Overview | |
---|---|
Official name | Clyde Tunnel |
Location | River Clyde, Linthouse and Whiteinch in Glasgow |
Coordinates | 55°52′07″N4°19′52″W / 55.86867°N 4.33115°W |
Route | part of A739 |
Operation | |
Opened | 3 July 1963 |
Operator | Glasgow City Council |
Traffic | 65,000 |
Toll | Free |
Technical | |
Design engineer | Sir Alan Muir Wood of Halcrow |
Length | 762 m (2,500 ft) (northbound and southbound) [1] |
No. of lanes | 4 |
Tunnel clearance | 17 ft 6 in (5.3 m) [2] |
The Clyde Tunnel is a crossing beneath the River Clyde in Glasgow, Scotland for road traffic, cyclists and pedestrians. Two parallel tunnel tubes connect the districts of Whiteinch to the north and Govan to the south in the west of the city.
Efforts to improve the transport infrastructure of Glasgow post-World War II were hit by the problem of crossing the Clyde. Downstream of Jamaica Street in the city centre, it was perceived to be impossible to build a bridge due to the prevalence of shipping. The solution — to build a tunnel beneath the river — was not a new one, with the Harbour Tunnel at Finnieston having been built in the 1890s. However, the Clyde Tunnel project was to be built in the boom of the car era and would be a much larger project. It was given the green light in 1948 but financial difficulties prevented work from beginning until 1957. [3]
Construction began in 1957, with tunnelling shields, based on Marc Isambard Brunel's design used for the Thames Tunnel a century earlier, used to dig the two tunnels. [1] The tunnels were cut perfectly circular with the road deck sitting a third of the way up. [4] Under each road deck is the pedestrian/cycle tunnel and ventilation ducts. 16 miners operated the shield working shifts in a compressed air environment to ensure that the rock and the river above did not collapse into the tunneling area. The digging itself would be done only with great difficulty due to the geology of the area, hard rock sitting under a soft silt layer beneath the river.
The techniques for decompression after a period of working in a high pressure atmosphere had not been perfected at this time and – also owing to the prevalence of workers refusing to go through the decompression sequence given the length of time required (around an hour) – there were a number of cases of decompression sickness diagnosed as a result, resulting in two fatalities. [5] Work on the tunnel was halted for a time after an explosion when compressed air escaped through the tunnel lining into the river, flushing outward in a fountain.
The first completed tunnel tube, for northbound traffic, was eventually opened by Elizabeth II on 3 July 1963, [6] with the southbound tunnel opening in March 1964. The total cost of the project was £10 million. (equivalent to £304,530,000in 2023). [7] By this time, the migration of port facilities downstream to the deeper waters of the Firth of Clyde and improvements in engineering technology had allowed the consideration of bridges downstream of the city centre, namely the Kingston Bridge and, much further downstream than the Tunnel, the Erskine Bridge.
The road tunnels are each 762 metres (2,500 feet) long with a gradient approaching 6% or 1:16. The width of the river at this point is 123 metres (404 ft). Each road tunnel carries two lanes of traffic as part of the A739 road, and are completely separate except for a very small crossover passage between the road tunnels at the nadir (barely large enough for a single pedestrian). They are monitored and controlled from the two Portal towers, one at each end of the tunnel, where CCTV monitors the entirety of the tunnel. Beneath the road tunnel decks run foot and cycle tunnels; and below those, the tunnels' services.
Both tunnels are open to pedestrians in both directions. The eastern tunnel is open to cyclists going southbound, and the western tunnel to cyclists going northbound. In 2008, CCTV secure entry systems were installed at the portals of these tunnels in order to reduce crime and anti-social behaviour in the tunnels. [8]
The estimate for traffic levels in the tunnel was between 9,000 and 13,000 vehicles per day during construction; on the first day of opening, 22,000 vehicles used the tunnel. Current estimates for traffic levels are around 65,000 vehicles per day. These unanticipated high volumes of traffic have increased the wear rate for the tunnel, causing it to close repeatedly for repair and renovation work, which has disrupted traffic in the area for over a decade, and has arguably led to the increase in traffic causing similar problems on the Kingston Bridge.
