Location | Gauteng |
---|---|
Launched | December 3, 2013 |
Discontinued | April 12, 2024 |
Currency | Rand |
Website | sanral.co.za |
e-toll (in South Africa) consisted of the electronic toll collection (ETC) processes employed by South Africa's roads agency SANRAL on selected toll roads or toll lanes in the Gauteng province, subject to the Sanral Act of 1998. SANRAL derives its income both from toll income and the national fiscus, while initial capital outlay for large projects are funded by open market bond issues. [1] In total SANRAL manages 13,000 km of non-toll roads in South Africa, besides the majority (or 2,952 km) [2] of its toll roads, including 187 km of Gauteng's freeways which were subject to e-toll. [3]
The two main ETC methods were "Boom-down" electronic toll collection and open road tolling (ORT). The systems were designed to fund the R20 billion highway upgrade program (GFIP or Gauteng Freeway Improvement Project) which was implemented in 2007 and largely completed by April 2011. [4] Open road tolling went live in Gauteng province on December 3, 2013, [5] when the province had some 3.5 million registered vehicles. [1]
In October 2022, it was announced that e-tolling on Gauteng freeways would be shut down. [6] [7] [8] It was also announced that customers who paid their e-tolls would be refunded their money. [9] It was agreed that the R20 billion needed by SANRAL to pay back creditors for the Gauteng Freeway Improvement Project (GFIP) would be granted to them by the Gauteng Provincial Government (30%) and the National Treasury of South Africa (70%). [7]
However, by 2023, e-tolls were not yet officially shut down on the Gauteng freeways by the Ministry of Transport (they still charged motorists). [10] [11] [12] The South African government then announced on 28 March 2024 [13] that e-tolls in Gauteng would officially be scrapped and gantries would be disconnected and dismantled by the end of the 11th of April 2024, at midnight. [14] [15]
Vehicles are identified electronically without any cash transactions taking place on the road or highway. [1] Vehicle identification is facilitated by an e-tag or a vehicle license plate number which is recorded by overhead cameras installed on gantries, and interpreted by computer. Electronic Toll Collection (Pty) Ltd (ETC), a subsidiary of Kapsch TrafficCom AG, [16] is the contracted company that designed, built and is still operating the system, [17] and in turn oversees the Transaction Clearing House (TCH) which oversees customer accounts, and the Violation Processing Centre (VPC) which would follow procedures against payment defaulters. [18]
Initially, e-tagged road users received a 48 percent discount on tariffs and their monthly bill was capped. Owning an e-tag is however not compulsory, [19] and consequently does not require any enforcement. [20] Tariffs were increased in line with inflation, [21] but the May 2015 amendments entailed significant reductions. Bills were mailed to road users who were not registered on the eTag system. During the review of the system and the subsequent consultation process, Sanral delayed in sending final demands to those who had not settled their accounts. [22]
At conventional toll plazas, in lanes marked with the e-tag sign, overhead equipment register and verify the details of an e-tag in a slow-moving vehicle, and an amount is deducted from the road user's toll account, whereupon the boom lifts, [1] or a light turns green.
The multi-lane free flow ETC system operated without any toll booths. Cameras and other sensors mounted on overhead gantries register either the e-tag or the vehicle license plate number, and an amount was deducted from an eTag registered road user's account. For verification each vehicle was photographed from above for length classification, with additional photos of the front and rear number plates. [1] The 43 overhead gantries are spaced at about 10 km intervals on the N1, N3, N12 and R21 highways. [18]
The highways that were subject to e-toll include the entire Johannesburg Ring Road (N1 Western Bypass; N3 Eastern Bypass; N12 Southern Bypass), the entire freeway section of the R21 (from Pretoria to the Rietfontein Interchange in Boksburg North), the Danie Joubert Freeway (the N1 from the Proefplaas Interchange east of Pretoria CBD to the Brakfontein Interchange in Centurion), the N1 section of the Ben Schoeman Freeway (Brakfontein Interchange in Centurion to Buccleuch Interchange in Sandton), the N12 section from the George Bizos Interchange in Bedfordview to the R51 Daveyton interchange and the N3 section from the Elands Interchange in Germiston to the R554 Heidelberg Road Interchange in Alberton.
