Lima and Callao Metro | |||
---|---|---|---|
Overview | |||
Native name | Metro de Lima y Callao | ||
Owner | Authority for Urban Transport in Lima and Callao (ATU) | ||
Locale | Lima, Peru | ||
Transit type | Rapid transit | ||
Number of lines | 2 | ||
Number of stations | 53 | ||
Daily ridership | 692,000 per day [1] | ||
Annual ridership | 124,134,820 [2] | ||
Operation | |||
Began operation | April 28, 1990 (completion) July 11, 2011 (revenue service) | ||
Operator(s) | Ferrovías (Grupo Emepa) | ||
Number of vehicles | 5 × AnsaldoBreda MB-300 39 × Alstom Metropolis 9000 | ||
Technical | |||
System length | 39.6 km (24.6 mi) | ||
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) standard gauge | ||
Electrification | 1,500 V DC overhead catenary | ||
Top speed | 80 km/h (50 mph) | ||
|
This article needs additional citations for verification .(July 2023) |
The Lima and Callao Metro (Spanish : Metro de Lima y Callao) is a rapid transit system that serves the cities of Lima and Callao, which make up the Lima metropolitan area. [3] The existing metro lines (1 and 2) currently link the district of Villa El Salvador in the south of Lima with San Juan de Lurigancho in the northeast of the city, as well as a 5 km (3.1 mi) segment in the east of the metro area. Furthermore, there are four additional lines planned for the network. [4]
Line 1 started full operations on July 28, 2014, after decades of delays. [5] Construction of the line began during the first presidency of Alan García (1985–1990) with an initial seven stations, but the segment did not have the distance or demand required to make it commercially viable. Thus, the project stalled and became mired in accusations of bribery [6] involving an investment of 226 million dollars co-financed by the Italian government.
During the second presidency of Alan García (2006–2011) the government resumed construction of Line 1, which opened for full revenue service in 2014. [5] The completed line now totals 34.6 kilometers (21.5 mi) of elevated viaduct with 26 stations and crosses several districts: Villa El Salvador, Villa María del Triunfo, San Juan de Miraflores, Santiago de Surco, Surquillo, San Borja, San Luis, La Victoria, Lima District and San Juan de Lurigancho. The elevated viaduct of the Metro railway is the longest in Latin America, and was the longest in the world until it was surpassed by Wuhan Metro Line 1 in 2017. [7]
Line 2 started operations on December 21, 2023 with the opening of its first 5 stations within Santa Anita district in the east of the city. [8]
Between 1972 and 1973, the "Metrolima" consortium elaborated the technical-economical feasibility studies and the pre-project of the "Mass Rapid Transit System for Passengers in the Metropolitan Area of Lima and Callao", approved by the Government of Peru in 1974. [9] However, the political crisis generated by the sudden illness of President Juan Velasco Alvarado and the problem of his succession, added to the complexity of the Limean soil located in a highly seismic zone, as well as the international economic crisis of the time, made it impossible to get the necessary financing of US$317,000,000. [9] This way, the "Metrolima" project, contemplating a total of 5 lines of underground train, was unable to be realized. [9]
In 1986, the first presidency of Alan García created the "Autonomous Authority for the Mass Transit Electrical Transport System Special Project" with the Supreme Decree N° 001-86 MIPRE, with degree of Law N° 24565. [10] [11] This entity called for a public contest for the implementation of this system, won by the Italian-capital "Consorcio Tralima" consortium. It started promptly the infrastructure work for an elevated viaduct metro.
Construction started by placing the first stone on October 18, 1986, [12] making its construction the main promise made in 1987 by the newly elected Mayor of Lima and member of the government party Jorge del Castillo.
The work began with a maintenance facility in the district of Villa El Salvador, south of the city, where the trains were meant to be stored and receive preventive maintenance. Construction advanced at a relatively fast pace, but when Line 1 reached the Atocongo Station, the country became immersed in a deep economical and social crisis, in addition to corruption scandals involving President Garcia, [6] which halted construction. It was meant to continue through Av. Aviación up to the Dos de Mayo Hospital in the city center, but the assigned budget had been already spent.
On April 28, 1990, three months before ending the first government by APRA. [13] Alan García celebrated the opening of the line, despite the fact that the line was incomplete and did not reach areas of higher demand and density. The metro remained nearly useless in practice, given that the required investments for its operation and maintenance were unjustifiable for its ridership. In spite of that, the subsequent governments tried to revive the project because of the significant investment put into the trains and infrastructure. On several occasions, candidates in both presidential and municipal elections used it politically with the promise of finishing the project, although it never materialized.
