USCGC Edisto

Last updated
USCGC Edisto (WAGB-284) 09080208.jpg
USCGC Edisto (WAGB-284) underway
History
Flag of the United States.svgUnited States
NameUSS Edisto
Namesake Edisto Island, South Carolina
Builder Western Pipe & Steel (WPS), San Pedro, California, U.S.
Laid down1946 WPS yard, San Pedro, California, U.S.
Launched29 May 1946
Sponsored byMrs. George B Gelly
Commissioned20 March 1947
Decommissioned20 October 1965
Maiden voyage11 April 1947
Out of service20 October 1965
ReclassifiedAGB-2 on 29 January 1949
HomeportBoston, Massachusetts, U.S.
IdentificationAGB-2
Nickname(s)"Ready Eddie"
FateTransferred to U.S. Coast Guard on 20 October 1965
Flag of the United States.svgFlag of the United States Coast Guard.svgUnited States
NameUSCGC Edisto
Namesake Edisto Island, South Carolina
Acquired20 October 1965
Commissioned20 October 1965
Decommissioned15 November 1974
Refit1963-1964 at Boston Naval Shipyard
Homeport
  • Boston, Massachusetts, U.S
  • Baltimore, Maryland, U.S.
Identification
  • WAGB-284
  • Call sign: NLKY
Nickname(s)
  • "Lucky Eddie"
  • "Unlucky"
  • "Ready Eddie"
  • "Guardian of the Redwood Coast"
  • "Red Microphone of Death"
FateTransferred to US General Services Administration (GSA), sold 29 September 1977 to Boston Metals Company of Baltimore Maryland who sold her to Union Minerals Company of Carey New Jersey in 1980. Broken up at Baltimore Shipyards.
General characteristics
Class and type Wind-class icebreaker
Tonnage5,957 (1966)
Displacement5,957 tons. (1966)
Length269 ft (82.0 m)
Beam63 ft 6 in (19.4 m)
Draft28 ft 4 in (8.6 m) max
Installed power
Propulsion2 × Westinghouse Electric DC electric motors driving the 2 aft propellers, 1 × 3,000 shp (2,200 kW) Westinghouse DC electric motor driving the detachable and seldom used bow propeller.
Speed13 knots (24 km/h; 15 mph)
Range27,000 nmi (50,000 km; 31,000 mi) at 10 knots (19 km/h; 12 mph)
Boats & landing
craft carried
4 lifeboats, 1 LCVP, 1 Greenland Cruiser, replaced later with 1 Arctic Survey Boat (1946).
Complement14 officers, 2 warrants officers, 189 enlisted (1966).
CrewOn polar operations, the crew includes a group of SCUBA divers, a medical officer, four pilots, twelve aviation ratings, and various scientists and observers, bringing the total force to about 225.
Sensors and
processing systems
Radar: SPS-10B; SPS-6C; SPA-4; SPA-8A (1966). Other: LORAN, radioteletype (RTTY), facsimile, all-mode MF, HF, VHF, and UHF radios, radio direction finder, sonic sounding machine, handy-talkies, radio-telephone, and an amateur radio station.
Armament
Aircraft carried2 helicopters
Aviation facilitiesHelicopter flight deck with retractable hangar.
NotesEquipped with laboratories and facilities for conducting oceanographic studies, hydrographic surveys, and high altitude meteorological observations by radiosonde.
USCGC Edisto. Note retracted hangar. USCGC Edisto (WAGB-284) 09080206.jpg
USCGC Edisto. Note retracted hangar.
USCGC Edisto. Note the hangar is retracted while a helicopter rests on the hangar deck. USCGC Edisto (WAGB-284) 09080207.jpg
USCGC Edisto. Note the hangar is retracted while a helicopter rests on the hangar deck.

