Wellard | |||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
General information | |||||||||||||||
Location | Chiswick Parade, Charing Cross, Wellard Western Australia Australia | ||||||||||||||
Coordinates | 32°15′50″S115°49′01″E / 32.263919°S 115.817074°E | ||||||||||||||
Owned by | Public Transport Authority | ||||||||||||||
Operated by | Transperth Train Operations | ||||||||||||||
Line(s) | Mandurah line | ||||||||||||||
Distance | 37.1 kilometres from Perth | ||||||||||||||
Platforms | 2 side platforms | ||||||||||||||
Tracks | 2 | ||||||||||||||
Bus routes | 3 | ||||||||||||||
Bus stands | 4 | ||||||||||||||
Construction | |||||||||||||||
Structure type | Ground | ||||||||||||||
Accessible | Yes | ||||||||||||||
Other information | |||||||||||||||
Station code | RWD 99691 (platform 1) 99692 (platform 2) | ||||||||||||||
Fare zone | 4 | ||||||||||||||
History | |||||||||||||||
Opened | 23 December 2007 | ||||||||||||||
Electrified | Yes | ||||||||||||||
Passengers | |||||||||||||||
2013–14 | 363,790 | ||||||||||||||
Services | |||||||||||||||
| |||||||||||||||
|
Wellard railway station is a railway station in Wellard, a suburb of Perth, Western Australia. It is on the Mandurah railway line, which is part of the Transperth commuter rail network, and is located at the centre of a transit oriented development. It has two side platforms located in a cutting, accessed by a ground-level station concourse. Services run every 10 minutes during peak, and every 15 minutes between peak. The journey to Perth railway station is 37.1 kilometres (23.1 mi), and takes 30 minutes. The station has a bus interchange with four bus stands, and three regular bus routes.
The station was known as Leda station during planning. The station was designed by Woodhead International Architects and MPS Architects. Construction of the station by Doric Constructions and Brierty Contractors started in late 2005. The station was complete by January 2007, and was opened on 23 December 2007, along with the rest of the Mandurah line.
Wellard railway station is in Wellard, Western Australia, a suburb of Perth. The station is 37.1 kilometres (23.1 mi), [1] or a 30-minute train journey, from Perth railway station. [2] The adjacent stations are Kwinana railway station towards Perth, and Rockingham railway station towards Mandurah. [2] [3]
The station consists of two side platforms situated in a cutting below ground level. The platforms are approximately 150 metres (490 ft) long, or long enough for a Transperth 6 car train – the longest trains used by Transperth. At ground level is a concourse which can be used to cross over the railway or access the station's platforms. There is one escalator, one lift, and one set of stairs to each platform. On the station concourse is a kiosk, a customer service office, fare gates, and toilets. The station is fully accessible. At the north-western entrance to the station is a bus interchange with four bus stands. At the south-eastern entrance to the station is a car park with 297 car bays, and 15 motorcycle bays. [3] [4] [5] : 303
The station was known as Leda station during planning, named after the nearby suburb of Leda. In March 1999, the Government of Western Australia released the South West Metropolitan Railway Master Plan. It laid out the route of and stations along the proposed railway between Perth and Mandurah. Leda station was one of the stations included in the plan. [6] The station had a projected number of daily boardings of 1,030. [7] : 19
In August 2002, the government released a new master plan, after a change in the railway's route south from Perth, and through Rockingham. Leda station was removed from the list of stations proposed to be built initially, relegated to being a future prospect. [7] At some point after that plan was released, it was decided to build Leda station along with the rest of the line initially.
