Metro Express (Mauritius)

Last updated
Metro Express Ltd
Metro Express Mauritius.jpg
An Urbos 100-3 at Rose Hill Central Station
Overview
StatusOperational
Locale Mauritius
Termini
Stations21 (operational)
22 (total planned)
Website mauritiusmetroexpress.mu
Service
Type Light rail
Services2
Operator(s)Metro Express Ltd
Depot(s)Richelieu
Rolling stock CAF Urbos 100-3
Daily ridership55,000 [1]
History
OpenedPhase 1: 2 October 2019 (soft launch)
10 January 2020 (commercial launch)
Phase 2A: 20 June 2021
Phase 2B: 10 October 2022
Technical
Line length30 km (19 mi)
Number of tracks2
Track gauge 1,435 mm (4 ft 8+12 in) standard gauge
Electrification 750 V DC overhead lines
Operating speed35-80 km/h [2]
Route map

Mauritius Metro Express Map.svg

Contents

BSicon uexKINTa.svg
Aapravasi Ghat BSicon BUS2.svg
BSicon uHST.svg
Place D'Armes
(temporary)
BSicon dWASSERq.svg
BSicon uWBRUCKE1.svg
BSicon dWASSERq.svg
Le Pouce Creek
BSicon uINT.svg
Port Louis Victoria BSicon BUS2.svg
BSicon dWASSERq.svg
BSicon uhKRZWa.svg
BSicon dWASSERq.svg
Ruisseau Creole
BSicon cRP4q.svg
BSicon uhSKRZ-G4.svg
BSicon cRP4q.svg
 M1 
Port Louis–Plaisance
Dual Carriageway
BSicon cRP2q.svg
BSicon uhSKRZ-G2e.svg
BSicon cRP2q.svg
 A1  Brabant Street
BSicon cRP4q.svg
BSicon uSKRZ-G4o.svg
BSicon cRP4q.svg
 M1 
Port Louis–Plaisance
Dual Carriageway
BSicon uHST.svg
St Louis
BSicon dWASSERq.svg
BSicon uWBRUCKE1.svg
BSicon dWASSERq.svg
Rivière St Louis
BSicon uhbKRZWae.svg
Grande Rivière Nord-Ouest
BSicon cRP2q.svg
BSicon uSKRZ-G2u.svg
BSicon cRP2q.svg
 A1  Grand River Road
BSicon uHST.svg
Coromandel BSicon PARKING.svg
BSicon uKDSTaq.svg
BSicon uABZgr+r.svg
Richelieu Depot
BSicon uHST.svg
Barkly
BSicon uHST.svg
Beau Bassin
BSicon cRP2q.svg
BSicon uSKRZ-G2BUE.svg
BSicon cRP2q.svg
 A1  Royal Road Rose Hill
BSicon lhSTRa@f.svg
BSicon uHST.svg
Vandermeersch
BSicon uhABZg+l.svg
BSicon uhCONTfq.svg
Réduit branch
BSicon uhABZg+l.svg
BSicon uhSTR+r.svg
Réduit branch
BSicon uhSTR.svg
BSicon uhSKRZ-G2.svg
 A14  Rose Hill Trianon Road
BSicon uhSTR.svg
BSicon uhKRZWe.svg
Grande Rivière Nord-Ouest
BSicon uhSTR.svg
BSicon uHST.svg
Ebène station
BSicon uhSTR.svg
BSicon uhKRZWae.svg
Rivière Terre Rouge
BSicon uhSTR.svg
BSicon uKINTe.svg
Réduit Interchange
BSicon uhINT.svg
Rose Hill Central BSicon BUS2.svg
BSicon cRP2q.svg
BSicon uhSKRZ-G2.svg
BSicon cRP2q.svg
 A1  Royal Road Rose Hill
BSicon lhSTRe@g.svg
BSicon uHST.svg
Belle Rose
BSicon uINT.svg
Quatre Bornes Central BSicon BUS2.svg
BSicon uHST.svg
St Jean
BSicon cRP2q.svg
BSicon uSKRZ-G2o.svg
BSicon cRP2q.svg
 A8  St Jean Road
BSicon uHST.svg
Trianon
BSicon uSKRZ-G4u.svg
 M1  interchange
BSicon uHST.svg
Phoenix BSicon PARKING.svg
BSicon uHST.svg
Phoenix Mall
BSicon uHST.svg
Palmerstone
BSicon uINT.svg
Vacoas Central BSicon BUS2.svg BSicon PARKING.svg
BSicon uHST.svg
Sadally
BSicon uHST.svg
Floreal
BSicon dWASSERq.svg
BSicon uWBRUCKE1.svg
BSicon dWASSERq.svg
Rivière Sèche
BSicon lhSTRa@f.svg
BSicon uHST.svg
Curepipe North
BSicon cRP2q.svg
BSicon uhSKRZ-G2.svg
BSicon cRP2q.svg
 A10  Royal Road Curepipe
BSicon uhKINTe.svg
Curepipe Central BSicon BUS2.svg


