Mechanical systems drawing is a type of technical drawing that shows information about heating, ventilating, air conditioning and transportation around the building (Elevators or Lifts and Escalator). [1] It is a powerful tool that helps analyze complex systems. These drawings are often a set of detailed drawings used for construction projects; it is a requirement for all HVAC work. They are based on the floor and reflected ceiling plans of the architect. After the mechanical drawings are complete, they become part of the construction drawings, which is then used to apply for a building permit. They are also used to determine the price of the project. [1]
Arrangement drawings include information about the self-contained units that make up the system: table of parts, fabrication and detail drawing, overall dimension, weight/mass, lifting points, and information needed to construct, test, lift, transport, and install the equipment. These drawings should show at least three different orthographic views and clear details of all the components and how they are assembled. [2]
The assembly drawing typically includes three orthographic views of the system: overall dimensions, weight and mass, identification of all the components, quantities of material, supply details, list of reference drawings, and notes. Assembly drawings detail how certain component parts are assembled. [2]
An assembly drawing shows which order the product is put together, showing all the parts as if they were stretched out. This will help a welder to understand how the product will go together so he get an idea of where the weld is needed. The assembly drawing will contain the following; information overall dimensions, weight and mass, identification of all the components, quantities of material, supply details, list of reference drawings, and notes.
In detail drawings, components used to build the mechanical system are described in some detail to show that the designer's specifications are met: relevant codes, standards, geometry, weight, mass, material, heat treatment requirements, surface texture, size tolerances, and geometric tolerances. [2]
A fabrication is made up of many different parts. A fabrication drawing has a list of parts that make up the fabrication. In the list, parts are identified (balloons and leader lines) and complex details are included: welding details, material standards, codes, and tolerances, and details about heat/stress treatments. and also [2]
Line diagrams and layouts indicating basic proposals, location of main items of plant, routes of main pipes, air ducts and cable runs in such detail as to illustrate the incorporation of the engineering services within the project as a whole.
The schematic is a line diagram, not necessarily to scale, that describes interconnection of components in a system. The main features of a schematic drawing show:
A drawing the intended locations of plant items and service routes in such detail as to indicate the design intent. The main features of detailed design drawings should be as follows:
A drawing which based on the detailed drawing, installation drawing or co-ordination drawing (interface drawing) with the primary purpose of defining that information needed by the tradesmen on site to install the works or concurrently work among various engineering assembly. The main features of typical installation drawings are:
A drawing showing the building and services installations as installed at the date of practical completion. Generally the record drawing is a development of the installation drawing. The main features of the record drawings should be as follows.
These drawings show the provisions required to accommodate the services that significantly affect the design of the building structure, fabric, and external works. This includes drawings (and schedules) of work the building trade carries out, or that must be cost-estimated at the design stage, e.g., plant bases
These drawings show requirements for building works necessary to facilitate installing the engineering services (other than where it is appropriate to mark out on site). Information on these drawing includes details of all:
About 80,000 jobs are held by mechanical drafters in the United States of America during 2008. From 2008 to 2018, mechanical drafting hiring rate is expected to neither increase nor decrease. It is encouraged to either take two additional years of training in drafting school after high school or attend a four-year college/university to develop better technical skills and gain more experience with CAD (computer-aided design). [3]
The American Design Drafting Association (ADDA) has developed a Drafter Certification Test. The test assesses the drafter's skill in basic drafting concepts: geometric construction, working drawings, and architectural terms and standards. The test is administered periodically at ADDA-authorized sites. [3]
Mechanical system drawings must abide by all of the following regulations: the National Building Code of Canada, the National Fire Code, and Model National Energy Code of Canada for Buildings. For residential projects, The National Housing Code of Canada and the Model National Energy Code of Canada for Houses must also be followed. These drawings must also adhere to local and provincial codes and bylaws. [1]
In telecommunications, the term outside plant has the following meanings:
Technical drawing, drafting or drawing, is the act and discipline of composing drawings that visually communicate how something functions or is constructed.
Heating, ventilation, and air conditioning (HVAC) is the use of various technologies to control the temperature, humidity, and purity of the air in an enclosed space. Its goal is to provide thermal comfort and acceptable indoor air quality. HVAC system design is a subdiscipline of mechanical engineering, based on the principles of thermodynamics, fluid mechanics, and heat transfer. "Refrigeration" is sometimes added to the field's abbreviation as HVAC&R or HVACR, or "ventilation" is dropped, as in HACR.
A furnace, referred to as a heater or boiler in British English, is an appliance used to generate heat for all or part of a building. Furnaces are mostly used as a major component of a central heating system. Furnaces are permanently installed to provide heat to an interior space through intermediary fluid movement, which may be air, steam, or hot water. Heating appliances that use steam or hot water as the fluid are normally referred to as a residential steam boilers or residential hot water boilers. The most common fuel source for modern furnaces in North America and much of Europe is natural gas; other common fuel sources include LPG, fuel oil, wood and in rare cases coal. In some areas electrical resistance heating is used, especially where the cost of electricity is low or the primary purpose is for air conditioning. Modern high-efficiency furnaces can be up to 98% efficient and operate without a chimney, with a typical gas furnace being about 80% efficient. Waste gas and heat are mechanically ventilated through either metal flue pipes or polyvinyl chloride (PVC) pipes that can be vented through the side or roof of the structure. Fuel efficiency in a gas furnace is measured in AFUE.
Electrical wiring is an electrical installation of cabling and associated devices such as switches, distribution boards, sockets, and light fittings in a structure.
