Dyugon-class landing craft

Last updated

<<Michman Lermontov>>.jpg
Michman Lermontov underway in September 2015.
Class overview
NameDyugon class
BuildersOJSC Vostochnaya Verf in Vladivostok (1)

OJSC Shipbuilding Plant Volga in Nizhny Novgorod (1)

OJSC Yaroslavl Shipyard in Yaroslavl (3)

Contents

OperatorsNaval Ensign of Russia.svg  Russian Navy
In commission2010–present [1]
Building6
Completed5
Active5
General characteristics [2]
Type Landing craft
Displacement280 tonnes
Length45 m (148 ft)
Beam8.6 m (28 ft)
Height5.1 m (17 ft)
Draft1.9 m (6 ft 3 in)
Propulsion2 × 9,000 hp (6,700 kW) M507A-2D diesel engines
Speed35 knots (65 km/h; 40 mph)
Range500 nautical miles (926 km)
Capacity120-140 tonnes of cargo, 3 battle tanks or 5 BTR personnel carriers and up to 100 marines
Crew7
Armament2 KPV 14.5 mm machine guns

The Dyugon-class landing craft, or Project 21820, is a class of five air-cavity landing craft in service with the Russian Navy. [2]

Ships

NameHull No.Laid downLaunchedCommissionedFleetStatusNotes
Ataman Platov21 February 200617 July 20092010 [3] Caspian Fleet Active
Denis Davydov701 [3] 18 January 2012 [4] 26 July 201324 November 2014 [5] Baltic Fleet Active
Ivan Kartsov201030 September 2013 [6] 11 June 2015 [7] Pacific Fleet Active
Lieutenant Rimskij-Korsakov71421 June 2012 [4] 10 April 20144 July 2015 [8] Baltic Fleet Active
Midshipman Lermontov75718 January 20135 June 2014 [9] 4 July 2015 [8] Baltic Fleet Active

Controversies

According to Russian newspaper Izvestija , the central command of the Russian Navy sent a report to the Russian Defence minister after the sea trials of the first Dyugon-class landing craft in the Caspian Sea, complaining about serious design errors and poor workmanship in the craft, stating cracks developed in the hull while travelling at speed, potentially breaking the vessel apart. Izvestija also claimed the orders for the five vessels were split between multiple shipyards for socio-economic reasons... to keep them busy, instead of ordering them from a shipyard with experience in building air-cavity vessels.

The High Command of the Navy prepared a report addressed to Defense Minister Sergei Shoigu with a request to close the project of the newest airborne landing craft 21820 "Dugong". Navy sailors believe that there were serious design errors in the project. A source in the Navy told Izvestia that the position of the High Command is based on reports from the headquarters of the Caspian Military Flotilla, where one ship is based.

— We have Ataman Platov in the Caspian Sea, and Ivan Kartsov will be launched in the Pacific Ocean. Three more are at shipyards in varying degrees of readiness. As a result of operation, cracks have formed in the stern of the combat boat; the seams of the hull cannot withstand movement at high speed and are coming apart,” an officer from the Commander-in-Chief shared with Izvestia.

According to the sailors, the problems arose due to incorrect design and assembly at the shipyard. The operational load on the housing exceeds the values set in the strength characteristics. In other words, the designers and shipbuilders calculated one resistance indicator, but in reality they came out with another, higher one. Because of this, at high speeds the ship “catches a wave” and is subjected to a strong hydrodynamic shock, which can even break it in half.

An air cavity is a dynamic type of air cushion, where a layer of compressed air under the bottom of a ship arises due to the movement of the ship. This differs from a static air cushion, where a layer of air is pumped by fans. Thanks to the bubble, friction and hydrodynamic resistance are significantly reduced, and the speed increases to 30–50 knots.

The displacement of the Dugong is 280 tons, which is quite a lot for similar ships. In addition to it, the domestic fleet has eight boats of the 11770 Serna series. They are much smaller - displacing about 100 tons - and have earned praise from sailors. One of the Baltic Fleet officers who served on the Serna notes its reliability, speed and seaworthiness.