The system was widely denounced, [18] [24] [25] [26] and poor compliance affected SANRAL's credit rating. [27] A public coalition known as 'Opposition to Urban Tolling Alliance', later renamed Organisation Undoing Tax Abuse (OUTA), launched initiatives to frustrate e-tolling's implementation, and a trade union, [28] law firm [29] and church [30] were among the dissenting voices. [18] OUTA believed the system to be unlawful and approached the high court in 2012, which ruled that the GFIP was lawfully instituted, [31] but denied SANRAL a punitive costs order. [30] In 2014 OUTA launched the Rule of Law campaign and promised to challenge the legality of procedures against payment defaulters.
In the first six months the overdue toll fees of unregistered road users accrued to R1 billion, [24] and the Gauteng government acknowledged the dissatisfaction of motorists. [32] Its transport MEC, Ismail Vadi, however clarified that e-tolling in the province would remain, though a provincial fuel levy, provincial tax or shadow tolling may be considered as alternatives for future upgrade projects. [25] Gauteng relied on significant fuel levy increases up to 2014. [33]
In 2014 the Gauteng premier David Makhura established an advisory panel to review the socio-economic impact of e-tolling, [31] [34] [24] [35] [36] but no review of the GFIP was anticipated. [25] In the hearings opposition parties heaped scorn on the system, [37] [38] while the ruling party seemed divided on the matter. [39]
The 2015 consultation process led by deputy president Cyril Ramaphosa concluded GFIP policy and financing matters. [27] The government accepted the advisory panel's report which stated that the GFIP had benefited the province's economy by reducing travel times, improving fuel efficiency, reducing vehicle operating costs and by additional logistical efficiencies. [40]
In November 2015, a news report [41] indicated that the camera systems on the gantries did not have calibration certificates required by the National Regulator for Compulsory Specifications. This may have implications with regards to tolls which were charged using the number plate recognition system only (i.e. no transponder/e-tag).
Soon after the Gauteng ANC established a task team in August 2018 to evaluate the scrapping of e-tolls, transport minister Blade Nzimande confirmed that e-tolls would remain to service the R67 billion still owed for constructing and repairing the freeways. [42]
In October 2022, it was announced that e-tolling on Gauteng freeways would be shut down. [6] [7] [8] It was also announced that customers who paid their e-tolls would be refunded their money. [9] It was agreed that the R20 billion needed by SANRAL to pay back creditors for the Gauteng Freeway Improvement Project (GFIP) would be granted to them by the Gauteng Provincial Government (30%) and the National Treasury of South Africa (70%). [7]
However, by 2023, e-tolls were not yet officially shut down on the Gauteng freeways by the Ministry of Transport (they still charged motorists). [10] [11] [12] The South African government then announced on 28 March 2024 [13] that e-tolls in Gauteng would officially be scrapped and gantries would be disconnected and dismantled by the end of the 11th of April 2024, at midnight. [14] [15]
In December 2014, the Transport Department published amendments to e-tolling legislation which extended e-tolling to motorists not licensed in South Africa, extended to 60 (rather than 32) days the period in which invoices must be sent, and provided for the keeping of a register of all e-toll transactions. [43] Public transport remained exempt.
In May 2015 Cyril Ramaphosa announced a tariff decrease to 30c/km for light vehicles, capped at R225 per month (with or without an e-tag). Formerly e-tag holders paid 30c/km, capped at R450 per month, and those without an e-tag, 58c/km. Visitors to Gauteng would be exempt for the first 30 gantries passed per annum, whereafter normal fees would apply to these and additional gantries. [38] [44] For a limited period, e-toll fees in arrears were payable at 70c/km rather than R1.74/km, and all e-toll could henceforth be paid at post offices or online, in addition to Sanral kiosks. Individual accounts were also integrated with the eNaTIS system. [38] [44] Ramaphosa indicated that the e-toll system would be subsidized to an amount of R700 million per annum from the state's eventuality fund, [44] to service a backlog which accrued to R197 billion by 2015. [40]
e-road compliant users | distance tariffs | capped at | capped at |
---|---|---|---|
vehicle type | May 2015 | May 2015 | March 2019 [45] |
Motorcycle | 18c/km | R125 per month | R153 per month |
Light motor vehicle | 30c/km | R225 per month | R276 per month |
Medium heavy vehicle | 75c/km | R875 per month | R1,073 per month |
Large heavy vehicle | R1.50/km | R2,900 per month | R3,556 per month |
ETC issued 15,505 summonses on motorists between 2015 and 2018, of which 24% were actually served on the payment defaulters. This proved largely ineffectual as R10.2 million was recovered from 2016 to 2018, at a cost of R4.6 million to ETC in legal fees. [3] Consequently R1.6 billion of non-toll business was diverted to support the e-toll system.
