Nanticoke Generating Station

Last updated • 4 min readFrom Wikipedia, The Free Encyclopedia
Nanticoke Generating Station
Nanticoke Generating Station 2.jpg
Nanticoke Generating Station
CountryCanada
Location Nanticoke, Haldimand County, Ontario
Coordinates 42°48′0″N80°3′1″W / 42.80000°N 80.05028°W / 42.80000; -80.05028
StatusDecommissioned
Construction began1967 (1967)
Commission date 1972–1978
Decommission date2013 (2013)
Owner Ontario Power Generation
Operator Ontario Power Generation
Thermal power station
Primary fuel Sub-bituminous coal
Turbine technology Steam turbine
Cooling source Lake Erie
Power generation
Units decommissioned8 × 500 MW
Nameplate capacity 3964 MW (8 units)
1880 MW (4 units) [1]
Capacity factor 69% (peak)
Annual net output 24,000 GWh (peak)
External links
Commons Related media on Commons

The Nanticoke Generating Station was a coal-fired power station in Nanticoke, Ontario in operation from 1972 to 2013. It was the largest coal power station in North America and, at full capacity, it could provide 3,964 MW of power into the southern Ontario power grid from its base in Nanticoke, Ontario, Canada, [2] and provided as much as 15% of Ontario's electricity.

Contents

It was decommissioned in 2013 as part of the Government of Ontario's commitment to eliminate coal power. [3] A 44 MW photovoltaic power station, the Nanticoke Solar Facility, was built on the site and entered service in 2019. [4] [5] [6]

Prior to the commencement of decommissioning, Nanticoke was one of Canada's top ten single sources of greenhouse gases. [7]

History

The Nanticoke Generating Station was built on the site of the "Battle of Nanticoke", where in 1813 the Norfolk volunteer militia routed a band of American marauders who had been pillaging area farms and terrorizing the country, an exploit that inspired the British military forces and the people of Upper Canada during the War of 1812. The site was designated a National Historic Site of Canada in 1924. [8]

Ontario Hydro revealed plans to build a 4,000 MW fossil-fuel generating station near Long Point, Ontario in 1967. [9] Its current site was selected in Nanticoke, Ontario, because of the nearby harbour, the proximity of United States coal supplies, and proximity to much of Ontario's population. [9] The construction of the plant cost CAN$800 million and operations started in 1972. [1] Eight pulverized coal-fired steam generators were built in phases between 1973 and 1978. [9]

By 1981, the plant was consuming 35,000 tonnes of coal per day. Over the years, another $900 million was invested in making the plant more energy efficient, robust, and improving its emissions. [1]

Plant operations

Power generation and distribution

At full capacity (4000 MW) with all eight generating units functioning, the station's annual electricity production had been as high as 24 billion kilowatt-hours (kWh), enough electricity to run nearly 2.5 million households. [1] Although the plant houses eight generating units, four of those units were retired previously prior to the plant's overall closure. [1] (Two were retired in 2010, and two were retired in 2011. [10] ) The remaining four units are not in operation. [11]

Previously, power generation at this plant was on a stand-by basis, only operating during peak levels of energy consumption, or when other generating facilities are unavailable. At other times the plant would remain idle. [1] When demand for electricity was high, the remaining four active generating units were put into service, with the maximum potential to produce approximately 5% of Ontario's total generating capacity. (1880 MW [1] out of the 34,079 MW of existing power generation in the province as of January 2012. [10] ) The plant is connected to the power grid by numerous 230,000- and 500,000-volt transmission lines. [12]

Cooling water for the plant was drawn from Lake Erie using two pipes that are 6.5 m in diameter, stretch 550 m offshore, and sit 10 m below the surface. [13] The plant had two multi-flue smokestacks which were both 198 m (650 ft) tall. [14] [15] A dock on the shore of the site allows ships to deliver coal to an on-site stock pile, which can hold up to 4.5 megatonnes.

At its peak, Nanticoke employed approximately 634 staff from the Haldimand—Norfolk area. [1] [16] [17]

Emissions

The Nanticoke station used to be one of Canada's largest greenhouse gas emitters and polluters. [18] In 2001, it was the largest single source of greenhouse gases according to Environment Canada. [19] Due to major reductions in output since 2009, it was eventually surpassed by facilities in Alberta. [20] [21]

Greenhouse Gases (2013) [22]
Greenhouse gasAmount (tonnes) Carbon dioxide equivalent*
CO2 1,530,2371,530,237
CH4 24.80620
N2O 27.308,135
Total-1,538,992
*Calculated figures for CO2e are rounded to the nearest tonne.
Total emissions, 20042014 [22]
YearEmissions (tonnes CO2e)
200414,715,952
200517,629,437
200616,271,466
200717,887,649
200815,427,913
20096,037,137
20108,601,215
20112,836,299
20122,021,667
20131,538,992
20140*
* Facility shut down in 2013

