Eglinton railway station, Perth

Last updated

Eglinton
General information
Location Eglinton, Western Australia
Australia
Coordinates 31°35′01″S115°40′21″E / 31.583702°S 115.672572°E / -31.583702; 115.672572 (Eglinton Station) OOjs UI icon edit-ltr-progressive.svg
Owned by Public Transport Authority
Operated by Public Transport Authority
Line(s)      Joondalup line
Distance46.7 km (29.0 mi) from Perth Underground
Platforms2 side platforms
Tracks2
Bus stands8
ConnectionsBus
Construction
Structure typeCutting
ParkingApproximately 400 bays
Bicycle facilitiesYes
AccessibleYes
Other information
StatusUnder construction
Fare zone5
History
Opening15 July 2024
Passengers
Predicted4,792 per day in 2031
Services
Preceding station Transperth icon.svg Transperth Following station
Opening in 2024
Alkimos Joondalup line Yanchep
Terminus
Location
Eglinton railway station, Perth
Location of Eglinton station

Eglinton railway station is an under-construction suburban rail station in Eglinton, Western Australia. The station is being constructed as part of the Yanchep Rail Extension of Transperth's Joondalup line, and is planned to open on 15 July 2024.

Contents

Description

Eglinton station is in Eglinton, a suburb of Perth in Western Australia. It is located south of Pipidinny Road and east of Marmion Avenue in an area undeveloped at the time of construction. [1] The station is 46.7 kilometres (29.0 mi) from Perth Underground station [2] and is in fare zone five. [3] The adjacent stations are Alkimos to the south and Yanchep to the north. [4]

The station will consist of two 150-metre (490 ft) long side platforms sunk into a cutting. [5] :5,16 On top of the platforms will be a ground level concourse, connected to the platforms by a set of lifts, stairs and escalators. [1] [4] It was designed this way to improve the experience of pedestrians, to lower the impact of noise, and to lower the visual impact. There will be entrances on the west and east sides of the station, but only the west entrance will be open initially as that land will not be developed upon the station opening. West of the station will be the bus interchange with eight stands, and north-west will be a car park with 436 bays. Other facilities will include parking for bicycles and toilets. The station will be fully accessible. [5] :16,20

Public art

On the ceiling and entry screens are paintings of Grevillea preissii plants and western xenica butterflies by artist Ian Mutch. On the platform's retaining walls is a tiled artwork by Concreto representing Eglinton's "landscape through rhythmic colour sequences expressing the area’s natural environment". [6]

History

The original stage of the Joondalup line began construction in November 1989. [7] It was opened between Perth station and Joondalup station on 20 December 1992, [8] and extended to Currambine station on 8 August 1993. [9] An extension to Clarkson station opened on 4 October 2004 [10] and an extension to Butler station opened on 21 September 2014. [11] [12]

To cater for continuous population growth in the northern suburbs of Perth, in 2017, the government initiated the Yanchep Rail Extension, an extension of the Joondalup line 14.5 kilometres (9.0 mi) to Yanchep, with three new stations: Alkimos, Eglinton, and Yanchep. The Yanchep Rail Extension was part of the government's wider Metronet project to expand and upgrade Perth's rail network, and was delivered by the Public Transport Authority (PTA). The PTA chose to put the Yanchep Rail Extension under the same contract as the Thornlie–Cockburn Link. [4] The contract for the Yanchep Rail Extension and the Thornlie–Cockburn Link was awarded to the NEWest Alliance, a joint venture of CPB Contractors and Downer. [13] [14]

Earthworks for the Yanchep Rail Extension began in mid-2020. [15] The design of Eglinton station was revealed in August 2020. [16] From August 2021 to April 2023, Pipidinny Road was closed to construct a bridge across the railway line and for the construction of Eglinton station. The closure was originally meant to take nine months, but it was extended due to "additional works to accommodate utility services, the widening of Pipidinny Road, and challenging ground conditions impeding bridge works". [17] [18] [19] Foundation works for Eglinton station had begun by the end of 2021. [20] [21] By March 2024, the building's structure was complete, with work focussing on tiling and internal fit-out. Landscaping and the installation of public art was also underway. [22]

Opening

The Yanchep Rail Extension was originally meant to open in late 2021. [4] This was first delayed to 2022. After the September 2021 state budget, the extension was delayed to late 2023. [23] [24] [25] After the May 2023 state budget, the government said that the Yanchep extension "is due for completion at the end of 2023, with services commencing in the new year". [26] At the end of 2023, the Yanchep extension was still under construction and services were planned to commence in the first half of 2024. [27] [28] In April 2024, it was announced the Yanchep Rail Extension would open on 15 July 2024, with an opening ceremony and celebrations the day before on 14 July 2024. [29] [30]

