![]() Russian frigate Admiral Gorshkov | |
Class overview | |
---|---|
Name | Project 22350 |
Builders | Severnaya Verf, Saint Petersburg |
Operators | ![]() |
Preceded by | |
Subclasses | Project 22350M |
Cost | Approximately US$250 million per unit |
Built | 2006–present |
In commission | 2018–present |
Planned | 10 [1] |
Building | 7 |
Completed | 4 |
Active | 3 |
General characteristics [2] | |
Type | Guided missile frigate |
Displacement |
|
Length | 135 m (442 ft 11 in) |
Beam | 16 m (52 ft 6 in) [4] |
Draught | 4.5 m (14 ft 9 in) |
Propulsion |
|
Speed | 29.5 knots (54.6 km/h; 33.9 mph) |
Range | 4,850 nmi (8,980 km; 5,580 mi) at 14 kn (26 km/h; 16 mph) |
Endurance | 30 days |
Complement | 210 |
Sensors and processing systems |
|
Electronic warfare & decoys |
|
Armament |
|
Aircraft carried | 1 × Ka-27 series helicopter |
Aviation facilities | Helipad and hangar for one helicopter |
The Project 22350 also known as the Admiral Gorshkov class, is a class of frigates of the Russian Navy. [13] The ships are being built by the Severnaya Verf in Saint Petersburg at a cost of $250 million per ship. The class was designed by the Severnoye Design Bureau and incorporates use of stealth technology. [14] As of August 2020, ten vessels have been ordered for delivery by 2027. The lead ship of the class, Admiral Gorshkov, was commissioned on 28 July 2018.
The design of the ship, developed by Severnoye PKB (Northern Design Bureau) FSUE in Saint Petersburg, was approved by Naval Command in July 2003. [15] The plan is to fully replace the older Neustrashimy and Krivak class in four Russian fleets. [16]
The lead ship, Admiral Gorshkov or its full name – Admiral of the Fleet of the Soviet Union Gorshkov, [17] was laid down on 1 February 2006 in Severnaya Verf shipyard in Saint Petersburg.[ citation needed ] In late October 2008 the Russian deputy prime minister, Sergei Ivanov, said the timely construction of combat ships is a priority task for Russia's shipbuilding industry, and announced that the first ship in the class would be ready by 2011.[ citation needed ] The completion date of the lead ship was initially slated for 2009, but this was later pushed back, as was the commissioning date. [18]
On 24 June 2009, during the "МВМС-IMDS 2009" International Naval Expo, the Commander in Chief of the Russian Navy, Admiral Vladimir Vysotsky, announced that the production of a second Admiral Gorshkov-class frigate would begin at Severnaya Verf by the end of the year.[ citation needed ] In November 2009 the Severnaya Verf shipyard announced that it would start the construction of the second ship of the class on 26 November named Admiral Kasatonov.[ citation needed ] The ship was laid down in a ceremony attended by representatives of the Russian Navy, the Saint Petersburg administration, and Admiral Igor Kasatonov - the son of the ship's namesake, Vladimir Kasatonov. [19] In December 2014, one engine from Admiral Kasatonov was transferred to Admiral Gorshkov. [20]
The Russian Navy set a requirement for 20–30 such ships. [21] The Severnaya Verf shipyard has thus far announced having received orders for six units. [22] [23] According to the Russian Navy's deputy commander for armament Vice Admiral Viktor Bursuk, the Russian Navy needs no less than 15 such frigates in basic and upgraded versions. [24]
The first frigate was floated out of the launch dock on 29 October 2010. The ship was only 40 percent complete and then began to be fitted out.[ citation needed ] At that point, main mechanical equipment and systems providing safe launching had been installed, including a combined diesel and gas (CODAG) turbine powerplant, gear assemblies, drive shafts and screws, and electric power supply facilities. Further work was performed at the shipyard's fitting quay. [25]
In August 2012, the shipyard received loans worth RUB 16.23 billion (US$510 million) from the state-owned Sberbank to facilitate the frigate construction project. [26]
