Horns Rev | |
---|---|
Country | Denmark |
Location | Horns Rev, East North Sea |
Coordinates | 55°31′47″N7°54′22″E / 55.52972°N 7.90611°E |
Status | Operational |
Construction began | May 2008 (II) 2016 (III) |
Commission date | 2002 (I) November 2009 (II) 2019 (III) |
Construction cost | €448 million [1] (II) €1 billion [2] (III) |
Owner(s) | Vattenfall (60%),Ørsted (40%) (I) Ørsted (II) Vattenfall (III) |
Operator(s) | Vattenfall (I) Ørsted (II) Vattenfall (III) |
Wind farm | |
Type | Offshore |
Max. water depth | 6–14 m (20–46 ft) (I) 9–17 m (30–56 ft) (II) 11–19 m (36–62 ft) (III) |
Distance from shore | 14–20 km (9–12 mi) (I) 30 km (19 mi) (II) 29–44 km (18–27 mi) (III) |
Hub height | 70 m (230 ft) (I) 68 m (223 ft) (II) 105 m (344 ft) (III) |
Rotor diameter | 80 m (262 ft) (I) 93 m (305 ft) (II) 164 m (538 ft) (III) |
Rated wind speed | 9.7 m/s (32 ft/s) (I) 10 m/s (33 ft/s) (II) 14 m/s (46 ft/s) (III) |
Power generation | |
Units operational | 80 × 2 MW (I) 91 × 2.3 MW (II) 49 × 8.3 MW (III) |
Make and model | Vestas: V80-2.0 (I) Siemens: SWT 2.3-93 (II) MHI Vestas: V164 (III) |
Nameplate capacity | 160 MW [3] (I) 209 MW (II) 406.7 MW (III) |
Capacity factor | 47.7% [4] (II) |
Annual net output | 600 GW·h [5] (I) |
External links | |
Website | www.hornsrev.dk www.dongenergy.com corporate.vattenfall.com |
Commons | Related media on Commons |
Horns Rev is an offshore wind farm in Danish waters in the North Sea.
The wind farm was built in three phases, the first coming online in 2002, the second in 2009 and the third in 2019. Horns Rev 1, the first phase, was the first large-scale offshore wind farm in the world, with a capacity of 160 MW. [3] [6]
Horns Rev 1, built by Danish energy company Elsam (later DONG, now Ørsted) was the first large-scale offshore wind farm in the world. Its capacity of 160 MW was four times that of the previous largest, the Middelgrunden at 40 MW. [7] [8] It was the first offshore wind farm in the North Sea, the first to use the monopile foundation type and the first to have its transformer on an adjacent platform rather than onshore. [9] Technologies used for the first time at Horns Rev 1 have since become industry standard.
The farm has 80 Vestas V80 wind turbines, each generating 2.0 MW. They were installed by the Danish offshore wind farm services provider A2SEA in 2002, the last turbine coming into operation on 11 December 2002. A guaranteed price of 0.453 DKK/kWh was agreed for the first 42,000 hours of generation. [10]
In 2005, 60% of the wind farm was sold to Vattenfall, also the operator of the park, for DKK2bn. [11] [ unreliable source? ]
The turbines are laid out in an oblique 8 by 10 grid over an area of 5 km × 3.8 km, with 560 m between turbines in both directions. A radar measures details of the wind patterns, improving local short-term forecasting. [12] [13]
The main method of transport to the first wind park is an adapted Eurocopter EC-135 helicopter, [14] used to hoist workers to and from a small platform on each turbine. Sea conditions render the area inaccessible to boats for large parts of the year.
The farm has an availability of 96–97%. Two turbines are burnt out, and uneconomic to replace with less than 10 years left. [14] Grout between monopile and tower was damaged by vibrations, requiring a costly fix. [15]
In May 2008, Dong Energy began construction of the second wind farm in the Horns Rev area, Horns Rev 2. Construction was completed in September 2009 [16] and was inaugurated on September 17, 2009 by Prince Frederik on the Poseidon accommodation platform. [17] When inaugurated, Horns Rev 2 was the largest offshore wind farm in the world until Thanet Wind Farm opened on 23 September 2010. [17] [18]
For the year of 2012, HR2 reached a capacity factor of 52.0%. [4] It receives 51.8 øre/kWh for the first 50,000 hours, paid by electricity consumers. [10] The farm has had some cable outages, [19] [20] and blades are being renovated. [21]
The Horns Rev 2 consists of 91 Siemens Wind Power SWT 2.3-93 wind turbines with a total generating capacity of 209 MW. [18] The foundations are monopiles like on Horns Rev 1.
