General Dynamics Ajax

Last updated

Ajax
AJAX, the Future Armoured Fighting Vehicle for the British Army MOD 45159441.jpg
Pre-production prototype of the turreted Ajax variant
Type Armoured fighting vehicle
Place of originUnited Kingdom
Production history
Designer General Dynamics UK
ManufacturerGeneral Dynamics UK
Specifications
Mass38 tonnes with growth potential to 42 tonnes
Length7.62 m (25 ft 0 in)
Width3.35 m (11 ft 0 in)
Height3.00 m (9 ft 10 in)
Crew3+7 passengers for PMRS variant [1]

Main
armament
40 mm (1.6 in) CTA International CTAS40 cannon
Secondary
armament
7.62 mm L94A1 coaxial chain gun
Kongsberg Protector Remote Weapon Station (UK testing with 7.62 mm L7 General-purpose machine gun and Javelin ATGM [2] [3] [4] )
Engine MTU Friedrichshafen V8 engine
600 kW (800 bhp)
TransmissionRENK 6 speed HSWL 256B
SuspensionTorsion bar
Maximum speed 70 km/h (43 mph)

The Ajax, formerly known as the Scout SV (Specialist Vehicle), is a group of armoured fighting vehicles being developed by General Dynamics UK for the British Army. [5] It has suffered serious development and production difficulties. [6]

Contents

The Ajax is a development of the ASCOD armoured fighting vehicles used by the Spanish Armed Forces and Austrian Armed Forces. The vehicles were originally developed by Steyr-Daimler-Puch Spezialfahrzeug and Santa Bárbara Sistemas in the early 1990s. Both companies were purchased by General Dynamics in the early 2000s.

In 2010, General Dynamics UK was selected as the winner of the Future Rapid Effect System contract with the ASCOD Common Base Platform, beating BAE Systems' CV90 proposal. The Ajax vehicles were to be procured in a number of variants, initially planned to be in blocks, with the first vehicles planned to be delivered in 2017. Delays meant that as of January 2020, initial operating capability was expected in July 2020. [7]

In November 2020, trials were halted over excessive noise and vibration. In September 2021 Jeremy Quin, Minister for Defence Procurement, in a written response stated that dynamic testing and training on Ajax was suspended and that "it is not possible to determine a realistic timescale for the introduction of Ajax vehicles into operational service". [8] Limited trials resumed in October 2022, with extended trials to last possibly until early 2025.

In a statement in March 2023, the Ministry of Defence (MOD) said that full operating capability was expected between October 2028 and September 2029, when the army has trained and converted forces to the vehicle. [9]

Development

Rear view of Ajax variant in October 2016 AJAX Armoured Vehicle at a 3 Div Combined Arms Manoeuvre Demonstration MOD 45161419.jpg
Rear view of Ajax variant in October 2016

The Ajax has its origins in the Future Rapid Effect System programme going back to the 1990s when the joint UK/USA TRACER programme was cancelled. The purpose of the FRES programme was to find a replacement for the British Army's Combat Vehicle Reconnaissance (Tracked) (CVR(T)) family of vehicles, which have been in service from 1971. General Dynamics UK won the contract in March 2010 after years of competition from BAE Systems. After the Ministry of Defence had selected the ASCOD 2 Common Base Platform, BAE tried to reverse the decision by offering to manufacture the CV90 at their Newcastle facility. Nevertheless, the Ministry of Defence awarded General Dynamics a £500 million Demonstration Phase contract. General Dynamics has conducted design review work using the input of soldiers and bringing the ASCOD 2 Chassis in line with the British requirements.