For the construction of the railway to Mandurah, among other rail projects in Perth, New MetroRail was set up as a division of the Public Transport Authority. [8] The design and construction of the Mandurah railway line was split up into eight "packages". Among the things that were part of Package A was the bulk earthworks for several stations on the line, including Wellard station. [9] The $310 million contract for Package A was awarded to a joint venture between John Holland, MacMahon Contractors, and Multiplex Constructions Pty Ltd on 23 May 2004. [5] : 301
The actual construction of Wellard station, along with Cockburn Central station and Kwinana station, was part of Package B. The designer for Package B was Woodhead International Architects and MPS Architects. [5] : 301 The design contract was awarded to them in April 2002, at a cost of $2.1 million. [10] Expressions of interest for the construction of Package B opened in September 2003. [11] The contract for the construction of Package B was awarded to the consortium of Doric Constructions and Brierty Contractors in March 2005, at a cost of $32 million. [12] [13] Construction on the station began in late 2005. [14] By January 2007, the station was complete and handed over to the Public Transport Authority. [15] Wellard station opened along with the rest of the Mandurah line on 23 December 2007. [16]
The station is at the heart of an award-winning transit-oriented development scheme known as The Village at Wellard. Its design that incorporates parks, walkability, and rail proximity has earned it awards from the Urban Development Institute of Western Australia, Planning Institute Australia, Landscape Industries Association, and HIA Land-Corp. [17] The development contains low- and medium-density residential development, as well as over 57 ha (0.22 sq mi) of parkland and conservation areas. [18]
Wellard railway station is served by the Mandurah railway line on the Transperth network. These services are operated by Transperth Train Operations, a division of the Public Transport Authority. [19] The line goes between Mandurah railway station and Perth railway station, continuing north from there as the Yanchep line. Mandurah line trains stop at the station every 10 minutes during peak on weekdays, and every 15 minutes during the day outside peak every day of the year except Christmas Day. At night, trains are half-hourly, or hourly. All services stop at all stations, except for the once-per-day K pattern, which runs early in the morning each direction, terminating and commencing at Rockingham station. [2] The station saw 363,790 boardings in the 2013–14 financial year, making it the least used station on the Mandurah line. [20]
Stop | Platform | Line | Stopping pattern | Destination | Notes |
---|---|---|---|---|---|
99691 | 1 | Mandurah | All stations, K | Perth Underground | |
99692 | 2 | Mandurah | All stations, K | Mandurah |
Wellard station has a bus interchange with four bus stands. [4] Bus services are operated by Transdev WA under contract. [21]
Stop | Route | Destination / description | Notes |
---|---|---|---|
Stand 1 | 541 | to Kwinana station via Dalrymple Drive, Kwinana bus station & Sulphur Road [22] | |
909 | Rail replacement service to Perth station | ||
Stand 2 | 542 | to Kwinana station via Kwinana bus station, Chisham Avenue & Warner Road [23] | |
909 | Rail replacement service to Mandurah station | ||
Stand 3 | 544 | to Kwinana station via Lambeth Circle & Johnson Road [24] | |
Stand 4 | Set down only |
The Yanchep line is a suburban railway line and service in Perth, Western Australia, linking the city's central business district (CBD) with its northern suburbs. Operated by the Public Transport Authority as part of the Transperth system, the Yanchep line is 54.5 kilometres (33.9 mi) long and has sixteen stations. It commences in a tunnel under the Perth CBD as a through service with the Mandurah line. North from there, the line enters the median strip of the Mitchell Freeway, where nine of the line's stations are. The Yanchep line diverges from the freeway to serve the centre of Joondalup and permanently leaves the freeway north of Butler for the northernmost four stations to Yanchep.
Clarkson railway station is a suburban rail station in Clarkson, a suburb of Perth, Western Australia. It is on the Yanchep line, which is part of the Transperth network. Located in the median of the Mitchell Freeway, the station consists of an island platform connected to the west by a pedestrian footbridge. A six-stand bus interchange and two carparks are located near the entrance.
Victoria Park railway station is a suburban railway station on the Transperth network in Western Australia. The station is in the Perth suburbs of Lathlain and Victoria Park. Since November 2023, the station has been the terminus of the Armadale and Thornlie lines due to the Victoria Park-Canning Level Crossing Removal Project. The whole of each line is expected to reopen in mid-2025.
The Mandurah line is a commuter railway and service on the Transperth network in Western Australia that runs from Perth south to the state's second largest city Mandurah. The service is operated by Transperth Train Operations, a division of the Public Transport Authority. The line is 70.1 kilometres (43.6 mi) long and has 12 stations. At its northern end, the line begins as a continuation of the Yanchep line at Perth Underground, and ends as a continuation of the Yanchep line at Elizabeth Quay. The first 1.3 kilometres (0.81 mi) of the line is underground, passing under the Perth central business district. The line surfaces and enters the median of the Kwinana Freeway just north of the Swan River. It continues south down the freeway's median for 30 kilometres (19 mi), before veering south-west towards Rockingham. The final stretch of the line goes south from Rockingham to Mandurah.
Whitfords railway station is a railway station located on the boundary of Padbury and Kingsley, suburbs of Perth, Western Australia. It is on the Yanchep line, which is part of the Transperth commuter rail network. It is located in the median of the Mitchell Freeway, and consists of an elevated bus interchange on top of an island platform at ground level. South of Whitfords, trains run every 5 minutes during peak. North of Whitfords, trains run every 10 minutes during peak. Between peak during the day, trains run every 15 minutes. The journey to Perth Underground railway station is 19.8 kilometres (12.3 mi), and takes 19 minutes.