USS Edisto (AGB-2) was a Wind-class icebreaker in the service of the United States Navy and was later transferred to the United States Coast Guard as USCGC Edisto (WAGB-284). She was named after Edisto Island, South Carolina. The island is named after the Native American Edisto Band who inhabited the island and the surrounding area. As of 2011 there is a namesake cutter USCGC Edisto (WPB-1313). The newer Edisto is a 110-foot Island-class patrol boat and is stationed in San Diego County, California. [1]

Contents

History

Construction

Edisto was one of the icebreakers designed by Lieutenant Commander Edward Thiele and Gibbs & Cox of New York, who modeled them after plans for European icebreakers he obtained before the start of World War II. She was the last of seven completed ships of the Wind class of icebreakers operated by the United States Coast Guard. Her keel was laid on May 15, 1945 at Western Pipe and Steel Company shipyards in San Pedro, California, she was launched on December 28, 1946, and commissioned on March 20, 1947. [2] [3] [4]

Her outer hull plating was constructed with 1+58-inch (41 mm)-thick high tensile steel. Edisto had a double bottom above the waterline with the two "skins" being approximately 15 in (380 mm) apart, insulated with cork. Framing was closely spaced and the entire hull girder was designed for great strength. Edisto's bow had the characteristic sloping forefoot that enabled her to ride up on heavy ice and break it with the weight of the vessel. Edisto's stern was similarly shaped to facilitate breaking ice while backing down. The sides of the icebreaker were rounded, with marked tumble home, that enabled the ship to break free from ice by heeling from side to side. Such heeling was accomplished by shifting water rapidly from wing tanks on one side of the ship to the other. A total of 220 tons of water could be shifted from one side to the other in as little as 90 seconds, which induced a list of 10 degrees. Ballast could also be shifted rapidly between fore and aft tanks to change the trim of the ship. Diesel electric machinery was chosen for its controlability and resistance to damage. [5]

Edisto was built during peacetime, so she had a much lighter armament than her war-built sisters, one 5 in (127 mm) 38 caliber deck gun when in Navy service, and unarmed for the Coast Guard. [2] [4]

U.S. Navy service

On April 11, 1947, Edisto sailed for the United States East Coast on a shake-down cruise. That summer, during a training cruise to Greenland, she crossed the Arctic Circle for the first of many times in her career. Upon her return to Boston, Massachusetts, Edisto was assigned to Task Force 39 for the Second Antarctic Development Project. She sailed on November 1, 1947 for a rendezvous via the Panama Canal with USS Burton Island at American Samoa. Together, they ventured south, becoming the first ships to penetrate the pack ice east of the Ross Sea. While in the Antarctic on this deployment, Edisto trained sailors and tested cold weather equipment, as well as investigating installations and equipment left by Operation Highjump of the previous year. She also collected valuable scientific data concerning geographic, hydrographic, photographic, oceanographic, meteorological, and electromagnetic conditions in the south polar regions.

Upon her return to Boston, Massachusetts on March 31, 1948, Edisto immediately began preparing for operations in the far north. During this summer deployment, her task force resupplied weather stations at Thule, Greenland, and on Ellesmere and Ellif Renghes Islands. The ships in this task force did reconnaissance to establish additional weather stations, trained men in cold weather operations, tested equipment, and collected a variety of data. Except for brief repairs in Boston for replacement of a broken propeller shaft, Edisto continued this grueling grind until September 25, 1948. During December 1948, in company with USS Hoist, she successfully rescued USS Whitewood, which had been damaged by ice and had run aground in Tunulliarfik Fjord at Narsaq, Greenland.

The next cruise of Edisto to the north polar regions was for purely exploratory purposes. Not even waiting for summer, she sailed out of Boston Harbor on January 24, 1949 to determine how much an icebreaker would be limited by the foul Arctic storms and lowest temperatures. She weathered extreme sub-zero conditions and returned to Boston on March 25, 1949.

From 1949 until her transfer to the U.S. Coast Guard on October 20, 1965, Edisto continued her support to exploration in both Arctic and Antarctic regions. The icebreaker supplied bases, reported ice packs and floes, took part in oceanographic, hydrographic, geological, coast and geodetic, and hydrophone surveys, and participated in Arctic convoy exercises. In 1949, Edisto took part in Operation Bluejay, the construction of radar stations in the far north. The following year, on August 6, 1950, Edisto set a record for northernmost penetration by reaching latitude 82 degrees North while conducting oceanographic surveys. In 1952, the work she had begun in Operation Bluejay was completed.