Wheelchair symbol.svg All stations are accessible

BSicon BICYCLE.svg
All stations are equipped
with bicycle racks


BSicon PARKING.svg Park and ride location

The Metro Express is a light rail public transport system in Mauritius.

The route runs between the capital Port Louis in the district of the same name and the cities of the Plaines Wilhems District with an additional branch, running between the city of Rose Hill and the University of Mauritius at Réduit [3] [1]

History

Mauritius had been without a railway system following the closure of Mauritius Government Railways in the 1950s. The last passenger train ran on 31 March 1956, between Port Louis and Curepipe.

Due to increased car usage and chronic road congestion, plans for a light railway system had been proposed for many years. The idea of introducing Light Rail Transit was first floated in the 1970s and started being developed in the 1980s as a way to solve increasing road congestion. The idea only started gaining traction in 1995, when the concept of light rail was formulated. The main argument against it was the cost of the system construction. The investment was made in the development of road infrastructure instead, like building new roads and adding new lanes to existing motorways. Busways were considered but were not implemented.

In 2010, during a visit to Singapore, the Prime Minister of Mauritius Navin Ramgoolam signed an intergovernmental agreement, under which the Singapore Cooperative Enterprise, would assist Mauritius in preparing a request for a proposal document to be launched to potential developers. A delegation from the SMRT was in Mauritius in March 2011 to study the possibilities of introducing the LRT system. In September 2012 the Government of Mauritius signed a contract with the Singapore Cooperative Enterprise, valued at around Rs  180 million ($6 million as of September 2012), for the determination of a feasible alignment of the light rail line, development of reference design and consideration of potential future line extension. [4]

In December 2016, Sir Anerood Jugnauth gave the green light for the implementation of the Metro Express Project because of mitigating the rising cost of traffic congestion. [5]

On 31 July 2017 in Ebene the Government of Mauritius signed a contract for the creation of a light rail transit system. [6]

The project is led by the Indian company Larsen & Toubro, after winning a tender from the Government of Mauritius for Rs 18.8 billion (3,375 crores (₹33.75 billion); $557 million as of September 2017), of which Rs 9.9bn ($293M as of September 2017) is being provided by a grant from the Government of India. [7] [8]

A launching ceremony by the Prime Minister of Mauritius, Pravind Jugnauth was held on 10 March 2017 at Caudan Old Train Depot. [9] On 28 September 2017 groundbreaking and laying foundation ceremonies were held. [10] [11]

The Project, 26 km long, is being implemented in multiple phases as below: Phase 1:Port Louis Victoria to Rose Hill Central (Commercial Operation started on 10th January 2019), Phase 2a: Port Louis Victoria to Quatre Bornes Central (Operation started in June 2021), Phase 2b: Port Louis Victoria to Curepipe Central (Operation started in October 2022).

The first phase of the project was inaugurated on the 3rd of October 2019 by Pravind Jugnauth, Prime Minister of Mauritius, and Narendra Modi, Prime Minister of India. [12]

Various partners are involved in the Project: The Singapore Cooperation Enterprise (SCE) was engaged to produce the reference design and they currently act as a consultant on the delivery of the Project. The Engineering-Procurement-Construction (EPC) contract was awarded to Larsen & Toubro (L&T), India in 2017, which is the main contractor on this project. RITES Ltd, a Government of India engineering consultancy company, currently acts in a supervisory role to ensure the quality and timely delivery of the Project. The help of SMRT Corporation, Singapore has been retained to help MEL prepare for Operational Readiness for both Phase 1 and Phase 2. The Light Rail Vehicles (LRVs) for this Project are from Construcciones y Auxiliar de Ferrocarriles (CAF), Spain. CAF furnished 18 LRV URBOS 100 3rd Generation. [13]

