Sir Leo Hielscher Bridges | |
---|---|
![]() The Gateway Bridge (now named Sir Leo Hielscher Bridges), pictured from the Brisbane River in 2003. | |
Coordinates | 27°26′40″S153°06′02″E / 27.44444°S 153.10056°E |
Carries | Motor vehicles |
Crosses | Brisbane River |
Locale | Brisbane, Queensland, Australia |
Official name | Sir Leo Hielscher Bridges |
Characteristics | |
Design | Twin concrete cantilever box girder |
Total length | 1,627 metres (5,338 ft) |
Width | 22 metres (72 ft) |
Height | 64.5 metres (212 ft) above river level [1] |
Longest span | 260 metres (850 ft) |
Clearance below | 59.2 m (194.2 ft) at mid-span [1] |
History | |
Construction cost | $92 million (1986) $350 million (2010) |
Opened | 11 January 1986 (1986 span) [2] 22 May 2011 (2010 span) |
Location | |
![]() |
The Sir Leo Hielscher Bridges, formerly and still collectively referred to as the Gateway Bridge, are a pair of twin road bridges that carry the Gateway Motorway (M1) over the Brisbane River, skirting the eastern suburbs of the city of Brisbane. The western bridge carries traffic to the north and the eastern bridge carries traffic to the south. They are the most eastern crossings of the Brisbane River and the closest to Moreton Bay, crossing at the Quarries Reach and linking the suburbs of Eagle Farm and Murarrie. The original western bridge (formerly named the Gateway Bridge) was opened on 11 January 1986 and cost A$92 million to build. [1] [3] The duplicate bridge was opened in May 2010, and cost $350 million. [1]
In February 2010, the Queensland Government renamed the Gateway Bridge and its duplicate the Sir Leo Hielscher Bridges. [4] [5] Following the announcement, an opinion poll conducted by Brisbane's Channel Nine News showed that 97% of people were against the decision to rename the bridge and that most would continue to call it the Gateway Bridge. [6] [ citation needed ]
A public open day for the duplicate bridge was held on 16 May 2010 and the new bridge was opened to traffic on 22 May 2010, six months ahead of schedule. Following the opening, the old bridge was refurbished, three vehicle lanes at a time. From November 2010 the two bridges carry 12 lanes of vehicle traffic (six in each direction). [7] [8] The associated upgrade of the Gateway Motorway south of the bridge was completed in May 2010 to coincide with the new bridge opening. [9]
To pay for the duplication of the bridge, a toll was imposed on the original bridge in 2005, and on the new bridge when the latter opened. [10] The bridges are tolled using the Linkt (formerly go via) electronic system and will remain so until 2051. [11] The toll booths were removed and free flow tolling began in July 2009. [12] The booth removal saw an immediate drop in road crashes due to the reduction in queuing and weaving at the toll booths on the southern approach. [12]
Construction on the Gateway Bridge commenced on 5 June 1980. The construction of the bridge started before the design was completed, to fast track its construction. It was officially commissioned on 11 January 1986. On this day 200,000 people crossed the bridge by foot as part of the opening activities. [3]
In 1986 the bridge carried an average of 12,500 vehicles per day. [13] In 2001 the bridge was crossed by 27 million vehicles (approximately 73,975 vehicles per day). [14] In early 2010 the single bridge was carrying an average of 100,000 vehicles per day. [13]
The annual Bridge to Brisbane fun run has begun from the southern entrance to the bridge from its first year until 2015, when it was moved, and again since 2021, after being moved back. [15]
In 1979, a tender was called by the Queensland Main Roads Department for a new bridge crossing of the Brisbane River. The conforming design main span was designed as a balanced cantilever with two raised post tensioned concrete compression stays located on the median and over each of the two main piers to support the 260-metre span. Due to the proximity of the Brisbane Airport, an overall structural height constraint was provided due to aircraft flight path and clearances. This constraint ruled out the possibility of a conventional cable-stayed bridge due to the height of the pylons that would be required. Due to cost considerations, an alternative design concept was proposed by Bruce Ramsay (Manager Engineering) of VSL. This alternative design required a world record main span of 260 m for a free cantilever, concrete box girder bridge. The concept was adopted by one of the tenderers – Transfield Queensland Pty.Ltd. who was subsequently awarded the project on the basis of this alternative. It held the record span of 260 m for over 15 years. The box girder is still the largest prestressed concrete, single box in the world, measuring 15 m deep at the pier, with a box width of 12 m and an overall deck width for the six lanes of 22 m. [16]
As stated above the bridge owes its distinctive shape to air traffic requirements restricting its height to under 80 metres (260 ft) above sea level (all features of the bridge including light poles) coupled with shipping needs requiring a navigational clearance of 55 metres (180 ft). [17]
The bridge has six lanes (originally three lanes in each direction, which were subsequently reconfigured to six lanes of northbound traffic after opening of the duplicate bridge).[ citation needed ]