Services

Eglinton station will be served by the Joondalup line on the Transperth network. [31] Services are operated by the PTA. [32] The line will go between Yanchep and Elizabeth Quay station in the Perth central business district, continuing south from there as the Mandurah line. [31] It is expected that a train journey will take 46 minutes from Eglinton to Perth, [4] and that peak frequencies will be a train every 10 minutes. [5] :7 It is projected that Eglinton station will have 4,792 boardings per day by 2031. [4]

The planned bus network will have five bus routes serving Eglinton station. Routes 491 and 492 are planned to run south to Alkimos station. These routes will have peak headways of 10 minutes, lowering to 60 minute headways on weekends. Routes 494, 495 and 496 are planned to run north to Yanchep station. These routes will have peak headways of 20 minutes, lowing to 60 minute headways on weekends. [33] [34]

Related Research Articles

<span class="mw-page-title-main">Armadale line</span> Suburban rail line in Perth, Western Australia

The Armadale line is a suburban railway service in Perth, Western Australia, operated by the Public Transport Authority as part of the Transperth system. The Armadale line is 30.4 kilometres (18.9 mi) long, and starts at Perth station, heading south-east of there to serve Perth's south-eastern suburbs, terminating at Armadale station.

<span class="mw-page-title-main">Joondalup line</span> Suburban rail line in Perth, Western Australia

The Joondalup line is a commuter rail service in Western Australia, linking the Perth central business district (CBD) with the metropolitan area's north-western suburbs. The service is operated on the Northern Suburbs Railway by Transperth Train Operations, a division of the Public Transport Authority, and is part of the Transperth network. It is 40.7 kilometres (25.3 mi) long and serves 13 stations. The service is currently being extended to Yanchep.

<span class="mw-page-title-main">Perth railway station</span> Railway station in Perth, Western Australia

Perth railway station is the largest station on the Transperth network, serving the central business district of Perth, Western Australia. It serves as an interchange between the Airport, Armadale, Fremantle, Midland, and Thornlie lines as well as Transwa's Australind service. It is also directly connected to Perth Underground railway station, which has the Joondalup line and Mandurah line.

<span class="mw-page-title-main">Clarkson railway station, Perth</span> Railway station in Perth, Western Australia

Clarkson railway station is a commuter rail station in Clarkson, a suburb of Perth, Western Australia. It is on the Joondalup line, which is part of the Transperth network. Located in the median of the Mitchell Freeway, the station consists of an island platform connected to the west by a pedestrian footbridge. A six stand bus interchange and two carparks are located near the entrance.

<span class="mw-page-title-main">Mandurah line</span> Commuter rail line in Perth, Western Australia

The Mandurah line is a commuter railway and service on the Transperth network in Western Australia that runs from Perth south to the state's second largest city Mandurah. The service is operated by Transperth Train Operations, a division of the Public Transport Authority. The line is 70.1 kilometres (43.6 mi) long and has 12 stations. At its northern end, the line begins as a continuation of the Joondalup line at Perth Underground, and ends as a continuation of the Joondalup line at Elizabeth Quay. The first 1.3 kilometres (0.81 mi) of the line is underground, passing under the Perth central business district. The line surfaces and enters the median of the Kwinana Freeway just north of the Swan River. It continues south down the freeway's median for 30 kilometres (19 mi), before veering south-west towards Rockingham. The final stretch of the line goes south from Rockingham to Mandurah.

<span class="mw-page-title-main">Whitfords railway station</span> Railway station in Perth, Western Australia

Whitfords railway station is a railway station located on the boundary of Padbury and Kingsley, suburbs of Perth, Western Australia. It is on the Joondalup railway line, which is part of the Transperth commuter rail network. It is located in the median of the Mitchell Freeway, and consists of an elevated bus interchange on top of an island platform at ground level. South of Whitfords, trains run every 5 minutes during peak. North of Whitfords, trains run every 10 minutes during peak. Between peak during the day, trains run every 15 minutes. The journey to Perth railway station is 19.8 kilometres (12.3 mi), and takes 19 minutes.

<span class="mw-page-title-main">Glendalough railway station</span> Railway station in Perth, Western Australia

Glendalough railway station is a railway station on the Transperth network in Perth, Western Australia. It is located on the Joondalup line, five kilometres from Perth station serving the suburb of Glendalough.