On 17 December 2019 Metro Express Ltd, the company running the system, announced that operations will start on 22 December 2019 at 11 am. For the initial period of 15 days, the passengers were carried free of charge on presentation of a free ticket, valid in a given direction and for a given time. The promotional period ended on 10 January 2020. [14]

On 30 March 2021 first trial run took place on the 3 km (1.9 mi) line extension from Rose Hill Central to Quatre Bornes Central, built as Phase 2A. [15] [16]

On 25 May 2021, the Ministry of Land Transport and Light Rail, Honourable Alan Ganoo announced in parliament the extension of Phase 3 Ebene and Reduit which will allow 15,000 additional passengers to use the Light Rail Vehicles. The works will cost Rs 4.5 billion and the extension will be 3.4 kilometers long which will be financed by India. [17]

Construction

Phase 1 linked Port Louis to Rose Hill and Commercial Service started on 10 January 2020. It was originally planned that Phase 2 would extend the line from Rose Hill to Curepipe in September 2021. [6] An intermediate phase, known as Phase 2A consisting of Belle Rose Station and Quatre Bornes Central Station, was opened on 20 June 2021. [16] The target to complete the rest of the line (Phase 2B) was pushed back to the end of 2022, given the COVID-19 Pandemic and lockdowns in the Country. As of early July 2021, 61% of the work has been completed for Phase 2B and 85% for the whole line. [18]

The scope of the project involves the construction. [19] It also includes the installation of advanced signalling systems across the network to ensure integration with road traffic. [20]

Phase 3 will bring major economic development to the country. The multimodal station already integrates several modes of transport and its connection with Phase 3 will generate job creation and will certainly contribute to an increase in economic growth and standard of living. [21]

Phase 2b Port Louis Victoria to Aapravasi Ghat

During a site visit on 1 July 2021, the Minister of Land Transport and Light Rail, Alan Ganoo announced among others that a new temporary stop, near the Caudan flyover some 300 m (984 ft) down the line from the Port Louis Victoria station, would be built and be in service until the works at Caudan are completed. The works in the area will be conducted between July and December 2021.

Several works are being undertaken by Larsen and Toubro at their own cost. They form mostly part of the ongoing development of the Metro Express project for Phase 2, with an integration element with various infrastructural facilities. They are the upcoming integration works with Victoria Urban Terminal; maintenance and improvement (enabling works) at the Caudan entrance; Le Pouce Railway Bridge; a temporary light rail platform at Waterfront; and a temporary light rail station near Caudan flyover. [22]

These works will collectively enhance the vibrancy, accessibility, and image of the Port Louis Waterfront area. The temporary station has the same facilities as the Port Louis Victoria station and it opened on 10 August 2021. [23]

The completion of the section from the Waterfront temporary station to Aapravasi Ghat is subject to ongoing coordination with UNESCO.

Phase 2b Quatre Bornes Central to Curepipe Central

Phase 2b connecting Quatre Bornes Central to Curepipe Central consists of the construction of approximately 3 km (1.9 mi) of track. Despite two lockdowns, the project is on track and ongoing stakeholder engagement activities with various stakeholders are being carried out. The section from Quatre Bornes Central to Phoenix is expected to be completed by June 2022. The completion of the entire section up to Curepipe Central is scheduled for December 2022.

The Government (Cabinet) approved an agreement between Ascencia and MEL for the construction of an additional station in Phoenix. The Phoenix Mall Station is expected to be operational by mid-2022. Between 4,000 to 5,000 people will use this station daily. Construction will be carried out by L&T. The Phoenix Mall Station will be integrated with the Phoenix Shopping Mall and will provide direct access to the mall. According to Dr Das Mootanah, Chief Executive Officer of Metro Express Ltd, "The Phoenix Mall Station will be the first station of its kind in Mauritius and will benefit the public as well as MEL and Phoenix Mall. This project will be fully funded by Ascencia for Rs 235 million. It is a true example of a public and private partnership. [24]

Plans

A 3.4 km (2.1 mi) branch from Rose Hill through Ebène to Réduit is planned. Of the 2 planned stations along the branch, one will serve the Ebène Cybercity and the other (terminus)— the University of Mauritius, Open University of Mauritius and several other educational establishments, research institutes and state departments. Major structural works on the branch will include a 548 m (1,798 ft) long flyover, between the Rose Hill Central elevated station (installed north of the station), and Ebène (in front of the Ebène State Secondary School), and a 120 m (394 ft) long bridge over Cascade River, located next to a disused railway bridge, which will be preserved; and the presence of a hydroelectric dam nearby will have to be taken into consideration. Its potential ridership was assessed to be 15,000 passengers per day. This leg is planned to be completed by End 2022/Early 2023. [3] [25] [26]

On 14 July 2021 the CEO of Metro Express Ltd, Das Mootanah announced that the acquisition of land for the Rose Hill to Ebène branch has already started and the company was engaging in dialogue with stakeholders - Réduit, Larsen & Toubro and RITES. [23]

The Ebène and Réduit extension lines and the stations were already recommended in a report by the Singapore Cooperation Enterprise, submitted to the Mauritian authorities in 2016.