The municipalities crossed by the metro started to cover the unfinished segments in an attempt to diminish the negative impact on the urban landscape. This way, the centre median of Av. Aviación had pillars with grass in order to avoid the invasion of ambulatory commerce (which represented a large problem in Lima at the time). Vegetation was planted in order to cover the uncovered pieces of steel and concrete of the unfinished project. Some districts also painted the columns and walls with images of Peruvian landscapes and nature, deeming the project as definitively cancelled.
On August 5, 2001, the AATE (Electrical Train Autonomous Authority) was passed on to the Metropolitan Municipality of Lima through the Urgency Decree N° 058–2001. [14] Subsequently, the Lima Metro only made trips to give preventive maintenance to the trains.
The columns and rights-of-way of the train remained, for more than two decades, as a living example of the bad management of the first APRA government between 1985 and 1990. Several artistic and musical groups took advantage of the situation to satirize the project. The "El Tren Eléctrico" song by Juan Luis Dammert [15] and the imaginary launch campaign denominated "Lima 2427" (calculated finishing year given the progress rate the project had thus far), launched by artist Camila Bustamante. This campaign placed stickers in the supposed future stations and gave out informative flyers on the streets, allowing the general public to find out that the project didn't have just one line but seven interconnected lines servicing the whole city.
In 2009, the government decided that the Ministry of Transport and Communications (MTC) would retake the administration of the AATE (Electrical Train Autonomous Authority). It also put an entity called "Provias Nacional" in charge of organizing a public bid to select the consortium that would build the remaining sections of the project. Financing would come from a foreign debt operation with the Development Bank of Latin America and the Caribbean (CAF) for US$300 million. This credit was approved on August 18, 2009. [16]
On December 2, 2009, the government approved for the "Consorcio Tren Eléctrico Lima" consortium, (formed by Brazilian company Odebrecht and Peruvian company Graña y Montero) to build the line from the unfinished first segment until Grau station in Downtown Lima. Construction started On March 2, 2010, and the second segment opened on July 11, 2011. [17] [18] The third segment of the line that connects Downtown Lima to the northeastern district of San Juan de Lurigancho opened for public service on July 25, 2014. [17]
On December 23, 2010, president Alan Garcia established through supreme decree 059-2010-MTC [19] the Basic Metro Network of Lima and Callao, signaling the implementation of a network consisting of 5 lines of metro for Lima, contemplating the construction of ground, elevated and underground segments. [20]
The consortium "Nuevo Metro de Lima", consisting of the companies COSAPI (Peru), Impregilo, Ansaldo Breda & Ansaldo STS (Italy), Iridium, and Vialia (Spain) won the bid for the construction of Line 2 of the Lima Metro, and a segment of Line 4 that will connect it to the airport. The contract was signed on April 28, 2014. [21]
Though initially scheduled for completion in 2021, only the first segment of the project, spanning 5 kilometers and 5 stations, has been completed as of January 2024. This segment opened for operations in December 2023. [8]
The Lima Metro first phase has sixteen passenger stations, located at an average distance of 1.2 km (0.7 mi). It starts its path in the Industrial Park of Villa El Salvador, south of the city, continuing on to Av. Pachacútec in Villa María del Triunfo and then to Av. Los Héroes in San Juan de Miraflores. Afterwards, it continues through Av. Tomás Marsano in Surco to reach Ov. Los Cabitos and then on to Av. Aviación to finish in Av. Grau in the city center.
Currently, Line 1 has a fleet of trains from the 1980s by AnsaldoBreda, put in service through the 16 stations. This fleet includes an additional 42 trains in order to be able to service with the adequate frequencies, contemplating 26 stations in total, the integral remodeling of the current stations and the revamping of wagons, including the installation of air conditioning among other facilities and 19 new Alstom trains similar to the 9000 Series on the Barcelona Metro. Left-hand running is used on this line, unlike the most metro systems in South America.
Prior to July 2014, Line 1 was 21.48 kilometers (13.3 mi) long, operating from Villa El Salvador (where the maintenance depot is located) to the Miguel Grau station in Downtown Lima.
