Hook Norton | |
---|---|
General information | |
Location | Hook Norton, Cherwell England |
Grid reference | SP363335 |
Platforms | 2 |
Other information | |
Status | Disused |
History | |
Original company | Banbury and Cheltenham Direct Railway |
Pre-grouping | Great Western Railway |
Post-grouping | Great Western Railway Western Region of British Railways |
Key dates | |
6 Apr 1887 | Station opens |
4 June 1951 | Station closes |
4 November 1963 | closed for freight |
Hook Norton railway station served the village of Hook Norton in northern Oxfordshire, England.
The station was built for the Banbury and Cheltenham Direct Railway, which was operated by the Great Western Railway before complete takeover in 1897. [1] Following the passing of the Act of Parliament in 1873 authorising the construction of the B&CDR, it was announced in 1874 that a station would be provided at Hook Norton. [2] The location originally proposed was north of the Milcombe Road and a start had been made on construction at this site but this was abandoned in 1883 in favour of a site to the south, slightly nearer the village. [3]
On 2 June 1884 it was reported that "Hook Norton Station is built nearly up to the level of the doors". [4] The entire station and goods yard were built on a large embankment containing 120,000 cubic yards of earth, [5] which led onto the first of Hook Norton's two viaducts. In order to provide solid foundations, the platforms were supported on iron girders and the station building had a 20-foot deep cellar. [6] Hook Norton was a passing place with two platforms. The main station building containing booking office, waiting rooms and toilets was on the up platform while the down platform had a small waiting shelter. [7] The first train ran on 6 April 1887.
There were a number of ironstone quarries around Hook Norton. In the 1890s the Hook Norton Ironstone Partnership were dispatching ore by rail, with sidings on the south side of the down platform. [8] From the sidings a steep standard gauge line ran in a curve, passing under the viaduct to a tipping dock where ore was tipped from a 1'8" gauge tramway line. This line was operated by an 0-6-0 Manning Wardle locomotive named Hook Norton [9] The sidings were subsequently turned into loops with the addition of a connection at the west end. [10] The partnership was wound up in 1903 and the sidings became the property of the GWR.
In 1907 they were extended towards Banbury, forming a loop which could hold sixty mineral wagons. [11] A new signal box was opened on the up platform at this time. The GWR also acquired the locomotive Hook Norton which was subsequently used on the Weymouth Harbour Tramway for many years. [12] In 1899 the Brymbo Ironworks of Wrexham established a new quarry at Hook Norton, [13] which it connected to the railway at Council Hill Sidings, 3⁄4 mile east of the station, with a narrow gauge railway. The Brymbo Ironworks closed in 1946 and was dismantled in 1948.
In 1929 the GWR began operating a bus service between Chipping Norton and Banbury via Hook Norton. [14] In the early 1930s this service was transferred to Midland Red and became a serious competitor to the railway's passenger service, [15] having the advantage of a direct journey to Banbury compared to the circuitous route taken by the railway. In the period 1935-9 only 40-64 rail tickets per week were sold. [16] In 1930 the station had a staff of four: a stationmaster, two porters and two signalmen. [17]
When Britain's railways were nationalised in 1948 the B&CDR became part of the Western Region of British Railways. Passenger numbers remained low - a teacher who travelled to Hook Norton from Chipping Norton once a week recalled that on several occasions he was given consecutively numbered tickets. [18] In 1951 British Railways withdrew passenger services from the line through Hook Norton. In 1958 a landslide at Hook Norton caused freight services to be discontinued between Hook Norton and Chipping Norton. On 4 November 1963 BR closed the railway to freight traffic and the line was dismantled in 1965. [19]
Preceding station | Disused railways | Following station | ||
---|---|---|---|---|
Rollright Halt Line and station closed | Great Western Railway Banbury and Cheltenham Direct Railway | Bloxham Line and station closed |
Hook Norton is a village and civil parish in Oxfordshire, England. It lies 4+1⁄2 miles (7 km) northeast of Chipping Norton, close to the Cotswold Hills. The 2011 Census recorded the parish's population as 2,117. The village is formed of four neighbourhoods: East End, Scotland End, Down End and Southrop.