The Ajax programme passed the "Preliminary Design Review" (PDR), initial design point in December 2012. At this stage of development, system maturity and preliminary system design were reviewed. In late 2013, the "Common Base Platform Critical Design Review" (CDR) was completed and development continued. In June 2014, the Protected Mobility Reconnaissance Support (PMRS) variant of the Scout Family officially completed its CDR. A "Mobile Test Rig", the precursor to a prototype, which had been undergoing rigorous testing including cold weather and Operational and Tactical (O&T) mobility trials, as well as Accelerated Life Testing (ALT), completed system de-risking. At the DVD exhibition in 2014, the first pre-production prototype of the PMRS variant was unveiled, built at General Dynamics' facilities in Spain.

Initially, the Ajax was to be procured in a number of blocks totalling 1,010 vehicles. The first order of Block 1 vehicles encompassed Scout Reconnaissance, PMRS APC, and Repair and Recovery variants, with a following order of Block 2 to consist of Reconnaissance, C2, and Ambulance variants. There was a possibility for a third Block of vehicles encompassing a "Direct Fire" vehicle with a 120 mm main gun, "Manoeuvre Support", and a "Joint Fires" variant equipped to succeed the FV102 Striker in the anti-tank role. However, in September 2014, Block 3 vehicles were dropped and the Ministry of Defence had "no plans" to order any Block 2 vehicles.[ citation needed ]

On 3 September 2014, the British Government ordered 589 Scout SV vehicles, totalling a cost of £3.5 billion excluding VAT. A number of Block 2 variants were merged into the Block 1 order.

Pre-production prototype of the Ares (PMRS variant) Scout SV Specialist Vehicle MOD 45157765.jpg
Pre-production prototype of the Ares (PMRS variant)

The variants ordered include: [10] [11]

Deliveries to the British Army began in 2017; the last deliveries were scheduled for around 2026. [13]

In July 2015, the Ministry of Defence concluded their study into having final assembly of the Scout SV vehicles take place in the UK rather than General Dynamics' primary production facility in Spain. There was a business case for UK final assembly and testing. As part of a £390 million maintenance package running until 2024, General Dynamics moved production of the last 489 vehicles to Britain. [14] General Dynamics bought a former forklift factory in Pentrebach in South Wales to assemble the Scout SV. [15] Thales UK won the sight system contract for the Scout family, safeguarding engineering and manufacturing jobs at their site in Scotland. [16]

In early August 2015, Rheinmetall of Germany was contracted to manufacture the Scout SV turrets. [17] Meggitt was to manufacture the Scout SV ammunition handling system. [18]

On 15 September 2015, Scout was renamed Ajax. [19] The name Ajax applies to the family as a whole, but also to the turreted variant specifically. The reconnaissance support variant was named Ares after the Greek god of war; the command-and-control variant was named after Athena; the equipment repair vehicle was named Apollo; the equipment recovery variant was named Atlas; and the engineering reconnaissance variant was named Argus. [19]

In April 2016, the main cannon and chain gun were fired successfully. [20] In December 2016 manned firing tests of the three machine guns which can be fitted to the Ares vehicle were successfully carried out. [21]

Design

Ajax prototype in March 2016 AJAX, the Future Armoured Fighting Vehicle for the British Army MOD 45159446.jpg
Ajax prototype in March 2016

The Ajax is manufactured and designed by General Dynamics UK and General Dynamics Santa Bárbara Sistemas (Spain), with the new turret and fire control system fitted on the Reconnaissance variant being designed and manufactured by Lockheed Martin UK. Lockheed Martin is working closely with the Defence Support Group for turret manufacture and assembly as well as Rheinmetall. 75% of turret and Case Telescoped Armament System 40 (CTAS40) cannon work will be carried out in the UK.

The turret ring is 1.7 m (5 ft 7 in) in diameter, allowing for much more work-space than comparable AFVs. The Scout SV is also equipped with a state of the art Intelligence, surveillance, target acquisition, and reconnaissance (ISTAR) package with advanced sensors and space for further future growth. This advanced ISTAR package allows for automated search, tracking and detection, more than doubling stand-off range at which targets can be identified and tracked.

