicians under closely controlled conditions, the purpose of the Mark 4 was to produce an atomic weapon as a practical piece of ordnance. The Mark 4 Mod 0 entered the stockpile starting March 19, 1949 and was in use until 1953. With over 500 units procured, the Mark 4 was the first mass-produced nuclear weapon.
The W79 Artillery-Fired Atomic Projectile (AFAP), also known as XM753 (Atomic RA), was an American nuclear artillery shell, capable of being fired from any NATO 8 in (203 mm) howitzer e.g. the M115 and M110 howitzer. The weapon was produced in two models; the enhanced radiation (ERW) W79 Mod 0 and fission-only W79 Mod 1. Both were plutonium-based linear-implosion nuclear weapons.
The B61 Family is a series of nuclear weapons based on the B61 nuclear bomb.
Volkel Air Base is a military airbase used by the Royal Netherlands Air Force (RNLAF) - Dutch: Koninklijke Luchtmacht (KLu), located near the village of Volkel, Netherlands. Located in the north-east corner of the province of North Brabant, the air base is home to one F-16 Fighting Falcon squadron, No 312 and a F-35 squadron No 313 and a maintenance, logistical, base Squadron for the RNLAF.
Of the LASL devices currently entering stockpile, the B61-3 and B61-4 do not contain beryllium. The B61-5 does, but the B61-3 could probably be substituted for it.
ACM[EPW]/W61 schedule for which Phase 2A has been completed (Phase 3 is planned in the next few months) and will permit the removal of the B53 from standing alert.
Media related to B61 nuclear bomb at Wikimedia Commons