Mahatma Gandhi Road metro station (Bengaluru)

Last updated

Mahatma Gandhi Road
Namma Metro Logo.png Namma Metro station
MG Road metro station (2024) 01.jpg
Church Street entrance of the station, October 2024
General information
Location M.G. Road, Shivaji Nagar, Bengaluru, Karnataka 560001
India
Coordinates 12°58′32″N77°36′25″E / 12.975536°N 77.606830°E / 12.975536; 77.606830
Owned by Bangalore Metro Rail Corporation Ltd (BMRCL)
Operated by Namma Metro
Line(s) Purple Line Pink Line
Platforms Side platform
Platform-1 → Whitefield (Kadugodi)
Platform-2 → Challaghatta
Tracks2 + 2 (U/C)
Connections BSicon SUBWAY.svg Upcoming Pink Line
Construction
Structure type Elevated
Platform levels5 (2 Elevated + 2 UG)
Bicycle facilitiesYes [1]
AccessibleYes Wheelchair symbol.svg
Architect  Punj Lloyd - Sembawang Infrastructure (India) JV
  Larsen & Toubro
Other information
Station codeMAGR
History
Opened  20 October 2011;13 years ago (2011-10-20)
Opening  December 2026;23 months' time (December 2026)(TBC)
Electrified750 V DC third rail
Services
Preceding station Namma Metro Logo.png Namma Metro Following station
Trinity Purple Line Cubbon Park
towards Challaghatta
Shivaji Nagar
towards Nagawara
Pink Line
(Operational around December 2026)
National Military School
Location
Mahatma Gandhi Road metro station (Bengaluru)

Mahatma Gandhi Road (commonly referred to as MG Road) is an elevated metro station on the East-West corridor of the Purple Line of Namma Metro in Bengaluru, India. Purple line station was constructed by Punj Lloyd [2] and opened to the public on 20 October 2011. [3] The station MG Road has a bicycle stand next to the Urban Square, from where commuters can rent cycles. [4] This metro station will serve as Purple line's 2nd interchange station after Majestic metro station for the upcoming Pink Line, being constructed by Larsen & Toubro.

Contents

As per the latest updates, this metro station, under the second phase (Pink Line), covering the total distance of 13.8km stretch (Dairy Circle - Nagawara) is expected to be operational around December 2026. [5] [6] [7] [8] [9] [10]

History

Boulevard

The old MG Road boulevard was demolished to build Namma Metro. [11] The reconstruction work was contracted to Rajiv Gandhi Rural Housing Corporation and Karnataka Land Army Corporation. The deadline for completion was fixed as March 2012. However, the work was delayed when the ground was found to be unstable and had to be reinforced. [12]

The new boulevard cost 50 million (US$600,000) and portions of it were inaugurated on 5 September 2012. It spreads across 850 square metres. [13]

Further plans include a two-tier walkway with a museum, art gallery, amphitheatre and children's play area located on the ground floor. The first floor of the walkway will lead to the first floor/concourse of the metro station and both floors will be equipped with internationally designed toilets. The area where the dummy coach is parked will have ramps leading up to the boulevard. [14]

Gandhi Centre

BMRCL plans to open an exhibition of the life of Mahatma Gandhi on one floor of the station. It was scheduled to open in 2013. [4]

Station layout

Purple Line - Station Layout

Mahatma Gandhi Road track layout
BSicon vCONTgfa.svg
BSicon cPLT.svg
BSicon vSTR.svg
BSicon cPLT.svg
P2
BSicon cPLT.svg
BSicon vSTR.svg
BSicon cPLT.svg
P1
BSicon cPLT.svg
BSicon vSTR.svg
BSicon cPLT.svg
BSicon vCONTgfe.svg
Station with two tracks and two side platforms
GStreet levelExit/Entrance
L1MezzanineFare control, station agent, Metro Card vending machines, crossover
L2 Side Platform | Doors will open on the left Wheelchair symbol.svg
Platform 1
Eastbound
Towards → Whitefield (Kadugodi)
Next Station: Trinity
Platform 2 WestboundTowards ← Challaghatta
Next Station: Cubbon Park
Side Platform | Doors will open on the left Wheelchair symbol.svg
L2