The Ajax has a 20 Gbit/s Ethernet intelligent open architecture, which enables it to capture, process and store six TBs of information gathered by the sensors. It can then share this data, be it images or other information, via a real-time integrated Bowman communication system as fitted to the Challenger 2. Power for these systems comes from a silent auxiliary power generator.[ citation needed ]

Eighty per cent of the vehicle manufacture will be completed in the UK, with 70% of the supply chain companies UK-based.[ citation needed ] The Ajax family project supports 400 jobs at General Dynamics UK's two facilities at Merthyr Tydfil and Oakdale in South Wales, and an estimated further 4,000 jobs in the British supply chain. [22]

Project progress

Ordered in 2014, the first delivery was scheduled for 2017, while it was stated that the first British Army squadron "will be equipped by mid-2019" so that they could be deployed by the end of 2020. [21] This was delayed due to design and testing problems. Test crews were required to wear noise cancelling headphones and be checked for hearing loss at the end of operations and the vehicles were unable to reverse over obstacles more than 20 centimeters high. [23] As of March 2021, the British Army had taken deliveries of the Ares variant, whilst 12 Ajax variants were going through acceptance testing. [24] In June 2021 it was revealed that trials of Ajax variants were halted from November 2020 to March 2021 due to excessive vibration and noise, leaving crews suffering from nausea, swollen joints and tinnitus. Test crews were then limited to 105 minutes inside and 20 miles per hour (32 km/h). The excessive vibration while moving was also damaging electronic systems and preventing armament from stabilising. Suspension faults on the Ajax variant meant that its turret could not fire while moving. [25] [26] The hulls were of inconsistent lengths and had non-parallel sides, which meant that the vibration problems did not manifest in a uniform manner, making it exceedingly difficult to determine if the vibration arose from a fundamental design problem or from build quality failures. [26] A leaked report doubted whether the Ajax Armoured Vehicle programme would be delivered on time and within budget and suggested that there was a risk that the vehicles' credibility would be questioned by troops and morale impaired. General Dynamics UK refused to comment on the report. [27]

In early 2021 MPs on the Defence Select Committee issued a report critical of the state of the Army's armoured vehicle programme—including Ajax—which had spent hundreds of millions of pounds with little to show for it. Some defence experts questioned whether Ajax would ever enter service, calling it "the Army's Nimrod MRA4" (an upgrade of which never entered service and was scrapped in 2010 at a cost of £3.8bn). [27] The Times reported that in June 2021 the problems with noise and rough handling were so serious that trials involving the Ajax had been suspended. The paper quoted Francis Tusa, editor of Defence Analysis, concluding that the British Army "are spending good money after bad for something that is arguably unfixable." [28] On 20 July 2021, Minister for Defence Procurement Jeremy Quin told the Defence Select Committee that "we cannot be 100 per cent certain that [the salvation of the programme] can be achieved." [26] On 15 December 2021, Quin updated the Parliament and stated that "We are commissioning a senior legal figure to look more deeply at Ajax, and not just health and safety; to examine the cultural and process flaws that it has highlighted. We will leave no stone unturned to learn these lessons." Quin also listed four key points for the review to consider, relating to safety concerns by MoD officials that were communicated to the manufacturer. [29] In June 2022 a report by the UK Parliament's Public Accounts Committee found that delays had been caused by a "litany of failures" and advised that the Ministry of Defence needed to either resolve the problems or scrap the project, to prevent the compromising of national security. [30]

Limited User Validation Trials recommenced in October 2022, with a view to commencing Reliability Growth Trials in January 2023. [31] On 21 December 2022, the Minister of State for the Ministry of Defence, Alex Chalk, stated that these trials could last from 18 to 24 months—a period which would mean that the results of the trials would not be available until after the next UK general election. [32]

On 24 February 2023 Defence Secretary Ben Wallace described the programme as having "turned a corner" and being "back on track." [33]

In March 2023 the MOD said that it had resumed payments to General Dynamics Land Systems UK (GDLS-UK), having halted them more than two years previously. The project has cost around £5.5bn so far, although according to the MOD "the whole programme remains within its originally approved budget level." [9]