Decommissioning

The Government of Ontario had originally targeted to phase out all of its coal plants by 2009, but abandoned this target in 2006 to the ire of organizations representing nurses and physicians, community groups and environment groups. [23] The province could not replace Nanticoke's energy output by the deadline, despite Units 3 and 4 at Bruce "A" being brought back online between 2003 and 2004. [24] [ circular reference ] The province was examining replacing this output using nuclear power by refurbishing its existing fleet, and building two additional reactors at the Darlington Nuclear Generating Station. Bruce Power, Canada's only private nuclear power company, also proposed building two reactors on former Stelco lands in Nanticoke. However, this was met with immediate opposition and dismissal from the government. "It's a speculative move on the part of a private company...It doesn't enjoy the support, encouragement [or] approval...of the Government of Ontario," stated George Smitherman, Minister of Energy and Infrastructure. [25] Bruce Power did however move ahead with the refurbishment of "A" Units 1 and 2 in 2005 [24] [ circular reference ] and Ontario Power Generation commenced refurbishment of Darlington in 2016. [26]

Two units at Nanticoke were shut down in fall 2010. [27] Another two were shut down in 2011. [28] The final four were shut down on December 31, 2013. [29] This was made possible, in part, by the reactivation of Units 1 and 2 at Bruce Nuclear Generating Station the previous year. [30] In July 2015, Ontario Power Generation announced it will no longer "preserve and staff Nanticoke", and the expectation is that the plant will be permanently decommissioned. [31] Its two smokestacks were imploded using controlled demolition on February 28, 2018. [32] The last sections were demolished on August 22, 2019. [5] [33]

See also

Notes

  1. 1 2 3 4 5 6 7 8 "Nanticoke Generating Station". Ontario Power Generation. Retrieved 25 January 2011.
  2. "Weather and Ontario's Electricity System" (PDF). Independent Electricity System Operator. July 2008. Archived from the original (PDF) on 19 March 2012. Retrieved 21 August 2012.
  3. "Thermal power". Ontario Power Generation. Retrieved 22 July 2015.
  4. Morley, Liisa. "Nanticoke Solar Project Completed on Budget and on Schedule". PCL Constructors. Retrieved 2019-08-03.
  5. 1 2 Foreman, Gideon (July 19, 2019). "Industry and nature make peace at former home of North America's largest coal plant". David Suzuki Foundation. Retrieved 2019-08-03.
  6. "Former coal-fired power plant in Ontario becomes solar facility". MINING.com. 1 April 2019. Retrieved 3 April 2019.
  7. "GHG Facility Table 2009". Environment Canada. 15 March 2010. Archived from the original on 1 January 2013. Retrieved 21 August 2012.
  8. Nanticoke National Historic Site of Canada . Canadian Register of Historic Places .
  9. 1 2 3 Wiancko 1981, p. 96
  10. 1 2 "Supply Overview". Archived from the original on 2012-05-12. Retrieved 2012-06-03.
  11. "Nanticoke Generating Station". opg.com. Ontario Power Generation. Retrieved 3 March 2018.
  12. "Archived copy" (PDF). Archived from the original (PDF) on 2014-08-10. Retrieved 2012-06-03.{{cite web}}: CS1 maint: archived copy as title (link)
  13. http://www3.carleton.ca/fecpl/pdfs/Cat_Carp_MS.pdf [ bare URL PDF ]
  14. "Drawings of Nanticoke Generating Station Units 1-4". SkyscraperPage.com. Retrieved 2022-05-02.
  15. "Drawings of Nanticoke Generating Station Units 5-8". SkyscraperPage.com. Retrieved 2022-05-02.
  16. "Jobs - CHCH". www.chch.com. June 3, 2011.
  17. "Ontario Power Generation | Reflecting on Nanticoke Generating Station's legacy". www.opg.com. Retrieved 3 April 2019.
  18. CTV.ca [ dead link ]
  19. "Nanticoke Facility Worst Single Source of Greenhouse Gases, Study Finds - CityNews". Archived from the original on 2011-05-19. Retrieved 2011-01-25.
  20. "Erreur HTTP 404 - non trouvé".
  21. "GHG Facility Table 2010". Environment Canada. Archived from the original on 1 January 2013. Retrieved 21 December 2012.
  22. 1 2 "Facility and GHG Information - Nanticoke Generating Station". Environment Canada . Retrieved 21 July 2015.
  23. Ecojustice (11 October 2006). "Ontario abandons coal phase-out, guts smog and climate change plans". Archived from the original on 6 July 2011. Retrieved 24 April 2010.
  24. 1 2 Bruce Nuclear Generating Station
  25. CBC News (1 November 2008). "Ont. government signals opposition to Bruce Power nuclear reactors". CBC . Retrieved 25 April 2010.
  26. "Our projects > Darlington Refurbishment".
  27. Talaga, Tanya (3 September 2009). "Ontario shuts 4 coal-fired units". The Star. Toronto.
  28. "Ontario's Long-Term Energy Plan" (PDF). Government of Ontario. 2010. Archived from the original (PDF) on 4 September 2012. Retrieved 22 August 2012.
  29. "OPG'S NANTICOKE STATION STOPS BURNING COAL" (PDF). Ontario Power Generation. 2014. Archived from the original (PDF) on 2014-01-16. Retrieved 18 April 2014.
  30. "BPRIA backgrounder". 2015-12-03.
  31. "Simcoe Reformer". Archived from the original on 2015-07-23. Retrieved 2015-07-23.
  32. Craggs, Samantha (28 February 2018). "Watch as OPG demolishes 2 huge smokestacks at the Nanticoke generating station". CBC Hamiltion. Retrieved 1 March 2018.
  33. "Nanticoke powerhouse safely demolished". 22 August 2019. Retrieved 22 September 2019.