Stations and stops

NameNotesCoordinates
Aapravasi GhatEarly name: Immigration. Future rail-bus (Immigration Square bus station) interchange.
Place D'ArmesTemporary station until Aapravasi Ghat station is built 20°09′38″S57°30′05″E / 20.16043°S 57.50141°E / -20.16043; 57.50141 (Place D'Armes stop (temporary) (Metro Express))
Port Louis VictoriaRail-bus (Victoria Urban Terminal) interchange. 20°09′45″S57°29′54″E / 20.1625355°S 57.4982032°E / -20.1625355; 57.4982032 (Port Louis Victoria station (Metro Express))
St Louis 20°10′50″S57°28′39″E / 20.18057°S 57.47749°E / -20.18057; 57.47749 (St Louis stop (Metro Express))
CoromandelEarly name: Black River Rd. Park and ride available. 20°11′01″S57°28′11″E / 20.18365°S 57.4697°E / -20.18365; 57.4697 (Coromandel stop (Metro Express))
BarklyEarly name: Nelson Mandela. 20°13′15″S57°27′30″E / 20.22081°S 57.45841°E / -20.22081; 57.45841 (Barkly stop (Metro Express))
Beau Bassin 20°13′36″S57°28′03″E / 20.2267°S 57.46738°E / -20.2267; 57.46738 (Beau Bassin stop (Metro Express))
VandermeerschEarly name: Reverend Lebrun. 20°14′07″S57°28′23″E / 20.23531°S 57.47304°E / -20.23531; 57.47304 (Vandermeersch stop (Metro Express))
Rose Hill CentralRail-bus interchange, elevated. 20°14′31″S57°28′33″E / 20.24186°S 57.47593°E / -20.24186; 57.47593 (Rose Hill Central station (Metro Express))
Belle RoseEarly name: Victoria Ave. [27] 20°15′20″S57°28′40″E / 20.255676°S 57.477712°E / -20.255676; 57.477712 (Belle Rose stop (Metro Express))
Quatre Bornes CentralRail-bus interchange. 20°15′55″S57°28′42″E / 20.265142°S 57.478341°E / -20.265142; 57.478341 (Quatre Bornes Central station (Metro Express))
St Jean 20°15′42″S57°28′57″E / 20.261731°S 57.482473°E / -20.261731; 57.482473 (St Jean stop (Metro Express))
Trianon 20°15′40″S57°29′24″E / 20.261233°S 57.489880°E / -20.261233; 57.489880 (Trianon stop (Metro Express))
PhoenixPark and ride will be available. 20°16′30″S57°29′48″E / 20.27504°S 57.496612°E / -20.27504; 57.496612 (Phoenix stop (Metro Express))
Phoenix Mall 20°16′48″S57°29′50″E / 20.279886°S 57.497186°E / -20.279886; 57.497186 (Phoenix Mall stop (Metro Express))
Palmerstone 20°17′07″S57°29′50″E / 20.285324°S 57.497198°E / -20.285324; 57.497198 (Palmerstone stop (Metro Express))
Vacoas CentralFuture rail-bus interchange. Park and ride will be available. 20°17′42″S57°29′36″E / 20.294997°S 57.493334°E / -20.294997; 57.493334 (Vacoas Central station (Metro Express))
Sadally 20°18′07″S57°29′45″E / 20.302034°S 57.495930°E / -20.302034; 57.495930 (Sadally stop (Metro Express))
Floreal 20°18′27″S57°30′28″E / 20.307438°S 57.507640°E / -20.307438; 57.507640 (Floreal stop (Metro Express))
Curepipe North 20°18′43″S57°31′16″E / 20.311979°S 57.521249°E / -20.311979; 57.521249 (Curepipe North stop (Metro Express))
Curepipe CentralFuture rail-bus (Jan Palach bus station) interchange, elevated. 20°19′00″S57°31′32″E / 20.316607°S 57.525629°E / -20.316607; 57.525629 (Curepipe Central station (Metro Express))
Ebéne CybercityRèduit branch. See § Plans. 20°14′30″S57°29′14″E / 20.241586°S 57.487119°E / -20.241586; 57.487119 (Ebéne Cybercity stop (Metro Express))
Mahatma Gandhi 20°13′55″S57°29′55″E / 20.232056°S 57.498541°E / -20.232056; 57.498541 (Mahatma Gandhi station (Metro Express))
Legend:

Name in bold – major interchange station
Name in grey italic – station or stop planned, location subject to confirmation
Name in small font – temporary station, it will be operational until the one it replaces is opened

Fares

As of January 2020 single adult fare is Rs 30 (82¢ as of January 2020) or Rs 20 (55¢ as of January 2020) if the trip does not involve travelling between Coromandel and Barkly. Children below the age of 3 and eligible senior citizens and disabled people are entitled to free fares. [28] [29] Eligible pupils and students are entitled to free travel to and from school on school days (along a pre-determined route). [30] There are concession fares for children aged between 3 and 12, and pupils and students not qualifying for free fares. The entitlements to free and concession fares on the Metro Express are identical to those on buses. [31]

As of June 2021, after adding two new stations to the line (Phase 2A), a single adult fare for the longest journeys that start or terminate at one of the newly opened stations is Rs 40; the fares for journeys between the other 7 stations (opened as part of Phase 1) remain unchanged. [32]

Single tickets can be purchased using cash or a credit/debit card from ticket machines located at each platform. Regular commuters are encouraged to use the MECard—a contactless, stored-value card that automatically deducts the correct fare by tapping on it before boarding and off after disembarking. The card, loaded with applicable entitlement, needs also to be used by those who are entitled to free fares. The fare paid with the MECard is the same as the cash fare, there are no weekly or monthly passes and there are no through fares for those changing from or to bus services. [31]

Ridership

Upon opening, ridership of the line was on average 17,000 passengers daily, dropping to 10,000 after the COVID-19 pandemic in Mauritius began. [33]

Since the opening of the Quatre Bornes extension (Phase 2A), the total number of passengers increased by 65% in the first week and in the second week of July there were 85% more passengers over the last two days, almost double the usual number noted before the launch of Quatre Bornes. Demographic-wise, 26% of travellers have been over the age of 60 and 71% – are between 18 and 60. [18] As of January 2023, the daily ridership is around 55,000 passengers and expected to increase after the opening up of the Réduit line. [1]

Rolling stock

On 26 July 2017, CAF announced that they had won a tender to provide 18 Urbos 100-3 worth over €100 million. The deal also includes providing the signalling system, automatic vehicle location system (AVLS), transit signal priority system (TSPS), depot equipment and a driving simulator. [7]

Each train is bi-directional, consists of seven modules, has five doors (per side), measures 45.411 m (148 ft 11.8 in) (length) by 2.65 m (8 ft 8 in) (width) by 3.25 m (10 ft 8 in) (height), [34] can reach a maximum speed of 70 km/h (43 mph), can carry up to 422 passengers (based on 6 pax/m2) and is equipped with, among others, air-conditioning of both the driver's cab and the passenger saloon, security CCTV and an event recorder. [35]

Infrastructure and facilities

Mauritius Metro LRV, departing Port Louis Victoria for Rose Hill Central, on the Caudan flyover over the M1 motorway. Mauricio in the center of the City of Port louis.jpg
Mauritius Metro LRV, departing Port Louis Victoria for Rose Hill Central, on the Caudan flyover over the M1 motorway.

The line largely follows the old Mauritius Government Railways' Midland Line alignment. It is fully grade-separated from major roads and at level crossings with secondary roads (with little vehicular traffic) and pedestrian crossings are equipped with transit signal priority traffic lights. The system was designed so that there would be no on-street running. [36] :93–94

Between the end of the Rose Hill flyover and the Barkly station the rails are embedded in concrete, and the space between the rails, as well as between the tracks, is grassed. On the Barkly to Coromandel section, the track is laid on concrete sleepers and ballasted. On the flyover on the approach to Port Louis, the tracks are laid in concrete. [36] :96

The depot at Richelieu covers an area of approx. 1 km2 (0.39 sq mi) and features eight external stabling tracks, a maintenance building, a wash facility and a sanding plant. An office building houses the control centre and staff offices. [36] :97 The maintenance building is equipped with retractable overhead supply rails that, when extended, allow LRVs to move under their power and, when retracted and isolated, allowing safe access to the roof-mounted equipment. [37]