While participating in Operation Deep Freeze I during the winter (Antarctic summer) of 1955–1956, Edisto penetrated unexplored areas in the Antarctic near Cape Hallett, leaving "Edisto Bay" and "Edisto Acres" penguin rookery named in her honor. After her return to Boston the ship was again assigned to Arctic missions, aiding shipping in the Newfoundland and Labrador area for the remainder of 1956 and all of 1957. In December 1958, Edisto departed for Operation Deep Freeze IV. Her work in the Antarctic this time was in support of the International Geophysical Year. From April 16–26, 1959, while en route home, she stopped in Montevideo, Uruguay, which was experiencing disastrous floods. The crew labored many long hours in flood relief work, rescuing 227 persons by helicopter, thereby receiving the personal thanks of the president of Uruguay on their departure. [6]

Her next Antarctic trip came during the winter (Antarctic summer) of 1960-1961 as a member of Operation Deep Freeze 61. While operating far south of New Zealand in an attempt to salvage a naval vessel that had broken loose from its moorings, Edisto encountered what was probably the worst storm of her career. With tons of ice loading her topside down, she staggered to regain stability at the end of each long, agonizing roll. Before the storm had blown itself out, Edisto had lost most of her rigging and her starboard propeller.

As a unit of the task force for Operation Deep Freeze 63 in 1962–1963, she spent 131 consecutive days in the ice. During this time, her crew witnessed the breakup of Rear Admiral Richard Evelyn Byrd's Little America III, built in 1940 and 1941. Instead of going south for the 1963–1964 season in the Antarctic, Edisto entered the Boston Naval Shipyard. Then, on June 15, 1963, she departed Boston for military resupply operations in the Arctic. While on this cruise, Edisto used Prince Christian Sound instead of rounding Cape Farewell, Greenland probably making her the first US naval vessel to transit this sound since USCGC Northland in 1941. Before returning to Boston in early October 1964, she picked up ten Navy scientists in Iceland and proceeded to the waters between Greenland and Spitsbergen, Norway to carry out an oceanographic survey between June 25 and August 26. [7]

On December 10, 1964, Edisto departed for the Antarctic as a unit of the task force for Operation Deep Freeze 65 on an assignment unprecedented in icebreaker history. She had the responsibility for constructing the new Palmer Station for marine biological studies on Anvers Island off the Antarctic Peninsula. No sooner had she accomplished this assignment and returned to Boston, than Edisto was ordered to sail on a polar rescue mission. Drifting south was the Ice Island Arlis II, with 20 scientists on board waiting to be evacuated before the island broke up underneath them. Departing Boston on April 6, 1965, after a stay of only five days, she battled some of the thickest and hardest ice ever encountered by an American icebreaker to moor alongside Ice Island Arlis II and to effect the evacuation of the men and equipment.

During the summer of 1965, Edisto again sailed to the Arctic in support of the northern defense outposts and for oceanographic survey work. Before her return to Boston in early October 1965, a message informed her that she would be the first of the United States Navy icebreakers turned over to the United States Coast Guard under the transfer agreement signed between the United States Department of the Treasury and United States Department of the Navy. As Edisto sailed south, U.S. Coast Guard officers boarded who would command the vessel following the turnover.

U.S. Coast Guard service

On October 20, 1965, Edisto was transferred to the U.S. Coast Guard and re-designated as USCGC Edisto (WAGB-284). The icebreaker was decommissioned by the U.S. Navy, transferred, and immediately commissioned by the Coast Guard at Constitution Wharf, U.S. Coast Guard Base in Boston, Massachusetts. The Coast Guard changed Edisto's hull number to WAGB-284.

Her first mission as a Coast Guard icebreaker came the following month, when a vital undersea defense cable broke near Thule, Greenland. Although she got underway on short notice and steamed far north to join the other Canadian and American icebreakers in the repair operation, Edisto arrived only to learn that the cable had already been repaired.