By October 2018 the outstanding debt of Gauteng motorists approached R11 billion, and Sanral issued a final warning that they would start serving court summonses in bulk. [3] By employing the eNaTIS system, Sanral started obtaining default judgments in 2019 against defaulters who ignored these summonses. [46] As a state institution Sanral is not obligated to inform motorists of the judgements, and motorists consequently discover their blacklisted credit rating when applying for loans.
OUTA deemed this remedy unethical as they were in an advanced stage of a test case to determine the legality of e-tolling. [46] The ETC's CEO, Coenie Vermaak, highlighted the tremendous cost to taxpayers of the non-paying civil disobedience campaign. Sanral borrowed R22 billion to implement the GFIP, supported by an investment grade credit rating. The revolt against e-tolls prompted Moody's to downgrade its long-term local and foreign currency global scale ratings, causing this debt to balloon to R45 billion. [47]
Sanral has stated that only 20% of users were paying e-tolls. [48]
According to Sanral, toll fees were levied selectively and employed exclusively to improve and maintain roads. The routine preventative maintenance was said to be 18 times cheaper than major reconstruction following neglect. [2] Selective tolling removes these burdens from the national fiscus and general public, by charging only those who use the roads. The public-private sector partnerships were able to raise upfront capital independently for important infrastructure projects, without drawing on fuel levies or taxes. [2] The GFIP (Phase 1) led to a large decrease in traffic congestion when its construction was completed in 2011-2012. Cape Town, for the first time in decades, became the most congested city in South Africa. [49] [50]
As of 2019 Gauteng is seen as the powerhouse of South Africa, and consequently requires a road network of permanent good quality. Construction of additional roads is said to be urgent to ensure province-wide mobility but GFIP (Phase 2), promising to add 158 km of new routes, is languishing while funds are not forthcoming. [51] Projections of the effects of project delays and resulting cost increases suggest exorbitant future increases in fuel levies and unacceptable low mobility on Gauteng's freeways if income from e-toll cannot be relied upon. [52]
The N3 is a national route in South Africa that connects Johannesburg and Durban, respectively South Africa's largest and third-largest cities. Johannesburg is the financial and commercial heartland of South Africa, while Durban is South Africa's key port and one of the busiest ports in the Southern Hemisphere and is also a holiday destination. Durban is the port through which Johannesburg imports and exports most of its goods. As a result, the N3 is a very busy highway and has a high volume of traffic.
The Johannesburg Ring Road is a set of freeways that circle the city of Johannesburg, South Africa and service the City of Johannesburg Metropolitan Municipality. The entire ring road is approximately 83 km long and was an e-toll highway from 3 December 2013 up until e-tolls were shut down in Gauteng on 12 April 2024.
The N3 Eastern Bypass is a section of the Johannesburg Ring Road that forms a beltway around the city of Johannesburg, South Africa, as part of the N3. The first section of the freeway opened in 1971, from Buccleuch to the interchange with Main Reef Road in Germiston. This is one reason why Germiston is listed as the southbound destination of this route, from the Buccleuch to Geldenhuys Interchanges, rather than to the Elands Interchange south of Germiston. The remaining section from Main Reed Road to Black Reef Road, which included the construction of the Geldenhuys Interchange, was opened in 1977, linking the Eastern Bypass with the N3 freeway to Heidelberg. The interchange at Main Reef Road was removed.
The Western Bypass is a section of the N1 and the Johannesburg Ring Road located in the city of Johannesburg, South Africa. Known at the time as the Concrete Highway, the freeway was initially opened in 1975 as a route to avoid the city centre of Johannesburg and to provide access to the western areas of the Witwatersrand. From the south, the Western Bypass begins at the Diepkloof Interchange in Soweto, where it splits from the N12 freeway and ends at the Buccleuch Interchange, where it merges with the N3 Eastern Bypass, M1 South and N1 Ben Schoeman freeways.