— There are no problems with the boat, except for one small one. It carries one tank or two infantry fighting vehicles, but we would like something more substantial. It’s a pity that the Caspians didn’t like the Dugong,” he told Izvestia.

Both projects were developed by the Nizhny Novgorod Central Design Bureau for Hydrofoils named after Alekseev. In fact, the Dugong is an enlarged Chamois, capable of lifting three tanks or five armored vehicles. Why design mistakes were made in a large boat, sailors are at a loss.

A representative of the military-industrial complex who participated in the projects clarified the situation to Izvestia on condition of anonymity. According to him, problems arose at the production stage. Laid down in 2006, the Ataman Platov was transferred to the fleet only in 2010, although in four years it is possible to build not only a 280-ton boat, but also a cruiser with a displacement of 25 thousand tons. This is how much the domestic flagship “Peter” was built in Soviet times Great,” the source emphasizes.

Administrative and economic confusion is to blame, he says. Platova built the Volga plant in Nizhny Novgorod. The Ivan Kartsov was laid down at the Eastern Shipyard in Vladivostok, although it should have been at the Volga. And the next three boats of the project were laid down at the Yaroslavl Shipyard.

— “Dugongs” must be built at the same production facilities, and jumping across the whole country ruins the project. The Volga is best suited for construction, where it has accumulated extensive experience in hovercraft. And the decision to move production was made for socio-political reasons,” said a representative of the military-industrial complex.

By the time the Ivan Kartsov was laid down in 2010, serious problems with orders had arisen at the Eastern Shipyard, and this is one of the city-forming enterprises of Vladivostok. The country's leadership could not allow social tension in the city, which was preparing for the APEC 2012 summit, so the construction of the boat was moved here. Approximately the same motives were behind the transfer of production to Yaroslavl, which is less prosperous than Nizhny Novgorod.

— The problems of Ataman Platov are well known to the designers. But sailors could take into account that this is the first ship of the project, it has “childhood diseases” that are treated after additional tests. Why immediately cut from the shoulder? After all, the Navy needs Dugongs,” says Izvestia’s interlocutor.

Vice-President of the Academy of Geopolitical Problems Konstantin Sivkov agrees with the shipbuilders.

— Ships in an air cavity moving at a speed of 50 knots (90 km/h) are very difficult to hit before landing. If they are abandoned, then carrying out landing missions will require more massive fire suppression of the defense, and your losses will increase. So we must not abandon the Dugongs, but ensure that they are improved,” the expert told Izvestia.

The first ships with a dynamic support principle were built on static air cushions with powerful fans and enormous fuel consumption. Air-cavity vessels are more economical. In both types, the bottom has special contours to hold a layer of compressed air. [10]

See also

Related Research Articles

Tarantul-class corvette Class of Soviet missile corvette

The Soviet designation Project 1241 Molniya are a class of Russian missile corvettes. They have the NATO reporting name Tarantul. These ships were designed to replace the Project 205M Tsunami missile cutter.

Landing Craft Utility Type of boat designed for transporting amphibious forces and cargo to shore

A Landing Craft Utility (LCU) is a type of boat used by amphibious forces to transport equipment and troops to the shore. They are capable of transporting tracked or wheeled vehicles and troops from amphibious assault ships to beachheads or piers.

<span class="mw-page-title-main">Caspian Flotilla</span> Military unit

The Caspian Flotilla is the flotilla of the Russian Navy in the Caspian Sea.

<span class="mw-page-title-main">Ukrainian Sea Guard</span> Coast guard of Ukraine

The Ukrainian Sea Guard is the coast guard service of Ukraine, subordinated to the State Border Guard Service.

