Following the dissolution of the Soviet Union at the end of 1991, the Russian Navy struggled to adjust Cold War force structures while suffering severely with insufficient maintenance and a lack of funding. However, there were improvements in the Russian economy over the first decade of the twenty-first century. The economy and standard of living grew rapidly during the early period of Putin's regime, fueled largely by a boom in the oil industry. [1] [2] [3] This led to a significant rise in defence expenditure and an increase in the number of ships under construction.
An extensive rearmament program began after 2011, with the Russian Defence Ministry expected to procure 100 warships by 2020. [4] In early 2013 it was reported that the navy was to receive 54 new warships of various classes plus 24 submarines by 2020.[ citation needed ] A report by the US Navy's Office of Naval Intelligence issued in December 2015 provided descriptions and timelines for the construction of a modern 21st century Russian Navy. [5]
Some of these plans were modified over the course of the decade with delays pushing back the procurement of major surface combatants. During the 2010s, the focus shifted to several new classes of lighter units (corvettes) as well as on the procurement of several classes of new nuclear and conventionally-powered submarines. In addition, the new Admiral Gorshkov-class frigates have begun to enter service and the large Priboy-class helicopter assault ships have also started construction. These programs are expected to continue through the 2020s and, depending on available funding, projects to acquire larger frigates (the Super-Gorshkov - Project 22350M) and destroyers/cruisers (Lider-class destroyer) may also be initiated. However, until the arrival of such heavier units, older classes of Soviet-era cruisers and destroyers are being modernized.
The economic and financial fallout from the Covid-19 pandemic is likely to have some impact on Russian Navy modernization plans. In September 2020 it was reported that the defence budget was to be cut by 5% as part of a shift to social spending and in response the financial impacts of the pandemic. [6] However, the specific impact of such a cut on Russian Navy modernization plans was not immediately known.
Likely even more significant is the impact of sanctions imposed on the Russian Federation after the 2022 Russian invasion of Ukraine. In 2021, Russian Security Council Secretary Nikolai Patrushev reportedly acknowledged that the Russian defence industry “is still dependent on foreign technologies.” [7] In an interview with the head of United Shipbuilding Corporation Alexei Rakhmanov on 15 August 2022, he stated that the effects of sanctions on the Russian shipbuilding industry are practically unnoticeable, with only 5% of components for military shipbuilding (mainly electronics) being dependent on foreign imports. [8]
On 31 July 2022 during Russian Navy Day, Vladimir Putin approved a new maritime doctrine for Russia. The new doctrine suggests an increased state focus on the Arctic and the Northern Sea Route, as well as an increased naval presence in the Mediterranean and Red Seas, both using already-established bases and establishing new bases on other territories in the area. Plans for the development of shipbuilding industries in Crimea were also mentioned, as well as the development of new LNG terminals and shipbuilding industries in the Far East. With the US and Allies identified as the major maritime threat, cooperation with India and Middle Eastern allies was also emphasised, as well as the necessity for increased foreign port visits by Russian Navy vessels. [9] In 2023, the Russian Navy received 3 submarines, 7 surface ships (including a modernized one), 33 multipurpose, raid and support vessels, 11 aircraft and helicopters, and also over 7,700 cruise, anti-ship and anti-submarine missiles. [10]
Russian President Dmitriy Medvedev stated in 2008 that Russia intended to build nuclear aircraft carriers in the next decade. However Russia currently does not have a yard capable of building aircraft carriers. All previous Soviet aircraft carriers were built in what was then known as the Nikolayev South Shipyard (Shipyard 444) at Mykolaiv in what is now Ukraine. On 2 August 2010 Admiral Vladimir Vysotskiy stressed their importance: "If, for example, we do not have an aircraft carrier in the North, the combat capability of the Northern Fleet's guided-missile submarines will be reduced to zero after Day One because the submarines' principal adversary is aviation." [11]