Currambine railway station is a suburban rail station on the border of Currambine and Joondalup, north of Perth, Western Australia. It is on the Yanchep line, which is part of the Transperth network. Located in the median of the Mitchell Freeway, the station consists of an island platform connected to the east and west by an underpass.
Wellard is a suburb of Perth, Western Australia, located within the City of Kwinana.
New MetroRail was a division of the Public Transport Authority in Western Australia. It was responsible for managing extensions to Perth's railway network. The project doubled Perth's rail network, which is operated by Transperth, and was completed in 2007, after various projects were completed. Costing $1.6 billion, the project was the largest public transport project ever undertaken by the Western Australian government and effectively doubled the size of Perth's railway network. A similar agency Metronet was created in 2017 for future Perth rail extensions.
Elizabeth Quay railway station, also known as Esplanade station prior to 2016, is an underground railway station on the southern side of the Perth central business district in Western Australia.
Canning Bridge railway station is a railway station on the Transperth network. It is located on the Mandurah line, four kilometres from Perth station inside the median strip of the Kwinana Freeway located adjacent to the suburb of Como.
Bull Creek railway station is a railway station on the Transperth network. It is located on the Mandurah line, 11.7 kilometres from Perth station inside the median strip of the Kwinana Freeway serving the suburb of Bull Creek.
Murdoch railway station is a railway and bus station on the Transperth network. It is located on the Mandurah line, 13.8 kilometres (8.6 mi) from Perth station inside the median strip of the Kwinana Freeway serving the suburb of Murdoch.
Cockburn Central station is a bus and railway station on the Transperth network. It is located at the juncture of the Mandurah and – once completed – Thornlie lines, 20.5 kilometres (12.7 mi) from Perth station inside the median strip of the Kwinana Freeway serving the suburb of Cockburn Central.
Kwinana railway station is a railway station in Bertram and Parmelia, suburbs of Perth, Western Australia. It is on the Mandurah railway line, which is part of the Transperth commuter rail network, and it serves the City of Kwinana. It has two side platforms located in a cutting, accessed by a ground-level station concourse. Services run every 10 minutes during peak, and every 15 minutes between peak. The journey to Perth railway station is 32.9 kilometres (20.4 mi), and takes 26 minutes. The station has a bus interchange with five bus stands, and five regular bus routes.
Rockingham railway station is a railway station in Rockingham, a suburb of Perth, Western Australia. It is on the Mandurah railway line, which is part of the Transperth commuter rail network. It has two side platforms, linked by a pedestrian overpass accessed by stairs, a lift, and escalators. Services run every 10 minutes during peak, and every 15 minutes between peak. The journey to Perth railway station is 43.2 kilometres (26.8 mi), and takes 34 minutes. The journey to Mandurah railway station is 27.6 kilometres (17.1 mi), and takes 17 minutes. The station has a bus interchange with twelve bus stands, and 14 regular bus routes.
Warnbro railway station is a commuter railway station in Warnbro, a suburb of Perth, Western Australia. It is on the Mandurah line, which is part of the Transperth commuter rail network, and is located immediately south-east of the interchange of Safety Bay Road and Ennis Avenue. It has two side platforms, linked by a pedestrian overpass accessed by stairs, a lift, and escalators. Services run every 10 minutes during peak, and every 15 minutes between peak. The journey to Perth Underground station is 47.5 kilometres (29.5 mi), and takes 38 minutes. The journey to Mandurah station is 23.3 kilometres (14.5 mi), and takes 13 minutes. The station has a bus interchange with seven bus stands and 12 regular bus routes.
Railways in Perth, the capital city of Western Australia, have existed since 1881, when the Eastern Railway was opened between Fremantle and Guildford. Today, Perth has seven Transperth suburban rail lines and 79 stations.
Transperth is the public transport system for Perth and surrounding areas in Western Australia. It is managed by the Public Transport Authority (PTA), a state government organisation, and consists of train, bus and ferry services. Bus operations are contracted out to Swan Transit, Path Transit and Transdev. Ferry operations are contracted out to Captain Cook Cruises. Train operations are done by the PTA through their Transperth Train Operations division.
Nicholson Road railway station is an under construction station on the Thornlie–Cockburn Link in Perth, Western Australia as part of Metronet. It is planned to open in 2025.
Lakelands railway station is a railway station along the Mandurah line on the Transperth network in Western Australia. The station is in the Mandurah suburb of Lakelands, 6.5 kilometres (4.0 mi) north of Mandurah station and 64.5 kilometres (40.1 mi) south of Perth Underground station. Construction started in 2021 and it opened on 11 June 2023.