Warnbro | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
General information | |||||||||||
Location | Safety Bay Road, Warnbro Western Australia Australia | ||||||||||
Coordinates | 32°19′35″S115°46′04″E / 32.326395°S 115.767823°E | ||||||||||
Owned by | Public Transport Authority | ||||||||||
Operated by | Public Transport Authority | ||||||||||
Line(s) | Mandurah line | ||||||||||
Distance | 47.5 kilometres (29.5 mi) from Perth | ||||||||||
Platforms | 2 side platforms | ||||||||||
Tracks | 2 | ||||||||||
Bus routes | 13 | ||||||||||
Bus stands | 7 | ||||||||||
Construction | |||||||||||
Parking | 790 | ||||||||||
Accessible | Yes | ||||||||||
Other information | |||||||||||
Fare zone | 5 | ||||||||||
History | |||||||||||
Opened | 23 December 2007 | ||||||||||
Passengers | |||||||||||
2013–14 | 1,006,118 | ||||||||||
Services | |||||||||||
| |||||||||||
|
Warnbro railway station is a commuter railway station in Warnbro, a suburb of Perth, Western Australia. It is on the Mandurah line, which is part of the Transperth commuter rail network, and is located immediately south-east of the interchange of Safety Bay Road and Ennis Avenue. It has two side platforms, linked by a pedestrian overpass accessed by stairs, a lift, and escalators. Services run every 10 minutes during peak, and every 15 minutes between peak. The journey to Perth Underground station is 47.5 kilometres (29.5 mi), and takes 38 minutes. The journey to Mandurah station is 23.3 kilometres (14.5 mi), and takes 13 minutes. The station has a bus interchange with seven bus stands and 12 regular bus routes.
Known as Waikiki station during planning, the station was included in the South West Metropolitan Railway Master Plan, released in 1999. Originally, there was only going to be a single track railway south of Waikiki station, making the station the terminus for the majority of trains on the line. This was revised later to the entire Mandurah line being dual tracked. The station was designed by Jones Coulter Young Architects and Taylor Robinson Architects. Construction on the station by Doric Constructions and Brierty Contractors began in August 2005. The cost of the station was $15 million. Construction was completed in March 2007, and the station opened, along with the rest of the Mandurah line, on 23 December 2007.
Warnbro station is in Warnbro, Western Australia, a suburb of Perth. It is located southeast of the interchange of Ennis Avenue and Safety Bay Road. To the east is the Rockingham Lakes Regional Park. Access is via Safety Bay Road. [1] : 303 It is owned by the Public Transport Authority, a state government agency, [2] and is part of the Transperth system. The station is 47.5 kilometres (29.5 mi), [3] or a 38 minute train journey, from Perth Underground station; [4] and 23.3 kilometres (14.5 mi), [3] or a 13 minute train journey, from Mandurah station. [4] The adjacent stations are Rockingham station towards Perth, and Lakelands station towards Mandurah. [4] [5] Warnbro station is within fare zone five. [6]
The station consists of two side platforms, approximately 150 metres (490 ft) long, or long enough for a Transperth six-car train – the longest trains used by Transperth. The station's entrance leads onto platform two. Platform one can be accessed through a pedestrian overpass which links to the platforms by stairs, an escalator and a lift. The station has a large roof covering much of the platforms. The station is fully accessible. [1] [5] [7] At the station building entrance is a seven stand bus interchange. Surrounding the bus interchange is the station's car park, which has 832 regular parking bays and 26 short term parking bays. Other facilities at the station include a transit officer booth and toilets. [5] [7]
Warnbro station has two public art installations. From A to B is a piece by Jude Bunn and Johanna Standish-Hansen, from The Glow Studio. It is hanging on the western platform wall, and is made of 48 squares with various images printed on them. Each square has a different angle. [8] Urban Glow is a piece by The Graphite Crew, with help from TUES and local youth. It is a piece of urban art painted on the walls that surround bins. [9]