<span class="mw-page-title-main">Leederville railway station</span> Railway station in Perth, Western Australia

Leederville railway station is a railway station on the Transperth network in Western Australia. It is located on the Joondalup line, 3.2 kilometres (2.0 mi) from Perth station serving the suburb of Leederville.

<span class="mw-page-title-main">Currambine railway station</span> Railway station in Perth, Western Australia

Currambine railway station is a commuter rail station on the border of Currambine and Joondalup, north of Perth, Western Australia. It is on the Joondalup line, which is part of the Transperth network. Located in the median of the Mitchell Freeway, the station consists of an island platform connected to the east and west by an underpass.

<span class="mw-page-title-main">Eglinton, Western Australia</span> Suburb of Perth, Western Australia

Eglinton is a locality in the Western Australian capital city of Perth, approximately 44 kilometres (27 mi) north of Perth's central business district on the Indian Ocean. For the most part, the suburb is covered in native banksia woodland, scrubland and heath typical of the Swan Coastal Plain. However, in recent years, there has been growth in residential estates, with a town centre to be built in the near future.

<span class="mw-page-title-main">Railways in Perth</span> Public transport system serving Perth, Western Australia

Railways in Perth, the capital city of Western Australia, have existed since 1881, when the Eastern Railway was opened between Fremantle and Guildford. Today, Perth has seven Transperth commuter rail lines and 75 stations.

<span class="mw-page-title-main">Transperth</span> Public transport system serving Perth, Western Australia

Transperth is the public transport system for Perth and surrounding areas in Western Australia. It is managed by the Public Transport Authority (PTA), a state government organisation, and consists of train, bus and ferry services. Bus operations are contracted out to Swan Transit, Path Transit and Transdev. Ferry operations are contracted out to Captain Cook Cruises. Train operations are done by the PTA through their Transperth Train Operations division.

<span class="mw-page-title-main">Butler railway station</span> Railway station in Perth, Western Australia

Butler railway station is a suburban railway station in Butler, a suburb of Perth, Western Australia. It is the terminus of the Joondalup line, which is on the Transperth rail network. Planning for the Joondalup line in the Butler area began in the late 1990s. The station was built as part of a A$240 million extension of the Joondalup line from Clarkson to Butler. Construction began on the station on 16 July 2012, and was completed on 16 May 2014, opening on 21 September 2014. On 15 July 2024, an extension of the Joondalup line from Butler to Yanchep will open.

Nicholson Road railway station is an under construction station on the Thornlie–Cockburn Link in Perth, Western Australia as part of Metronet. It is planned to open in 2025.

<span class="mw-page-title-main">Ranford Road railway station</span> Station in Perth, Western Australia

Ranford Road railway station is an under construction station on the Thornlie–Cockburn Link in Perth, Western Australia as part of Metronet. It is planned to open in 2025.

<span class="mw-page-title-main">Alkimos railway station</span> Under construction railway station in Western Australia

Alkimos railway station is an under-construction suburban rail station in Alkimos, Western Australia. The station is being constructed as part of the Yanchep Rail Extension of Transperth's Joondalup line, and is planned to open on 15 July 2024.

Yanchep railway station is an under-construction suburban rail station in Yanchep, a suburb of Perth, Western Australia. The station is being constructed as part of the Yanchep Rail Extension of Transperth's Joondalup line, and is planned to open on 15 July 2024.

<span class="mw-page-title-main">Metronet (Western Australia)</span> Government agency in Western Australia

Metronet is a multi-government agency in Western Australia. It is responsible for managing extensions to Perth's rail network. It was formed to deliver commitments made by the McGowan Government during the 2017 election campaign.

<span class="mw-page-title-main">Thornlie line</span> Suburban rail line in Perth, Western Australia

The Thornlie line is a temporarily closed suburban railway line and service in Perth, Western Australia, operated by the Public Transport Authority as part of the Transperth system. The Thornlie line is a branch of the Armadale line which opened on 7 August 2005 and runs for 2.9 kilometres (1.8 mi) parallel to the Kwinana freight railway between the Armadale line at Kenwick and Thornlie station. Thornlie line services continued north of Kenwick along the Armadale line to Perth station, stopping at most stations, in contrast to Armadale line services, which skipped most stations along that section. The Thornlie line been suspended since 20 November 2023 due to construction work; it is planned to reopen in mid-2025.