Related Research Articles

<span class="mw-page-title-main">Pickering Nuclear Generating Station</span> Nuclear power plant in Canada

Pickering Nuclear Generating Station is a Canadian nuclear power station located on the north shore of Lake Ontario in Pickering, Ontario. It is one of the oldest nuclear power stations in the world and Canada's third-largest, with eight CANDU reactors. Since 2003, two of these units have been defuelled and deactivated. The remaining six produce about 16% of Ontario's power and employ 3,000 workers.

<span class="mw-page-title-main">Bruce Nuclear Generating Station</span> Nuclear power station in Ontario, Canada. Largest nuclear power station in Canada

Bruce Nuclear Generating Station is a nuclear power station located on the eastern shore of Lake Huron in Ontario, Canada. It occupies 932 ha of land. The facility derives its name from Bruce Township, the local municipality when the plant was constructed, now Kincardine due to amalgamation. With eight CANDU pressurized heavy-water reactors, it was the world's largest fully operational nuclear generating station by total reactor count and the number of currently operational reactors until 2016, when it was exceeded in nameplate capacity by South Korea's Kori Nuclear Power Plant. The station is the largest employer in Bruce County, with over 4000 workers.

<span class="mw-page-title-main">Darlington Nuclear Generating Station</span> Power station in Clarington, Ontario, Canada

Darlington Nuclear Generating Station is a Canadian nuclear power station located on the north shore of Lake Ontario in Clarington, Ontario. It is a large nuclear facility comprising four CANDU nuclear reactors with a total output of 3,512 MWe when all units are online, providing about 20 percent of Ontario's electricity needs, enough to serve a city of two million people. The reactor design is significantly more powerful than those used in previous CANDU sites at Pickering and Bruce, making its 4-unit plant the second-largest in Canada behind the 8-unit Bruce. It is named for the Township of Darlington, the name of the municipality in which it is located, which is now part of the amalgamated Municipality of Clarington.

Puget Sound Energy, Inc. (PSE) is an energy utility company based in the U.S. state of Washington that provides electrical power and natural gas to the Puget Sound region. The utility serves electricity to more than 1.2 million customers in Island, King, Kitsap, Kittitas, Pierce, Skagit, Thurston, and Whatcom counties, and provides natural gas to 877,000 customers in King, Kittitas, Lewis, Pierce, Snohomish and Thurston counties. The company's electric and natural gas service area spans 6,000 square miles (16,000 km2).

<span class="mw-page-title-main">Hearn Generating Station</span> Decommissioned power station in Toronto, Canada

The Richard L. Hearn Generating Station is a decommissioned electrical generating station in Toronto, Ontario, Canada. The plant was originally fired by coal, but later converted to burn natural gas. The plant has been described as "Pharaonic in scale", and encompasses 650 thousand cubic metres of space—large enough to fit 12 Parthenons inside.

<span class="mw-page-title-main">Electricity sector in Canada</span>

The electricity sector in Canada has played a significant role in the economic and political life of the country since the late 19th century. The sector is organized along provincial and territorial lines. In a majority of provinces, large government-owned integrated public utilities play a leading role in the generation, transmission, and distribution of electricity. Ontario and Alberta have created electricity markets in the last decade to increase investment and competition in this sector of the economy.