A raised floor provides an elevated structural floor above a solid substrate to create a hidden void for the passage of mechanical and electrical services. Raised floors are widely used in modern office buildings, and in specialized areas such as command centers, Information technology data centers and computer rooms, where there is a requirement to route mechanical services and cables, wiring, and electrical supply. Such flooring can be installed at varying heights from 2 inches (51 mm) to heights above 4 feet (1.2 m) to suit services that may be accommodated beneath. Additional structural support and lighting are often provided when a floor is raised enough for a person to crawl or even walk beneath.
A steel detailer is a person who produces detailed drawings for steel fabricators and steel erectors. The detailer prepares detailed plans, drawings and other documents for the manufacture and erection of steel members used in the construction of buildings, bridges, industrial plans, and nonbuilding structures.
A fire alarm system is a building system designed to detect, alert occupants, and alert emergency forces of the presence of fire, smoke, carbon monoxide, or other fire-related emergencies. Fire alarm systems are required in most commercial buildings. They may include smoke detectors, heat detectors, and manual fire alarm activation devices. All components of a fire alarm system are connected to a fire alarm control panel. Fire alarm control panels are usually found in an electrical or panel room. Fire alarm systems generally use visual and audio signalization to warn the occupants of the building. Some fire alarm systems may also disable elevators, which are unsafe to use during a fire under most circumstances.
In manufacturing and design, a mockup, or mock-up, is a scale or full-size model of a design or device, used for teaching, demonstration, design evaluation, promotion, and other purposes. A mockup may be a prototype if it provides at least part of the functionality of a system and enables testing of a design.
Ducts are conduits or passages used in heating, ventilation, and air conditioning (HVAC) to deliver and remove air. The needed airflows include, for example, supply air, return air, and exhaust air. Ducts commonly also deliver ventilation air as part of the supply air. As such, air ducts are one method of ensuring acceptable indoor air quality as well as thermal comfort.
Submittals in construction management can include: shop drawings, material data, samples, and product data. Submittals are required primarily for the architect and engineer to verify that the correct products will be installed on the project.
A shop drawing is a drawing or set of drawings produced by the contractor, supplier, manufacturer, subcontractor, consultants, or fabricator. Shop drawings are typically required for prefabricated components. Examples of these include: elevators, structural steel, trusses, pre-cast concrete, windows, appliances, cabinets, air handling units, and millwork. Also critical are the installation and coordination shop drawings of the MEP trades such as sheet metal ductwork, piping, plumbing, fire protection, and electrical. Shop drawings are produced by contractors and suppliers under their contract with the owner. The shop drawing is the manufacturer’s or the contractor’s drawn version of information shown in the construction documents. The shop drawing normally shows more detail than the construction documents. It is drawn to explain the fabrication and/or installation of the items to the manufacturer’s production crew or contractor's installation crews. The style of the shop drawing is usually very different from that of the architect’s drawing. The shop drawing’s primary emphasis is on the particular product or installation and excludes notation concerning other products and installations, unless integration with the subject product is necessary.
A house plan is a set of construction or working drawings that define all the construction specifications of a residential house such as the dimensions, materials, layouts, installation methods and techniques.
Plans are a set of drawings or two-dimensional diagrams used to describe a place or object, or to communicate building or fabrication instructions. Usually plans are drawn or printed on paper, but they can take the form of a digital file.
ASME BPE is an international Standard developed as an aid for the design and construction of equipment intended for use in the manufacturing of biopharmaceuticals. The standard is approved as an American National Standard by the ASME Board of Pressure Technologies. The first edition of this Standard was approved as an American National Standard on May 20, 1997. The most recent edition was approved by ANSI on March 21, 2022.
A drafter is an engineering technician who makes detailed technical drawings or CAD designs for machinery, buildings, electronics, infrastructure, sections, etc. Drafters use computer software and manual sketches to convert the designs, plans, and layouts of engineers and architects into a set of technical drawings. Drafters operate as the supporting developers and sketch engineering designs and drawings from preliminary design concepts.
An architectural drawing or architect's drawing is a technical drawing of a building that falls within the definition of architecture. Architectural drawings are used by architects and others for a number of purposes: to develop a design idea into a coherent proposal, to communicate ideas and concepts, to convince clients of the merits of a design, to assist a building contractor to construct it based on design intent, as a record of the design and planned development, or to make a record of a building that already exists.
MPDS, the MEDUSA Plant Design System, is a suite of plant engineering applications for 2D/3D layout, design, and modeling of process plants, factories, or installations. The system's history is closely tied to the very beginnings of mainstream CAD and the research culture fostered by Cambridge University and the UK government including the resulting "Cambridge Phenomenon " MPDS was initially developed for 3D plant design and layout and piping design. Today, the software includes modules for 2D/3D factory layout, process, instrumentation diagrams (P&ID), mechanical handling systems design, steel design, ducting (HVAC) design, electrical design, and hangers and supports Design. The latest version, MPDS4 5.2.1, was released for Microsoft Windows and Sun Solaris in February 2014.
The Uniform Mechanical Code (UMC) is a model code developed by the International Association of Plumbing and Mechanical Officials (IAPMO) to govern the installation, inspection and maintenance of HVAC and refrigeration systems. It is designated as an American National Standard.
Mechanical, Electrical, and Plumbing (MEP) refers to the installation of services which provide a functional and comfortable space for the building occupants. In residential and commercial buildings, these elements are often designed by specialized MEP engineers. MEP's design is important for planning, decision-making, accurate documentation, performance- and cost-estimation, construction, and operating/maintaining the resulting facilities.