Pink Line Station Layout - To Be Confirmed

Mahatma Gandhi Road track layout
BSicon HSTg.svg
BSicon HSTf.svg
BSicon PSTR(L).svg
BSicon PSTR(R).svg
P#
BSicon PSTR(L).svg
BSicon PSTR(R).svg
P#
BSicon PSTR(L).svg
BSicon PSTR(R).svg
BSicon HSTg.svg
BSicon HSTf.svg
Station with two tracks and one Island platform
** Under Construction
GStreet levelExit/Entrance
MMezzanineFare control, station agent, Ticket/token, shops
PPlatform #
Southbound
Towards → Kalena Agrahara
Next Station: National Military School
Island platform | Doors will open on the right Wheelchair symbol.svg
Platform #
Northbound
Towards ← Nagawara
Next Station: Shivaji Nagar

Entry/Exits

There are 3 Entry/Exit points - A, B and C. Commuters can use either of the points for their travel.

The introduction scene of Adah Sharma in 2015 Kannada film Rana Vikrama was shot at MG Road Metro railway station. [15]

Facilities

ATM of several banks have been installed at Mahatma Gandhi Road metro station. [16]

  1. ICICI Bank [17]
  2. HDFC Bank

See also

Related Research Articles

<span class="mw-page-title-main">Namma Metro</span> Rapid transit system in Bengaluru, Karnataka, India

Namma Metro, also known as Bengaluru Metro, is a rapid transit system serving the city of Bengaluru, the capital city of the state of Karnataka, India. It is the second-longest operational metro network in India with an operational length of 76.95 kilometers, just behind Delhi Metro. Upon its inauguration in 2011, it became the first underground metro system in South India. Namma Metro has a mix of underground, at grade, and elevated stations. Out of the 68 operational metro stations of Namma Metro as of November 2024, there are 59 elevated stations, eight underground stations and one at-grade station. The system runs on standard-gauge tracks.

<span class="mw-page-title-main">Green Line (Namma Metro)</span> Line of Bengalurus Namma Metro

Green Line of Namma Metro was built along with the Purple Line during the first phase of construction of the metro rail system for the city of Bengaluru, Karnataka, India. The 30.5 km (19.0 mi) line connects Madavara in the northwest to Silk Institute in the south. The line connects the industrial centers of Peenya and Yeshwanthpur along Tumakuru Road in the north with the central hub of Majestic and the southern residential areas of Bangalore such as Basavanagudi, Jayanagar, Banashankari, Konanakunte Cross, Thalaghattapura along Kanakapura Road. Green Line is mostly elevated, with 26 elevated and 3 underground stations. The Line passes through Majestic station which is an interchange station between Green and Purple Lines.

<span class="mw-page-title-main">Purple Line (Namma Metro)</span> Line of Bengalurus Namma Metro

The Purple Line is a part of the Namma Metro rail system for the city of Bengaluru, Karnataka, India. As of 2023, the line is 43.49 km (27.02 mi) long and spans 37 stations from Challaghatta in the southwest to Whitefield (Kadugodi) to the east. The Purple Line is mostly elevated, with 31 elevated stations, 5 underground stations and 1 at-grade station. The Line passes through many prime activity centers of the city including Whitefield, Krishnarajapura, MG Road, Vidhana Soudha and Majestic station, which is an interchange station between Purple and Green Lines. Phase I of the Purple Line was the first underground metro section in South India.

<span class="mw-page-title-main">Halasuru metro station</span> Namma Metros Purple Line metro station

Halasuru is an elevated metro station on the East-West corridor of the Purple Line of Namma Metro in Bengaluru, India. It was opened to the public on 20 October 2011. It is located in the Halasuru locality of Bengaluru.

<span class="mw-page-title-main">Trinity metro station</span> Namma Metros Purple Line metro station

Trinity is an elevated metro station on the East-West corridor of the Purple Line of Namma Metro in Bangalore, India. It was opened to the public on 20 October 2011. The station was constructed by Punj Lloyd.

<span class="mw-page-title-main">Cubbon Park metro station</span> Namma Metros Purple Line metro station

Cubbon Park is an underground metro station on the East-West corridor of the Purple Line of Namma Metro in Bengaluru, India. It was opened to the public on 30 April 2016. The station is located a few metres away from one of the entrances to Cubbon Park.