Speaking in Saint Petersburg on 30 June 2011, the head of United Shipbuilding Corporation, a Russian state holding company, said his company expected to begin design work for a new carrier in 2016, with a goal of beginning construction in 2018 and having the carrier achieve initial operational capability by 2023.[ citation needed ] Several months later, on 3 November 2011 the Russian newspaper Izvestiya reported the naval building plan now included (first) the construction of a new shipyard capable of building large hull ships, after which Moscow will build four nuclear-powered aircraft carriers by 2023. The spokesperson said one carrier would be assigned to the Russian Navy's Northern Fleet at Murmansk, and the second would be stationed with the Pacific Fleet at Vladivostok. [12]
In February 2015, Russian media said that the Krylov State Research Center in St. Petersburg was on its way towards developing another aircraft carrier. The design was under conceptual testing in Krylov's laboratory. [13] There was no announcement of what shipyard would be able to build the carrier. One super-carrier project has been code-named Project 23000E or "Shtorm". [14] As of 2020, the project had not yet been approved and, given the financial costs, it was unclear whether it would be made a priority over other elements of Russian naval modernization. [15]
In July 2021, the Director General of United Shipbuilding Corporation Alexey Rakhmanov stated that best suited for the construction of new aircraft carrier in Russia is Sevmash. [16]
In December 2021, a First Vice-chairman of Military-Industrial Commission of Russia Andrey Yelchaninov [17] stated in an interview that the construction of a new aircraft carrier is being considered for the new State Armament Program for 2024–2033. Work is currently underway to assess the financial and technological risks in the construction of such a ship. [18]
In the new naval doctrine approved on 31 July 2022, the development of new modern shipbuilding facilities in the Far East was mentioned, particularly for the construction of large vessels such as aircraft carriers. [9]
In an interview on 15 August 2022, the head of United Shipbuilding Corporation Alexei Rakhmanov stated that the company is ready to build any large warship, including aircraft carriers, after the modernisation of Severnaya Verf is completed. He also confirmed that if the construction of a new aircraft carrier is approved, the majority of the work will be done at Severnaya Verf. [8]
In 2014 it was reported that the specification had been signed off for a new anti-air destroyer. Twelve ships of the 19,000 tonne Lider class are planned to enter service, split between the Northern and Pacific Fleets. Undecided whether versions will use nuclear or conventional power but they will carry the ABM-capable S-500 SAM and Kalibr (SS-N-30) and SS-N-27 cruise missiles. [19] The Lider-class destroyer concept is a project of JSC Severnoye. In May 2015, Jane's reported that the Krylov State Research Center has also developed the Project 23560 destroyer design concept.
Initial reporting said that these ships would enter service in 2023–2025. In January 2018 however it was reported that detailed design phase will start after 2020 and construction in 2025. [20] On 18 April 2020 Russian newspaper Interfax reported that the Severnoye Design Bureau had suspended development on the Lider. [21] However, in June Alexei Rakhmanov, head of the United Shipbuilding Corporation, reported that the Lider project was still moving forward. [22]
In an interview on 15 August 2022, the head of United Shipbuilding Corporation Alexei Rakhmanov stated that the Lider-class destroyer project has not been abandoned, however, he also stated that the Russian Ministry of Defence will only approve one project for large ocean-going warships. The Russian MoD currently favours the Project 22350M Super-Gorshkov frigate, and therefore it is unlikely that the Lider-class destroyer project will be approved for construction. [8]