During planning, Warnbro station was called Waikiki station. In March 1999, the Government of Western Australia released the South West Metropolitan Railway Master Plan. It laid out the route of the proposed railway between Perth and Mandurah as branching off from the Armadale line at Kenwick, following the Kwinana freight railway, and then going south through Kwinana and Rockingham, down to Mandurah. Waikiki station was the only station planned to be built between Rockingham and Mandurah. [10] The railway south of Waikiki station was only intended to be single track, and only two trains per hour were planned to be run between Mandurah and Waikiki, with there being eight trains per hour planned north of Waikiki. [11] : vii Waikiki station was predicted to be the busiest station on the line, with 3,980 boardings per day when it was planned to open in 2006. [11] : 19
On 16 July 2001, the Gallop ministry approved a change in the railway's route, from a spur off the Armadale line to a direct line south from Perth. [11] : 1 In August 2002, the government released a new master plan. The tunnel through Rockingham was removed from the plan in order to save costs, and a park-and-ride station was planned on the outskirts of Rockingham instead of the station in the centre of Rockingham. [11] : viii The railway was also changed to be double tracked between Waikiki and Mandurah, causing the planned frequency between Waikiki to Mandurah to increase to six trains per hour. [11] : vii These changes lowered the predicted patronage at Waikiki station. [11] : 59, 63 The master plan gave a revised patronage of 1,800, when factoring in the removal of the tunnel in Rockingham, and new land use data, but not the change in route from the Armadale line. [11] : 20 The master plan gave another revised patronage, factoring in the removal of the tunnel in Rockingham and the rerouting of the line as a more direct route, as 2,060. [11] : 21 Furthermore, the plan called for the railway line between Perth and Waikiki to be opened by December 2006, and the railway line between Waikiki and Mandurah be opened by December 2007, leaving Waikiki station as the line's terminus for a year. [11] : 140
For the construction of the railway to Mandurah, among other rail projects in Perth, New MetroRail was set up as a division of the Public Transport Authority. [12] The design and construction of the Mandurah line was split up into eight "packages". Among the things that were part of Package A was the bulk earthworks for several stations on the line, including Warnbro station. [13] The $310 million contract for Package A was awarded to a joint venture between John Holland, MacMahon Contractors, and Multiplex Constructions Pty Ltd on 23 May 2004. [1] : 301
The actual construction of Warnbro station, along with Mandurah station and Rockingham station, was part of Package C. [14] Warnbro station was designed by Jones Coulter Young Architects and Taylor Robinson Architects. [1] : 303 The design contract was awarded to Jones Coulter Young in April 2002, at a cost of $2.5 million. [15] During the design process, the car park footprint was changed, as a 0.9-hectare (2.2-acre) important ecological community was identified north-east of the station, where part of the car park was planned to be built. Instead, the car park was extended south to cover an area of degraded bushland. [1] : 198
Expressions of interest for the construction of Package C opened in September 2003. [16] The $32 million contract for building Warnbro station and Rockingham station was awarded to a joint venture between Doric Constructions and Brierty Contractors in June 2005. [17] [18] Brierty did the civil works, and Doric did the construction of the station. [19] $15 million from that contract is for Warnbro station. [20] Construction on the station began in August 2005. [21] The station was completed and handed over to the Public Transport Authority on 9 March 2007. [1] : XVII [22] It opened along with the rest of the Mandurah line on 23 December 2007. [23]
Patronage at Warnbro station was higher than expected, so in 2010, 132 more parking bays were added. [24] [25] In 2013, a $4.5 million upgrade to the station's bus interchange opened. The upgrade included a continuous canopy shelter, five additional bus stands, and two bus layover bays, and allowed for new bus routes to be introduced. [26]
Warnbro station is served by the Mandurah line on the Transperth network. These services are operated the Public Transport Authority. [27] The line goes between Mandurah station and Perth Underground station, continuing north from there as the Yanchep line. Mandurah line trains stop at the station every 10 minutes during peak on weekdays, and every 15 minutes during the day outside peak every day of the year except Christmas Day. At night, trains are half-hourly, or hourly. [4] The station saw 1,006,118 passengers in the 2013–14 financial year. [28]