The bridge was financed by funds borrowed by the Queensland Government, and as a result, users of the bridge pay a toll when crossing the bridge in either direction. The bridge is operated and maintained by Transurban Queensland. [18]
The total length is 1,627 metres (5,338 feet). This is divided into a southern approach of 376 metres (1,234 feet), a northern approach of 731 metres (2,398 feet) and the three central spans of 520 metres (1,710 feet). The record main span is 260 metres (850 feet) long by 64.5 metres (212 feet) high, which is equivalent to a 20-storey building. A total of 150,000 tonnes (165,000 short tons) of concrete was used to construct the bridge.[ citation needed ]
The original design did not include a safety fence to prevent suicide attempts and base jumping. [3] Three-metre high safety fences attached to the top of the concrete traffic barrier were later installed to prevent these incidents occurring. [19] Anti-climbing screens are part of the second bridge's security features. [19]
In 2005, a major upgrade of the Gateway Motorway was announced. [10] Leighton Contractors and joint venture partner Abigroup won the contract to upgrade the motorway. The A$1.88 billion Gateway Upgrade Project includes the duplication of the Gateway Bridge and upgrades to 20 km (12 mi) of the Gateway Motorway from Mt Gravatt-Capalaba Road in the south to Nudgee Road in the north. The bridge duplication was the largest bridge and road development in Queensland's history. [20] The duplicate bridge was specified to have a design life of 300 years. [21]
To the south, the upgrade included widening 12 km (7 mi) of the Gateway Motorway from 4 to 6 lanes. To the north, it involved the construction of the 7 km (4 mi) Gateway Motorway deviation, an entirely new six-lane motorway between the Gateway Bridge and Nudgee Road. The deviation runs east of the original motorway through Brisbane Airport Corporation land and provides an alternative means of access to Brisbane Airport (the only effective access from the south). The new bridge provides a bicycle path unlike the first crossing. [13]
The Wynnum Road upgrade was completed on 13 July 2007 and 2 additional southbound lanes between the Port of Brisbane Motorway and Wynnum Road completed in late 2007. Four of six lanes of the new Gateway Motorway deviation were opened in July 2009. All works south of the river were complete by the end of 2009 after 10 years of constant roadwork and traffic disruption. The final concrete pour linking the sides of the new bridge was made in late October 2009. [13] A total of 748 concrete segments, which are supported by 17 piers, were placed for the new bridge. [20]
The duplicate bridge was completed in May 2010 along with the remaining lanes of the Gateway Motorway deviation. [22]
In October 2010, then Minister for Main Roads, Craig Wallace, announced that the original course of the Gateway Motorway via Eagle Farm would be renamed to Southern Cross Way, after Sir Charles Kingsford Smith's aircraft, the Southern Cross , which landed at Eagle Farm in 1928, and so as to avoid confusion with the newly opened Gateway Motorway deviation. [23] The new Gateway Motorway deviation was given the name Gateway Motorway. However, like the renaming of the bridges themselves, the change to Southern Cross Way was not without controversy, attracting criticism from the then Shadow Minister for Main Roads and Transport, Fiona Simpson. [24]
Refurbishment of the existing bridge was completed in November 2010. [8]
In 2009 as part of the Q150 celebrations, the Gateway Bridge was announced as one of the Q150 Icons of Queensland for its role as a "structure and engineering feat". [25]
The Centenary Bridge is a motorway crossing of the Brisbane River. As it forms part of Brisbane's Centenary Motorway, it is used primarily by vehicular traffic, although it includes footpaths for pedestrian traffic. The bridge was used by 85,000 vehicles per day in 2023.
Pacific Highway is a 790-kilometre-long (491 mi) national highway and major transport route along the central east coast of Australia, with the majority of the highway being part of Australia's Highway 1. The highway and its adjoining Pacific Motorway between Brisbane and Brunswick Heads and Pacific Motorway between Sydney and Newcastle links the state capitals of Sydney in New South Wales with Brisbane in Queensland. It approximately parallels the Tasman Sea and the Coral Sea of the South Pacific Ocean coast. Additionally, between Brunswick Heads and Port Macquarie, the road is also signed as Pacific Motorway, but has not been legally gazetted as such.
Hornibrook Bridge is a heritage-listed mostly-demolished road bridge on the Hornibrook Highway over Hays Inlet at Bramble Bay from Brighton, City of Brisbane to Clontarf, City of Moreton Bay, Queensland, Australia. It was designed by Manuel Hornibrook and built from 1932 to 1935 by Manuel Hornibrook. It was added to the Queensland Heritage Register on 7 October 1994.
The Houghton Highway is a 2.74 km (1.70 mi) reinforced concrete viaduct, the second bridge to be built across Hays Inlet at Bramble Bay connecting the cities of Redcliffe and Brisbane in Queensland, Australia. The bridge, along with the third bridge, the Ted Smout Memorial Bridge, were the longest bridges in the country until 27 March 2013, when the Macleay River Bridge opened in Kempsey, NSW.
