Feather River Route

Last updated

Feather River Route
West pacific railroad logo.jpg
KeddieWye.JPG
Keddie Wye, 2013. Above is the Western Pacific Railroad logo, with the name of the Feather River Route.
Overview
StatusOperational
Locale California
Nevada
Utah
Termini
Service
System Western Pacific Railroad (formerly)
Union Pacific Railroad
Technical
Track gauge 1,435 mm (4 ft 8+12 in) standard gauge
Old gauge1,000 mm (3 ft 3+38 in) metre gauge
Routemap

Contents

BSicon CONTg.svg
BSicon eINT.svg
Salt Lake City
BSicon LSTR.svg
Minor settlements
BSicon STR.svg
Minor settlements
BSicon STR.svg
Garfield
BSicon STR.svg
Grants
BSicon STR.svg
Delle
BSicon STR.svg
Low
BSicon STR.svg
Clive
BSicon STR.svg
Knolls
BSicon STR.svg
Barro
BSicon STR.svg
Arinosa
BSicon STR.svg
Salduro
BSicon eABZg+l.svg
BSicon exCONTfq.svg
BSicon eHST.svg
Wendover
BSicon STR+GRZq.svg
BSicon LSTR.svg
Minor settlements
BSicon STR.svg
Minor settlements
BSicon STR.svg
Pilot
BSicon STR.svg
Proctor
BSicon STR.svg
Silver Zone
BSicon STR.svg
Shafter
BSicon exCONTgq.svg
BSicon eKRZl.svg
BSicon CONTfq.svg
BSicon TUNNEL1.svg
Hogan's Tunnel
elev. 5,901 ft (1,799 m)
BSicon LSTR.svg
Minor settlements
BSicon STR.svg
Minor settlements
BSicon STR.svg
Jasper
BSicon STR.svg
Ventrosa
BSicon STR.svg
Tobar
BSicon STR.svg
Ruby
BSicon STR.svg
Boaz
BSicon eHST.svg
Wells
BSicon LSTR.svg
Minor settlements
BSicon STR.svg
Minor settlements
BSicon STR.svg
Deeth
BSicon STR.svg
Halleck
BSicon STR.svg
Pardo
BSicon eBHF.svg
Elko Station
BSicon STR.svg
Hunter
BSicon STR.svg
Tonka
BSicon TUNNEL1.svg
BSicon eHST.svg
Carlin
BSicon CONTg+2.svg
BSicon STRc3.svg
BSicon eINT.svg
Palisade
BSicon STRc1.svg
BSicon KRZ2+4o.svg
BSicon STRc3.svg
BSicon STR+c1.svg
BSicon STR+4.svg
BSicon exCONTl+4.svg
E&P
BSicon LSTR.svg
BSicon CONTf.svg
BSicon STR.svg
Dunphy
BSicon STR.svg
Kampos
BSicon STR.svg
Nelson
BSicon STR.svg
Red House
BSicon STR.svg
Golconda
BSicon eBHF.svg
Winnemucca
BSicon LSTR.svg
Minor settlements
BSicon STR.svg
Minor settlements
BSicon STR.svg
Raglan
BSicon STR.svg
Pronto
BSicon STR.svg
Gaskell
BSicon STR.svg
Venado
BSicon STR.svg
Jungo
BSicon STR.svg
Antelope
BSicon STR.svg
Sulphur
BSicon STR.svg
Ronda
BSicon STR.svg
Cholona
BSicon STR.svg
Trego
BSicon STR.svg
Ascalon
BSicon eHST.svg
BSicon eABZgl+l.svg
BSicon exSTR+r.svg
Gerlach
BSicon STR.svg
BSicon exCONTf.svg
BSicon LSTR.svg
BSicon STR.svg
Phil
BSicon STR.svg
Bronte
BSicon STR.svg
Reynard
BSicon STR.svg
Sano
BSicon STR.svg
Sand Pass
BSicon STR.svg
Kepler
BSicon STR.svg
Flanigan
BSicon lENDE@Fq.svg
BSicon exCONTg@Gq.svg
BSicon ABZgr+xr.svg
BSicon exSTRq.svg
BSicon exCONTfq.svg
F&L
BSicon STR+GRZq.svg
BSicon STR.svg
Calneva
BSicon STR.svg
Herlong
BSicon STR.svg
Doyle
BSicon STR.svg
Omira
BSicon ABZgxl+l.svg
BSicon CONTfq.svg
NCO
BSicon STR.svg
Reno Junction
elev. 5,011 ft (1,527 m)
BSicon STR.svg
BSicon lGIPl.svg