After her return in early December 1965, Edisto spent the entire winter in the Bethlehem Steel Shipyard, where she underwent major repairs and alterations. Part of the alterations consisted of installations of a new flight deck with a telescopic hangar to house two helicopters which she would carry. The summer of 1966 saw Edisto deployed to the Arctic waters off Greenland and Iceland to participate in "Arctic East Summer" (AES) operations, which entailed the annual resupply of American bases in the Arctic and the advancement of polar sciences. As in the previous winter, Edisto was ordered on an unusual winter penetration into northern Baffin Bay.

The vital undersea cable connecting the remote North American defense outposts with the mainland of the United States had broken again. Reaching the break area on December 12, 1966, the icebreaker braved extreme cold, continual darkness, gale winds, and heavy icing until the break was located and repaired. For their "extremely meritorious service in support of Coast Guard operations" during this emergency, Edisto and her crew were awarded the U.S. Coast Guard Unit Commendation for the period of December 2–22, 1966.

In 1967, while in company with USCGC Eastwind, Edisto made an unsuccessful attempt to circumnavigate the Arctic, a feat that would have rivaled the 16th century voyages around the world of Magellan and Drake and has yet to be accomplished by surface vessels of any nation. In 1968 and 1969, Edisto participated in Antarctic polar deployments in support of operations Deep Freeze 69 and Deep Freeze 70.

In 1971, as in every summer since she became a U.S. Coast Guard icebreaker, Edisto took part in "Arctic East Summer" (AES) operations. From December 1971 to December 1972, she was homeported in Milwaukee, Wisconsin to take part in a test, along with USCGC Mackinaw, of icebreaking operations designed to extend the length of the shipping season on the Great Lakes and the Saint Lawrence Seaway system. [8] In the autumn of 1972, however, Edisto conducted icebreaking operations off Greenland in concert with the U.S. Navy oceanographic research ship USNS Mizar. She was sent there from the Great Lakes after the cutter originally assigned the duty, USCGC Southwind, suffered an engine casualty; although she remained off Greenland. Edisto arrived in the Arctic on September 30, 1972 and began escorting Mizar into the icepack for oceanographic research. At one point, the two were as far as 40 miles (64 km) into the heavy ice, some of which was a thick as 6 feet (1.8 m). In early October 1972, one of the Mizar's engines went out, so Edisto took her in tow, intending to take the research vessel out of the ice. On October 6, 1972, Mizar slipped out of its tow with Edisto and collided with the icebreaker, doing minor damage to Edisto's starboard side superstructure. Later, Edisto, due to the heavy ice; lost her starboard propeller and damaged her rudder and starboard shaft.

Although Mizar repaired her engine, the ship could not break ice, so the need for a fully operational icebreaker still existed. U.S. Coast Guard officials, through the U.S. State Department, arranged for the support of Canada's 315-foot (96 m) icebreaker CCGS John A. Macdonald, in case Southwind was unable to free Mizar. John A. Macdonald sailed from Baffin Bay around the southern tip of Greenland and berthed at Reykjavík, Iceland and awaited the call for assistance.

Fortunately, Edisto managed to work her way through the open leads in the ice while Southwind, with only four of her six engines running was able to reach Mizar, still icebound where it had struck Edisto, and freed her. Southwind then took Edisto in tow, and made for Reykjavík. They arrived on October 23, 1972 and Edisto's crew made temporary repairs to her rudder for the long tow back to the U.S. They departed and headed for the U.S., but the repairs did not hold and they once again returned to Iceland. On November 2, 1972 they once again set sail.

U.S. Coast Guard Headquarters decided that Southwind would take Edisto's place on the Great Lakes for that season. They were under pressure to get a second icebreaker there before the Welland Canal closed on December 15, 1972. To lessen the impact on the crews, headquarters also determined that the ships would simply exchange their entire crews. Southwind's crew would take over during the repairs on Edisto while Edisto's crew would join Southwind once she made her new home port of Milwaukee, Wisconsin in preparation for the 1972-1973 winter season.

On November 10, 1972 USCGC Morgenthau rendezvoused with the icebreakers and prepared to take over the tow but severe weather prevented a switch. By November 13, 1972, however, the weather moderated and she took over towing, and set course for Baltimore, Maryland. Southwind then made her way to the Great Lakes. On November 24, 1972 she rendezvoused with USCGC Chilula approximately 35 miles (56 km) west of the Nantucket Lightship after first dodging a storm by sailing towards Nova Scotia. Chilula took over the towing and headed to Hampton Roads, Virginia and then to the Coast Guard Yard, where the two cutters arrived safely on November 30, 1972.