All stations are fully accessible. The minor stations are of simple construction, featuring side platforms (the Vandermeersch station and Belle Rose station feature a single island platform). The elevated Rose Hill Central station is equipped with escalators and lifts. Each station offers bicycle racks. Five stations, namely, Port Louis Victoria, Rose Hill Central, Quatre Bornes Central, Vacoas Central and Curepipe Central are located next to bus stations; the Aapravasi Ghat station will be located next to bus stations as well. There is a park-and-ride facility at Coromandel, and other parking facilities will be built at Phoenix and Vacoas. [36] :95 [38]

Advertising on the Mauritius Metro Express

Mauritius Metro Advertising Mauritius Metro Advertising.jpg
Mauritius Metro Advertising

The Metro Express LRVs and stations provide a unique advertising platform in Mauritius. Alliance Media Mauritius, chosen as the advertising business partner for Metro Express Ltd since August 28, 2020, has solidified this partnership through a long-term contract.

Leveraging its expertise in transit advertising, Alliance Media brings cutting-edge technology and sophisticated aesthetics to advertising on the Metro Express. This initiative offers Metro Express commuters a distinctive Mauritian experience. The advertising presence extends across various media platforms both within and outside the LRVs, encompassing digital advertising along the Metro Alignment from Curepipe to Port Louis. [39]

Notes

    Related Research Articles

    <span class="mw-page-title-main">Transport in Mauritius</span>

    Transportation in Mauritius is characterized by the network of roadways, ports, and airports. The island was originally only accessible by boat until 1922, when the first flight landed in Mauritius.

    <span class="mw-page-title-main">Port Louis</span> Capital of Mauritius

    Port Louis is the capital city of Mauritius. It is mainly located in the Port Louis District, with a small western part in the Black River District. Port Louis is the country's financial and political centre, and the most populous city. It is administered by the Municipal City Council of Port Louis. According to the 2018 census conducted by Statistics Mauritius, the population was 147,066.

    <span class="mw-page-title-main">Muni Metro</span> Light rail system in San Francisco

    Muni Metro is a semi-metro system serving San Francisco, California, United States. Operated by the San Francisco Municipal Railway (Muni), a part of the San Francisco Municipal Transportation Agency (SFMTA), Muni Metro served an average of 68,700 passengers per weekday in the first quarter of 2023, making it the seventh-busiest light rail system in the United States.

    The Districts of the Republic of Mauritius are the second-level administrative divisions after the Outer Islands of Mauritius.

    <span class="mw-page-title-main">Quatre Bornes</span> Town in Plaines Wilhems, Mauritius

    Quatre Bornes, also known as La Ville des Fleurs, is a town in Mauritius, located mainly in the Plaines Wilhems District. Its western part lies in the Rivière Noire District. The town is administered by the Municipal Council of Quatre Bornes. Situated between the towns of Beau-Bassin Rose-Hill and Vacoas-Phoenix, Quatre Bornes is linked by roads to the north, east, south and west of Mauritius. According to the census made by Statistics Mauritius in 2015, the population of the town was at 77,308.

    <span class="mw-page-title-main">Plaines Wilhems District</span> District in Mauritius

    Plaines Wilhems is a district of Mauritius. It is the most populous district, with an estimated population of 366,506 at the end of 2018. The district is mainly urban; it consists of four towns, the village of Midlands and part of two other villages. The Plaines Wilhems district does not have a District Council; it has four Municipal Town Councils. The towns are Beau-Bassin Rose-Hill, Curepipe, Quatre Bornes and Vacoas-Phoenix. The villages are Midlands, Cascavelle and Moka. The district was named after Wilhem Leicknig. Of Prussian origin, he settled on the island of Mauritius, then known as Isle de France, in 1721.

    <span class="mw-page-title-main">Ebene, Mauritius</span> Suburb in Plaines Wilhems, Mauritius

    Ébène is a suburb of Quatre Bornes, Mauritius, 15 kilometres (9.3 mi) south of the capital, Port Louis. Construction began in November 2001, with the suburb being promoted as a new information technology hub for Mauritius and as a link between African and Asian markets. The aim was to create a hi-tech office area in order to dynamise the country. As a result, it is also referred to as Ébène Cybercity or Cyber City.