BSicon TUNNEL1.svg
BSicon lGIPr.svg
BSicon STR.svg
Chilcoot
BSicon ABZg+l.svg
BSicon CONTfq.svg
BSicon STR.svg
Hawley
BSicon eBHF.svg
Portola
BSicon evSHI2gl-.svg
BSicon lv-DST.svg
BSicon vSTR-exKBHFe.svg
Western Pacific Railroad Museum
BSicon hSTRae.svg
BSicon STR.svg
Clio
BSicon TUNNEL1.svg
BSicon vWSLaq.svg
BSicon STR+r-STRro.svg
BSicon ABZg+l.svg
BSicon CONTfq.svg
BSicon STR.svg
Marston
BSicon eHST.svg
Keddie
BSicon STRc2.svg
BSicon WYE3+fg.svg
BSicon CONT1.svg
BSicon STRc4.svg
BSicon TUNNEL2.svg
BSicon STR.svg
Virgilia
BSicon STR.svg
Rich
BSicon STR.svg
Belden
BSicon WASSERl.svg
BSicon WBRUCKE1.svg
BSicon WASSER+r.svg
BSicon STR.svg
BSicon WASSER.svg
Merlin
BSicon WASSER+l.svg
BSicon WBRUCKE1.svg
BSicon WASSERr.svg
BSicon WASSER.svg
BSicon eKRWgl.svg
BSicon exKRW+r.svg
route change 1957
BSicon WASSERl.svg
BSicon WBRUCKE1.svg
BSicon exSTR.svg
BSicon vWASSER+r-.svg
BSicon emKRZo.svg
BSicon vWASSER-.svg
BSicon WDOCKS.svg
BSicon exSTR.svg
BSicon WBRUCKE1.svg
BSicon exSTR.svg
BSicon vWASSERr-.svg
BSicon eKRWg+l.svg
BSicon exKRWr.svg
BSicon eHST.svg
Oroville
BSicon STR.svg
Palermo
BSicon STR.svg
Tambo
BSicon CONTgq.svg
BSicon KRZul+l.svg
BSicon KRZul+r.svg
BSicon CONTfq.svg
SP East Valley Line
BSicon exCONTgq.svg
BSicon eABZg+r.svg
BSicon eHST.svg
Marysville
BSicon WBRUCKE1.svg
BSicon exCONTgq.svg
BSicon eABZgr.svg
BSicon STR.svg
Donniston
BSicon STR.svg
Towbridge
BSicon STR.svg
Pleasant Grove
BSicon exCONTgq.svg
BSicon eKRZ.svg
BSicon exCONTfq.svg
BSicon STR.svg
Counsman
BSicon fCONTgq.svg
BSicon fSTRq.svg
BSicon lBUE-us.svg
BSicon STR.svg
BSicon fCONTfq.svg
BSicon WBRUCKE1.svg
BSicon CONTgq.svg
BSicon KRZulr.svg
BSicon CONTfq.svg
BSicon eBHF.svg
Sacramento
BSicon LSTR.svg
Minor settlements
BSicon STR.svg
Minor settlements
BSicon STR.svg
Cordova
BSicon STR.svg
Franklin
BSicon STR.svg
Glannvale
BSicon STR.svg
Thornton
BSicon STR.svg
Kingdon
BSicon eBHF.svg
Stockton
BSicon STR.svg
Lathrop
BSicon STR.svg
Lyoth
BSicon STR.svg
Carbona
BSicon ABZgl.svg
BSicon KHSTeq.svg
Tesla
BSicon HST.svg
Livermore
BSicon lCSTRa@f.svg
BSicon HST.svg
Pleasanton
BSicon tCSTRe.svg
BSicon PORTALf.svg
BSicon PORTALg.svg
BSicon CSTR.svg
BSicon tSTRe.svg
BSicon eHST.svg
Fremont–Niles
BSicon STR.svg
Hayward
BSicon STR.svg
San Leandro
BSicon STR.svg
Melrose
BSicon GRZ+l.svg
BSicon KBHFxe.svg
BSicon GRZeq.svg
2525 mi
4064 km
Oakland
BSicon BUS2.svg
BSicon GRZ.svg
BSicon exKRWgl.svg
BSicon exKRW+r.svg
motor coach transfer
BSicon GRZ.svg
BSicon exSTR.svg
BSicon exKBHFe.svg
BSicon exGRZa.svg
WP Mole
1910–
1949
BSicon GRZ.svg
BSicon exKBHFe.svg
BSicon exGRZa.svg
BSicon exGRZ.svg
Oakland Pier
1949–
1958
BSicon GRZ.svg
BSicon exBOOT.svg
BSicon exGRZ.svg
BSicon exBOOT.svg
BSicon exGRZ.svg
ferry transfer
BSicon GRZl.svg
BSicon exGRZaq.svg
BSicon GRZeq.svg
BSicon lBHF.svg
BSicon exGRZe.svg
BSicon exGRZr.svg
2532 mi
4075 km
San Francisco