Variants

Operators

See also

Related Research Articles

<span class="mw-page-title-main">Combat Vehicle 90</span> Swedish Infantry fighting vehicle

The Combat Vehicle 90 (CV90) is a family of Swedish tracked armoured combat vehicles designed by the Swedish Defence Materiel Administration (FMV), Hägglund & Söner and Bofors during the mid-1980s to early 1990s, before entering service in Sweden in the mid-1990s. The CV90 platform design has continuously evolved from the Mk 0 to the current Mk IV with technological advances and changing battlefield requirements.

<span class="mw-page-title-main">Patria AMV</span> Finnish wheeled armoured personnel carrier

The Patria AMV is an 8×8 multi-role military vehicle produced by the Finnish defence industry company Patria.

<span class="mw-page-title-main">Mowag Piranha</span> Swiss armoured fighting vehicle

The Mowag Piranha is a family of armoured fighting vehicles designed by the Swiss company Mowag.

<span class="mw-page-title-main">Boxer (armoured fighting vehicle)</span> Multinational wheeled armoured fighting vehicle

The Boxer is a multirole armoured fighting vehicle designed by an international consortium to accomplish a number of operations through the use of installable mission modules. The governments participating in the Boxer programme have changed as the programme has developed. The Boxer vehicle is produced by the ARTEC GmbH industrial group, and the programme is being managed by OCCAR. ARTEC GmbH is based in Munich; its parent companies are Krauss-Maffei Wegmann GmbH and Rheinmetall Military Vehicles GmbH on the German side, and Rheinmetall Defence Nederland B.V. for the Netherlands. Overall, Rheinmetall has a 64% stake in the joint venture.

The Future Rapid Effect System (FRES) was the name for the British Ministry of Defence (MOD) programme to deliver a fleet of more than 4,000 armoured fighting vehicles for the British Army. The vehicles were to be rapidly deployable, network-enabled, capable of operating across the spectrum of operations, and protected against current threats. The programme has now been split into two separate procurement projects for a reconnaissance Specialist Vehicle (SV) and an aspiration for a future Utility Vehicle (UV). The General Dynamics Ajax was selected to fulfill the SV requirement in 2016.

<span class="mw-page-title-main">FV107 Scimitar</span> Reconnaissance vehicle

The FV107 Scimitar is an armoured tracked military reconnaissance vehicle formerly used by the British Army, until it was retired from active service in April 2023. It was manufactured by Alvis in Coventry. It is very similar to the FV101 Scorpion, but mounts a high-velocity 30 mm L21 RARDEN cannon instead of a low-velocity 76 mm gun. It was issued to Royal Armoured Corps armoured regiments in the reconnaissance role. Each regiment originally had a close reconnaissance squadron of five troops, each containing eight FV107 Scimitars. Each Main Battle Tank Regiment also employed eight Scimitars in the close reconnaissance role.

<span class="mw-page-title-main">Warrior tracked armoured vehicle</span> British infantry fighting vehicle

The Warrior tracked vehicle family is a series of British armoured vehicles, originally developed to replace FV430 series armoured vehicles. The Warrior started life as the MCV-80, "Mechanised Combat Vehicle for the 1980s". One of the requirements of the new vehicle was a top speed able to keep up with the projected new MBT, the MBT-80 – later cancelled and replaced by what became the Challenger 1 – which the FV432 armoured personnel carrier could not. The project was begun in 1972; GKN Defence won the production contract in 1984 and the Warrior was accepted for service with the British Army in November 1984. Production commenced in January 1986 at Telford, with the first vehicles completed in December that year. GKN Defence was purchased by BAE Systems, via Alvis plc.