Jane's Defence Weekly and NavyRecognition.com said in March and January 2015 respectively that the Project 20385 (Gremyashchiy), Project 21631 (Buyan-M), Project 22350 (Admiral Gorshkov), and Project 11356Р/М (Admiral Grigorovich-class) corvettes and frigates were dependent on German and Ukrainian engines. [23] Projects 20385 and 21631 used German diesel engines, while the 22350 and 11356M used Ukrainian-assembled turbines. [24] Given the sanctions and standoff over the Russo-Ukrainian War, these components were not available from 2015. As a result, two more Steregushchiy-class corvettes, the seventh and eighth of the class, were laid down in February 2015. The Steregushchiy class uses Russian-built Kolomna engines. Similarly, the power plant in units of the Admiral Gorshkov class (following on the first two) were adapted to use a CODAG diesel and gas turbine engine of Russian manufacture (UEC-Saturn). [25] In November 2020 it was announced that United Engine Corporation had initiated delivery of the DGTA M55R diesel-gas power plant which would be installed on frigates of the 22350-class beginning with Admiral Isakov. [26]
With respect to corvettes/large patrol ships, as of 2021 six separate classes were in production to replace Soviet-era vessels. They ranged in size from the small 800-860-ton Karakurt class (Project 22800) up to the 3,400-ton Project 20386 corvette/light frigate. The first of the 2,500-ton Gremyashchiy class (Project 20385) entered service in December 2020. [27] Corvette classes in production as of 2020 include:
The State Armament Program 2011–2020 was expected to build and deliver up to 24 submarines (both nuclear and conventional) to the Russian Navy. [28]
Borei SSBN
Before 2012 there were only about ten nuclear submarine patrols a year, each lasting three months at most and usually a lot less. [29]
However, in that same year the first unit of the Borei-class ballistic missile submarine entered service. Three Borei-class boats were initially built. The lead boat, Yuriy Dolgorukiy, was launched in April 2007, began sea trials in June 2009 and was commissioned as a part of the Northern Fleet in 2012. [30] [31] The second boat, Aleksandr Nevskiy was scheduled to be delivered to the Pacific Fleet in 2012. [32] The third was named Vladimir Monomakh. The Yuriy Dolgorukiy is operational with the Northern Fleet, while the Aleksandr Nevskiy and Vladimir Monomakh serve in the Pacific Fleet. A fourth unit, Knyaz Vladimir, to a modified Borei-A design, was laid down in 2012. Six more units to this modified design were subsequently ordered, the Kynaz Oleg and Generalissimus Suvorov being laid down in 2014, two more in 2015 and 2016, and another two in 2021. The mainstay of the SSBN force, the Delta IVs, joined the fleet during 1985–91. While the service life of an SSBN normally is twenty to twenty-five years, without maintenance, it may be as short as ten to fifteen years. [33] As of the end of 2022, there are six units in active service and an additional four units under construction. Two further boats were planned to start construction in 2023 and be in service by the early 2030s. [34]
Yasen SSN
12 Yasen-class nuclear attack submarines are to be delivered to the Russian Navy. Severodvinsk, keel laid down on 21 December 1993, was the first boat of the class slated for launch in 1998 delayed due to problems in financing. In 1996 work on the submarine appeared to have stopped completely. In 2003, the project received additional funding and the work of finishing the submarine continued. In 2004 it was reported that the work on the submarine was moving forward, but due to the priority given to the new Borei-class submarine, Severodvinsk, the lead unit of the Yasen class would not be ready before 2010. In July 2006 the deputy chairman of the Military-Industrial Commission, Vladislav Putilin, stated that two Yasen-class submarines were to join the Russian Navy before 2015. [35] On 24 July 2009 the work on a second Yasen submarine, named Kazan, was started. On 26 July the Russian navy command announced that one multipurpose submarine would be laid down every year, not necessarily of this class, starting in 2011.[ citation needed ] The launch of the first boat of this class and the beginning of sea trials was reported in September 2011.[ citation needed ]
As of August 2022 the Severodvinsk,Kazan and Novosibirsk are operational, Krasnoyarsk began sea trials in June 2022, and five more units are under construction.
Kilo
Following on from the success of the Kilo-class submarines, improved design Project 636.3 units are being built for the Russian Navy. Six Improved Kilo-class submarines have been built for the Black Sea Fleet, four for the Pacific Fleet (as of 2022) with further units on order.