The Feather River Route is a rail line that was built and operated by the Western Pacific Railroad. It was constructed between 1906 and 1909, and connects the cities of Oakland, California, and Salt Lake City, Utah. The line was built to compete with the Southern Pacific Railroad, which at the time held a nearly complete monopoly on Northern California rail service. The route derives its name from its crossing of the Sierra Nevada, where it follows both the North and Middle Forks of the Feather River. The route is famous for its impressive engineering qualities and its considerable scenic value. All of the route is now owned and operated by the Union Pacific Railroad; however, the Union Pacific has transferred significant portions of the route to other lines. The portion still called the Feather River Route by the Union Pacific runs from the California Central Valley to Winnemucca, Nevada and has been divided into three subdivisions named the Sacramento, Canyon and Winnemucca subdivisions.

History

A rare example of a bridge crossing over another bridge: State Route 70 crosses over the railroad bridge, which crosses over the Feather River near Pulga. FeatherRiver.JPG
A rare example of a bridge crossing over another bridge: State Route 70 crosses over the railroad bridge, which crosses over the Feather River near Pulga.

Early history

Interest in building a transportation artery through the Feather River Canyon and across the deserts of Nevada and Utah began with the discovery of Beckwourth Pass, in the Sierra Nevada, in 1850. The pass, at 5,221 feet (1,591 m) in elevation, is the lowest pass through the Sierra Nevada. In the 1860s, Arthur W. Keddie began surveying in the Feather River Canyon, in order to find a suitable route for such an artery. He eventually found such a route, and helped to found the Oroville and Virginia City Railroad Company in 1867 to build a railroad along it. Political pressure from the Central Pacific Railroad, among other factors, led to the end of all construction efforts by 1869. [1]

Throughout the 1870s and 1880s, little progress was made in forming a company to construct the railroad line. Some interest remained, because the proposed route was much less steep and passed through the Sierra Nevada at a point 2,000 feet (610 m) lower than that of the recently finished First transcontinental railroad, owned by the Central Pacific Railroad between Sacramento and Ogden, Utah. The Union Pacific Railroad, which terminated in Ogden at the time, considered building the line multiple times throughout this era to bypass the Central Pacific and access the Pacific Coast on its own. None of these proposals resulted in any level of action, and the idea was widely considered dead by the 1890s. [1]

Interest in a line through the Feather River Canyon was renewed in 1900, when the Union Pacific Railroad, then led by E. H. Harriman, took control of the Southern Pacific Railroad. Subsequently, Harriman decided to close off access to the Southern Pacific to all railroads other than the Union Pacific, leaving all other railroads unable to access the Pacific Coast from Salt Lake City. Foremost among these railroads was the Denver and Rio Grande Western Railroad, the westernmost part of an 11,000-mile (18,000 km) transcontinental rail network organized by Jay Gould. Jay's son and successor, George Gould, decided to obtain access to the Pacific Coast. Hence, on April 3, 1903, the Western Pacific Railroad, backed heavily by Gould, was founded in San Francisco. [1]

