Ngong Hills Wind Power Station

Last updated
Ngong Hills Wind Power Station
Ngong Hills Wind Farm.jpg
Ngong Hills Wind Power Station
Location of Ngong Hills Wind Power Station in Kenya
Country Kenya
Location Ngong, Kajiado County
Coordinates 01°22′52″S36°38′08″E / 1.38111°S 36.63556°E / -1.38111; 36.63556
StatusOperational
Commission date 1993
Owner(s)
Operator(s)
Power generation
Nameplate capacity 25.5 MW
Annual net output 12 GW.h

Ngong Hills Wind Power Station, also Ngong Hills Wind Farm, is a wind-powered power station in Kenya.

Contents

Location

Ngong Hills Wind Power Station Ngong Hills Wind Power farm.jpg
Ngong Hills Wind Power Station

The power station is located in the northern foothills of Ngong Hills, near the town of Ngong, in Kajiado County, approximately 35 kilometres (22 mi), by road, southwest of Nairobi, the capital and largest city in Kenya. [1] The coordinates of the power station are:1°22'51.9"S, 36°38'08.0"E (Latitude:-1.381071; Longitude:36.635542). [2] The wind is strongest in the evening and in March, and weakest in the morning and in July, contrasting with Lake Turkana Wind Power Station. [3]

History

Ngong Hills Power Station was initially commissioned in 1993 with two wind turbines donated by the government of Belgium. After those two turbines were retired, the installation of new hardware led to a second commissioning in August 2009, with capacity of 5.1 MW. [4] Beginning in 2013, Kenya Electricity Generating Company, who own and operate the wind farm and power station began adding new turbines and by 2015, when the work was completed, the power station's generation capacity had increased to 25.5 megawatts. [5] [6]

See also

Related Research Articles

<span class="mw-page-title-main">Kenya Electricity Generating Company</span> State-owned electric power production company

Kenya Electricity Generating Company PLC abbreviated to KenGen, is a government enterprise in the Republic of Kenya charged with the production of electricity for the country. KenGen is the largest electric power producer in Kenya, generating over 60% of the electricity consumed in the country.

The Gitaru Hydroelectric Power Station, also known as the Gitaru Dam, is a rock and earth-filled embankment dam on the Tana River in Kenya. It straddles the border between Embu and Machakos Counties in the former Eastern Province. The primary purpose of the dam is hydroelectric power generation. It supports a 225 megawatt power station.

The Turkwel Hydroelectric Power Station, also Turkwel Dam, is an arch dam on the Turkwel River about 76 km (47 mi) north of Lorokon in Turkana County, Kenya. The dam serves several purposes, including hydroelectric power production, irrigation, tourism and fisheries. It was constructed between 1986 and 1991. It supports the third largest hydroelectric power plant in the country, having an installed electric capacity of 106 megawatts (142,000 hp).

The Olkaria I Geothermal Power Station, also known as Olkaria I Geothermal Power Plant is a geothermal power station in Kenya, with an installed capacity of 268.3 megawatts (359,800 hp).

The Olkaria II Geothermal Power Station also known as Olkaria II Geothermal Power Plant is a geothermal power plant in Kenya, with installed electric generating capacity of 105 megawatts (141,000 hp)

<span class="mw-page-title-main">Lake Turkana Wind Power Station</span> Wind farm in Kenya

Lake Turkana Wind Power Project (LTWP) is a wind farm in Kenya. It is located in Loiyangalani District, in Marsabit County, approximately 545 kilometres (339 mi) by road north of Nairobi, Kenya's capital city. The wind farm covers 160 square kilometres and has a capacity of 310 MW, enough to supply one million homes. It comprises 365 wind turbines, each with a capacity of 850 kilowatts. The associated overhead electric grid distribution system and a high voltage substation that connect it to the national grid.