The more recent repairs, costing as much as the initial outlay for construction, involved installing a second, modern, fireproof layer, enabling the tunnel to meet European safety standards after St Gotthard and Mont Blanc tunnel fires, along with new air extraction systems and new lighting. Work began in March 2005 and was scheduled to last until at least April 2006, with one of the tunnels closed during off-peak hours (19:00 to 07:00 daily). However, problems that were encountered meant the work was only completed in 2010.
The roadworks coincided with the "Hold Your Breath" project which aimed to add an artistic experience to travel through the tunnel. The pedestrian tunnel also had its years of graffiti removed as part of a beautification project, but it was often redone soon after being removed.
A popular game amongst local children, and some adults, is attempting to hold one's breath for the duration of the journey by motorized vehicle through the Clyde Tunnel. This is possible due to the short length of the tunnel – a car travelling at the 30 mph (50 km/h) limit takes 57 seconds to pass through. Success is hampered by snarl-ups (particularly at the interchange on the north end) slowing traffic. The breath-holding game was the subject of Scottish artist Roderick Buchanan's video Gobstopper, for which he won the Beck's Futures art prize in 2000. [9]
The Leonard P. ZakimBunker Hill Memorial Bridge is a cable-stayed bridge completed in 2003 across the Charles River in Boston, Massachusetts. It is a replacement for the Charlestown High Bridge, an older truss bridge constructed in the 1950s.
The Dartford–Thurrock River Crossing, commonly known as the Dartford Crossing and until 1991 the Dartford Tunnel, is a major road crossing of the River Thames in England, carrying the A282 road between Dartford in Kent in the south and Thurrock in Essex in the north.
The Blackwall Tunnel is a pair of road tunnels underneath the River Thames in east London, England, linking the London Borough of Tower Hamlets with the Royal Borough of Greenwich, and part of the A102 road. The northern portal lies just south of the East India Dock Road (A13) in Blackwall; the southern entrances are just south of The O2 on the Greenwich Peninsula. The road is managed by Transport for London (TfL).
The Bayonne Bridge is an arch bridge that spans the Kill Van Kull between Staten Island, New York and Bayonne, New Jersey. It carries New York State Route 440 and New Jersey Route 440, with the two roads connecting at the state border at the river’s center. It has the sixth-longest steel arch mainspan in the world, the longest in the world at the time of its completion. The bridge is also one of four connecting New Jersey with Staten Island; the other two roadway bridges are the Goethals Bridge in Elizabeth and Outerbridge Crossing in Perth Amboy, and the rail-only span is the Arthur Kill Vertical Lift Bridge, all of which cross the Arthur Kill.
The 14th Street bridges refers to the three bridges near each other that cross the Potomac River, connecting Arlington, Virginia and Washington, D.C. Sometimes the two nearby rail bridges are included as part of the 14th Street bridge complex. A major gateway for automotive, bicycle and rail traffic, the bridge complex is named for 14th Street, which feeds automotive traffic into it on the D.C. end.
The Kingston Bridge is a balanced cantilever dual-span ten lane road bridge made of triple-cell segmented prestressed concrete box girders crossing the River Clyde in Glasgow, Scotland.
Interstate 395 (I-395) in Virginia and Washington, D.C., is a 13.79-mile-long (22.19 km) spur route of I-95 that begins at an interchange with I-95 in Springfield and ends at an interchange with US Route 50 (US 50) in Northwest Washington, D.C. It passes underneath the National Mall near the US Capitol and ends at a junction with US 50 at New York Avenue, roughly one mile (1.6 km) north of the 3rd Street Tunnel. Despite its proximity to I-395 in Maryland, the route is unrelated and unconnected.
The Erskine Bridge is a multi span cable-stayed box girder bridge spanning the River Clyde in west central Scotland. The bridge connects West Dunbartonshire with Renfrewshire and can be used by all types of motor vehicles, cyclists and pedestrians. As well as crossing the Clyde, the bridge also crosses the Forth and Clyde Canal and the North Clyde railway line. A small part of Kilpatrick railway station is situated underneath the bridge at the north side. The bridge is part of the A898 road. On completion the bridge replaced the Erskine to Old Kilpatrick ferry service.