In an interview on 15 August 2022, the head of United Shipbuilding Corporation Alexei Rakhmanov stated that the company is currently producing one Project 636.3 submarine per year, however this can be increased to two per year with more funding. He also stated that a few modernisation proposals are being considered, including the ability to carry more Kalibr cruise missiles. [8]
Lada and Amur
The Lada-class submarine (Project 677) began construction in the latter 1990s. The class experienced significant problems and delays, resulting in a halt to series production and a redesign of the vessels. Series production resumed in the mid-2010s and as of 2022 the first unit is in service, the second on sea trials and four more vessels are under construction or ordered. In 2023, the lead (prototype) unit was decommissioned owing to several years of developmental problems which appear never to have been successfully rectified. [36]
On 18 May 2013 Russian Navy Commander-in-Chief Admiral Viktor Chirkov announced that the Lada-class would receive an air-independent propulsion system by 2016–2017. However, in 2019, Alexander Buzakov, the head of the Admiralty Shipyard, indicated that there were no plans to equip the Lada class with an air-independent propulsion system. [37] The Amur class is advertised as an export version of the Lada class.
Haski (Husky)
The Laika class, Russian designation Project 545 Laika (Russian : Лайка), [38] also referred to as Husky class (Russian : Хаски, lit. ' husky '), [39] is a series of nuclear-powered fifth-generation multi-purpose submarines currently under development by Malakhit Marine Engineering Bureau for the Russian Navy. [40] [41]
In an interview on 15 August 2022, the head of United Shipbuilding Corporation Alexei Rakhmanov confirmed that the development of fifth-generation submarines is continuing according to schedule. It is unknown if he was referring to the Laika-class submarine, or an as-of-yet (August 2022) unannounced project. [8]
Khabarovsk (Project 09851)
The Khabarovsk class is a new submarine class based on the Borei class but with missile tubes removed. To be armed with Status-6 Oceanic Multipurpose System. [42]
Belgorod Special Operations Submarine
Belgorod was delivered to the Russian Navy in July 2022 but is expected to remain in an "experimental role" with the Northern Fleet for an indefinite period before transferring to the Pacific Fleet. [43] She is a derivative of the Oscar-class submarine reportedly designed as a combination special operations and strategic weapons submarine. She is planned to act as a mothership for smaller special operations submarines as well as being armed with six Status-6 Oceanic Multipurpose System weapons. [44] [45]
From 2010-2014 Russian officials negotiated the purchase of four Mistral-class amphibious assault ships. On 3 September 2014, French President announced that due to Russia's "recent actions in Ukraine", the two ships would not be delivered. [46] In November 2014, François Hollande placed a hold on the delivery of the first Mistral to Russia in view of the conflict in east Ukraine. Hollande set two conditions for delivery: the observation of a ceasefire in Ukraine and a political agreement between Moscow and Kiev. [47] On 5 August 2015 it was announced that France was to pay back Russia's partial payments and keep the two ships initially produced for Russia. [48] [49] The ships eventually were sold to Egypt.