Warnbro station has a bus interchange with seven bus stands. [7] Bus services are operated by Transdev WA under contract. [29] In 2013, more than a third of Warnbro station passengers caught the bus to the station. [26] 13 regular bus routes serve the station. Routes 564, 565, 566, 567, 568 and 569 travel east on Safety Bay Road to serve Baldivis. Routes 557, 558, and 559 travel west on Safety Bay Road, then north through Waikiki, Safety Bay, and Cooloongup to reach Rockingham Centre, and then Rockingham station. Routes 560, 561, and 563 travel west on Safety Bay Road, then through the suburbs south of Warnbro. Route 560 terminates in Port Kennedy, routes 561 and 563 terminate in Secret Harbour, and route 574 goes all the way to Lakelands station. [30] [31] Rail replacement services operate as route 909. The only other bus services that operate at Warnbro station are school routes. [7]
Clarkson railway station is a suburban rail station in Clarkson, a suburb of Perth, Western Australia. It is on the Yanchep line, which is part of the Transperth network. Located in the median of the Mitchell Freeway, the station consists of an island platform connected to the west by a pedestrian footbridge. A six-stand bus interchange and two carparks are located near the entrance.
Oats Street railway station is a temporarily-closed Transperth suburban railway station in Western Australia, located in the Perth suburbs of Carlisle and East Victoria Park. The station was served by the Armadale and Thornlie lines prior to its closure in November 2023.
Victoria Park railway station is a suburban railway station on the Transperth network in Western Australia. The station is in the Perth suburbs of Lathlain and Victoria Park. Since November 2023, the station has been the terminus of the Armadale and Thornlie lines due to the Victoria Park-Canning Level Crossing Removal Project. The whole of each line is expected to reopen in mid-2025.
The Mandurah line is a commuter railway and service on the Transperth network in Western Australia that runs from Perth south to the state's second largest city Mandurah. The service is operated by Transperth Train Operations, a division of the Public Transport Authority. The line is 70.1 kilometres (43.6 mi) long and has 12 stations. At its northern end, the line begins as a continuation of the Yanchep line at Perth Underground, and ends as a continuation of the Yanchep line at Elizabeth Quay. The first 1.3 kilometres (0.81 mi) of the line is underground, passing under the Perth central business district. The line surfaces and enters the median of the Kwinana Freeway just north of the Swan River. It continues south down the freeway's median for 30 kilometres (19 mi), before veering south-west towards Rockingham. The final stretch of the line goes south from Rockingham to Mandurah.
Warwick railway station is a railway station on the Transperth network. It is located on the Yanchep line, 13 kilometres (8.1 mi) from Perth Underground station serving the suburb of Warwick.
Whitfords railway station is a railway station located on the boundary of Padbury and Kingsley, suburbs of Perth, Western Australia. It is on the Yanchep line, which is part of the Transperth commuter rail network. It is located in the median of the Mitchell Freeway, and consists of an elevated bus interchange on top of an island platform at ground level. South of Whitfords, trains run every 5 minutes during peak. North of Whitfords, trains run every 10 minutes during peak. Between peak during the day, trains run every 15 minutes. The journey to Perth Underground railway station is 19.8 kilometres (12.3 mi), and takes 19 minutes.
New MetroRail was a division of the Public Transport Authority in Western Australia. It was responsible for managing extensions to Perth's railway network. The project doubled Perth's rail network, which is operated by Transperth, and was completed in 2007, after various projects were completed. Costing $1.6 billion, the project was the largest public transport project ever undertaken by the Western Australian government and effectively doubled the size of Perth's railway network. A similar agency Metronet was created in 2017 for future Perth rail extensions.
Secret Harbour is an outer southern suburb of the metropolitan area of Perth, the capital city of Western Australia, located within the City of Rockingham on the Indian Ocean coast at Warnbro Sound. Despite its name, Secret Harbour does not have a harbour. The name results from a failed marina development and was approved in 1984.
