Marina Barrage

Last updated

Marina Barrage
Marina Barrage Logo.png
Marina Barrage Closeup 300522.jpg
Official nameMarina Barrage
Location8 Marina Gardens Drive, Singapore 018951
Coordinates 1°16′46.124″N103°52′16.26″E / 1.27947889°N 103.8711833°E / 1.27947889; 103.8711833
StatusOperational
Opening date31 October 2008;15 years ago (2008-10-31)
Construction costS$226 million [1]
Dam and spillways
ImpoundsMarina Channel
Length350m
Reservoir
Creates Marina Reservoir
Catchment area 10,000 ha
Surface area240 ha [2]

Marina Barrage is a dam in southern Singapore built at the confluence of five rivers, across the Marina Channel between Marina East and Marina South. [3]

Contents

First conceptualised in 1987 by then prime minister Lee Kuan Yew to help achieve greater self-sufficiency for the country's water needs, the barrage began construction on 22 March 2005, [4] and was officially opened on 31 October 2008 as Singapore's fifteenth reservoir, the Marina Reservoir. [5]

It provides water storage, flood control and recreation. It won a Superior Achievement Award from the American Academy of Environmental Engineers in 2009. [6] It also turned the previously salt water Singapore River into fresh water for the first time in its history.

Purpose

The S$3 billion project, with $226 million for the structure itself, turned Marina Bay and Kallang Basin into a new downtown freshwater Marina Reservoir. It provides water supply, flood control and a new lifestyle attraction. After its opening, the Marina Barrage quickly became a tourist attraction not long after. [7]

By keeping out seawater, the barrage formed Singapore's 15th reservoir and first reservoir in the city. Marina Reservoir, together with the future Punggol and Serangoon reservoirs, increased Singapore's water catchment areas by one-sixth of Singapore's total land area. [8]

Marina Barrage also acts as a tidal barrier to keep seawater out, helping to alleviate flooding in high-risk low-lying areas of the downtown districts such as Chinatown, Jalan Besar and Geylang. [9]

When it rains heavily during low-tide, the barrage's crest gates will be lowered to release excess water from the coastal reservoir into the sea. If heavy rain falls during high-tide, the crest gates remain closed and giant drainage pumps are activated to pump excess water out to sea.

As the water in the Marina Basin is unaffected by the tides, the water level will be kept constant, making it ideal for all kinds of recreational activities such as boating, windsurfing, kayaking and dragonboating.

Impact

The building of the Marina Barrage required the relocation of Clifford Pier from Collyer Quay to Marina South (see Marina South Pier).

It has proved to be a tourist attraction. Marina Barrage is open for viewing 24/7. The information counter is open from 9.00am to 9.00pm daily. Tours for a maximum capacity of 80 people to the Visitor Centre can be arranged prior to arrival.

From 2012 onward, it played host to annual public youth community and cosplay event EOY Cosplay Festival.

Awards

The Marina Barrage was conferred the Superior Achievement Award – the highest honour of the competition for the best project entry - at the AAEE Annual Awards Luncheon held in Washington, DC, USA on 6 May 2009. [6] The Marina Barrage beat 33 other entries to take home the top prize in this year's competition organised by the American Academy of Environmental Engineers (AAEE), becoming the second project outside of USA to win the award, in the last decade. [6]

See also

Related Research Articles

<span class="mw-page-title-main">River Ancholme</span> River in Lincolnshire, England

The River Ancholme is a river in Lincolnshire, England, and a tributary of the Humber. It rises at Ancholme Head, a spring just north of the village of Ingham and immediately west of the Roman Road, Ermine Street. It flows east and then north to Bishopbridge west of Market Rasen, where it is joined by the Rase. North of there it flows through the market town of Brigg before draining into the Humber at South Ferriby. It drains a large part of northern Lincolnshire between the Trent and the North Sea.

<span class="mw-page-title-main">Pumped-storage hydroelectricity</span> Electric energy storage system

Pumped-storage hydroelectricity (PSH), or pumped hydroelectric energy storage (PHES), is a type of hydroelectric energy storage used by electric power systems for load balancing. The method stores energy in the form of gravitational potential energy of water, pumped from a lower elevation reservoir to a higher elevation. Low-cost surplus off-peak electric power is typically used to run the pumps. During periods of high electrical demand, the stored water is released through turbines to produce electric power. Although the losses of the pumping process make the plant a net consumer of energy overall, the system increases revenue by selling more electricity during periods of peak demand, when electricity prices are highest. If the upper lake collects significant rainfall or is fed by a river then the plant may be a net energy producer in the manner of a traditional hydroelectric plant.