<span class="mw-page-title-main">Lakeview Generating Station</span>

The Lakeview Generating Station was an Ontario Power Generation coal-burning power station located in Mississauga, Ontario, Canada, in the Lakeview neighbourhood on Lakeshore Road just east of Cawthra Road. The former station, constructed in 1958–1962, had four smokestacks known as the Four Sisters; the eight boilers of the generating plant all 'twinned' their emissions into common stacks. The station was a landmark for years and was shut down in April, 2005, after 43 years of service. The four stacks, which could be seen from as far away as Burlington to the west and downtown Toronto to the east, were demolished on June 12, 2006. The rest of the building was demolished on June 28, 2007.

Nuclear power in Canada is provided by 19 commercial reactors with a net capacity of 13.5 gigawatt (GW), producing a total of 95.6 terawatt-hours (TWh) of electricity, which accounted for 16.6% of the country's total electric energy generation in 2015. All but one of these reactors are located in Ontario, where they produced 61% of the province's electricity in 2019. Seven smaller reactors are used for research and to produce radiopharmaceuticals for use in nuclear medicine.

<span class="mw-page-title-main">Bruce Power</span> Energy Company

Bruce Power Limited Partnership is a Canadian business partnership composed of several corporations. It exists as a partnership between TC Energy (31.6%), BPC Generation Infrastructure Trust (61.4%), the Power Workers Union (4%) and The Society of United Professionals (1.2%). It is the licensed operator of the Bruce Nuclear Generating Station, located on the shores of Lake Huron, roughly 250 kilometres northwest of Toronto, between the towns of Kincardine and Saugeen Shores. It is the third-largest operating nuclear plant in the world by capacity.

The electricity policy of Ontario refers to plans, legislation, incentives, guidelines, and policy processes put in place by the Government of the Province of Ontario, Canada, to address issues of electricity production, distribution, and consumption. Policymaking in the electricity sector involves economic, social, and environmental considerations. Ontario's electricity supply outlook is projected to deteriorate in the near future due to increasing demand, aging electricity supply infrastructure, and political commitments, particularly the phase-out of coal-fired generation. Policymakers are presented with a range of policy choices in addressing the situation, both in terms of overall system design and structure, and specific electricity generating technologies.

<span class="mw-page-title-main">Thunder Bay Generating Station</span>

Thunder Bay Generating Station is a defunct biomass-fired thermal power station owned by Ontario Power Generation ("OPG"). It is located on Mission Island in Thunder Bay, on the shore of Lake Superior.

Atikokan Generating Station is a biomass power plant owned by Ontario Power Generation (OPG) located 8 km (5 mi) north of Atikokan, Ontario. The plant employs 90 people. The Atikokan Generating Station began operation as a coal fired station in 1985 and underwent an overhaul in the autumn of 2003.

<span class="mw-page-title-main">Ontario Power Generation</span> Electric utility company in Canada

Ontario Power Generation Inc. (OPG) is a Crown corporation and "government business enterprise" that is responsible for approximately half of the electricity generation in the province of Ontario, Canada. It is wholly owned by the government of Ontario. Sources of electricity include nuclear, hydroelectric, wind, gas and biomass. Although Ontario has an open electricity market, the provincial government, as OPG's sole shareholder, regulates the price the company receives for its electricity to be less than the market average, in an attempt to stabilize prices. Since 1 April 2008, the company's rates have been regulated by the Ontario Energy Board.

According to the International Hydropower Association, Canada is the fourth largest producer of hydroelectricity in the world in 2021 after the United States, Brazil, and China. In 2019, Canada produced 632.2 TWh of electricity with 60% of energy coming from Hydroelectric and Tidal Energy Sources).

Coal reserves in Canada rank 13th largest in the world at approximately 10 billion tons, 0.6% of the world total. This represents more energy than all of the oil and gas in the country combined. The coal industry generates CDN$5 billion annually. Most of Canada's coal mining occurs in the West of the country. British Columbia operates 9 coal mines, Alberta nine, Saskatchewan three and New Brunswick one. Nova Scotia operates several small-scale mines, Westray having closed following the 1992 disaster there.

<span class="mw-page-title-main">Lambton Generating Station</span> Decommissioned coal-fired power station in Lambton County, Ontario

The Lambton Generating Station was a coal-fuelled power plant located on the St. Clair River near Corunna, Ontario, delivering up to 950 MW of power to the grid. It is owned by Ontario Power Generation.

The Nanticoke Solar Facility is a 44 MW solar power station in Nanticoke, Ontario, Canada. It is located on the site of the defunct Nanticoke Generating Station, which operated from 1972 to 2013 and was the largest coal-fired power plant in North America.

References