Construction

A Western Pacific passenger train in the Feather River canyon, c. 1910s Western Pacific in Feather River grand canyon.JPG
A Western Pacific passenger train in the Feather River canyon, c.1910s

Construction of the line began in 1906 and continued under harsh conditions. In the Sierra, a total absence of roads, along with rockslides in the Feather River Canyon and extreme temperature fluctuation, made working conditions uncomfortable and dangerous. In the deserts of Nevada and Utah high temperature and lack of water made conditions similarly difficult. Construction costs skyrocketed, nearly bankrupting the contractors building the line. Labor turnover was extremely high, due to the miserable working conditions. Nonetheless, progress inched further, although slower than anticipated, due to the challenges caused by the need for many long tunnels on the Sierra portion of the route. [1]

When the line was finished in 1909 it spanned a total of 927 miles (1,492 km), and had been built at the then ferociously expensive cost of $75 million (equivalent to $2.62 billion in 2024). It featured a ruling grade of 1%, making it only half as steep as Southern Pacific's Donner Pass line, its primary competitor. [2]

History under the Western Pacific

Combined Western Pacific/Denver & Rio Grande Western route map (c. 1914) 1930 D&RGW WP.jpg
Combined Western Pacific/Denver & Rio Grande Western route map (c.1914)

The traffic levels of the Feather River Route fluctuated considerably between its completion in 1909 and the purchase of the Western Pacific Railroad by the Union Pacific Railroad in 1983. Between 1909 and 1918, traffic rose with the onset of World War I, although such gains vanished in the 1920s and 1930s. The construction of the Inside Gateway line, completed in 1931 between Keddie and Bieber, California, failed to alleviate the problem. Yet in 1936, in spite of falling traffic, the Western Pacific rehabilitated the Feather River Route using RFC funds. As a result, the line was in optimal condition at the onset of World War II in 1939.[ citation needed ]

Traffic levels on the route exploded during the first year of the war. Freight traffic doubled, and passenger traffic increased sixfold. Traffic increased steadily in both categories over the next few years of the war. In response to this, the Western Pacific installed Centralized Traffic Control between Oroville and Portola, California, in the Sierra Nevada, during 1944 and 1945.[ citation needed ]

Palisade Canyon on the Humboldt River, between Battle Mountain and Carlin. The Feather River Route and Overland Route run parallel on opposite sides of the river PalisadeCanyonNV.jpg
Palisade Canyon on the Humboldt River, between Battle Mountain and Carlin. The Feather River Route and Overland Route run parallel on opposite sides of the river

From the late 1940s through to the early 1970s, freight traffic on the line grew slowly, while passenger traffic fell substantially.[ citation needed ] This did not stop the Western Pacific from introducing the California Zephyr in 1949. The Zephyr, which operated over three railroads on its route between Oakland and Chicago, gained immense recognition but failed to last past the year 1970, when lack of riders and unprofitability forced the Western Pacific to abandon the service. [3]

In 1957, a portion of the route between Oroville and Intake had to be relocated to make way for the Oroville Dam. [4] The new line features the North Fork Bridge, [5] [6] which is 1,000 feet (300 m) long and 200 feet (61 m) high. The line began operation in 1962. During the 1970s, the Feather River Route experienced modernization, as operations became computerized.[ citation needed ]

Shared trackage agreement

The Feather River Route parallels the Overland Route in central Nevada between Weso (near Winnemucca) and Alazon (near Wells). The Southern Pacific Railroad and Western Pacific came to a shared trackage agreement to use directional running. [7] Eastbound trains of both companies used the tracks for the Feather River Route while westbound trains used the Overland Route. [8] In the shared track area, the tracks mostly run on opposite sides of the Humboldt River; at some points the two lines are several miles apart. Crossovers were constructed where the lines run in close proximity to allow bi-directional service to the areas previously only accessible from one of the lines, such as Battle Mountain. There is a grade separated crossover of the two lines in the shared track area near Palisade, Nevada. This results in trains following right hand traffic in the eastern half of the shared track area, but left hand traffic in the western half. [9]

By 1967, a second section of the Feather River Route was converted to directional running. The easternmost portion of the line (Shafter Subdivision), from the Kennecott Smokestack of the Bingham Canyon Mine smelting facilities to the end of the line in downtown Salt Lake City was operationally combined with the Lynndyl Subdivision of the former Los Angeles and Salt Lake Railroad for a continuous dual track into Salt Lake City. Initially this required a crossover between the two tracks. When the WP and UP merged in 1983, the crossover was eliminated. [10]

Present

The Western Pacific was purchased by the Union Pacific Railroad in 1983. In 1996, the Union Pacific acquired the Southern Pacific, resulting in both lines between Oakland and Utah being owned by the same company. [7] After the acquisition, the Union Pacific truncated the Feather River Route to the meeting points of the two lines near Sacramento, California and Winnemucca, Nevada.