The first two ships of the class have gas turbines from Zorya-Mashproekt in Ukraine. Following the annexation of Crimea by the Russian Federation, Ukrainian industry refused to supply Russia with military technology. As a result, NPO Saturn has been commissioned to design indigenous engines. Initial forecasts expected these new engines to be available in 2017–18, allowing ships to be commissioned from 2020; [27] however, after intervention by the Russian government, the plan was brought forward. [28] In November 2020 it was announced that United Engine Corporation had initiated delivery of the DGTA M55R diesel-gas power plant which would be installed on frigates of the class beginning with Admiral Isakov. [29]
The first frigate in the class, Admiral Gorshkov, was commissioned on 28 July 2018. [30]
State testing of the Russian shipborne Poliment-Redut 150 km (93 mi) range air defence missile system with a phased array radar for the frigates of 22350 series has been completed, Commander-in-Chief of the Russian Navy Admiral Vladimir Korolyov announced in February 2019. [31] [32] That month, Admiral Gorshkov and Admiral Kasatonov were equipped with a naval version of the new 5P-42 Filin electro-optic countermeasure system. The Filin fires a beam similar to a strobe light that affects enemy combatants' eyesight, making it more difficult for them to aim at night. During testing, volunteers reportedly used rifles and guns to shoot targets that were protected by the system and reported having trouble aiming because they could not see. Additionally, about half of the volunteers said they felt dizzy, nauseated and disoriented. About 20 percent of the volunteers reported experiencing hallucinations. [33]
On 30 December 2020 it was reported that Admiral Kasatonov successfully completed acceptance trials of the Otvet anti-submarine missile complex. [34]
On 15 November 2022, General Director of Severnaya Verf Igor Orlov stated that the shipyard would lay down five additional Admiral Gorshkov-class frigates. [35]
On 11 December 2023 it was reported that Admiral Kasatonov was upgraded with Zircon hypersonic missiles. [36]
In March 2019, the Severnoye Design Bureau reported it has completed the outline design of the upgraded Project 22350M frigate and began working on the technical documentation for the ship. The Project 22350M frigates are believed to incorporate increased number of VLS cells for combination of 48 or 64 [37] Kalibr, Oniks and Zircon anti-ship cruise missiles while displacing about 7,000 tons. [38] The ships are expected to be laid down in a new boathouse with two slipways at Severnaya Verf which will be completed in 2022. [37]
On 23 April 2019, two modified Project 22350 frigates, Admiral Amelko and Admiral Chichagov, were laid down at Severnaya Verf in Saint Petersburg during a ceremony attended by Russian President Vladimir Putin. [39] It was reported that they were to be fitted with 24 VLS cells for Kalibr, Oniks or Zircon cruise missiles, as opposed to 16 VLS cells installed on the first four frigates of the class. Their delivery to the Russian Navy is scheduled for 2023/24 and 2025, respectively. [40] In 2021 it was reported that the intent was actually to fit 32 3S-14 versatile shipborne VLS cells in Admiral Amelko, Admiral Chichagov and follow-on ships. This remained to be confirmed. [10] In 2020 it was indicated that three ships would be assigned to the Northern Fleet, three to the Pacific Fleet and two to the Black Sea Fleet. [41] A further contract for two additional frigates of the class was announced at the Army-2020 forum increasing the numbers of projected frigates in the Northern and Pacific Fleets to four vessels each. [42]
On 30 December 2021, it was reported that the Amur Shipyard was preparing to sign a contract for the construction of six frigates for the Pacific Fleet, likely of the Admiral Gorshkov class. This would decrease the load on Severnaya Verf, which is currently responsible for the construction of all Admiral Gorshkov-class frigates. However, there has been no official confirmation from either the Ministry of Defence or Amur Shipyard. [43]
On 17 August 2022, the United Shipbuilding Corporation stated that they would submit a design proposal for the Project 22350M "Super Gorshkov" to the Ministry of Defence, with a lead vessel laying already planned but not yet publicly known (as of August 2022). [44] [45] [46]
