Kangaroo Point Green Bridge

Last updated

Kangaroo Point Bridge
Brisbane CBD seen from Kangaroo Point, 2024, 03.jpg
Bridge completed in December 2024
CarriesPedestrians and cyclists
Crosses Brisbane River
Locale Brisbane, Queensland, Australia
Other name(s)Alice Street Bridge
Characteristics
DesignSteel cable stayed bridge
Total length470 metres (1,540 ft)
Width6.8 metres (22 ft)
Clearance below 11.4 metres (37 ft)-12.7 metres (42 ft) from high water level to the bridge deck
History
Opened15 December 2024 [1]

The Kangaroo Point Bridge is a pedestrian and cyclist bridge across the Brisbane River in Brisbane, Australia. The bridge connects the suburb of Kangaroo Point with the Brisbane CBD. [2]

Contents

The design for the bridge is a single-mast cable stayed structure which aligns the Alice StreetEdward Street intersection in the City with Scott Street, Kangaroo Point north from the Thornton Street ferry wharf. Construction of the bridge began in 2021 and it opened on 15 December 2024.

Design

The reference design for the bridge was completed by Cox and Arup. [3] The single-mast cable stayed structure has a length of 470 metres (1,540 feet) with a width of 6.8 metres (22 feet) reaching a height of 11.4 to 12.7 metres (37 to 42 feet) from high water level to the bridge deck, which is the same height as Victoria and Captain Cook bridges. The final design and documentation was developed by Blight Rayner Architecture and Dissing + Weitling  as part of Connect Brisbane consortium with Besix Watpac as Managing Contractor. The redesign includes the optimisation of the four-pronged mast by introducing a cruciform mast tie, refining the original sketch  and making it more structurally efficient. The redesign of the Kangaroo Point pier, opens up to C.T. White Park and employs a curated selection of angular geometries to create a cohesive design.  The new design also incorporated the addition of a boutique restaurant over the river and a cafe at the city end. [4]

History

The bridge construction was included in the Brisbane City Master Plan 2014 as a priority project. It was expected that the construction of the bridge would be completed within five years. [5] On 31 October 2016, council commenced geotechnical investigative works. [6]

In August 2018, the state government offered funding to the city council to develop a business case. [7] In November 2020, the Brisbane City Council released Draft Reference Design Consultation Report for the bridge. A preliminary business case for the project was expected in late 2021. [8]

Construction was awarded in 2021 to BESIX Group's Australian subsidiary, BESIX Watpac. [9] Construction of the bridge began in 2021 and was expected to be completed in 2023. [10] 30 boat moorings on the Brisbane River were removed for the bridge's construction. [11] The bridge's construction cost was initially expected to be $190 million. [4] In September 2023, it was announced the bridge would cost $299 million. [12] The bridge was officially opened on 15 December 2024. [13]

Integration and connectivity

The Kangaroo Point Green Bridge significantly enhances bike path connectivity between the Brisbane CBD and Kangaroo Point, facilitating easier movement between the city and eastern suburbs.

Project features

The bridge spans approximately 460 metres with an elegant single-mast cable-stayed design, minimizing visual impact while complementing the city skyline.

Includes dedicated pedestrian and cycle paths, with a minimum width of 6.8 metres.

Features high-quality landing points that connect and activate communities on either side of the Brisbane River, including upgraded public realms and enhanced connectivity for pedestrians and cyclists.

Safetylyne’s advanced ladder cable system and Canopy Horizontal Lifelines and Static Lines play a crucial role in protecting maintenance staff responsible for the bridge's ongoing upkeep. These systems are designed to facilitate safe access while supporting Brisbane City Council’s long-term maintenance objectives, helping to preserve the landmark’s condition and potentially extending its lifespan. [14]

Environmental and social impact

Incorporates design elements like solar panels, cooling vegetation, and shade cover along the length of the bridge.

The bridge features unique dining venues such as an above-water restaurant and bar, and a riverside café, creating new social spaces for residents and visitors.

Offers panoramic views of the river and city, with rest nodes for seating and shade.

A new signalized crossing at Edward and Alice Streets provides safe, continuous access between the bridge and the city center.

See also

Related Research Articles

<span class="mw-page-title-main">Story Bridge</span> Steel cantilever bridge in Brisbane, Queensland, Australia

The Story Bridge is a heritage-listed steel cantilever bridge spanning the Brisbane River that carries vehicular, bicycle and pedestrian traffic between the northern and the southern suburbs of Brisbane, Queensland, Australia. It is the longest cantilever bridge in Australia.

<span class="mw-page-title-main">Goodwill Bridge</span> Bridge in Queensland, Australia

The Goodwill Bridge is a pedestrian and cyclist bridge which spans the Brisbane River in Brisbane, Queensland, Australia. The bridge connects the South Bank Parklands in South Brisbane to Gardens Point in the Brisbane CBD.