    Mauritian Premier League is the top division of football in Mauritius. The 10-team league has been governed by the Mauritius Football Association since its establishment in 1935.

    The Mauritian Cup is the top knockout tournament of the Mauritian football. It was created in 1957 by the Mauritius Football Association.

    <span class="mw-page-title-main">Hyderabad Metro</span> Rapid transit system in Hyderabad, India

    The Hyderabad Metro is a rapid transit system, serving the city of Hyderabad, Telangana, India. It is the third longest operational metro network in India after Delhi Metro and Namma Metro (Bengaluru), and the lines are arranged in a secant model. It is funded by a public–private partnership (PPP), with the state government holding a minority equity stake. Hyderabad Metro is the world's largest elevated Metro Rail system based on DBFOT basis. A special purpose vehicle company, L&T Metro Rail Hyderabad Ltd (L&TMRHL), was established by the construction company L&T to develop the Hyderabad metro rail project.

    <span class="mw-page-title-main">Outline of Mauritius</span> Overview of and topical guide to Mauritius

    The following outline is provided as an overview of and topical guide to Mauritius:

    <span class="mw-page-title-main">History of rail transport in Mauritius</span> Aspect of history

    The history of rail transport in Mauritius began in the 1860s. The Mauritian rail network was quickly built and it soon provided service to most of the island. It was a key factor in the social-economic development of Mauritius during its period of operation. However, due to persistent unprofitability from 1948 to 1953, it was closed in 1964. In 2019, the Metro Express light rail system opened, bringing rail passenger traffic back to Mauritius.

    Loreto College Rose Hill is a private secondary girls' school in Rose Hill, Mauritius. One of seven Loreto College campuses in Mauritius, it opened in 1951. Cathy de Cazanove is the current rector and the asst. rector is Roselyn Thomas.

    A railway system existed in Mauritius from the 1860s until 1964. In 1956 the decision was made to close the railway due to unprofitability. At this time, Mauritius Government Railways had 146 km (91 mi) of 1,435 mm track and 47 locomotives. Freight transport continued until 1964 when the railway was scrapped.

    The following is an index of Mauritius-related topics by alphabetical order. For a list by topic, see list of Mauritius-related topics

    Bank OneMauritius is a full service commercial bank based in Mauritius and jointly owned by CIEL Finance Limited and I&M Group PLC.

    <span class="mw-page-title-main">Metro (Minnesota)</span> Rapid transit network in the Minneapolis metropolitan area of the United States

    Metro is a transit network in Minnesota serving the cities of Minneapolis and Saint Paul. It also provides service to some suburban areas. As of 2022, the system consists of two light rail lines and five bus rapid transit (BRT) lines all of which are operated by the local public transit company: Metro Transit. The five lines connect Downtown Minneapolis and St Paul with the Bloomington, Minneapolis-St Paul International Airport, Roseville, Richfield, Burnsville and Brooklyn Center.

    The 2015–16 Mauritian Premier League season is the 36th season of top-flight football in Mauritius. Cercle de Joachim are the defending champions having won their second title in consecutive seasons. The season got underway on 24 October 2015 and finished on 10 July 2016. Port-Louis won the league.

    The following is a timeline of the history of the city of Port Louis on the island of Mauritius.