In June 2017, the construction of two future amphibious assault ships for the Russian Navy was included in the Russia's new state armament programme for 2018–2025. [50] The cost for one ship is to be about 40 billion RUB ($675 million). [51]
In January 2018, it was reported the construction of the ships would take place at the Severnaya Verf in Saint Petersburg. [52] However, in July 2020 two units of the class were laid down at the Zalyv Shipbuilding yard in Crimea. The design called for a ship of more than 30,000 tons with the delivery of both units anticipated in the latter 2020s. [53]
Up to thirty Alexandrit-class minesweepers are planned by 2035. As of 2020, four are active and additional units are under construction or ordered. In January 2018 Deputy Chief of the Naval Shipbuilding Directorate Captain Mikhail Krasnopeyev said that the Russian Navy is planning to acquire 10 new Alexandrit-class (Project 12700) minesweepers by 2027 and 30 by 2035. [54] In 2019, the Commander-in-Chief of the Navy, Admiral Vladimir Korolyov, significantly enhanced that objective stating that the aim was to have 40 Alexandrit-class mine warfare vessels in service by 2030. [55]
A new ship class to replace the Ob-class hospital ships can be constructed at Severnaya Verf or Baltic Shipyard. [16]
In the new naval doctrine approved on 31 July 2022, the necessity to construction new modern fully-armed hospital ships was mentioned. [9]
A carrier battle group (CVBG) is a naval fleet consisting of an aircraft carrier capital ship and its large number of escorts, together defining the group. The CV in CVBG is the United States Navy hull classification code for an aircraft carrier.
The Russian Navy Russian: Военно-морской флот [ВМФ], romanized: Voyenno-morskoi flot [VMF], lit. '"Military Maritime Fleet"' is part of the Russian Armed Forces. It has existed in various forms since 1696. Its present iteration was formed in January 1992 when it succeeded the Navy of the Commonwealth of Independent States.
The Hellenic Navy is the naval force of Greece, part of the Hellenic Armed Forces. The modern Greek navy historically hails from the naval forces of various Aegean Islands, which fought in the Greek War of Independence. During the periods of monarchy it was known as the Royal Hellenic Navy.
A vertical launching system (VLS) is an advanced system for holding and firing missiles on mobile naval platforms, such as surface ships and submarines. Each vertical launch system consists of a number of cells, which can hold one or more missiles ready for firing. Typically, each cell can hold a number of different types of missiles, allowing the ship flexibility to load the best set for any given mission. Further, when new missiles are developed, they are typically fitted to the existing vertical launch systems of that nation, allowing existing ships to use new types of missiles without expensive rework. When the command is given, the missile flies straight up far enough to clear the cell and the ship, then turns onto the desired course.
The Soviet Navy was the naval warfare uniform service branch of the Soviet Armed Forces. Often referred to as the Red Fleet, the Soviet Navy made up a large part of the Soviet Union's strategic planning in the event of a conflict with the opposing superpower, the United States, during the Cold War (1945–1991). The Soviet Navy played a large role during the Cold War, either confronting the North Atlantic Treaty Organization in western Europe or power projection to maintain its sphere of influence in eastern Europe.
The Northern Fleet is the fleet of the Russian Navy in the Arctic.
A stealth ship is a ship that employs stealth technology construction techniques in an effort to make it harder to detect by one or more of radar, visual, sonar, and infrared methods.
The Borei class, alternate transliteration Borey, Russian designation Project 955 Borei and Project 955A Borei-A, are a series of nuclear-powered ballistic missile submarines being constructed by Sevmash for the Russian Navy. The class has been replacing the steadily retiring Russian Navy Delta III and Delta IV classes and fully retired Typhoon, all three classes being Soviet-era submarines.
The People's Liberation Army Navy Surface Force is the surface warfare branch of China's People's Liberation Army Navy (PLAN), consisting of all surface vessels in operational service with the PLAN. The PLAN Surface Force operates 661 ships organized into three fleets: the North Sea Fleet, the East Sea Fleet and the South Sea Fleet.
The Steregushchiy class, Russian designation Project 20380, is a class of corvettes being built for the Russian Navy. Designed by the Almaz Central Marine Design Bureau, subsequent vessels were built to an improved design, incorporating the Zaslon-Redut SAM system. The ship full displacement and dimensions are large for a corvette, thus it is designated as a frigate by NATO. The Steregushchiy class has been further developed into the Gremyashchiy class and Project 20386 subclasses. The export variant is known as Project 20382 Tigr.