<span class="mw-page-title-main">Nadaprabhu Kempegowda station, Majestic metro station</span> Namma Metros Purple & Green Line interchange station

Nadaprabhu KempegowdaStn., Majestic is an important underground interchange metro station on the east–west corridor of the Purple Line and north–south corridor of Green Line of Namma Metro in Bangalore, in the state of Karnataka, India. It opened to the public on 30 April 2016 as part of Namma Metro's Phase-1. This important metro station serves as the interchange station allowing passengers to transfer between these lines for ease of travel. The station is located within walking distance from BMTC & KSRTC's Kempegowda Bus Station, as also the City's Main Railway station.

<span class="mw-page-title-main">Magadi Road metro station</span> Namma Metros Purple Line metro station

Magadi Road is an elevated metro station on the East-West corridor of the Purple Line of Namma Metro serving the Magadi Road in Bengaluru, India. The station was constructed by Punj Lloyd and was opened to the public on 16 November 2015.

<span class="mw-page-title-main">Hosahalli metro station</span> Namma Metros Purple Line metro station

Sri Balagangadharanatha Swamiji Stn., Hosahalli is an elevated metro station on the East-West corridor of the Purple Line of Namma Metro serving the Hosahalli area in Bengaluru, India. It was opened to the public on 16 November 2015.

<span class="mw-page-title-main">Rashtreeya Vidyalaya Road metro station</span> Namma Metros Green & Yellow Line interchange station

Rashtreeya Vidyalaya Road is an elevated interchange metro station on the North-South corridor of the Green Line and the East-West corridor of the upcoming Yellow Line of Namma Metro serving the 5th and 8th Block of Jayanagar area of Bangalore, India. It was opened to the public on 18 June 2017.

<span class="mw-page-title-main">Mysuru Road metro station</span> Namma Metros Purple Line metro station and upcoming interchange for Orange Line

Mysuru Road is an elevated metro station on the East-West corridor of the Purple Line of Namma Metro serving Muthachari Industrial Estate, Nayandahalli and Deepanjali Nagar in Bengaluru. It was opened to the public on 16 November 2015. This metro station is proposed to act as an interchange for the upcoming Orange Line under Phase 3.

<span class="mw-page-title-main">Deepanjali Nagar metro station</span> Namma Metros Purple Line metro station

Deepanjali Nagar is an elevated metro station on the East-West corridor of the Purple Line of Namma Metro serving Deepanjali Nagar in Bengaluru, India. It was opened to the public on 16 November 2015.

<span class="mw-page-title-main">Krantivira Sangolli Rayanna Railway Station metro station</span> Namma Metros Purple Line metro station

Krantivira Sangolli Rayanna Railway Station is an underground metro station on the East-West corridor of the Purple Line of Namma Metro which serves the Subhash Nagar area, Sevashrama area in Bangalore, India. It was opened to the public on 30 April 2016.

The Pink Line of Namma Metro is under construction and will form part of the metro rail network for the city of Bangalore, Karnataka, India. The 21.25 km (13.20 mi) line connects Kalena Agrahara station on Bannerghatta Road in the south with Nagawara station on Outer Ring Road in the north. The Pink Line is mostly underground but also has a 6.98 km (4.34 mi) elevated section and a 0.48 km (0.30 mi) at-grade (surface) section. There are 18 stations on the line, including 12 underground and 6 elevated ones. Pink Line will have an interchange with the Purple Line at MG Road station. It will also have interchanges with the Yellow line at Jayadeva Hospital station and with the Blue Line at Nagawara. Both these lines are under construction.

The Blue Line or ORR-Airport Metro Line is part of the Namma Metro rail network for the city of Bangalore, Karnataka, India. It consists of two sections - Phase-2A and Phase-2B. Construction of Phase-2A began in August 2021. Construction of Phase-2B began in February 2022. The 58.19 km line connects Central Silk Board with the Kempegowda International Airport. The Line is mostly elevated but also has an at-grade (surface) section close to the Airport and 2 short underground sections where it passes the Jakkur Aerodrome and Yelahanka AFB. There are 30 stations on the line of which the two station/s at the Airport may be at surface level or underground. Blue Line will have interchanges with the Yellow Line at Central Silk Board, Purple Line at KR Pura, Pink Line at Nagawara and with the future /proposed Orange Line at Hebbal.

Dairy Circle is an upcoming underground metro station on the North-South corridor of the Pink Line of Namma Metro in Bengaluru, India with plans to make an interchange with the proposed Red Line. This metro station consists of the main Dairy Circle Flyover where to the east leads towards Silk Board junction and Christ University, to the west leads towards NIMHANS Hospital, Indira Gandhi Institute of Child Health Hospital, to the north leads towards Bosch, Karnataka Federal Foundation and to the south leads towards Sri Jayadeva Institute of Cardiovascular Sciences and Research, a healthcare institute in South Bengaluru.

