Line 7 (Suzhou Rail Transit)

Last updated
Line 7
SZRT Line 7 icon.svg
Construction Site of Line 7, Tongyuanlu South Station.jpg
Line 7 Under Construction at Tongyuanlu South station
Overview
StatusUnder construction
(Hongzhuang to Muli is operational as the branch of Line 4)
OwnerSuzhou Rail Transit Co., Ltd
Termini
Stations33
Service
Type Rapid transit
System Suzhou Rail Transit
Operator(s)Suzhou Rail Transit Co., Ltd
Technical
Line length29.6 km
Track gauge 1,435 mm (4 ft 8+12 in)

Line 7 of Suzhou Rail Transit is an under construction rapid transit line in Suzhou. Construction started on December 25, 2019. [1] The line will be 29.6 kilometers long. [1]

Contents

According to the plans, the part of Line 4 between Hongzhuang and Muli stations will be operated as part of Line 7. [2] The combined line will be 40.6 km long. In addition, a 4-station, 7.11 km northern extension from Moyang to Chunqiu Road started construction in May 2022, for an opening in 2026.

It has Tian'edang Yard (Chinese :天鹅荡停车场) in use for Line 4. [3]

Stations

Station name [4] ConnectionsDistance
km
Location
EnglishChinese
Moyang 莫阳-0 Xiangcheng
Zhujing 朱泾
Suzhou North Railway Station 高铁苏州北站  2  
Xuenan 雪南
Changlou 常楼
Dengyun 登云
Litanghelu 蠡塘河路
Chunshenhudonglu 春申湖东路
Huayuanlu East 华元路东
Baidang North 白荡北  8  
Baidang South 白荡南 SIP
Banjing 板泾
Yangjing 洋泾
Jicuiqiao 积翠桥
Central Park 中央公园  1  
Reyunqiao 惹云桥  6  
Huangtiandang 黄天荡  5  
Loufeng 娄葑
Qunli 群力
Tongyuanlu South 通园路南  3  
Linjiatan 林家潭 Wuzhong
Guoxiang 郭巷  2  
Yinshan 尹山
Jinjiaqiao South 金家桥南
Fengjinlu 枫津路
Hongzhuang 红庄  4  
Lishu 蠡墅
Shihu Moshe 石湖莫舍
Yuexi 越溪
Wenxi Lu 文溪路
Tian'edang Lu 天鹅荡路
Suzhouwan North 苏州湾北
Muli 木里

Rolling stock

Fleet numbersYear BuiltTime in serviceBuilderClassNumber in serviceNo
of
car
AssemblyRolling stockNumberDepotsLine assignedNotes
396 (66 sets)2023-2025 (planned)N/ACRRC Nanjing PuzhenBNever built6Tc+Mp+M - M + Mp+TcPM227070101-076606
(0701-0766)
None  7   (planned)The order scrapped in February 2023.
300 (50 sets)2023-2025 [lower-alpha 1] 2024-presentCRRC Nanjing PuzhenB132 (22 sets)6Tc+Mp+M - M + Mp+TcPM259070101-075006
(0701-0750)
Tian'Edang Yard
Songling Depot
Yuanhe Yard
  4    7  Converted from PM101, PM102 and PM116.

Related Research Articles

<span class="mw-page-title-main">Changchun Rail Transit</span> Public transport system in Changchun, China

Changchun Rail Transit, is the rapid transit and light rail system in the city of Changchun, Jilin Province, China. Its first line, Line 3, is the first true light rail line in Mainland China. The system consists of three light rail lines and three rapid transit lines.

<span class="mw-page-title-main">Suzhou Rail Transit</span> Rapid transit system in Suzhou, China

Suzhou Rail Transit, also known as Suzhou Metro, is a rapid transit system serving the city of Suzhou, in Jiangsu Province, China. Line 1 began operation on April 28, 2012. Line 2 opened on December 28, 2013. A further three lines, and an extension of Line 2, were completed between 2016 and 2021. Line 11 connecting Kunshan city which is under Suzhou's administration, and beyond to the Shanghai Metro was completed on June 24, 2023.

<span class="mw-page-title-main">Kunming Metro</span> Metro system in Kunming, China

Kunming Metro, or Kunming Rail Transit, is a rapid transit system in Kunming, the capital of China's Yunnan Province. The system currently consists of 6 lines with 2 extensions to existing lines under construction and 3 more lines planned, with a total track length of 164.3 kilometers.

<span class="mw-page-title-main">Guiyang Metro</span> Metro system in Guiyang, China

The Guiyang Metro is a rapid transit system in the city of Guiyang, Guizhou province, China. It is operated and branded as Guiyang Urban Rail Transit (GYURT).

<span class="mw-page-title-main">Wuxi Metro</span> Metro system in Wuxi, China

Wuxi Metro is the rapid transit system of Wuxi, Jiangsu province, China. Line 1 began operations on 1 July 2014, and Line 2 on 28 December 2014. Line 3 opened on 28 October 2020. Line 4 opened on 17 December 2021.

<span class="mw-page-title-main">Line 1 (Suzhou Rail Transit)</span> Railway line in Suzhou, Jiangsu, China

Line 1 is the main west–east line of Suzhou Rail Transit, and it started service on April 28, 2012. Line 1 is the first rapid transit line in Suzhou and this line is operated by Suzhou Rail Transit Co., Ltd.