<i>Steregushchiy</i>-class corvette Class of corvettes of the Russian Navy

The Steregushchiy class, Russian designation Project 20380, is a class of corvettes being built for the Russian Navy. Designed by the Almaz Central Marine Design Bureau, subsequent vessels were built to an improved design, incorporating the Zaslon-Redut SAM system. The ship full displacement and dimensions are large for a corvette, thus it is designated as a frigate by NATO. The Steregushchiy class has been further developed into the Gremyashchiy class and Project 20386 subclasses. The export variant is known as Project 20382 Tigr.

Zubr-class LCAC Class of air-cushioned landing craft of Soviet design

The Zubr class, Soviet designation Project 1232.2, is a class of Soviet-designed air-cushioned landing craft (LCAC). The name "Zubr" is Russian for the European bison. This class of military hovercraft is, as of 2023 the world's largest hovercraft, with a standard full load displacement of 555 tons. The hovercraft was designed to sealift amphibious assault units from equipped/non-equipped vessels to non-equipped shores, as well as to transport and plant naval mines.

Buyan-class corvette Small artillery and missile ships of the Russian Navy

The Buyan class, Russian designations Project 21630 Buyan and Project 21631 Buyan-M, are series of corvettes developed by Zelenodolsk Design Bureau for the Russian Navy. Since 2010, all subsequent vessels are being constructed as improved Project 21631 subclass, incorporating greater tonnage, stealth technology and the 3S14 vertical launching system for either Kalibr or Oniks anti-ship cruise missiles, significantly enhancing combat capabilities. The ships are primarily designed for operations within littoral zones to protect Russia's vast coastal areas. Due to the small tonnage, they can operate even within shallow parts of oceans and seas and Russia's extensive inland waterway system. The export variant is known as Project 21632 Tornado.

<i>Ivan Gren</i>-class landing ship Russian Navy ship class

The Ivan Gren class, Russian designation Project 11711, is a class of landing ship that is being built for the Russian Navy. The class was to be composed of two vessels, Ivan Gren and Pyotr Morgunov, but later it was announced that the Russian Navy intends to acquire several more vessels of a modified design.

<i>Alexandrit</i>-class minesweeper

The Alexandrit class, Russian designation Project 12700 Aleksandrit, is the newest class of Russian minesweepers designed by Almaz and being built by the Sredne-Nevsky Shipyard for the Russian Navy. The first ship was laid down on 22 September 2011 and was launched in June 2014. Anywhere between 30 and 50+ ships have been described as envisaged.

Ondatra-class landing craft 1971 landing craft class

The Ondatra class Soviet designation Project 1176 Akula ("shark") is a class of landing craft built for the Soviet Navy and Russian Navy between 1971 and 2009.

Air cavity system is a modern marine hull design concept based upon capturing air beneath a vessel's hull to reduce drag and increase speed and fuel efficiency.

<i>Grachonok</i>-class anti-saboteur ship

The Grachonok class, Russian designation Project 21980 Grachonok, is a class of anti-saboteur and large guard boats being built for the Russian Navy. The class is designed to combat sabotage and terrorist forces and means in the waters off bases and near the approaches to them, as well as to assist the Border Service of the Federal Security Service of the Russian Federation in solving the problems of preservation and protection of the state border of Russia. Twenty-seven boats were built since 2008.

Karakurt-class corvette Russian naval corvette

The Karakurt class, Russian designation Project 22800 Karakurt, is a new class of Russian corvettes which have been entering service with the Russian Navy since 2018.

Project 22160 patrol ship Russian patrol ship

Project 22160 is a series of large patrol ships being constructed for the Russian Navy. The vessels are primarily intended for duties such as patrol, monitoring and protection in open and closed seas. The first ship was laid down in February 2014 and joined the Russian Navy in December 2018. By January 2018, six ships were under construction.