<span class="mw-page-title-main">Energy in Kenya</span>

This article describes energy and electricity production, consumption, import and export in Kenya. Kenya's current effective installed electricity capacity is 2,651 megawatts (MW), with peak demand of 1,912 MW, as of November 2019. At that time, demand was rising at a calculated rate of 3.6 percent annually, given that peak demand was 1,770 MW, at the beginning of 2018. Electricity supply is mostly generated by renewable sources with the majority coming from geothermal power and hydroelectricity.

Despite its high potential for wind energy generation, wind power in Kenya currently contributes only about 16 percent of the country's total electrical power. However, its share in energy production is increasing. Kenya Vision 2030 aims to generate 2,036 MW of wind power by 2030. To accomplish this goal, Kenya is developing numerous wind power generation centers and continues to rely on the nation's three major wind farms: the Lake Turkana Wind Power Station, the Kipeto Wind Power Station, and the Ngong Hills Wind Farm. While these wind power stations are beneficial to help offset fossil fuel usage and increase overall energy supply reliability in Kenya, project developments have also negatively impacted some indigenous communities and the parts of the environment surrounding the wind farms.

The Kipeto Wind Power Station, also Kajiado Wind Power Project, is a 100 megawatts (130,000 hp) wind-powered electricity power station in Kenya. It is the second-largest wind farm in the country, behind the 310 megawatts Lake Turkana Wind Power Station.

Meru Wind Power Station, also Meru Wind Farm, is a 400MW wind-powered power station, under construction in Kenya.

The Sondu Miriu Hydroelectric Power Station is a hydroelectric power station on the Sondu River in Kenya.

The Tana Hydroelectric Power Station is a 20 MW (27,000 hp) hydroelectric power station on the Tana River in southern Kenya.

The Wanjii Hydroelectric Power Station is a 7.4 MW (9,900 hp) hydroelectric power station in Kenya.

The Ndula Hydroelectric Power Station is a 2.0 MW (2,700 hp) hydroelectric power station on the Thika River in Kenya.

Lamu Wind Power Station, also Lamu Wind Farm, is a planned 90 MW (120,000 hp) wind-powered power station in Kenya.

<span class="mw-page-title-main">Olkaria V Geothermal Power Station</span> Kenyan power station

The Olkaria V Geothermal Power Station, also known as the Olkaria V Geothermal Power Plant is a power station in Kenya, with an electric capacity of 158 megawatts (212,000 hp).

The Olkaria IV Geothermal Power Station is an operational geothermal power plant in Kenya, with installed capacity of 140 megawatts (190,000 hp).

The Turkana Geothermal Power Station, is a 140 megawatts (187,743 hp) geothermal power station under development in Kenya.

The Olkaria VII Geothermal Power Station, also known as the Olkaria VII Geothermal Power Plant, is a proposed geothermal power station in Kenya. The feasibility studies which will inform the design and generation capacity of this renewable energy infrastructure is ongoing, as of March 2022. The proposed generation capacity ranges from 83 megawatts, to 140 megawatts. The plant is owned and under development by Kenya Electricity Generating Company (KenGen), the electricity generation parastatal in Kenya.

References

  1. GFC (28 January 2016). "Distance between Nairobi, Kenya and Ngong Hills Nature Reserve, Kajiado, Kenya". Globefeed.com (GFC). Retrieved 28 January 2016.
  2. Google (28 January 2016). "Location of Ngong Hills Wind Power Station" (Map). Google Maps . Google. Retrieved 28 January 2016.
  3. Hindpal S. Jabbal. Basic Principles of Least-Cost Planning & Regional Interconnection in EA Countries, page 13-14
  4. KENGEN (2009). "Kenya Electricity Generating Company: Ngong Hills Power Station". Nairobi: Kenya Electricity Generating Company (KENGEN). Retrieved 28 January 2016.
  5. TSNO (24 July 2014). "KenGen to increase Ngong wind power firm by an extra twenty megawatts". The Standard Newspaper Online (TSNO). Nairobi. Retrieved 28 January 2016.
  6. CRO (12 August 2015). "Constructed Ngong wind power plant is to be commissioned in Kenya". Construction Review Online. Retrieved 28 January 2016.