The Warrego Highway is located in southern Queensland, Australia. It connects coastal centres to the south western areas of the state, and is approximately 715 km in length. It takes its name from the Warrego River, which is the endpoint of the highway. The entire highway is part of the National Highway system linking Darwin and Brisbane: formerly National Highway 54, Queensland began to convert to the alphanumeric system much of Australia had adopted in the early-2000s and this road is now designated as National Highway A2.
The Pacific Motorway is a motorway in Australia between Brisbane, Queensland, and Brunswick Heads, New South Wales, through the New South Wales–Queensland border at Tweed Heads.
The Gympie Arterial Road is a freeway in the northern suburbs of Brisbane in Queensland, Australia. The road starts in Carseldine at Gympie Road and terminates at the Gateway Motorway where it becomes the Bruce Highway. It is three lanes in each direction from Carseldine to the Strathpine Road intersection, and two lanes to the Gateway Motorway.
The Sunshine Motorway is a thirty-three kilometre Australian motorway on the Sunshine Coast region of Queensland, just north of Brisbane. It was initially a tolled motorway before these were removed in 1996 after excessive complaints regarding the need of a toll. It is part of State Route 70, which extends north a further 12.3 kilometres to Noosaville.
Transurban is a road operator company that manages and develops urban toll road networks in Australia, Canada and the United States. It is listed on the Australian Securities Exchange (ASX), and is the world’s largest toll road operator.
The Gateway Motorway is a major tolled motorway in Brisbane, Queensland, Australia which includes the Sir Leo Hielscher Bridges. The motorway is operated by toll road operator Transurban.
The M2/M6 Logan Motorway is a 30-kilometre toll road between Ipswich and the M1 or Pacific Motorway at Loganholme, and the Gateway Motorway, providing access to the Gold Coast on the eastern seaboard and to the rural areas of the Darling Downs to the west. The M6 portion runs from the Pacific Motorway to the junction with the Gateway Motorway at Drewvale, where it then becomes the M2, continuing on to merge with the Ipswich Motorway at Gailes.
TransApex was a road transport plan devised by Brisbane Lord Mayor Campbell Newman in the early 2000s to connect existing motorways and major arterial roads with new transport links and divert cross-city traffic out of the Brisbane central business district. The plan is currently being delivered by Brisbane City Council at an estimated total cost of over $10 billion across five stages. According to the Brisbane City Council website, TransApex is "the biggest urban road project proposed in Australia".
The M7 Clem Jones Tunnel (CLEM7), known during its development as the North–South Bypass Tunnel (NSBT), is a A$3.2 billion motorway grade toll road under the Brisbane River, between Woolloongabba and Bowen Hills in Brisbane, Queensland. The tunnel was progressively opened to traffic from late on 15 March 2010 until just after midnight on 16 March 2010. It was completely open by 12:02 am.
The M5 (Centenary Motorway) is a 43-kilometre (27 mi) motorway in the western suburbs of Brisbane, Australia.
The M3 Inner City Bypass (ICB) is a 5.6-kilometre (3.5 mi) major motorway standard bypass in Brisbane, Queensland, Australia. Bypassing the Brisbane central business district to the north, it connects Brisbane's Pacific Motorway and Go Between Bridge at Hale Street to Kingsford Smith Drive, Legacy Way Tunnel, Clem Jones Tunnel, AirportLink Tunnel and Lutwyche Road following the Exhibition railway line for the majority of its length.
Port of Brisbane Motorway is a motorway which connects the Port of Brisbane to the Gateway Motorway. Stage 1 was opened in December 2002. The motorway was built to take freight traffic off Lytton Road, with about 4,000 vehicles travelling to the Port of Brisbane in 2002. Stage 1 cost A$196 million and was finished six months ahead of schedule and A$20 million under budget. The Port of Brisbane Motorway holds the M4 motorway designation.
The road transport in Brisbane, Australia, consists of a network of highways, freeways and motorways. Some motorways have tolls applied.
Queensland Motorways was the company that managed the 70-kilometre-long Linkt network of tolled roads in Brisbane which includes the: Clem Jones Tunnel (CLEM7), Go Between Bridge, Gateway Motorway and Logan Motorway. It had its headquarters at Eight Mile Plains.
The Ted Smout Memorial Bridge is a road and pedestrian bridge in Brisbane, Australia, the third bridge crossing Hays Inlet in Bramble Bay. It is located 30 metres to the east of the Houghton Highway, providing 3 southbound traffic lanes and a bi-directional pedestrian and bicycle path. It connects the Redcliffe suburb of Clontarf with the Brisbane suburb of Brighton, and was opened by then Queensland Premier Anna Bligh on 11 July 2010. The Ted Smout Memorial Bridge were Australia's second longest bridges until 27 March 2013, when the Macleay River Bridge opened in Kempsey, NSW.
Deagon Deviation is a major road in Brisbane, Queensland, Australia. It provides part of the road connection between the Brisbane CBD and Redcliffe. It is designated State Route 26 throughout its length.