On 2 February 2023, it was reported that the Ministry of Defence would sign a contract for the construction of six Project 22350 and 22350M frigates at the "Army-2023" military exposition, with the Amur Shipyard being ready to begin construction of frigates in 2024. [47] [48] On 3 February it was reported that Project 22350M frigates and possibly some Project 22350 frigates will have their 3S14 vertical launching systems adapted to fire 40N6E long-range anti-aircraft guided missile which are used by the S-400 missile system and have a range of 400 km. [49] [50] [46]
The Admiral Gorshkov class is the successor to the Neustrashimy and Krivak-class frigates. Unlike their Soviet-era predecessors, the new ships are designed for multiple roles. They are to be capable to execute long-range strikes, conduct anti-submarine warfare and to carry out escort missions.[ citation needed ]
Name | Namesake | Builders | Laid down | Launched | Commissioned | Fleet | Status |
---|---|---|---|---|---|---|---|
Admiral Gorshkov | Sergey Georgiyevich Gorshkov | Severnaya Verf, Saint Petersburg | 1 February 2006 [21] | 29 October 2010 [25] | 28 July 2018 [51] | Northern [52] | Active |
Admiral Kasatonov | Vladimir Afanasyevich Kasatonov | Severnaya Verf, Saint Petersburg | 26 November 2009 | 12 December 2014 [53] [54] | 21 July 2020 [55] | Northern | Active |
Admiral Golovko | Arseniy Grigoriyevich Golovko | Severnaya Verf, Saint Petersburg | 1 February 2012 [56] [57] | 22 May 2020 [58] | 25 December 2023 [59] | Northern [60] | Active |
Admiral Isakov | Ivan Stepanovich Isakov | Severnaya Verf, Saint Petersburg | 14 November 2013 [61] | 27 September 2024 | 2027 [62] | Pacific [63] | Launched |
Admiral Amelko | Nikolai Nikolayevich Amelko | Severnaya Verf, Saint Petersburg | 23 April 2019 [39] | 2026 [64] | Pacific [65] | Under construction | |
Admiral Chichagov | Vasily Yakovlevich Chichagov | Severnaya Verf, Saint Petersburg | 23 April 2019 [39] | 2026 [64] | Northern [64] | Under construction | |
Admiral Yumashev | Ivan Stepanovich Yumashev | Severnaya Verf, Saint Petersburg | 20 July 2020 [66] | 2027 [64] | Northern [64] | Under construction | |
Admiral Spiridonov | Emil Nikolayevich Spiridonov | Severnaya Verf, Saint Petersburg | 20 July 2020 [66] | 2027 [64] | Northern [64] | Under construction | |
Admiral Gromov | Feliks Gromov | Severnaya Verf, Saint Petersburg | 2023 [64] | 2029 [64] | Northern [64] | Ordered [67] [68] | |
Admiral Vysotsky [69] | Vladimir Vysotsky | Severnaya Verf, Saint Petersburg | 2023 [64] | 2029 [64] | Pacific [64] | Ordered [67] |
The Russian Navy is the naval arm of the Russian Armed Forces. It has existed in various forms since 1696. Its present iteration was formed in January 1992 when it succeeded the Navy of the Commonwealth of Independent States.
The Krivak class, Soviet designation Project 1135 Burevestnik, are a series of frigates and patrol ships built in the Soviet Union primarily for the Soviet Navy since 1970. Later some sub-branches, like the Nerey (Nereus) were designed for coastal patrol by the KGB Border Troops. Until 1977, the ships in the class were considered to be large anti-submarine warfare vessels.
The Udaloy class, Soviet designation Project 1155 Fregat and Russian designation Project 11551 Fregat-M, are series of anti-submarine guided-missile destroyers built for the Soviet Navy, seven of which are currently in service with the Russian Navy. Twelve ships were built between 1980 and 1990, while the thirteenth ship built to a modified design, known as Udaloy II class, followed in 1999. They complement the Sovremenny-class destroyers in anti-aircraft and anti-surface warfare operations. The codename Udaloy comes from a Russian adjective удалой, meaning daring or bold.
The Russian cruiser Marshal Ustinov, is a Slava-class cruiser of the Russian Navy. The Russian name for the ship type is Raketnyy Kreyser (RKR), meaning "Missile Cruiser". The ship is named after Dmitriy Ustinov, a former Soviet Minister of Defence. Marshal Ustinov was assigned to the 43rd Missile Ship Division of the Russian Northern Fleet, whose homeport is in Severomorsk. From 2012 to 2016, the cruiser underwent a major overhaul. The vessel returned to service in 2017 and has since been deployed to the Mediterranean Sea.