The Household Cavalry Regiment (HCR) is an Armoured Cavalry regiment of the British Army based in Bulford Camp in Wiltshire. It is the brother regiment of the Household Cavalry Mounted Regiment (HCMR) based at Hyde Park Barracks in London - both regiments together form the Household Cavalry (HCav). The Household Cavalry Regiment was formed in 1992, under the Options for Change reforms, by the union of The Life Guards and The Blues and Royals in order to preserve the distinct identities of the regiments. A precedent for the Household Cavalry Regiment has previously been set by the Household Cavalry Composite Regiment - active during the Anglo-Egyptian War, the Second Boer War and latterly during both the First and Second World Wars.

<span class="mw-page-title-main">ASCOD</span> Austro-Spanish armoured fighting vehicle

The ASCOD armoured fighting vehicle family is the product of a cooperation agreement between Austrian Steyr-Daimler-Puch AG and Spanish General Dynamics Santa Bárbara Sistemas. Both companies are now divisions of a unit of General Dynamics. The ASCOD family includes the LT 105 light tank equipped with a 105 mm gun, a surface-to-air missile launcher, an anti-tank guided missile launcher, mortar carrier, R&R vehicle, command-and-control vehicle, ambulance, artillery observer, and the AIFV model.

<span class="mw-page-title-main">VBCI</span> French wheeled infantry fighting vehicle

The Véhicule Blindé de Combat d'Infanterie or VBCI is a French Infantry fighting vehicle designed and manufactured by GIAT Industries and Renault Trucks Defense to replace the AMX-10P. The first units entered active service with the French Army in 2008. 630 units were ordered and full delivery was completed in 2018. They are available in two core variants, the VCI infantry fighting vehicle and the VPC command post vehicle.

<span class="mw-page-title-main">VBTP-MR Guarani</span> Amphibious wheeled Armoured personnel carrier

The VBTP-MR Guarani is a 6×6 armoured personnel carrier developed by Iveco and the Brazilian Army as part of its "Urutu-III" modernization program aimed to replace all EE-11 Urutu by 2015. The 8×8 version of the VBTP-MR is the base of Iveco's Superav armoured personnel carrier. Other Brazilian companies also participated in the program, such as IMBEL (Communications), Elbit (Armaments), Usiminas and Villares.

<span class="mw-page-title-main">Mowag Piranha V</span> Infantry Fighting Vehicle

The Piranha V Infantry Fighting Vehicle (IFV) is the fifth generation variant of the Mowag Piranha family of vehicles. It was designed by General Dynamics European Land Systems - Mowag GmbH. The first prototype was completed in 2008. It was first introduced during the Eurosatory exhibition in 2010.

<span class="mw-page-title-main">Freccia IFV</span> Italian wheeled infantry fighting vehicle

The VBM – Freccia is a family of 8x8 armoured vehicles that was designed and manufactured for the Italian Army by IVECO for the hull, the engine and the suspension, and OTO Melara for the armament. The first variant to be developed was the IFV, the Freccia being equipped with a Hitfist turret, the same as the one installed on the Dardo IFV.

<span class="mw-page-title-main">Lynx (Rheinmetall armoured fighting vehicle)</span> German armored fighting vehicle

The Lynx is a German armoured fighting vehicle developed by Rheinmetall Landsysteme. The Lynx, configured as a KF31 infantry fighting vehicle (IFV), was unveiled at the Eurosatory defence exhibition on 14 June 2016. The KF41 variant was unveiled at the Eurosatory defence exhibition on 12 June 2018.

The Mechanised Infantry Vehicle (MIV) is the British Army's concept of an 8 × 8 wheeled vehicle. In March 2018 the United Kingdom rejoined the Boxer programme in order to move to an assessment phase, which may see the Boxer selected.

<span class="mw-page-title-main">Royal Lancers</span> Cavalry regiment of the British Army

The Royal Lancers (Queen Elizabeths' Own) is a cavalry regiment of the British Army. The regiment was formed by an amalgamation of 9th/12th Royal Lancers (Prince of Wales's) and the Queen's Royal Lancers on 2 May 2015. It serves in the 1st Deep Recce Strike Brigade Combat Team. The Royal Lancers are part of the 3rd (UK) Division.