The Yasen class, Russian designations Project 885 Yasen and Project 885M Yasen-M, also referred to as the Graney class, are a series of nuclear-powered cruise missile submarines designed by the Malakhit Marine Engineering Bureau and built by Sevmash for the Russian Navy. Design work commenced in earnest in the 1980s with the first submarine built in the 1990s–early 2010s with commissioning in 2013. Two additional boats to an upgraded Yasen-M design were commissioned in 2021 and six more are under construction. Based on the Akula class and Alfa class designs, the Yasen class is projected to replace the Russian Navy's current Soviet-era nuclear attack submarines. The Akula class is optimised for a hunter-killer role, whereas the Yasen class concept uses the platform as a nuclear guided missile submarine (SSGN).
JSC PO Sevmash is a Russian joint-stock company (JSC) under the vertically-integrated United Shipbuilding Corporation. The shipbuilding operations of Sevmash is in the port city of Severodvinsk on the White Sea in the Russian Federation.
K-561 Kazan is a Yasen-class nuclear-powered cruise missile submarine of the Russian Navy. It is the second boat of the project, separated from the first by 16 years (1993–2009). Considerable changes were made to the initial design. Differences in the project have appeared sufficient to consider it as a new upgraded version Yasen-M. The submarine is named after the city of Kazan. The submarine is deployed with the Russian Northern Fleet.
The Pacific Fleet is the Russian Navy fleet in the Pacific Ocean. Established in 1731 as part of the Imperial Russian Navy, the fleet was known as the Okhotsk Military Flotilla (1731–1856) and Siberian Military Flotilla (1856–1918), formed to defend Russian interests in the Russian Far East region along the Pacific coast. In 1918 the fleet was inherited by the Russian Soviet Federative Socialist Republic, then the Soviet Union in 1922 as part of the Soviet Navy, being reformed several times before being disbanded in 1926. In 1932 it was re-established as the Pacific Fleet, and was known as the Red Banner Pacific Fleet after World War II as it had earned the Order of the Red Banner. In the Soviet years, the fleet was also responsible for the Soviet Navy's operations in the Indian Ocean and Arabian Sea. Following the collapse of the Soviet Union in 1991, the Red Banner Pacific Fleet was inherited by the Russian Federation as part of the Russian Navy and its current name was adopted.
The Gremyashchiy class, Russian designation Project 20385, is an update of the Steregushchiy-class corvettes of the Russian Navy at a cost of 150 million $. This follow-on project was designed by the Almaz Central Marine Design Bureau in Saint Petersburg. The first ship was laid down on 26 May 2011 and the official laying down ceremony took place on 1 February 2012. Although classified as corvettes by the Russian Navy, these ships carry sensors and weapon systems akin to frigates and, as a result, are so classified by NATO.
The Lider class, also referred to as Shkval class, Russian designation Project 23560 Lider for domestic use and Project 23560E Shkval for export, is a combined stealth nuclear-powered guided missile destroyer and cruiser, under consideration for the Russian Navy. Detailed design phase began in 2016–2017, with construction expected to commence after 2020.
In the 9th century, the Kievan Rus' had a powerful naval fleet, as shown by their successful siege of Constantinople in 860. However, the fleet was irregular and primarily used for raids. The Mongol Empire's destructive invasion and weaknesses in the fleet led to its dissolution, except for the Principality of Novgorod, which had access to open seas and avoided Mongol invasions. In the 14th century, Novgorod pirates terrorized nearby regions. The Grand Duchy of Moscow, the first proper Russian state, gained access to open waters and marked the beginning of the Golden Age of the Russian Navy. In 1570, Ivan the Terrible created a flotilla to protect Russian navigation in the Baltic Sea, which lasted for about a year. In the 16th century, Russia fought against the Ottoman Empire to gain free access to the Black Sea. In the 17th century, Russian sailors explored the Arctic Ocean and reached the Pacific Ocean, with Semyon Dezhnev discovering the Bering Strait. Naval operations took place during the Russo-Swedish War.