After repairs were finished she was homeported in Baltimore, Maryland and used for icebreaking. Edisto's final cruise was a three-phase "Arctic East Summer" (AES) voyage that commenced at Baltimore on July 7, 1974. She first sailed in support of the International Ice Patrol, studying some 35 icebergs of varying sizes and shapes off the west coast of Greenland and the east coast of Baffin Island, Canada. Her crew took aerial, surface, and sonar measurements of bergs to be used by marine scientists to determine their rates of deterioration and drift. As tribute to their wives, some of the crew named the icebergs under study after their loved ones. During the voyage north, Edisto assisted USNS Private John R. Towle, a cargo ship that sustained ice damage to her hull off Hamilton Inlet, Labrador.

Edisto then sailed for Edinburgh, Scotland, arriving August 12, 1974. She departed Edinburgh on August 17, 1974 and headed for the Icelandic Sea for the second phase of her cruise, where she worked in conjunction with the Icelandic government. Her crew took 40 "Nansen Casts" in the Icelandic Sea and then, on September 2, 1974, made Reykjavík. Edisto departed Reykjavík on September 5, 1974 and sailed for the Labrador Sea for the third phase of her cruise. Arriving off Cape Farewell, Greenland on September 8, 1974, her crew took 52 "STD Casts" in the Labrador Sea and along the coast of Labrador, Canada. On September 14, 1974 she finished the third phase and began her return journey to Baltimore, arriving there on September 24, 1974.

She was decommissioned at Baltimore, Maryland on November 14, 1974 and then transferred to the U.S. General Services Administration (GSA). GSA sold Edisto on September 29, 1977 to Boston Metals Company of Baltimore, Maryland who then sold her for scrap metal to the Union Minerals Company of Carey, New Jersey.

Awards and decorations

Related Research Articles

USCGC <i>Healy</i> Icebreaker of the US Coast Guard

USCGC Healy (WAGB-20) is the United States' largest and most technologically advanced icebreaker as well as the US Coast Guard's largest vessel. She is classified as a medium icebreaker by the Coast Guard. She is homeported in Seattle, Washington, and was commissioned in 1999. On 6 September 2001 Healy visited the North Pole for the first time. The second visit occurred on 12 September 2005. On 5 September 2015, Healy became the first unaccompanied United States surface vessel to reach the North Pole, and Healy's fourth Pole visit happened on 30 September 2022.

USCGC <i>Polar Star</i> United States Coast Guard heavy icebreaker ship

USCGC Polar Star (WAGB-10) is a United States Coast Guard heavy icebreaker. Commissioned in 1976, the ship was built by Lockheed Shipbuilding and Construction Company of Seattle, Washington along with sister ship, USCGC Polar Sea.

USCGC <i>Polar Sea</i> United States Coast Guard heavy icebreaker ship

USCGC Polar Sea (WAGB-11) is a United States Coast Guard heavy icebreaker. Commissioned on 23 February 1977, the ship was built by Lockheed Shipbuilding and Construction Company of Seattle along with her sister ship, Polar Star (WAGB-10). Her home port is Seattle, Washington.

USCGC <i>Storis</i>

USCGC Storis (WAGL-38/WAG-38/WAGB-38/WMEC-38) was a light icebreaker and medium endurance cutter which served in the United States Coast Guard for 64 years and 5 months, making her the oldest vessel in commission with the Coast Guard fleet at the time of her decommissioning.

USCGC <i>Mackinaw</i> (WAGB-83) Former Coast Guard icebreaker, now a museum ship

USCGC Mackinaw (WAGB-83) is a 290-foot (88 m) former Coast Guard icebreaker on exhibit as a museum ship at the Icebreaker Mackinaw Maritime Museum in Mackinaw City, Michigan. The vessel has been known as the "Queen of the Great Lakes" and "The Largest Icebreaker on the Great Lakes"; the site states that "she was built during World War II to meet the heavy demands of war materials and transportation during the winter months".