The third phase of Line 1 was completed on July 25, 2014, with the opening of the 12.4-kilometer (7.7 mi), ten-station extension of Line 1. [22] With the extension now open, Line 1 is 34.6 kilometers (21.5 mi) in total[ citation needed ] serving 26 stations. [23]
On February 15, 2012, at the conclusion of discussions between the Central Government and the Municipalities of Lima and Callao, President Ollanta Humala announced the upcoming construction of the Lima Metro Line 2. It is to be a west-east line, entirely underground, with a length of 27 km. [24] The line will link the port of Callao in the west with the Historic Center of Lima, along with the eastern districts of Santa Anita and Ate. Furthermore, the line will be completely automated and will include accessibility features for people with physical disabilities [25]
The line will interconnect with the current BRT Central Station in Lima's historic center (which is also underground). Concurrently, the project also includes the construction of the first stage of line 4 (8 km), which will connect the system at Carmen de la Legua station to the International Airport. [24]
An international consortium won the bidding for this project; [26] and construction started in September 2014. [27]
The first stage of Line 2 (1a) opened on 21 December 2023. [8] It includes a five-station stretch spanning 5 kilometers from Evitamiento station to Mercado Santa Anita station. [28] The five operational stations are not yet connected to Line 1 of the system, but it is projected the connection will be made during subsequent stages of the project. The rest of the line is currently under construction, and projected to be completed by 2028.[ citation needed ]
On March 21, 2012, Lima's mayor Susana Villaran presented a feasibility study of an underground metro line that follows in large parts the route of Line 3 as originally planned by the central government. The study was done in 2009 for the municipality of Lima, with support from the French government.
According to the mayor's statements, these studies will be under consideration by the Ministry of Transport and Communication, and construction of this line will take only four years. The line will be underground from north to south, serving a section of the city with high ridership potential. This line is described as a "high speed" line, based on the distances between stations.
On May 13, 2013, the Ministry of Transport and Communications (MTC) said that the government had also awarded concessions for the construction of lines 3 and 4 by July 2016, out of the five lines that constitute the system. [29]
On May 9, 2012, the director of the Private Investment Promotion Agency (Proinversión), Hector Rene Rodriguez, announced that the MTC (Ministry of Transport and Communication) would construct Lines 2 and 4 simultaneously. Line 4 will follow an east–west route connecting the district of La Molina with Jorge Chavez International Airport.
This line will have an 8 km stage developed as a part of the concession of line 2, which is already under construction. This section will link line 2 to Jorge Chávez International Airport. [30]
Metro Line 5 will connect the districts in the south of the city, like Miraflores, Barranco and Chorrillos; with a final station next to the south Panamerican highway Villa toll. By now it is planned but there is no studies of design nor construction yet.[ citation needed ]
Metro Line 6 has been presented in 2014 as a private initiative and is under evaluation.[ citation needed ] These studies will determine technical aspects regarding whether Line 6 will be underground, aerial or both. The line has a length of 32 km extending, from the Naranjal Station of BRT system Metropolitano through Av. Tupac Amaru, Los Alisos Avenue, Universitaria Avenue, Bertolotto Avenue, Perez Aranibar Avenue and Angamos-Primavera Avenue.
This article describes the transport in Peru.
The Bilbao metro is a rapid transit system serving the city of Bilbao and the region of Greater Bilbao. Lines 1 and 2 have a "Y" shape, as they transit both banks of the river Ibaizabal and then combine to form one line that ends in the south of Bilbao. Line 3 has a "V" shape connecting the municipality of Etxebarri with the Bilbao neighbourhood of Matiko; the apex of the "V" is Zazpikaleak/Casco Viejo station, where all three current lines meet. The metro is connected with the Bilbao tram, Bilboko Aldiriak, Euskotren Trena, Feve, Renfe long-distance trains, and Bilbao's bus station. All three lines use metre gauge.
The Lima Metropolitan Area is an area formed by the conurbation of the Peruvian provinces of Lima and Callao. It is the largest of the metropolitan areas of Peru, the seventh largest in the Americas, the fourth largest in Latin America, and among the thirty largest in the world. The conurbation process started to be evident in the 1980s.
The Sistema de Tren Eléctrico Urbano or SITEUR is an urban rail transit system serving the Guadalajara metropolitan area, in the municipalities of Guadalajara, Zapopan and Tlaquepaque, in the state of Jalisco, Mexico. It is owned and operated by the state of Jalisco.
Misterios metro station is a Mexico City Metro station within the limits of Cuauhtémoc and Gustavo A. Madero, in Mexico City. It is an underground station with two side platforms, served by Line 5, between La Raza and Valle Gómez stations. Misterios station serves the colonias (neighborhoods) of Peralvillo and Vallejo.