<span class="mw-page-title-main">M113 armoured personnel carriers in Australian service</span> Australian Army armoured fighting vehicle

The M113 armoured personnel carriers are American produced military vehicles that have operated in the Australian Army since 1964. An initial pair of M113s was purchased for trials purposes in 1962. Either 817 or 840 were acquired by 1979, comprising nine different variants. A long-running modernisation program that commenced in the 1990s resulted in 431 M113s being upgraded between 2007 and 2012. All of the upgraded M113s remain in service as of 2020.

General Dynamics UK is the British subsidiary of the American defence and security corporation General Dynamics. Founded in London in 1962, the company has grown to include eight sites across the United Kingdom, including in Bristol, Chippenham, Hastings, Merthyr Tydfil, Oakdale and Rotherham. Specialising in armoured fighting vehicles, avionic systems and tactical communications, the company has produced the General Dynamics Ajax armoured fighting vehicle, the Ocelot light protected patrol vehicle and the Bowman communications system. It is one of the UK's leading defence companies and a key supplier to the UK Ministry of Defence.

General Dynamics European Land Systems (GDLS) is an automotive and arms manufacturer spread across Europe, with a headquarter in Madrid, Spain. It is a business unit of General Dynamics which consolidated in one structure all European subsidiaries of GDLS.

<span class="mw-page-title-main">40CT cannon</span> Cased telescoped autocannon

The 40CTC is a 40 mm autocannon and the central component of the Franco-British 40CTAS developed by CTA International. It is designed to fire 40mm telescoped ammunition. This format provides significant benefit within vehicles in the space envelope required for the gun and the ammunition storage. However, the selection of the unfielded, thus unproven, new design for major French and British programmes was controversial.