<span class="mw-page-title-main">Victoria Bridge, Brisbane</span> Bridge in Brisbane, Australia

The Victoria Bridge is a bus and pedestrian bridge over the Brisbane River. The current bridge, opened in 1969, is the third permanent crossing erected at this location. Since 24 January 2021, the bridge has been closed to general traffic, and now carries buses, pedestrians and cyclists only.

<span class="mw-page-title-main">William Jolly Bridge</span> Bridge in Queensland, Australia

The William Jolly Bridge is a heritage-listed road bridge over the Brisbane River between North Quay in the Brisbane central business district and Grey Street in South Brisbane, within City of Brisbane, Queensland, Australia. It was designed by Harding Frew and built from 1928 to 1932 by MR Hornibrook.

<span class="mw-page-title-main">Kangaroo Point, Queensland</span> Suburb of Brisbane, Queensland, Australia

Kangaroo Point is an inner southern suburb in the City of Brisbane, Queensland, Australia. In the 2021 census, Kangaroo Point had a population of 9,689 people.

<span class="mw-page-title-main">South Bank Parklands</span> Brisbane parkland

The South Bank Parklands are located at South Bank within the suburb of South Brisbane in Brisbane, Queensland, Australia. The parkland, on the transformed site of Brisbane's World Expo 88, was officially opened to the public on 20 June 1992.

<span class="mw-page-title-main">Bolte Bridge</span> Bridge in Melbourne, Australia

The Bolte Bridge is a large twin cantilever road bridge in Melbourne, Victoria, Australia. The Bolte Bridge carries a total of eight lanes of traffic – four lanes northbound and four lanes southbound. While officially only 490 metres in length, the actual structure appears much longer as it forms part of a 5 kilometre elevated roadway between Flemington Road and the West Gate Freeway. It spans the Yarra River and Victoria Harbour in the Docklands precinct to the west of the Melbourne CBD. It forms part of the CityLink system of toll roads that connects the Tullamarine Freeway from the northern suburbs with the West Gate Freeway and the Domain and Burnley tunnels to the Monash Freeway and the south eastern suburbs. It is named after Victoria's 38th and longest-serving Premier, Sir Henry Bolte.

<span class="mw-page-title-main">Riverside Expressway</span> Motorway in Brisbane, Australia

The Riverside Expressway is part of the Pacific Motorway that runs through Brisbane, Queensland, Australia. It is located on the western side of the Brisbane CBD and is made up of various bridges and overpasses. The North Bank development was formerly proposed to alleviate the visual disruption of the expressway and recapture Brisbane for pedestrians.

<span class="mw-page-title-main">Hampden Bridge, Kangaroo Valley</span> Bridge in New South Wales, Australia

Hampden Bridge is a heritage-listed single-span suspension bridge that carries Moss Vale Road (B73) across the Kangaroo River, in Kangaroo Valley, in the City of Shoalhaven local government area of New South Wales, Australia. The bridge was designed by Ernest de Burgh and built by Loveridge and Hudson. The property is owned by Transport for NSW. It was added to the New South Wales State Heritage Register on 2 August 2019.

The Brisbane River, running through Brisbane, Queensland, Australia, is crossed by seventeen major bridges, from the Sir Leo Hielscher Bridges downstream to the Centenary upstream. The river meanders through an urban area that comprises 2,562,000 people.

<span class="mw-page-title-main">Eleanor Schonell Bridge</span> Bridge in Queensland, Australia

The Eleanor Schonell Bridge, better known as the Green Bridge, is a 390-metre (1,280 ft)-long cable-stayed bridge which crosses the Brisbane River between Dutton Park and the University of Queensland's St Lucia campus, connecting the UQ Lakes and Dutton Park Place busway stations. Its deck is 185 metres long, 20 metres wide and about 18 metres above the river's surface. The bridge was opened on 17 December 2006, and is the first bridge in Australia exclusively designed for buses, cyclists and pedestrians. The bridge cost $55.5 million to construct.

<span class="mw-page-title-main">Brisbane central business district</span> Suburb of Brisbane, Queensland, Australia

Brisbane City is the central suburb and central business district of Brisbane, the state capital of Queensland, Australia. It is also colloquially referred to as the "Brisbane CBD", "the city", or simply "town". The CBD is located on a point on the northern bank of the Brisbane River, historically known as Meanjin, Mianjin or Meeanjin in the local Yuggera dialect. The triangular-shaped peninsula is bounded by the median of the Brisbane River to the east, south and west. The point, known at its tip as Gardens Point, slopes upward to the north-west where the city is bounded by parkland and the inner city suburb of Spring Hill to the north. The CBD is bounded to the north-east by the suburb of Fortitude Valley. To the west the CBD is bounded by Milton, Petrie Terrace, and Kelvin Grove.