The N12 Southern Bypass is a section of the Johannesburg Ring Road that forms a beltway around the city of Johannesburg, South Africa, as part of the N12. The freeway was the last section of the Ring Road to be built, with the final section opening in 1986. As part of the old South African Freeways, It was initially called the N13. The entire Southern Bypass freeway was an e-toll highway from 3 December 2013 to 11 April 2024.
The N1 is a national route in South Africa that runs from Cape Town through Bloemfontein, Johannesburg, Pretoria and Polokwane to Beit Bridge on the border with Zimbabwe. It forms the first section of the famed Cape to Cairo Road.
The R24 is a major East-West provincial route in the Gauteng and North West provinces that links OR Tambo International Airport with Rustenburg via Johannesburg, Krugersdorp and Magaliesburg. The section of the route from OR Tambo International westwards up to a point in Roodepoort is has been named Albertina Sisulu Road since 2013, named after anti-apartheid stalwart Albertina Sisulu.
The R55 is a north-south provincial route in Gauteng, South Africa that connects Sandton with Pretoria. It passes Woodmead, Kyalami, Olievenhoutbosch, Heuweloord, Sunderland Ridge, Erasmia, Laudium/Claudius, West Park, the Daspoort Tunnel and Danville. It connects with the M1, N14, and R80 highways. It is also designated as the P66-1 and K71 by the Gauteng Provincial Government.
.
The N2 is a national route in South Africa that runs from Cape Town through George, Gqeberha, East London, Mthatha, Port Shepstone and Durban to Ermelo. It is the main highway along the Indian Ocean coast of the country. Its current length of 2,255 kilometres (1,401 mi) makes it the longest numbered route in South Africa.
The N12 is a national route in South Africa which runs from George through Beaufort West, Kimberley, Klerksdorp and Johannesburg to eMalahleni.
The N4 is a national route in South Africa that runs from Skilpadshek on the Botswana border, past Rustenburg, Pretoria, eMalahleni and Mbombela, to Komatipoort on the Mozambique border. The entire route is a toll road.
The South African National Roads Agency SOC Ltd or SANRAL is a South African parastatal responsible for the management, maintenance and development of South Africa's proclaimed National Road network which includes many National ("N") and some Provincial and Regional ("R") route segments.
The R101 is a Regional Route in South Africa that is the designation for some of the old sections of roads that were previously the N1, prior to upgrading. It only has 2 sections, from Bellville to Worcester and from Johannesburg to Polokwane.
The Ben Schoeman Freeway or Ben Schoeman Highway is the main freeway between Johannesburg and Pretoria, and consists of portions of the M1, N1, and N14. Opened in 1968, it is named after former Minister of Transport Ben Schoeman, and is undoubtedly the busiest road in South Africa.
The R512 is a Regional Route in South Africa that connects Brits, North West with Randburg, Gauteng via the western side of Hartbeespoort. It is an alternative route to the R511 for travel between the Johannesburg Metropole and Brits.
Organisation Undoing Tax Abuse (OUTA) is a registered non-profit Civil Action Organisation, located in Johannesburg, South Africa. The anti-corruption advocacy organisation focuses on tackling government corruption and misappropriation of public funds. It is crowd funded by the public and businesses within the Republic of South Africa.
The Johannesburg Roads Agency is a department of the Government of Gauteng. JRA began on business on 1 January 2001 with the City of Johannesburg being the main shareholder. The JRA's plans, designs, constructs, operates, controls, rehabilitates and maintains the roads and stormwater infrastructure in Johannesburg. This Extends to constructing and maintaining of bridges, culverts, traffic Lights, pathways, road signs and markings.
South Africa has a highly developed road network, considered one of the finest in Africa. According to official records, the total road network spans approximately 535,000 kilometers, comprising 168,000 kilometers of urban roads and 366,872 kilometers of other roads. The network includes a significant number of high-capacity roads, with 2,160 kilometers of motorway and 940 kilometers of four-lane roads. Additionally, there are 62,794 kilometers of single-carriageway paved roads and 300,978 kilometers of gravel roads. However, the Transport Department reports a more extensive network of 750,000 kilometers, with 158,124 kilometers of paved roads. This discrepancy may be due to differences in classification or data sources.