The far western portion of the line, west of Stockton, now the Oakland Subdivision, is now used by the Altamont Corridor Express. A portion of the line through downtown Sacramento is now used by the Blue Line of the Sacramento Regional Transit District. East of Winnemucca, the former Feather River Route has been combined with lines from the former Denver and Rio Grande Western Railroad to form the Central Corridor. [11]

A Union Pacific freight train in the Feather River Canyon, Butte County, California, March 2022 Union Pacific freight train in the Feather River Canyon-3872.jpg
A Union Pacific freight train in the Feather River Canyon, Butte County, California, March 2022

The Western Pacific Railroad Museum, a preservation society founded in 1984, is located next to the Union Pacific rail yard in Portola, California. The remaining portion of the Feather River Route follows a corridor similar to that of State Route 70 in California and former State Route 49 in Nevada.

Points of interest

Along portions built as part of the Feather River Route that are currently assigned to other lines:

Lines served

References

  1. 1 2 3 4 Borden, Stanley T. (1968). "Western Pacific R.R. Feather River Route". The Western Railroader. 31 (338). Francis A. Guido: 5–18.
  2. Carrere, J.F. (August 28, 1910). "Westward Ho over the Western Pacific". Sacramento Union. Archived from the original on May 14, 2021. Retrieved May 1, 2017. From Salt Lake to San Francisco is 921 miles (1,482 km) over the Western Pacific, and as the distance from Sacramento to San Francisco over the same route is 139 miles (224 km), it follows that from the capital of California to the capital of Utah is 782 miles (1,259 km). While that is longer than the route of the Southern Pacific the lower grade over the new road enables it to more than make up in speed what it loses in distance.
     [...] Salt Lake City is 4,224 feet (1,287 m) above sea level. The highest point on the Western Pacific is 5,819 feet (1,774 m) at Silver Zone, one hundred and fifty miles west of that city. So there is quite a rapid ascent going east, but from Silver Zone until California is reached the altitude is never less than 3800 feet, so that the natural grade is not heavy compared with some of the other roads. For 42 miles (68 km) in one place the road is perfectly straight and perfectly level, for other long distances it does not exceed two-fifths of 1 per cent, and it never passes 1 per cent.
  3. Schafer & Welsh (1997), p. 68.
  4. "History of Water Development and the State Water Project". California Department of Water Resources. October 8, 2008. Archived from the original on August 23, 2010. Retrieved April 2, 2012.
  5. Gascoyne, Tom (July 12, 2001). "Empty Promise" . Retrieved October 12, 2010.
  6. Starr, Kevin (September 10, 2009). Golden Dreams: California in the Age of Abundance, 1950-1963. Oup USA. p. 278,279,281. ISBN   978-0-19-515377-4 . Retrieved September 25, 2010.
  7. 1 2 "Eureka County, Yucca Mountain Existing Transportation Corridor Study". Eureka County – Yucca Mountain Project. 2005. Retrieved May 8, 2010.
  8. Nevada Road and Recreation Atlas (Map) (2003 ed.). 1:250000. Benchmark Maps. 2003. p. 41–44. ISBN   0-929591-81-X.
  9. "Eureka County, Yucca Mountain Existing Transportation Corridor Study". Eureka County – Yucca Mountain Project. 2005. Retrieved May 8, 2010.
  10. Don Strack (October 19, 2018). "Union Pacific In Utah, 1900-1996". UtahRails.net. Retrieved November 28, 2018.
  11. UPRR Common Line Names (PDF) (Map). Union Pacific Railroad. Retrieved January 4, 2009.
  12. "Maps – Geographic Information System". Federal Railroad Administration . Retrieved July 28, 2020.