Operation Deep Freeze is codename for a series of United States missions to Antarctica, beginning with "Operation Deep Freeze I" in 1955–56, followed by "Operation Deep Freeze II", "Operation Deep Freeze III", and so on.. Given the continuing and constant US presence in Antarctica since that date, "Operation Deep Freeze" has come to be used as a general term for US operations in that continent, and in particular for the regular missions to resupply US Antarctic bases, coordinated by the United States military. Task Force 199 was involved.

USS <i>Glacier</i> (AGB-4) United States Navy/Coast Guard Glacier-class icebreaker

USS Glacier (AGB-4) was a U.S. Navy, then U.S. Coast Guard icebreaker which served in the first through fifteenth Operation Deep Freeze expeditions. Glacier was the first icebreaker to make her way through the frozen Bellingshausen Sea, and most of the topography in the area is named for her crew members. When built, Glacier had the largest capacity single armature DC motors ever installed on a ship. Glacier was capable of breaking ice up to 20 feet (6.1 m) thick, and of continuous breaking of 4-foot (1.2 m) thick ice at 3 knots.

USS <i>Bear</i> Dual steam-powered and sailing ship

USS Bear was a dual steam-powered and sailing ship built with six-inch (15.2 cm)-thick sides which had a long life in various cold-water and ice-filled environments. She was a forerunner of modern icebreakers and had a diverse service life. According to the United States Coast Guard official website, Bear is described as "probably the most famous ship in the history of the Coast Guard."

USCGC <i>Northwind</i> (WAGB-282)

USCGC Northwind (WAG/WAGB-282) was a Wind-class icebreaker, the second United States Coast Guard Cutter of her class to bear the name. She was built to replace USCGC Staten Island which was in Soviet lend-lease service.

USCGC <i>Burton Island</i>

USS Burton Island (AG-88) was a United States Navy Wind-class icebreaker that was later recommissioned in the United States Coast Guard as the USCGC Burton Island (WAGB-283). She was named after an island near the coast of Delaware.

Wind-class icebreaker Class of icebreaker ships

The Wind-class icebreakers were a line of diesel electric-powered icebreakers in service with the United States Navy, United States Coast Guard, Royal Canadian Navy, Canadian Coast Guard and Soviet Navy from 1944 through the late 1970s. They were very effective ships: all except Eastwind served at least thirty years, and Northwind served in the USCG continuously for forty-four years. Considered the most technologically advanced icebreakers in the world when first built, the Wind-class icebreakers were also heavily armed; the first operator of the class was the United States Coast Guard, which used the vessels for much-needed coastal patrol off Greenland during World War II. Three of the vessels of the class, Westwind, Southwind, and the first Northwind all went on to serve temporarily for the Soviet Union under the Lend-Lease program, while two others were built for the United States Navy and another was built for the Royal Canadian Navy; all eight vessels were eventually transferred to the United States Coast Guard and the Canadian Coast Guard.

USS <i>Callao</i> (IX-205) U.S. Navy unclassified miscellaneous vessel

USS Callao (IX-205), an unclassified miscellaneous vessel, was the third ship of the United States Navy to be named for Callao, a seaport in Peru. She was built for the Kriegsmarine as the weather ship and icebreaker Externsteine. The ship was captured on 16 October 1944 by USCGC Eastwind of the Greenland Patrol and was temporarily commissioned into the United States Coast Guard as USCGC East Breeze before being turned over to the United States Navy and commissioned as USS Callao in January 1945. The ship was sold out of service in 1950, and broken up the following year.

USS <i>Arneb</i> Cargo ship of the United States Navy

USS Arneb (AKA-56/LKA-56) was an Andromeda-class attack cargo ship named after Arneb, the brightest star in the southern constellation Lepus. She served as a commissioned ship for 27 years and 3 months, the longest time in commission of any AKA.

USCGC <i>Eastwind</i>

USCGC Eastwind (WAGB-279) was a Wind-class icebreaker that was built for the United States Coast Guard. Completed in time to see action in World War II, she continued in USCG service under the same name until decommissioned in 1968.