<span class="mw-page-title-main">Line 3 (Suzhou Rail Transit)</span> Metro line in Suzhou, Jiangsu, China

Line 3 is an east-west line of Suzhou Rail Transit. The line is 45.272 kilometers long. The line links the Wuzhong District, Suzhou Industrial Park, and the Suzhou New District.

<span class="mw-page-title-main">Line 4 (Suzhou Rail Transit)</span> Metro line in Suzhou, Jiangsu, China

Line 4 is a line of Suzhou Rail Transit. It runs in a north-south alignment from Longdaobang station in Xiangcheng District's the northern suburbs, to the canal town of Tongli in Wujiang District in the south and Muli in the southwest. The line is 52.8 km long with 38 stations, which consists of a 41.5 kilometer long main line with 30 stations and a branch line.

<span class="mw-page-title-main">Line 5 (Suzhou Rail Transit)</span> Metro line in Suzhou, Jiangsu, China

Line 5 is a southwest–northeast line of Suzhou Rail Transit. It opened on June 29, 2021. The line is 44.1 kilometers long. Its south-western terminus is at Taihu Xiangshan station in Wuzhong District, with its north-eastern terminus at Yangchenghu South station in Suzhou Industrial Park.

<span class="mw-page-title-main">Line 11 (Beijing Subway)</span> Railway line in Beijing, China

Line 11 of the Beijing Subway is a rapid transit line of the Beijing Subway. The line opened between Jin'anqiao and Xinshougang on December 31, 2021, and between Jin'anqiao and Moshikou on December 30, 2023. Line 11's color is grapefruit.

<span class="mw-page-title-main">Nanning Metro</span> Rapid transit system in Nanning, China

Nanning Metro or Nanning Rail Transit (NNRT) is a rapid transit system in Nanning, the capital of Guangxi Zhuang Autonomous Region in China.

<span class="mw-page-title-main">Line 11 (Suzhou Rail Transit)</span> Railway line in Suzhou, Jiangsu, China

Line 11 is a rapid transit line of the Suzhou Rail Transit system. It was formerly known as Line S1 during planning and construction. Construction started on November 27, 2018. It opened on 24 June 2023. The line uses driverless 6-car Class B rolling stock operating up to 100 km/h (62 mph). Partial through-running on Line 3 began on December 23, 2023, and full through-running began on June 29, 2024.

<span class="mw-page-title-main">Line 6 (Suzhou Rail Transit)</span> Metro line in Suzhou, Jiangsu, China

Line 6 of Suzhou Rail Transit is a line partly in operation. Running north-west to south-east, it will connect Suzhou New District, Suzhou's city center of Gusu District and Suzhou Industrial Park. The line 6, except Huayun station, started operation in 29 June 2024.

Line 9 of Suzhou Rail Transit, also known as the East-West Express Line is a planned east–west rapid transit line in Suzhou. No official public construction date is available, however construction is expected to start before 2035. It will serve Suzhou New District, Gusu District, Suzhou Industrial Park, Kunshan, and Taicang.

<span class="mw-page-title-main">Line 8 (Suzhou Rail Transit)</span> Metro line in Suzhou, Jiangsu, China

Line 8 of Suzhou Rail Transit is a L-shaped rapid transit line on both the east-west and north-south axes. It serves Suzhou New District, Gusu District, Xiangcheng District, and Suzhou Industrial Park. Construction started on September 30, 2019, and completed in March 2024. Line 8 was opened on September 10, 2024.

Line 10 of Suzhou Rail Transit is a under construction north–south regional rapid transit line in Suzhou, Jiangsu, China. The Northern section of Line 10 is 90.34 km in length with 21 stations, including 13 elevated stations and 8 underground stations. The line was formerly known as Suzhou Rail Transit Line S5.

Line S5 of Suzhou Rail Transit is an under construction north–south regional rapid transit line in Jiangsu, China.

<span class="mw-page-title-main">Tangzhuang station</span> Suzhou Metro station

Tangzhuang Station is a station of Line 3 and Line 8 Suzhou Rail Transit. The station is located in Suzhou Industrial Park, Jiangsu. It has been in use since December 25, 2019, when Line 3 first opened to the public. It acts as one of three interchanges between the two lines.

<span class="mw-page-title-main">Weiting station</span> Suzhou Metro station

Weiting station is the eastern terminus of Suzhou Rail Transit Line 3 and western terminus of Line 11. The station is located in Suzhou Industrial Park, Jiangsu. It has been in use since December 25, 2019; when Line 3 first opened to the public. On June 24, 2023, when Line 11 started operation, the station acted as the western terminus of the line and transfer station of the two lines. Through-running on lines 3 and 11 six months later, rendering Weiting obsolete as a terminal station. The line 11 platform is no longer in use. On June 29, 2024, through-running began on the entirety of the two lines.

References

  1. 1 2 "苏州轨道交通7号线开工建设". 2019-12-25.
  2. "苏州轨道交通". Archived from the original on 2012-07-13. Retrieved 2012-06-29. (Website of the subway operator "SZ-Transit" (苏州轨道交通/Suzhou Guidao Jiaotong) (information retrieved on Oct. 16th, 2010))[ dead link ]
  3. 顾蕾 (2012-02-10). 苏州轨交4号线及支线今年6月动工. 苏州日报 (in Chinese). Archived from the original on 2012-07-14. Retrieved 2012-06-19.
  4. "官宣!苏州轨道交通6、7、8号线车站站名定了". 2024-01-24.
  1. Cars modified under project PM259.