The Wrexham and Minera Railway or Wrexham and Minera Branch was a railway line in North Wales between the city of Wrexham, the village of Brymbo where it served the Brymbo Steelworks, and the lead mines and limeworks at Minera. A further branch ran from Brymbo to Coed Talon, where it connected with lines to Mold. The system was constructed in several stages between 1844 and 1872, while the various lines making up the system closed in 1952, 1972 and 1982.
Kings Sutton railway station serves the village of King's Sutton in Northamptonshire, England. It is also one of the nearest railway stations to the town of Brackley. The station is managed by Chiltern Railways, who provide most of the services, including from London Paddington and Marylebone to Oxford and Banbury.
Kingham railway station in Oxfordshire, England, is between the Oxfordshire village of Kingham and the Gloucestershire village of Bledington, to which it is closer. It is also the closest station to the town of Chipping Norton.
The Oxford, Worcester and Wolverhampton Railway (OW&WR) was a railway company in England. It built a line from Wolvercot Junction near Oxford to Worcester, Stourbridge, Dudley and Wolverhampton, as well as some branches.
The Hook Norton ironstone quarries (Brymbo) were ironstone quarries near Hook Norton in Oxfordshire, England. The quarries were in operation from 1899 to 1946 supplying ironstone to the Brymbo Steelworks in Wrexham and were served by the Brymbo Ironworks Railway, an extensive, 2 ft (610 mm) narrow gauge industrial railway.
Charwelton railway station was a station at Charwelton in Northamptonshire on the former Great Central Railway main line, the last main line to be built from the Northern England to London. The station opened with the line on 15 March 1899.
Andoversford Junction railway station was in Gloucestershire on the Great Western Railway's Banbury and Cheltenham Direct Railway that opened in 1881. Situated about six miles east of Cheltenham, the station served the village of Andoversford with its large market, which provided much of the traffic at the station.
The Banbury and Cheltenham Direct Railway (B&CDR) was a railway company through the Cotswolds in England that built a line between points near Banbury and Cheltenham. Its principal objective, as well as a general rural rail service, was the conveyance of iron ore from the East Midlands to South Wales.
Sarsden Halt was an unstaffed railway station on the Banbury and Cheltenham Direct Railway.
Milton Halt railway station is a former railway station that served the village of Milton in northern Oxfordshire, England.
Bloxham railway station served the village of Bloxham in northern Oxfordshire, England.
Rollright Halt railway station served the village of Great Rollright in Oxfordshire, England.
Chipping Norton railway station served the town of Chipping Norton, Oxfordshire, England. The station had two platforms and a signal box.
The Chipping Norton Railway opened in 1855, first linking the town of Chipping Norton with the Oxford, Worcester and Wolverhampton Railway (OW&W) at Kingham station, with a single station in the form of Sarsden Halt initially located on the route.
Kerne Bridge railway station is a disused railway station on the Ross and Monmouth Railway constructed in the Herefordshire hamlet of Kerne Bridge which also served the village of Goodrich across the River Wye.
The Hook Norton Ironstone Partnership was the first company to quarry ironstone at Hook Norton on a large scale. Although only in operation for twelve years, its quarries subsequently became part of the Brymbo Steelworks quarries and relics of the Partnership's railways and tramways can still be seen today.
The Hook Norton ironstone quarries (Baker) were ironstone quarries at Hook Norton, Oxfordshire, England, operating from the 1890s to the end of the First World War. Two sites were quarried and it was the only Hook Norton ironstone quarry business to be locally owned.
Eric Tonks was an English writer and historian of British industrial railways. He is regarded as one of the pioneers of the industrial archaeology of railways and quarrying. He was also a noted Jazz discographer.
Shipston-on-Stour railway station was a railway station which served the town of Shipston-on-Stour, Warwickshire. It was the terminus of the Shipston-on-Stour branch.