Chipping Norton railway station

Last updated

Chipping Norton
Chipping Norton2 6 62561rev.jpg
Chipping Norton railway station in June 1962
General information
Location Chipping Norton, West Oxfordshire
England
Grid reference SP307270
Platforms2
Other information
StatusDisused
History
Original company Chipping Norton Railway
Pre-grouping Great Western Railway
Post-grouping Great Western Railway
Western Region of British Railways
Key dates
10 August 1855Original station opened
6 April 1887Station resited
3 December 1962Station closed
1964closed completely

Chipping Norton railway station served the town of Chipping Norton, Oxfordshire, England. The station had two platforms and a signal box.

Contents

History

The station was opened in 1855 as the terminus of the Chipping Norton Railway, which linked the town to the Oxford, Worcester and Wolverhampton Railway by a junction at Kingham. The line was promoted by William Bliss and its traffic included freight to and from his tweed mill at Chipping Norton.

Goods trains started running to the station in June 1855 and the official opening to passengers took place on 10 August 1855. Initially there were three trains each way, but by January 1856 this had increased to six each way, the first and last of which continued along the main line to Shipton.

The station comprised a single platform and two-storey building. No photographs exist, but Bliss Tweed publicity material includes drawings of the station. A single-road engine shed, water tank and goods shed were also provided. Following complaints by passengers of the exposed state of the station a wooden overall roof was added. In 1872 a siding was added to serve the gasworks adjacent to the tweed mill.

In 1860 the OW&WR amalgamated with two other railway companies to form the West Midland Railway. In 1863 the WMR amalgamated with the GWR and Chipping Norton became part of the Great Western system.

In 1875 work began at Chipping Norton on the building of the Banbury and Cheltenham Direct Railway between Chipping Norton and Kings Sutton. A bridge was built to take the new line under the Worcester Road, [1] although it would be twelve years before the first train passed under it. Work also started on the Chipping Norton Tunnel. However, the B&CDR experienced financial difficulties and the building work ceased in 1877 with the tunnel uncompleted. Construction resumed six years later in 1883 with the line to Banbury finally opening on 6 April 1887. The GWR operated the services over the new line. In 1897 the B&CDR was purchased by the GWR.

The old station was no longer required and was demolished, the area it had occupied becoming the new goods yard. The engine shed remained for many years; it was closed in 1922 and was demolished by 1947. [2] The small weighbridge building survived until the closure of the line, the only original building to do so.

The new station was sited on a curve. The main station building was on the down side with a small shelter on the up side. A lattice girder footbridge linked the two platforms. There were two signal boxes: Chipping Norton East on the station platform and Chipping Norton West near to the Bliss Tweed Mill. The West box was abolished in August 1929 and the East Box was renamed Chipping Norton Signal Box. [3]

In 1904 a 6-stall stable was built for the railway's horses. It was no longer required for this purpose after 1921 as delivery work had been contracted out. In 1929 a large door was added in the end wall and the building was used to house GWR motor buses. In 1948 it continued in use as a garage but for the Zonal Delivery Scheme lorries. The stable is the only railway building at Chipping Norton to survive to the present day.

There was a dramatic fall in passenger traffic during the 1920s. 30,455 tickets were sold in 1923 but by 1929 this had fallen to 9,951. Parcels and goods traffic increased slightly over the same period. Jenkins, Brown and Parkhouse attribute the fall in passenger traffic to the transfer of railway road transport services to the local bus company. [4]

In 1948 Chipping Norton became a railhead for the Zonal Delivery Scheme. The goods shed was modified with a series of loading bays constructed enabling goods to be unloaded from wagons straight into lorries for local delivery.

When Britain's railways were nationalised in 1948 the Banbury and Cheltenham line became part of the Western Region of British Railways. British Railways withdrew passenger services from the Chipping Norton - Kings Sutton section in 1951. In April 1958 a landslide blocked the line between Hook Norton and Rollright Halt. The landslide was never cleared and after this time the only trains running north from Chipping Norton were occasional goods services to Rollright Siding. The Kingham to Chipping Norton line was listed in The Reshaping of British Railways report, although with an asterisk to indicate that closure had already been decided before compilation of the report. The final passenger train ran on 1 December 1962. BR withdrew freight traffic from the line in 1964 and it was dismantled in 1965.

Accidents

In 1907, a small tank engine (no. 546) and a Toad Brake Van crashed into the West Signal Box. The Brake Van was severely damaged, and the engine became derailed. The rails were taken up by the force of the locomotive.

World War Two

World War Two saw many children from London being evacuated to small towns and villages in the countryside. Chipping Norton was one such place, and trains brought children from Acton and Ealing Broadway to places such as Oxford and Chipping Norton. These trains were some of the longest to have ever used the platforms at the station.

Modern day

The site that was once occupied by the station and goods yard is now part of an industrial estate, and only the stable remains. The tunnel through the hill and bridge for the road still exist, but the tunnel has been closed and has become flooded due to the filling-in of the bridge.

Route

Preceding station Disused railways Following station
Sarsden Halt
Line and station closed
  Great Western Railway
Banbury and Cheltenham Direct Railway
  Rollright Halt
Line and station closed
Chipping Norton railway station on a postcard. Chipping Norton railway station.jpg
Chipping Norton railway station on a postcard.

Related Research Articles

<span class="mw-page-title-main">Winchcombe railway station</span> Heritage railway station in Gloucestershire, England

Winchcombe railway station is a heritage railway station which serves the town of Winchcombe in Gloucestershire, England. The stations itself is actually located in the nearby village of Greet. It is located on the Honeybourne Line which linked Cheltenham and Stratford-upon-Avon and which was opened by the Great Western Railway in 1906. The station closed to passengers in 1960, although the line itself remained open for freight and diversionary use until 1976, when a freight train derailed near Winchcombe and damaged the track.