    References

    1. 1 2 3 "Mauritian PM inaugurates Indian govt-sponsored Rose Hill-Reduit metro line". 23 January 2023.
    2. "About Metro Express". Mauritius Metro. Archived from the original on 21 June 2019.
    3. 1 2 "Metro Express: PM reiterates commitment to modernise public transport system". Government of Mauritius. 20 June 2021. Retrieved 29 June 2021.
    4. "LRT Project- Agreement Signed for Consultancy Services". Government of Mauritius. 7 September 2012.
    5. "Metro Express". Sunday Times Mauritius.
    6. 1 2 "Metro Express project to the tune of Rs 18.8 billion to kick-start in September 2017". Government of Mauritius. 1 August 2017.
    7. 1 2 "CAF TO SUPPLY 18 URBOS TRAMS TO LARSEN & TOUBRO IN THE MAURITIUS METRO EXPRESS PROJECT". CAF (Press release). 26 December 2017.
    8. "Mauritius starts construction of $557 million light rail system". Reuters. 28 September 2017.
    9. "Launching Ceremony". Mauritius Metro. Caudan Old Train Depot. 9 March 2017. Retrieved 14 July 2021.
    10. "L&T celebrates ground breaking for the Light Rail System (Metro Express) project". Mauritius Metro (Press release). Port Louis: Larsen & Toubro. 28 September 2017. Retrieved 14 July 2021.
    11. "Laying foundation ceremony". Mauritius Metro (Press release). Richelieu. 28 September 2017. Retrieved 14 July 2021.
    12. "Mauritius launches first phase of $525 million light rail system". Reuters. 3 October 2019. Retrieved 3 October 2019.
    13. Barrow, Keith. "Light rail arrives in Mauritius". International Railway Journal.
    14. MEL Management (17 December 2019). "Press Communique" (PDF). Mauritius Metro. Archived from the original (PDF) on 19 December 2019. Retrieved 19 December 2019.
    15. Joëlle Elix. "Mauricio fait son entrée à Quatre-Bornes" [Mauricio comes to Quatre-Bornes. Regular services started at 11 am on 20 June 2021.].
    16. 1 2 "Press Conference: OFFICIAL LAUNCH OF THE UPCOMING COMMERCIAL OPERATION of Phase 2A from Rose Hill to Quatre Bornes". Metro Express Mauritius. 17 June 2021. Retrieved 20 June 2021.
    17. O’NEILL, TERENCE. "Metro Express : le projet étendu à Ébène et Réduit, Rs 4,5 milliards pour les travaux". defimedia.
    18. 1 2 "Metro: 26% of travelers are elderly". Mauritius Newspapers. 11 July 2021.
    19. "Phase-1 of L&T-built Light Rail System (Metro Express) in Mauritius inaugurated". Construction world.
    20. "Mauritius Metro Express". Railway Technology.
    21. "(Transport ferroviaire) Das Mootanah (CEO de Metro Express Ltd) : "L'extension vers Ébène était dans le plan initial du projet de métro"". le mauricien.
    22. Radio one. "Métro à Aapravasi Ghat : le gouvernement attend le feu vert de l'UNESCO pour commencer les travaux". YouTube.
    23. 1 2 "Das Mootanah (Metro Express): the acquisition of land from Rose-Hill to Ebony has already started – archyworldys". Mauritius Newspapers. 14 July 2021. Retrieved 14 July 2021.
    24. St Cyr, Jean- Marie. "Transport en commun : Rs 235 millions pour la construction d'une station pour le Metro Express". Defimedia.
    25. "Metro Express: the Rose-Hill-Ebène-Réduit route takes shape – Le Mauricien". Mauritius Newspapers. 31 May 2021. Retrieved 1 July 2021.
    26. krsna (28 May 2021). "Metro Express : Le gouvernement étendra le réseau à Réduit en tant que projet prioritaire" [Metro Express: The government will expand the network to Réduit as a priority project]. inside.news (in French). Retrieved 13 July 2021.
    27. Karen Walter (19 September 2017). "Metro Express: cinq stations sur pilotis et 14 autres au sol" [Metro Express: five elevated stations and 14 on street level]. lexpress.mu (in French).
    28. "Press Conference Start of Commercial Services of Metro Express" (PDF). Mauritius Metro. 3 January 2020. Retrieved 6 January 2020.[ permanent dead link ]
    29. "Metro Express – MECard Points of Sales" (PDF). Mauritius Metro. 7 January 2020.
    30. "FAQ Student". Metro Express Mauritius. Retrieved 30 June 2021.
    31. 1 2 "FAQ". Metro Express Mauritius. Retrieved 23 June 2021.
    32. "Fare for Phase 2A: Quatre-Bornes to Port-Louis". Metro Express Mauritius. 18 June 2021. Retrieved 23 June 2021.
    33. "Metro Express - On the Right Track". Business Focus Magazine. 8 April 2021. Retrieved 21 June 2021.
    34. "Metro Express Project: First Light Rail Vehicle arrives in Mauritius". Government of Mauritius. 4 July 2019.
    35. "MAURITIUS LRV". CAF.
    36. 1 2 3 4 Oliver Doyle (March 2020). "Bringing LRT to Mauritius". Tramways & Urban Transit . Vol. 83, no. 987. Light Rail Transit Association. pp. 93–97. ISSN   1460-8324.
    37. "Mauritius LRT: Depot solutions for safe maintenance". Tramways & Urban Transit. 6 November 2019. Retrieved 30 June 2021.
    38. "My Journey: Intermodal". Metro Express Mauritius. Retrieved 1 July 2021.
    39. https://mauritiusmetroexpress.mu/advertising/