<span class="mw-page-title-main">Warragamba Dam</span> Dam in Warragamba, New South Wales

Warragamba Dam is a heritage-listed dam in the outer South Western Sydney suburb of Warragamba, Wollondilly Shire in New South Wales, Australia. It is a concrete gravity dam, which creates Lake Burragorang, the primary reservoir for water supply for the city of Sydney. The dam wall is located approximately 65 kilometres (40 mi) W of Sydney central business district, 4½ km SW of the town of Wallacia, and 1 km NW of the village of Warragamba.

<span class="mw-page-title-main">Singapore River</span> River in Singapore

The Singapore River is a river that flows parallel to Alexandra Road and feeds into the Marina Reservoir in the southern part of Singapore. The immediate upper watershed of the Singapore River is known as the Singapore River Planning Area, although the western part of the watershed is classified under the River Valley planning area.

<span class="mw-page-title-main">Marina Bay, Singapore</span> Place in Singapore

Marina Bay is a bay located in the Central Area of Singapore, surrounded by the perimeter of four other planning areas, the Downtown Core, Marina East, Marina South and Straits View. The area surrounding the bay itself, also called Marina Bay, is a 360 hectare extension to the adjacent Central Business District. It is also the new downtown of Singapore, built on reclaimed land.

<span class="mw-page-title-main">Table Rock Lake</span> Man-made lake in Missouri and Arkansas, United States

Table Rock Lake is an artificial lake or reservoir in the Ozarks of southwestern Missouri and northwestern Arkansas in the United States. Designed, built and operated by the U.S. Army Corps of Engineers, the lake is impounded by Table Rock Dam, which was constructed from 1954 to 1958 on the White River.

Water supply and sanitation in Singapore are intricately linked to the historical development of Singapore. It is characterised by a number of outstanding achievements in a challenging environment with geographical limitations. Access to water in Singapore is universal, affordable, efficient and of high quality.

<span class="mw-page-title-main">Tunnel and Reservoir Plan</span> American civil engineering project

The Tunnel and Reservoir Plan is a large civil engineering project that aims to reduce flooding in the metropolitan Chicago area, and to reduce the harmful effects of flushing raw sewage into Lake Michigan by diverting storm water and sewage into temporary holding reservoirs. The megaproject is one of the largest civil engineering projects ever undertaken in terms of scope, cost and timeframe. Commissioned in the mid-1970s, the project is managed by the Metropolitan Water Reclamation District of Greater Chicago. Completion of the system is not anticipated until 2029, but substantial portions of the system have already opened and are currently operational. Across 30 years of construction, over $3 billion has been spent on the project.

PUB, Singapore's National Water Agency, commonly known as PUB, an acronym for Public Utilities Board, is a statutory board under the Ministry of Sustainability and the Environment of the Government of Singapore responsible for ensuring a sustainable and efficient water supply in Singapore.

<span class="mw-page-title-main">Pollution of the Ganges</span> Ongoing environmental disaster in India

The ongoing pollution of the Ganges, the largest river in the Indian subcontinent, poses a significant threat to human health and the environment. The river, which is severely polluted with human waste and industrial contaminants, provides water to about 40% of India's population across 11 states, serving an estimated population of 500 million people, more than any other river in the world.

<span class="mw-page-title-main">Vamsadhara River</span> River in India

River Vamsadhara or River Banshadhara is an important east flowing river between Rushikulya and Godavari, in Odisha and Andhra Pradesh states in India.

<span class="mw-page-title-main">Fox Point Hurricane Barrier</span>

The Fox Point Hurricane Barrier is a 3,000-foot (910 m) long tidal flood barrier spanning the Providence River in Providence, Rhode Island, located 750 feet (230 m) upstream from Fox Point. It was constructed between 1960 and 1966 to protect the low-lying downtown area of the city from damaging storm surge and floods associated with hurricanes and other major storm events.

<span class="mw-page-title-main">Marina Reservoir</span> Reservoir in Singapore

The Marina Reservoir is a reservoir in Singapore formed in 2008 by building a dam across the mouth of the Marina Channel. With the completion of the Marina Barrage on 30 October 2008, the reservoir, which contained mainly salt water, became freshwater and started operations at 7 pm on 20 November 2010 after a process of natural desalination, when excess water was released out to the sea after heavy rains. The reservoir will provide 10% of the island's water needs.