<span class="mw-page-title-main">Transport in Brisbane</span>

Transport in Brisbane, the capital and largest city of Queensland, Australia, is provided by road, rail, river and bay ferries, footpaths, bike paths, sea and air.

<span class="mw-page-title-main">Besix</span> Belgian-French construction group

BESIX Group is a Belgian construction group based in Brussels, one of the world's leading international contractors according to the ENR ranking. Active since 1909, BESIX operates in Europe, the Middle East, Oceania, Africa, North America and Asia.

<span class="mw-page-title-main">CBD and South East Light Rail</span> Light rail line in Sydney, Australia

The CBD and South East Light Rail is a pair of light rail lines running between Sydney's central business district (CBD) and the south-eastern suburbs of Sydney, New South Wales, Australia. Services running between Circular Quay and Randwick are branded as the L2 Randwick Line, with services running between Circular Quay and Kingsford branded as the L3 Kingsford Line. Construction commenced in October 2015, with the L2 Randwick Line commencing services on the 14 December 2019 and the L3 Kingsford Line on the 3 April 2020. It is part of Sydney's light rail network.

<span class="mw-page-title-main">One Central Park</span> Shopping mall in New South Wales, Australia

One Central Park is a mixed-use dual high-rise building located in the Sydney suburb of Chippendale in New South Wales, Australia. Developed as a joint venture between Frasers Property and Sekisui House, it was constructed by Besix Watpac as the first stage of the Central Park urban renewal project.

<span class="mw-page-title-main">North Queensland Stadium</span> Stadium in Railway Estate , Queensland, Australia

North Queensland Stadium, currently known as Queensland Country Bank Stadium for sponsorship reasons, is a multi-purpose stadium located in Railway Estate, a suburb of Townsville, Queensland, Australia. It is the home ground of the North Queensland Cowboys of the National Rugby League (NRL) competition.

<span class="mw-page-title-main">Neville Bonner Bridge</span> Footbridge spanning the Brisbane River in Brisbane, Australia

The Neville Bonner Bridge is a pedestrian bridge spanning the Brisbane River in Brisbane, Australia, connecting the Queen's Wharf precinct in the Brisbane central business district to the South Bank Parklands in South Brisbane. The bridge opened to the public on 28 August 2024.

BESIX Watpac is an Australian construction and civil engineering company. Formerly listed in on the Australian Securities Exchange, it is now a subsidiary of Besix.

References

  1. https://www.brisbane.qld.gov.au/about-council/council-information-rates/news-publications/newsroom/changed-traffic-conditions-in-brisbane-city-for-kangaroo-point-bridge-opening-event
  2. Kim Stephens (16 September 2013). "New bridge for Brisbane?". Brisbane Times. Fairfax Media. Retrieved 24 November 2014.
  3. "Kangaroo Point Green Bridge". coxarchitecture.com.au. Retrieved 1 June 2023.
  4. 1 2 Stone, Lucy (29 June 2021). "Brisbane's $190m Kangaroo Point green bridge to host restaurant and bar". ABC News . Australian Broadcasting Corporation . Retrieved 1 June 2023.
  5. Kim Stephens (6 November 2013). "Brisbane City Council to fund Kangaroo Point to CBD bridge". Brisbane Times. Fairfax Media. Retrieved 24 November 2014.
  6. "Alice Street Bridge bikeway investigation works". Brisbane City Council. Retrieved 31 October 2016.
  7. "Kangaroo Point bridge plans to progress with new QLD government funding". Archived from the original on 20 August 2018. Retrieved 15 November 2018.
  8. "Kangaroo Point Green Bridge". Brisbane City Council. Retrieved 7 February 2021.
  9. "Besix to build half-kilometre-long pedestrian bridge in Brisbane". Global Construction Review. 30 June 2021. Retrieved 11 May 2022.
  10. "Inner Brisbane River moorings removed for Kangaroo Point green bridge construction". ABC News. 10 August 2021. Retrieved 1 June 2023.
  11. Stone, Lucy (11 August 2021). "Inner Brisbane River moorings removed for Kangaroo Point green bridge construction". ABC News. Retrieved 27 November 2023.
  12. Dennien, Matt (9 September 2023). "Kangaroo Point bridge build hits halfway mark – and $100m cost overrun". Brisbane Times. Retrieved 11 September 2023.
  13. Strohfeldt, Catherine (15 December 2024). "Kangaroo Point Bridge opens, but St Lucia to West End crossing axed". Brisbane Times. Retrieved 16 December 2024.
  14. "Kangaroo Point Bridge Height Safety Maintenance Access Systems". Safetylyne. Retrieved 4 November 2024.