It has the first offshore wind farm accommodation platform in the world, named Poseidon. It is connected by walkway to the transformer platform, [22] and is 750 square metres (8,100 sq ft) large with 3 decks and weighs 422 tons. On-site accommodation is cheaper and more efficient than transporting service personnel by boat 2 hours from Esbjerg harbour 60 kilometres (37 mi) away. A turbine is visited 10 times a year on average, mostly for routine service, and 1-2 times for fixing faults. [23] Flying people by helicopter to turbines like on Horns Rev 1 is not possible on Horns Rev 2 as the turbines there are not built for it, although the transformer platform has a helipad. [24] Poseidon has 24 rooms of 12 square meters each fitted with TV and internet. There is a gym, kitchen, dining room, laundry room, and a study room. Inspired by Poseidon, a similar platform is being built at the DanTysk wind farm. [25]
In April 2012, most of the Danish Folketing (parliament) agreed to send out tenders in 2013 for a 400 MW wind farm at Horns Rev called Horns Rev 3, and a 600 MW at Kriegers Flak in the Baltic Sea, both likely receiving 90 øre/kWh for the first 50,000 hours. [10] This is expected to raise wind power in Denmark above the 39% of annual electricity production (as of 2014), [26] which includes the 400 MW Anholt Offshore Wind Farm. [27] [28] The Danish Energy Agency expects construction candidates for Horns Rev 3 to have experience with installing and operating a large offshore wind farm. [29] [30] Some of the area is an old minefield from World War Two. [31] Four bidders were qualified for the tender. [32]
Vattenfall won the tender in February 2015, at a price of 77 øre/kWh, well below the 105 øre at Anholt. [33] Vattenfall states that they bid unaggressively against strong competition without sacrificing margins. [34] The price reduction contributes to a smaller "green subsidy" (PSO) over the next years. [35] [36] Horns Rev 3 consists of a total of 49 MHI Vestas V164-8.3 MW units, capable of producing 406.7 MW. [37] Three transformers were installed in July 2016. [38] The first turbines started to produce electricity for the grid in December 2018, [39] and the last turbine was installed in January 2019. [40] The official inauguration of Horns Rev 3 was on 22 August 2019. [41]
Horns Rev is a shallow sandy reef of glacial deposits in the eastern North Sea, about 15 km (9.3 mi) off the westernmost point of Denmark, Blåvands Huk. The reef contains the Horns Rev Offshore Wind Farm.
Ørsted A/S is a Danish multinational energy company. Headquartered in Fredericia, Denmark, Ørsted is the largest energy company in Denmark. The company adopted its current name on 6 November 2017. It was previously known as DONG.
Vestas Wind Systems A/S is a Danish manufacturer, seller, installer, and servicer of wind turbines that was founded in 1945. The company operates manufacturing plants in Denmark, Germany, the Netherlands, Taiwan, India, Italy, Romania, the United Kingdom, Spain, Sweden, Norway, Australia, China, Brazil, Poland and the United States, and employs 29,000 people globally.
Denmark was a pioneer in developing commercial wind power during the 1970s, and today a substantial share of the wind turbines around the world are produced by Danish manufacturers such as Vestas—the world's largest wind-turbine manufacturer—along with many component suppliers. Furthermore, Denmark has—as of 2022—the 2nd highest amount in the world of wind power generation capacity installed per capita, behind only neighboring Sweden.
The Nysted Wind Farm is a Danish offshore wind farm close to the Rødsand sand bank near Lolland. Gravity base foundations are used rather than piles due to ice conditions.
The Burbo Bank Offshore Wind Farm is a 348 MW offshore wind farm located on the Burbo Flats in Liverpool Bay on the west coast of the UK in the Irish Sea. It consists of an original 90 MW wind farm commissioned in 2007 and a 258 MW extension completed in 2017.
Offshore wind power or offshore wind energy is the generation of electricity through wind farms in bodies of water, usually at sea. There are higher wind speeds offshore than on land, so offshore farms generate more electricity per amount of capacity installed. Offshore wind farms are also less controversial than those on land, as they have less impact on people and the landscape.
DanTysk is a 288 megawatt (MW) offshore wind farm in the North Sea 70 kilometres (43 mi) west of the island Sylt, in the German EEZ at the border to Denmark. The wind farm operates 80 Siemens Wind Power's SWT-3.6-120 turbines with a capacity of 3.6 MW each.
Gunfleet Sands Offshore Wind Farm is a 172 MW wind farm about 7 kilometres (4.3 mi) off the Clacton-on-Sea coast in the Northern Thames Estuary.
Anholt Offshore Wind Farm is a Danish offshore wind power wind farm in the Kattegat, between Djursland and Anholt island. With a nameplate capacity of 400 megawatts (MW), it is one of the largest offshore wind farm in the world and was the largest in Denmark from 2013 to 2019. A cable from the wind farm to Anholt replaces most of the diesel-powered electricity on the island.
Denmark's western electrical grid is part of the Synchronous grid of Continental Europe whereas the eastern part is connected to the Synchronous grid of Northern Europe via Sweden.
Westermost Rough Wind Farm is an offshore wind farm 8 kilometres (5 mi) north east of Withernsea off the Holderness coast, in the North Sea, England. The farm covers an area of approximately 35 km2 (14 sq mi) with a generation capacity of approximately 210 MW. It became operational in May 2015.
The Vestas V164 is a three-bladed offshore wind turbine, produced by Vestas, with a nameplate capacity of up to 10 megawatts, a world record. Vestas revealed the V164's design in 2011 with the first prototype unit operated at Østerild in northern Denmark in January 2014. The first industrial units were installed in 2016 at Burbo Bank, off the west coast of the United Kingdom. By 2021, Vestas had produced 500 of the series.
Henrik Stiesdal is a Danish inventor and businessman in the modern wind power industry. In 1978, he designed one of the first wind turbines representing the so-called "Danish Concept" which dominated the global wind industry through the 1980s. Until 2014, Stiesdal was the chief technology officer of Siemens Wind Power. During his professional career, Stiesdal has made more than 175 inventions and has received more than 650 patents related to wind power technology.
Kriegers Flak is a 605 MW offshore wind farm in the Baltic Sea on the Danish part of the reef of the same name. It forms part of a new 400 MW interconnector between Denmark and Germany.
Avedøre Holme Offshore Wind Farm is a nearshore wind farm right off the coast of Avedøre, Copenhagen. It was commissioned in 2009 with three 3.6 MW Siemens turbines as a demonstrator project for future offshore wind turbines. Ørsted owns two turbines, and a private collective owns the third. Ørsted and partners build a 2MW hydrogen electrolysis station at Avedøre Power Station supplied by Ørsted's two turbines.