Water resources management in modern Egypt, is a complex process that involves multiple stakeholders who use water for irrigation, municipal and industrial water supply, hydropower generation and navigation. In addition, the waters of the Nile support aquatic ecosystems that are threatened by abstraction and pollution. Egypt also has substantial fossil groundwater resources in the Western Desert.

<span class="mw-page-title-main">John W. Flannagan Dam</span> Dam in Dickenson County, Virginia

John W. Flannagan Dam is a flood control dam located in the Cumberland Mountains of Dickenson County, Virginia. It forms the John W. Flannagan Reservoir behind it. It was named after Congressman John Williams Flannagan, Jr.

<span class="mw-page-title-main">Tidal barrage</span> Dam-like structure

A tidal barrage is a dam-like structure used to capture the energy from masses of water moving in and out of a bay or river due to tidal forces.

<span class="mw-page-title-main">Polavaram Project</span> Dam in Eluru district, Andhra Pradesh

The Polavaram Project is an under construction multi-purpose irrigation project on the Godavari River in the Eluru District and East Godavari District in Andhra Pradesh. The project has been accorded National project status by the Central Government of India. Its reservoir back water spreads up to the Dummugudem Anicut and approx 115 km on Sabari River side. Thus back water spreads into parts of Chhattisgarh and Odisha States. It gives major boost to tourism sector in Godavari Districts as the reservoir covers the famous Papikonda National Park, Polavaram hydro electric project (HEP) and National Waterway 4 are under construction on left side of the river. It is located 40 km to the upstream of Sir Arthur Cotton Barrage in Rajamahendravaram City and 25 km from Rajahmundry Airport.

<span class="mw-page-title-main">Marina Channel</span>

Marina Channel is a waterway in southern Singapore that connects the Kallang Basin in the north and Marina Bay in the west to the Singapore Straits in the south. Formed as a result of land reclamation in the 1980s, the Marina Channel effectively shifted Singapore's southern coastline further southwards from the Kallang Basin area. Marina Channel serves to separate Marina East and Kallang in the east from Marina South in the west. Both sides are connected by Singapore's tallest bridge, the Benjamin Sheares Bridge.

<span class="mw-page-title-main">Coastal reservoir</span> Place to store freshwater near seas

A Coastal reservoir is a type of reservoir to store fresh water on sea coast area near a river delta. Saemanguem in South Korea, Marina Barrage in Singapore, Qingcaosha in China, Plover Cove in Hong Kong, Delta Works in Netherlands, and Thanneermukkom Bund in India are a few existing coastal reservoirs.

<span class="mw-page-title-main">Figari Reservoir</span> Reservoir on Corsica, France

The Figari Reservoir is a reservoir in the Corse-du-Sud department of France on the island of Corsica. It provides water for irrigation and human consumption.

References

  1. "PUB annual report: Birth of the barrage". PUB. 2008. Archived from the original on 7 April 2015. Retrieved 29 September 2016.
  2. "Dealing with Water Scarcity in Singapore: Institutions, Strategies, and Enforcement". The World Bank. 2006. Retrieved 14 September 2012.
  3. Khoo, Teng Chye (2009), "Singapore Water: Yesterday, Today and Tomorrow", Water Management in 2020 and Beyond, Water Resources Development and Management, Springer Berlin Heidelberg, pp. 237–250, doi:10.1007/978-3-540-89346-2_12, ISBN   9783540893455
  4. "Marina Barrage Commencement Ceremony". NAS. 22 March 2005. Archived from the original on 19 July 2019. Retrieved 17 August 2019.
  5. "Speech by Mr Lee Hsien Loong, Prime Minister, at launch of Clean And Green Singapore 2009 and Opening of Marina Barrage". NAS. 31 October 2008. Retrieved 30 August 2019.[ permanent dead link ]
  6. 1 2 3 "MARINA BARRAGE BAGS TOP HONOURS AT INTERNATIONAL …". www.nas.gov.sg. Retrieved 6 August 2018.
  7. "Marina Barrage". www.visitsingapore.com. Retrieved 11 June 2022.
  8. PUB. "PUB, Singapore's National Water Agency". PUB, Singapore's National Water Agency. Retrieved 29 November 2019.
  9. Moh, W. H.; Su, P. L. (2009). "Marina Barrage – A Unique 3-in-1 Project in Singapore". Structural Engineering International. 19: 17–21. doi:10.2749/101686609787398399. S2CID   109899648.