References

  1. "AJAX: The Future of Armoured Fighting Vehicles" (PDF). General Dynamics UK. Archived from the original (PDF) on 17 April 2016.
  2. "Javelin missile completes ground vehicle launch tests for UK Army". Army Technology. 15 June 2016. Retrieved 3 June 2022.
  3. "Appendix A Ajax - Weapons". Think Defence. 17 September 2017. Retrieved 3 June 2022.
  4. "Ajax To MIV And The Emergence Of STRIKE". Think Defence. 15 September 2017. Retrieved 3 June 2022.
  5. "Scout SV named Ajax [DSEI15, D2]". Jane's Defence Weekly . 16 September 2015. Archived from the original on 19 September 2015.
  6. Brown, Larisa (29 June 2021). "New £3.2bn Ajax tanks withdrawn again after troops suffer hearing loss". The Times. ISSN   0140-0460 . Retrieved 16 January 2023.
  7. "General Dynamics' Ajax to achieve initial operating capacity this year". Army Technology. 22 January 2020. Retrieved 3 June 2022.
  8. Jeremy Quin, Minister for Defence Procurement (6 September 2021). "Written statement: Armoured Cavalry Programme (Ajax) Programme". Parliamentary Debates (Hansard) . United Kingdom: House of Commons.
  9. 1 2 Quinn, Ben (20 March 2023). "British army's new Ajax fighting vehicle will not be ready until end of decade". The Guardian. Retrieved 2 August 2023.
  10. de Larrinaga, Nicholas (16 September 2015). "DSEI 2015: UK's Scout SV renamed Ajax as first turreted prototype unveiled". Jane's Defence Weekly. Archived from the original on 20 September 2015.
  11. Coupe, Georgina (18 June 2021). "All The Gen On The AJAX Military Vehicle". Forces Network. British Forces Broadcasting Service . Retrieved 3 June 2022.
  12. Hawkes, Jon; Gibson, Neil; Griffith, Hugh. "Ajax uncovered: Detailing the British Army's latest combat vehicle family" (PDF). Jane's Defence Weekly. Archived from the original (PDF) on 30 December 2016.
  13. de Larrinaga, Nicholas; Foss, Christopher F. (4 September 2014). "UK places GBP3.5 billion Scout SV order". Jane's Defence Weekly. Archived from the original on 5 September 2014.
  14. de Larrinaga, Nicholas (22 July 2015). "Scout SV to be assembled in UK". Jane's Defence Weekly. Archived from the original on 31 July 2015.
  15. "David Cameron unveils £390m MoD deal creating 250 jobs". BBC News . 23 July 2015. Retrieved 3 June 2022.
  16. de Larrinaga, Nicholas (29 July 2015). "Thales UK receives Scout SV sights subcontract". Jane's Defence Weekly. Archived from the original on 19 August 2015.
  17. de Larrinaga, Nicholas (2 August 2015). "Rheinmetall contracted for Scout SV turrets". Jane's Defence Weekly. Archived from the original on 9 August 2015.
  18. de Larrinaga, Nicholas (2 August 2015). "Meggitt receives order for Scout SV ammunition handling system". Jane's Defence Weekly. Archived from the original on 7 August 2015.
  19. 1 2 de Larrinaga, Nicholas (16 September 2015). "DSEI 2015: UK's Scout SV renamed Ajax as first turreted prototype unveiled". Jane's Defence Weekly. Archived from the original on 20 September 2015.
  20. "AJAX successfully completes major live firing milestone". gov.uk (Press release). 12 April 2016. Retrieved 3 June 2022.
  21. 1 2 "General Dynamics Land Systems–UK completes first AJAX programme manned live firing trial". General Dynamics United Kingdom Limited. 14 December 2016. Archived from the original on 21 September 2017.
  22. Lewis, Gareth (11 March 2022). "Ajax: Doubt cast on future of new Army armoured vehicle". www.bbc.co.uk. BBC News. Retrieved 30 December 2022.
  23. Chuter, Andrew (3 June 2021). "The British Army's new Ajax vehicles ride too rough, too loud: report". Defense News . Retrieved 3 June 2022.
  24. Lye, Harry (4 March 2021). "The British Army could have an AJAX squadron this summer". Army Technology. Retrieved 3 June 2022.
  25. Marshallsea, Trevor (3 June 2021). "Army paused new tank trials over speed and safety concerns". Evening Standard . Retrieved 3 June 2022.
  26. 1 2 3 Watling, Dr Jack (22 July 2021). "The British Army's Greek Tragedy". Royal United Services Institute . Retrieved 3 June 2022.
  27. 1 2 Beale, Jonathan (3 June 2021). "Major design flaws in Army's new armoured vehicles, report shows". BBC News. Retrieved 3 June 2022.
  28. Brown, Larisa (29 June 2021). "New £3.2bn Ajax tanks grounded again after troops suffer hearing loss". The Times. Retrieved 3 June 2022.(subscription required)
  29. Chuter, Andrew (16 December 2021). "Ajax acquisition debacle prompts legal probe at UK Defence Ministry". Defense News. Retrieved 3 June 2022.
  30. Durbin, Adam (3 June 2022). "Delays to Ajax armoured vehicles risk national security, MPs warn". BBC News. Retrieved 3 June 2022.
  31. Thomas, Richard (26 December 2022). "No realistic timescale: the UK's Ajax armoured vehicle". www.army-technology.com. Verdict Media Limited. Retrieved 30 December 2022.
  32. "Question for Ministry of Defence - Ajax Vehicles: Testing". www.parliament.uk. 21 December 2021.
  33. "British army's Ajax armoured vehicle project 'back on track'". The Guardian. 25 February 2023. Retrieved 25 February 2023.
  34. "Ajax". The British Army.
  35. de Larrinaga, Nicholas (16 September 2015). "DSEI 2015: UK's Scout SV renamed Ajax as first turreted prototype unveiled". Jane's Defence Weekly . Archived from the original on 20 September 2015.