Elizabeth Quay railway station, also known as Esplanade station prior to 2016, is an underground railway station on the southern side of the Perth central business district in Western Australia.
Bull Creek railway station is a railway station on the Transperth network. It is located on the Mandurah line, 11.7 kilometres from Perth station inside the median strip of the Kwinana Freeway serving the suburb of Bull Creek.
Murdoch railway station is a railway and bus station on the Transperth network. It is located on the Mandurah line, 13.8 kilometres (8.6 mi) from Perth station inside the median strip of the Kwinana Freeway serving the suburb of Murdoch.
Kwinana railway station is a railway station in Bertram and Parmelia, suburbs of Perth, Western Australia. It is on the Mandurah railway line, which is part of the Transperth commuter rail network, and it serves the City of Kwinana. It has two side platforms located in a cutting, accessed by a ground-level station concourse. Services run every 10 minutes during peak, and every 15 minutes between peak. The journey to Perth railway station is 32.9 kilometres (20.4 mi), and takes 26 minutes. The station has a bus interchange with five bus stands, and five regular bus routes.
Wellard railway station is a railway station in Wellard, a suburb of Perth, Western Australia. It is on the Mandurah railway line, which is part of the Transperth commuter rail network, and is located at the centre of a transit oriented development. It has two side platforms located in a cutting, accessed by a ground-level station concourse. Services run every 10 minutes during peak, and every 15 minutes between peak. The journey to Perth railway station is 37.1 kilometres (23.1 mi), and takes 30 minutes. The station has a bus interchange with four bus stands, and three regular bus routes.
Rockingham railway station is a railway station in Rockingham, a suburb of Perth, Western Australia. It is on the Mandurah railway line, which is part of the Transperth commuter rail network. It has two side platforms, linked by a pedestrian overpass accessed by stairs, a lift, and escalators. Services run every 10 minutes during peak, and every 15 minutes between peak. The journey to Perth railway station is 43.2 kilometres (26.8 mi), and takes 34 minutes. The journey to Mandurah railway station is 27.6 kilometres (17.1 mi), and takes 17 minutes. The station has a bus interchange with twelve bus stands, and 14 regular bus routes.
Mandurah railway station is the terminus of the Mandurah railway line and a bus station on the Transperth network, serving the satellite city of Mandurah, Western Australia.
Railways in Perth, the capital city of Western Australia, have existed since 1881, when the Eastern Railway was opened between Fremantle and Guildford. Today, Perth has seven Transperth suburban rail lines and 79 stations.
Transperth is the public transport system for Perth and surrounding areas in Western Australia. It is managed by the Public Transport Authority (PTA), a state government organisation, and consists of train, bus and ferry services. Bus operations are contracted out to Swan Transit, Path Transit and Transdev. Ferry operations are contracted out to Captain Cook Cruises. Train operations are done by the PTA through their Transperth Train Operations division.
Rockingham is a suburb of Perth, Western Australia, located 47 km south-south-west of the city centre. It acts as the primary centre for the City of Rockingham. It has a beachside location at Mangles Bay, the southern extremity of Cockburn Sound. To its north stretches the maritime and resource-industry installations of Kwinana and Henderson. Offshore to the north-west is Australia's largest naval fleet and submarine base, Garden Island, connected to the mainland by an all-weather causeway. To the west and south lies the Shoalwater Islands Marine Park.
Nicholson Road railway station is an under construction station on the Thornlie–Cockburn Link in Perth, Western Australia as part of Metronet. It is planned to open in 2025.
Lakelands railway station is a railway station along the Mandurah line on the Transperth network in Western Australia. The station is in the Mandurah suburb of Lakelands, 6.5 kilometres (4.0 mi) north of Mandurah station and 64.5 kilometres (40.1 mi) south of Perth Underground station. Construction started in 2021 and it opened on 11 June 2023.