The Steregushchiy class, Russian designation Project 20380, is a class of corvettes being built for the Russian Navy. Designed by the Almaz Central Marine Design Bureau, subsequent vessels were built to an improved design, incorporating the Zaslon-Redut SAM system. The ship full displacement and dimensions are large for a corvette, thus it is designated as a frigate by NATO. The Steregushchiy class has been further developed into the Gremyashchiy class and Project 20386 subclasses. The export variant is known as Project 20382 Tigr.
Admiral Flota Sovetskogo Soyuza Gorshkov is an Admiral Gorshkov-class frigate of the Russian Navy and the lead ship of the class.
Admiral Flota Kasatonov is an Admiral Gorshkov class frigate of the Russian Navy and the second ship of the class.
The Admiral Grigorovich class, Russian designation Project 11356R, is a class of frigates built by the Yantar Shipyard in Kaliningrad for the Russian Navy and Indian Navy, with a cost of $450-500 million. Based on the Talwar class, six ships were ordered for the Russian Black Sea Fleet under two contracts in 2010 and 2011 as a complement to the Admiral Gorshkov-class frigates.
The Alexandrit class, Russian designation Project 12700 Aleksandrit, is the newest class of Russian minesweepers designed by Almaz and being built by the Sredne-Nevsky Shipyard for the Russian Navy. The first ship was laid down on 22 September 2011 and was launched in June 2014. Anywhere between 30 and 50+ ships have been described as envisaged.
The Gremyashchiy class, Russian designation Project 20385, is an update of the Steregushchiy-class corvettes of the Russian Navy at a cost of 150 million $. This follow-on project was designed by the Almaz Central Marine Design Bureau in Saint Petersburg. The first ship was laid down on 26 May 2011 and the official laying down ceremony took place on 1 February 2012. Although classified as corvettes by the Russian Navy, these ships carry sensors and weapon systems akin to frigates and, as a result, are so classified by NATO.
Following the dissolution of the Soviet Union at the end of 1991, the Russian Navy struggled to adjust Cold War force structures while suffering severely with insufficient maintenance and a lack of funding. However, there were improvements in the Russian economy over the first decade of the twenty-first century. The economy and standard of living grew rapidly during the early period of Putin's regime, fueled largely by a boom in the oil industry. This led to a significant rise in defence expenditure and an increase in the number of ships under construction.
The Yuriy Ivanov class is a type of Russian SIGINT intelligence collection ship. The ship is designed by the JSC Central Design Bureau "Iceberg". The displacement of the ship is more than 4,000 tons, the cruising range not less than 8,000 miles (13,000 km) and its armament consists of light anti-aircraft weapons. The ship on its performance characteristics and capabilities is considerably superior to similar vessels of previous generations mainly due to the versatility and high level of automation and systems integration. The vessels of this class are designed for providing communication. The first ship, Yuriy Ivanov, was laid down in 2004 and was launched on 30 September 2013. The second ship, Ivan Khurs, was launched on 16 May 2017. Russia originally planned to build at least four such ships by 2020, but this date was later pushed back to 2025.
The Karakurt class, Russian designation Project 22800 Karakurt, is a class of Russian Navy corvettes first commissioned in 2018.
Project 20386 is Russia's newest class of corvettes being constructed by Severnaya Verf for the Russian Navy. Based on the Steregushchiy and Gremyashchiy classes, the new class was to have been larger, incorporating a more stealthy design. As originally conceived, there were plans to build a series of at least ten such corvettes.
Admiral Grigorovich is the lead ship of the Admiral Grigorovich-class frigates of the Russian Navy. She is part of the Black Sea Fleet, and is based at Sevastopol.
Admiral Makarov is an Admiral Grigorovich-class frigate of the Russian Navy, part of the Black Sea Fleet based at Sevastopol. She was laid down at the Yantar Shipyard in February 2012 and commissioned on 25 December 2017. She is the most recently built of her class, and the third of six ships that had been planned in the class as of November 2014.
Gromkiy is a Steregushchiy-class corvette of the Russian Navy.
Provornyy is a Gremyashchiy-class corvette of the Russian Navy.
Admiral Golovko is an Admiral Gorshkov-class frigate of the Russian Navy. She is the first ship in the class to be equipped with domestic powerplant, rather than imported from Ukraine.