The Sarmiento line is a broad gauge commuter rail service in Buenos Aires Province, Argentina, run by the state-owned Trenes Argentinos since 11 September 2013.
The Roca line is a 1,676 mm gauge commuter rail service in the Buenos Aires Province, Argentina, part of General Roca Railway network. The service is currently operated by State-owned company Trenes Argentinos, from the city-centre terminus of Constitución south to Ezeiza, Alejandro Korn, La Plata, Cañuelas, Chascomús, Gutiérrez and Lobos, and west to Sarmiento Line's station Haedo. The transfer stations between the branch lines are Avellaneda, Temperley, Bosques and Berazategui.
The Bogotá Metro is a rapid transit project under construction in Bogotá, Colombia, it is projected to be in operation in 2028. Construction started in October 2020.
Graña y Montero is a company based in Latin America. It originated as a real estate and construction company, now the oldest and largest in Peru. Its many business interests include the construction of buildings and infrastructure, the energy and mining industries, and sanitation and highway services. In November 2020 changed its name to AENZA.
Mexico City Metro Line B is one of the twelve metro lines operating in Mexico City, Mexico. It has 21 stations and a total length of 23.772 km (14.771 mi), 20.278 km (12.600 mi) service the line while the rest are used for maneuvers.
The Panama Metro is a rapid transit system in Panama City, Panama. It links neighborhoods north and the east of the metropolitan area to the city center.
Line 12, also known as the Golden Line from its color on the system map, is a rapid transit line of the Mexico City Metro network. It travels 25.1 kilometers (15.6 mi) along the boroughs of Benito Juárez, Iztapalapa and Tláhuac in southwestern, central-southern and southeastern Mexico City, serving twenty stations. The line was inaugurated on 30 October 2012, going from Tláhuac to Mixcoac station. In 2016, work to expand it to Observatorio station started. All the stations are accessible to people with disabilities as they have elevators, tactile pavings and braille signage plates.
The Tren de la Costa is a planned regional rail line in Peru, paralleling the Pan American Highway between the cities of Sullana, Lima, and Ica. The line is estimated to cost $10 billion, and is expected to carry 57 million passengers per year.
Valentín Campa is a future station of the Mexico City Metro in the borough of Álvaro Obregón, Mexico City. It will be an underground station with two side platforms, served by Line 12, between Álvaro Obregón and Mixcoac stations. It will serve the colonias of Carola and Francisco Villa.
Line 3 of the Guadalajara Urban Electric Train System is the third public transport railway line in the Guadalajara metropolitan area (México) and currently its longest. The line connects the Historical Centres of Zapopan, Guadalajara and Tlaquepaque, through the Diagonal Metropolitan Vial Corridor; consisting of Juan Gil Preciado, Juan Pablo II, Manuel Ávila Camacho, Alcalde / 16 de Septiembre and Revolución / Francisco Silva Romero avenues, from the Arcos de Zapopan neighbourhood until the Central Camionera Oriente of Guadalajara. It has 18 stations from south-east to north-west, of which 13 are elevated and 5 are underground. It stretches along 21.5 km. It is estimated that the line moves 233,000 daily passengers.
Mercado del Mar is the sixteenth station of the Line 3 of the Sistema de Tren Eléctrico Urbano of Guadalajara from south-east to north-west and the third in the opposite direction.
Metrorrey Line 4 is an under-construction Metrorrey line that will municipalities of Monterrey and San Pedro Garza García. It will have an extension of approximately 7.5 kilometers. It will connect with lines 3, 5 and 6 at the Saint Lucia station.
MetrorreyLine 5 is one of the three Metrorrey lines currently under construction of that will connect the south of Monterrey with the center of Monterrey. The system shall be an Autonomous Rail Rapid Transit (ART) line, that is that it will use electric transport vehicle without rails or catenary and virtual semi-automatic guidance. Each vehicle will have a capacity of 300 passengers. It will have an extension of approximately 10.6 kilometers. It will connect with lines 4 and 6 at the Hospital de Ginecología station, connected to line 3 at the Santa Lucía station.
Metrorrey Line 6 is one of the three lines currently planned by Metrorrey, which will connect the municipalities of Monterrey, Guadalupe, San Nicolás de los Garza and Apodaca. It will have an extension of approximately 17.6 kilometers. It will connect with lines 3, 4 and 5 at the Saint Lucia station, in front of the High Specialty Medical Unit No. 33 of the Mexican Social Security Institute (IMSS). It connects to line 1 at the Y.A. station. Officially it does not have a distinctive color, but on the map, it is shown as purple.