Centaur-class fast assault craft Class of small craft of the Ukrainian Navy

The Project 58181 Centaur (Kentavr)/Project 58503 Centaur-LK class is a series of small armored assault craft being built for the Ukrainian Navy. The first two vessels were laid down at the Kuznya na Rybalskomu in December 2016. The 58181 project was developed by State Research and Design Shipbuilding Center on the basis of the Gyurza-M-class gunboats, and the 58503 project number was assigned to the altered design used after construction of the first eight units began (by the contractor that oversaw their construction, PJSC ZLK. Designed for carrying patrol service on rivers and coastal maritime areas, delivery and landing of marines.

Russian destroyer <i>Bezboyaznenny</i> Sovremenny-class destroyer of the Russian Navy

Bezboyaznenny was a Sovremenny-class destroyer of the Soviet and later Russian navy.

Raptor-class patrol boat Class of patrol boats of the Russian Navy

The Raptor-class patrol boat, formally identified as Project 03160, is a series of Russian high-speed coastal patrol boats. Boats of the class belong to the 4th rank ships in the Russian Navy. This project was developed by the design bureau of JSC Leningrad Shipyard Pella on the instructions of the Russian Navy. The boats are built at the Pella shipyard in the town of Otradnoye, Leningrad Region. Due to the great similarity in appearance, the boats of the project can be confused with the Swedish CB90-class fast assault craft and other transport and landing boats of the 02510 BK-16 project, developed by the Kalashnikov concern and manufactured at Rybinsk shipyard.

<span class="mw-page-title-main">Vostochnaya Verf</span> Russian company

JSC Vostochnaya Verf is a Russian shipbuilding enterprise located in Vladivostok.

Ukrainian patrol boat <i>Skadovsk</i> Zhuk class ( Project 1400M Grif-M) patrol boat of the Ukrainian Navy

Skadovsk (P170) is a Project 1400M Grif-M small patrol gunboat of the Ukrainian Navy. Built in 1990, she has been in Ukrainian Navy service since 1992.

References

  1. Volkov, Roman; Brichevsky, Andrew. "Landing craft Project 21820 Dyugon". Russianships.info (in Russian and English). Retrieved 28 February 2024.
  2. 1 2 Десантный катер проекта 21820 «Дюгонь» Archived 23 November 2021 at the Wayback Machine «Армейский вестник». Retrieved 23 November 2021
  3. 1 2 "Project 21820 Landing Craft". Naval-technology.com. Retrieved 30 April 2021.
  4. 1 2 "Десантный катер на воздушной каверне "Мичман Лермонтов" заложат в Ярославле 18 января" [Air cavity landing craft "Michman Lermontov" will be laid down at Yaroslavl on January 18]. flotprom.ru (in Russian). 14 January 2013.
  5. "Новый десантный катер "Денис Давыдов" вошел в состав ВМФ России" [New landing craft "Denis Davydov" enters the Russian Navy]. RIA Novosti (in Russian). 24 November 2014. Retrieved 30 October 2019.
  6. "Восточная верфь спустила на воду десантный катер проекта 21820" [Vostochnaya shipyard launched a Project 21820 landing craft]. flotprom.ru (in Russian). 3 October 2013.
  7. "Десантный катер "Иван Карцов" вошел в состав Тихоокеанского флота во Владивостоке" [Landing craft "Ivan Kartsov" joins the Pacific Fleet in Vladivostok]. VL.ru (in Russian). 12 June 2012. Archived from the original on 27 June 2021. Retrieved 30 October 2019.
  8. 1 2 "Новые десантные катера, названные именами героев войны 1812 года, вошли в состав Балтфлота" [New landing craft, named after the heroes of the war of 1812, became part of the Baltic Fleet]. TASS (in Russian). 4 July 2015.
  9. "Торжественная церемония спуска десантного катера проекта 21820 заводской № 703" [The solemn ceremony of launching landing craft project 21820, serial number 703]. Yaroslavl Shipyard (in Russian). 5 June 2014. Archived from the original on 6 June 2014. Retrieved 4 July 2017.
  10. Военно-морской флот отказался от «Дюгоней» (Navy ditches Dugongs). Izvestija, published 25 January 2013. Retrieved 8 December 2021