References

  1. 1 2 "Eglinton Station Fact Sheet" (PDF). Metronet. August 2021. Retrieved 14 May 2023.
  2. "Manual – Rail Access" (PDF). Public Transport Authority. p. 32. Retrieved 23 April 2024.
  3. "Transperth Zone Map" (PDF). Transperth. Retrieved 14 May 2023.
  4. 1 2 3 4 5 6 "Yanchep Rail Extension Project Definition Plan" (PDF). Metronet. June 2018. pp. 3–4. Retrieved 14 May 2023.
  5. 1 2 3 Urbis (August 2020). "METRONET Yanchep Rail Extension Eglinton Train Station" (PDF). Government of Western Australia. Retrieved 2 June 2023.
  6. "Yanchep Rail Extension: Public Art". Metronet. Retrieved 24 March 2024.
  7. "Our history". Public Transport Authority. Retrieved 14 May 2023.
  8. Acott, Kent (18 December 2017). "Joondalup and Mandurah train lines celebrate significant anniversaries". The West Australian. Retrieved 14 May 2023.
  9. "Opening of Currambine railway station next month". Media Statements. 17 July 1993. Archived from the original on 16 February 2016. Retrieved 14 May 2023.
  10. "Gallop Government delivers northern rail extension on time and budget". Media Statements. 4 October 2004. Archived from the original on 1 December 2021. Retrieved 14 May 2023.
  11. "Butler train station and rail extension opens". ABC News. 21 September 2014. Retrieved 14 May 2023.
  12. "Barnett opens rail extension as first train leaves Butler station". WAtoday. 21 September 2014. Retrieved 14 May 2023.
  13. "WA Government signs contracts with NEWest Alliance". Railway Technology. 17 December 2019. Retrieved 14 May 2023.
  14. "Major contract signed". Metronet. 18 December 2019. Retrieved 14 May 2023.
  15. "Eight months of milestones for Yanchep Rail Extension". Metronet. 17 December 2020. Retrieved 14 May 2023.
  16. Jarvis, Lucy (11 August 2020). "Latest station designs revealed for Yanchep rail extension". PerthNow. Wanneroo Times. Retrieved 14 May 2023.
  17. Jarvis, Lucy (13 July 2021). "Pipidinny Road closure starts soon for Yanchep rail works". PerthNow. Retrieved 7 January 2024.
  18. Brown, Tyler (12 May 2022). "Yanchep rail extension project delays could keep Pipidinny Road in Eglinton closed longer". PerthNow. Retrieved 7 January 2024.
  19. "Pipidinny Rd open again but with a reduced speed limit". Yanchep News Online. 4 April 2023. Retrieved 7 January 2024.
  20. Brown, Tyler (16 December 2021). "Metronet: Yanchep rail extension hits milestone with work underway at Alkimos, Eglinton and Yanchep stations". PerthNow. Retrieved 14 May 2023.
  21. "All stations go for Perth's northern corridor". Metronet. 16 December 2021. Retrieved 14 May 2023.
  22. "Finishing touches for all stations". Metronet. 18 March 2024. Retrieved 23 March 2024.
  23. "Project schedules adjusted to suit current economic conditions". Metronet. 9 September 2021. Retrieved 14 May 2023.
  24. Clarke, Jenna (9 September 2021). "Metronet projects, including Thornlie-Cockburn link and Yanchep train line, will be delayed by 12-months" . The West Australian. Retrieved 14 May 2023.
  25. de Kruijff, Peter (9 September 2021). "State projects delayed to ease pressure on 'hot' WA construction market". WAtoday. Retrieved 14 May 2023.
  26. "State Budget delivers continued METRONET investment". Metronet. 11 May 2023. Retrieved 14 May 2023.
  27. Dietsch, Jake (22 December 2023). "First test run for $1.8b Metronet Yanchep rail extension marks major milestone after years of delays" . The West Australian. Retrieved 22 December 2023.
  28. "Joint media statement – First test train on track at Yanchep". Media Statements. 22 December 2023. Retrieved 22 December 2023.
  29. "Joint Media Statement - Date Announced For First Train Services On Metronet Yanchep Rail Extension". Media Statements. 23 April 2024. Retrieved 23 April 2024.
  30. Dietsch, Jake (23 April 2024). "Metronet project: July opening date announced from Butler to Yanchep railway extension" . The West Australian. Retrieved 23 April 2024.
  31. 1 2 "Joondalup Line Train Timetable" (PDF). Transperth. 10 October 2022. Retrieved 14 May 2023.
  32. "Transperth". Public Transport Authority. Retrieved 14 May 2023.
  33. "Alkimos and Eglinton Stations Supporting Bus Network" (PDF). My Say Transport. Retrieved 23 January 2024.
  34. "Eglinton and Yanchep Stations Supporting Bus Network" (PDF). My Say Transport. Retrieved 23 January 2024.