USCGC <i>Westwind</i>

USCGC Westwind (WAGB-281) was a Wind-class icebreaker that served in the United States Coast Guard as USCGC Westwind (WAG-281), the Soviet Navy as the Severni Polius, and again in the U.S. Coast Guard as USCGC Westwind (WAGB-281).

USCGC <i>Staten Island</i>

USCGC Staten Island (WAGB-278) was a United States Coast Guard Wind-class icebreaker. Laid down on 9 June 1942 and launched on 28 December 1942, the ship was commissioned on 26 February 1944, and almost immediately afterward transferred to the Soviet Union, under the Lend Lease program, under the name Severny Veter, which loosely translates as Northwind, until 19 December 1951. When returned to the United States Navy, she was designated USS Northwind until 15 April 1952, when she was renamed Staten Island to distinguish her from her successor USCGC Northwind (WAGB-282) which had been laid down shortly after she was lent to the Soviet Union. The ship was transferred to the U.S. Coast Guard as USCGC Staten Island in February 1965, and served until November 1974, before being scrapped.

USCGC <i>Evergreen</i>

The USCGC Evergreen was a Cactus-class seagoing buoy tender operated by the United States Coast Guard. She served in the North Atlantic during World War II and participated in the International Ice Patrol in these waters after the war. She was the first dedicated oceanographic vessel in the Coast Guard's history. She was decommissioned in 1990 and sunk by the US Navy for target practice in 1992.

USS Whitewood (YN-84/AN-63/AG-129), a wooden-hulled Ailanthus-class net laying ship of the United States Navy was laid down on 24 October 1942 at Rockland, Maine, by the Snow Shipyard, Inc.; named Whitewood on 5 July 1943; re-classified a net laying ship, AN-63, on 1 January 1944; launched on 21 April 1944; sponsored by Mrs. Eben Kenney; and commissioned on 17 July 1944.

USCGC <i>Southwind</i>

USCGC Southwind (WAGB-280) was a Wind-class icebreaker that served in the United States Coast Guard as USCGC Southwind (WAG-280), the Soviet Navy as the Admiral Makarov, the United States Navy as USS Atka (AGB-3) and again in the U.S. Coast Guard as USCGC Southwind (WAGB-280).

USCGC <i>North Star</i>

The USCGC North Star was a United States Coast Guard Cutter during the Second World War. It was originally built for the U.S. Interior Department and served in the United States Coast Guard (USCG) before being acquired by the U.S. Navy.

References

  1. U.S. Coast Guard Historian's Office. USCGC Edisto (WPB-1313), San Diego, California. http://www.uscg.mil/d11/cgcEdisto/default.asp Archived 2014-09-03 at the Wayback Machine Retrieved: 29 August 2014
  2. 1 2 "USCG Edisto". U.S. Coast Guard Cutter History. United States Coast Guard. Archived from the original on 2012-10-15. Retrieved 2012-12-12.
  3. "USN Edisto". Dictionary of American Naval Fighting Ships. United States Navy. Archived from the original on 2012-09-20. Retrieved 2012-12-12.
  4. 1 2 "NavSource Edisto". Service Ship Photo Archive. NavSource Naval History. Archived from the original on 2013-09-10. Retrieved 2012-12-12.
  5. "USCG Icebreakers". U.S. Coast Guard Cutter History. United States Coast Guard. Archived from the original on 2015-07-01. Retrieved 2012-12-12.
  6. NHHC, Dates in American Naval History. http://www.history.navy.mil/wars/datesapr.htm Archived 2013-10-21 at the Wayback Machine
  7. NCEI Accession 6300929, USCGC EDISTO 1963. gov/archive/accession/ 6300929 "NOAA National Centers for Environmental Information. Dataset". NOAA Onestop. NOAA National Centers for Environmental Information. Retrieved August 10, 2023.{{cite web}}: Check |url= value (help)
  8. Scheina, Robert L. (1990). U.S. Coast Guard Cutters and Craft, 1946-1990. Annapolis: Naval Institute Press. p. 101. ISBN   0-87021-719-4.

Further reading

This article incorporates text from the public domain Dictionary of American Naval Fighting Ships .