<span class="mw-page-title-main">Banbury railway station</span> Railway station in Oxfordshire, England

Banbury railway station serves the town of Banbury in Oxfordshire, England. The station is operated by Chiltern Railways, on the Chiltern Main Line, and has four platforms in use.

<span class="mw-page-title-main">Kings Sutton railway station</span> Railway station in Northamptonshire, England

Kings Sutton railway station serves the village of King's Sutton in Northamptonshire, England. It is also one of the nearest railway stations to the town of Brackley. The station is managed by Chiltern Railways, who provide most of the services, including from London Paddington and Marylebone to Oxford and Banbury.

<span class="mw-page-title-main">Kingham railway station</span> Railway station in Oxfordshire, England

Kingham railway station in Oxfordshire, England, is between the Oxfordshire village of Kingham and the Gloucestershire village of Bledington, to which it is closer. It is also the closest station to the town of Chipping Norton.

The Oxford, Worcester and Wolverhampton Railway (OW&WR) was a railway company in England. It built a line from Wolvercot Junction near Oxford to Worcester, Stourbridge, Dudley and Wolverhampton, as well as some branches.

<span class="mw-page-title-main">Devon and Somerset Railway</span> Former railway line in England

The Devon and Somerset Railway (D&SR) was a cross-country line that connected Barnstaple in Devon, England, to the network of the Bristol and Exeter Railway (B&ER) near Taunton. It was opened in stages between 1871 and 1873 and closed in 1966. It served a mostly rural area although it carried some through services from east of Taunton to the seaside resort of Ilfracombe.

Andoversford and Dowdeswell railway station was on the Midland and South Western Junction Railway in Gloucestershire. The station opened to passengers on 1 August 1891 with the opening of the section of the line between Cirencester Watermoor and the junction at Andoversford with the Great Western Railway's Cheltenham Lansdown to Banbury line, which had opened in 1881.

<span class="mw-page-title-main">Swindon Town railway station</span> Former railway station in Wiltshire, England

Swindon Town railway station was on the Midland and South Western Junction Railway at Swindon in Wiltshire. The station was sited in the Old Town area about one-and-a-half miles from the Great Western Railway's Swindon Junction.

Andoversford Junction railway station was in Gloucestershire on the Great Western Railway's Banbury and Cheltenham Direct Railway that opened in 1881. Situated about six miles east of Cheltenham, the station served the village of Andoversford with its large market, which provided much of the traffic at the station.

The Banbury and Cheltenham Direct Railway (B&CDR) was a railway company through the Cotswolds in England that built a line between points near Banbury and Cheltenham. Its principal objective, as well as a general rural rail service, was the conveyance of iron ore from the East Midlands to South Wales.

The Oxford, Witney and Fairford Railway was a single track railway branch line, 22 miles (35 km) long, in Oxfordshire and Gloucestershire. It was opened in succession by two companies, the first in 1861 to connect the important woollen town of Witney to the main line network, and the second in 1873 as the rump of an ambitious scheme to connect to Cheltenham, but which ran only between Witney and Fairford. The junction with the main line was at Yarnton, north of Oxford.

Sarsden Halt was an unstaffed railway station on the Banbury and Cheltenham Direct Railway.

<span class="mw-page-title-main">Milton Halt railway station</span> Former railway station in England

Milton Halt railway station is a former railway station that served the village of Milton in northern Oxfordshire, England.

<span class="mw-page-title-main">Bloxham railway station</span> Former railway station in Oxfordshire, England

Bloxham railway station served the village of Bloxham in northern Oxfordshire, England.

<span class="mw-page-title-main">Hook Norton railway station</span> Former railway station in Oxfordshire, England

Hook Norton railway station served the village of Hook Norton in northern Oxfordshire, England.

Rollright Halt railway station served the village of Great Rollright in Oxfordshire, England.

<span class="mw-page-title-main">Chipping Norton Railway</span>

The Chipping Norton Railway opened in 1855, first linking the town of Chipping Norton with the Oxford, Worcester and Wolverhampton Railway (OW&W) at Kingham station, with a single station in the form of Sarsden Halt initially located on the route.

<span class="mw-page-title-main">Kidlington railway station</span> Former railway station in England

Kidlington railway station opened in 1855 on the Oxford and Rugby Railway to serve the adjacent Oxfordshire village of Kidlington, and act as a railhead for the town of Woodstock, 2.5 miles (4.0 km) away. It became a junction station in 1890 upon the opening of the Blenheim and Woodstock Branch Line, and served the area for over 100 years before falling victim to the programme of closures initiated by the Beeching Report in 1964. Following many proposals for its reopening, a new station to serve Kidlington opened in October 2015 at Oxford Parkway on the Oxford to Bicester Line.

The Hook Norton Ironstone Partnership was the first company to quarry ironstone at Hook Norton on a large scale. Although only in operation for twelve years, its quarries subsequently became part of the Brymbo Steelworks quarries and relics of the Partnership's railways and tramways can still be seen today.

<span class="mw-page-title-main">Shipston-on-Stour railway station</span> Railway station in Warwickshire, England

Shipston-on-Stour railway station was a railway station which served the town of Shipston-on-Stour, Warwickshire. It was the terminus of the Shipston-on-Stour branch.

References

Sources

51°56′26″N1°33′20″W / 51.94066°N 1.55569°W / 51.94066; -1.55569