The George Massey Tunnel is a highway traffic tunnel in the Metro Vancouver region of southwestern British Columbia carrying Highway 99 beneath the south arm of the Fraser River. It is located approximately 20 km (12.4 mi) south of the city centre of Vancouver, British Columbia, and approximately 30 km (18.6 mi) north of the Canada–United States border at Blaine, Washington.
The High Level Bridge is a bridge that spans the North Saskatchewan River in Edmonton, Alberta, Canada.
The Birmingham Bridge is a bowstring arch bridge that is located in Pittsburgh, Pennsylvania and spans the Monongahela River.
The Ohio River Bridges Project (ORBP) was a 2002–2016 transportation project in the Louisville metropolitan area primarily involving the construction of two Interstate highway bridges across the Ohio River and the reconstruction of the Kennedy Interchange near downtown Louisville.
The Nowra Bridge is a road bridge that carries the Princes Highway over the Shoalhaven River, at Nowra, New South Wales, Australia. The bridge joins the main area of Nowra to North Nowra and Bomaderry.
The Newhall Pass interchange is a highway interchange at Newhall Pass in Southern California, United States. It is south of the city of Santa Clarita and north of the Los Angeles neighborhoods of Granada Hills and Sylmar. It connects Interstate 5 with California State Route 14. It is officially named in the memory of Los Angeles Police officer Clarence Wayne Dean, who was killed when he was unable to stop before going over a collapsed section of the interchange immediately following the 1994 Northridge earthquake.
The Carl E. Stotz Memorial Little League Bridge, formerly known as the Market Street Bridge, carries approximately 27,700 vehicles a day on U.S. Route 15 over the West Branch Susquehanna River between Williamsport and South Williamsport in Lycoming County, Pennsylvania, in the United States. It is the seventh bridge on the site and was built at a cost of over $60,000,000.
The U.S. 40 and 59 Bridges are twin multi-beam girder bridges over the Kansas River at Lawrence, Kansas. The west bridge carries two lanes of southbound traffic, connecting to Vermont Street, while the east bridge carries two lanes of northbound traffic from Massachusetts Street. Both bridges converge on the north end to become North 2nd Street. The east bridge is also the third bridge to be built at this location.
The Walterdale Bridge is a through arch bridge across the North Saskatchewan River in Edmonton, Alberta, Canada. It replaced the previous Walterdale Bridge in 2017. The new bridge has three lanes for northbound vehicular traffic and improved pedestrian and cyclist crossings.
The Temse Bridge crosses the Scheldt at Temse, a small town approximately 25 km southwest of Antwerp. Between 1955 and 2009 the 365 m (1,197.5 ft) bridge was the longest in Belgium. The old bridge lost that distinction to the New Schelde Bridge which runs parallel to it, and has a length of 374 m (1,227.0 ft).
The Samuel-De Champlain Bridge, colloquially known as the Champlain Bridge, is a cable-stayed bridge design by architect Poul Ove Jensen and built to replace the original Champlain Bridge over the Saint Lawrence River in Quebec, between Nuns' Island in the borough of Verdun in Montreal and the suburban city of Brossard on the South Shore. A second, connected bridge links Nuns' Island to the main Island of Montreal. It is the busiest bridge in the country with more cars flowing into it than any other bridge.
A cycling tunnel or bicycle tunnel is a tunnel designed specifically for cyclists, and can be an essential part of cycling infrastructure. Due to speed differences, it is desirable that cyclists are separated from faster-moving traffic such as motor vehicles and slower moving traffic such as pedestrians. To make users feel safe, tunnels should also have an open design and good lighting, It can also be beneficial to have an artificial horizon by designing one-third of the tunnel situated above ground level, and natural lighting at the ends of the tunnel. Some tunnels are also ornamented with street art.
{{cite journal}}
: CS1 maint: unfit URL (link)Media related to Clyde Tunnel at Wikimedia Commons