<span class="mw-page-title-main">Krishnarajapura metro station</span> Namma Metros Purple & Blue Line interchange station

Krishnarajapura is an important elevated metro station on the East-West corridor of the Purple Line as well as the South-North corridor of the upcoming Blue Line of Namma Metro in Bengaluru, India. This will be an upcoming interchange metro station after Nadaprabhu Kempegowda Stn., Majestic having interchange with Purple and Green Lines. Around this station, holds the main KR Puram Railway station followed by some locations like KR Pura Hanging Bridge leading towards Hoskote, Tin Factory, ITI General Hospital and many more. This station under Blue Line is planned to be operational around the year 2026 (TBC).

<span class="mw-page-title-main">Kundalahalli metro station</span> Namma Metros Purple Line metro station

Kundalahalli is an elevated metro station on the East-West corridor of the Purple Line of Namma Metro in Bengaluru, India. SAP Labs India and some other locations like Fortune Select Trinity Hotel, Ginger Bangalore and many more, are in close proximityto this station.

<span class="mw-page-title-main">Challaghatta metro station</span> Namma Metros Purple Line terminal metro station

Challaghatta is the elevated western terminal metro station on the East-West corridor of the Purple Line of Namma Metro in the Bengaluru border, India. It is on a 2.05 km extension from Kengeri metro station. Alongside the station passes the main Bengaluru - Mysuru NH 275 Expressway which leads towards the cities of Mysore and Mangalore. Trial runs on the new Kengeri - Challaghatta section of the line commenced on 29 July 2023. The station was opened and scheduled services commenced on 9 October 2023. No inauguration ceremony was held, but the new section of line was virtually inaugurated by Prime Minister Modi on 20 October 2023.

References

  1. "Now, hop off Metro and take cycle". The Times of India . 21 October 2012. Archived from the original on 3 January 2013. Retrieved 24 October 2011.
  2. "Punj Lloyd to build more Metro stations". Deccan Herald . 19 October 2009. Retrieved 24 October 2011.
  3. "Bangalore's Diwali gift ready – 'Namma Metro'". Zee News. 18 October 2011. Retrieved 24 October 2011.
  4. 1 2 "Metro to showcase Gandhi". Deccan Herald . 20 October 2012. Retrieved 23 September 2014.
  5. "Bengaluru: Namma Metro pushes Pink Line deadline to December 2026". Deccan Herald. Retrieved 4 November 2024.
  6. Bureau, The Hindu (4 August 2024). "Namma Metro's Pink line likely to open in phases". The Hindu. ISSN   0971-751X . Retrieved 7 August 2024.{{cite news}}: |last= has generic name (help)
  7. "Namma Metro's Pink Line: This Upcoming Corridor Is Set To Redefine The City Commute". TimesNow. 25 June 2023. Retrieved 15 December 2023.
  8. "Namma Metro Phase 2 In Bengaluru To Be Operational By 2025, Announces Karnataka Deputy CM". TimesNow. 10 February 2024. Retrieved 12 February 2024.
  9. Staff Reporter (27 September 2023). "Good News! Pink Line of Bengaluru Metro to be 90% Ready by Second-half of 2024". Metro Rail News. Retrieved 15 December 2023.
  10. "Namma Metro: Bengaluru's Under-Construction Pink Line Slated To Achieve 2 Milestones In a Week". TimesNow. 31 January 2024. Retrieved 1 February 2024.
  11. "MG Road boulevard back in 2012". The Times of India . 12 December 2011. Archived from the original on 15 July 2012.
  12. "Loose soil delays boulevard work". The Times of India . 26 October 2012.
  13. "MG Road Metro station gets boulevard with fountain". The Asian Age . 6 September 2012.
  14. "Boulevard going through finishing touches: Sivasailam". The Times of India . 4 February 2013. Archived from the original on 11 April 2013.
  15. "Puneeth Rajkumar, Adah Sharma shoot at MG Road Metro Station, Bangalore". The Times of India.
  16. Lalitha, S (26 December 2016). "ATMs prove to be money-spinner for Namma Metro". The New Indian Express. Retrieved 25 October 2017.
  17. "ICICI Bank". ICICI Bank. Archived from the original on 27 November 2022. Retrieved 25 October 2017.