Microsoft Redmond campus

Last updated
Microsoft campus
Building92microsoft.jpg
Building 92, home of the Microsoft Visitor Center, in 2016
Microsoft Redmond campus
Built1986
Location Redmond, Washington, U.S.
Coordinates 47°38′31″N122°07′38″W / 47.64194°N 122.12722°W / 47.64194; -122.12722 Coordinates: 47°38′31″N122°07′38″W / 47.64194°N 122.12722°W / 47.64194; -122.12722
Industry Technology
Employees53,576 [1]
Buildings83
Area502 acres (203 ha) [2]
Owner(s) Microsoft

The Microsoft campus is the corporate headquarters of Microsoft, located in Redmond, Washington, United States, a part of the Seattle metropolitan area. Microsoft initially moved onto the grounds of the campus on February 26, 1986, shortly before going public on March 13. The headquarters has undergone multiple expansions since its establishment and is presently estimated to encompass over 8 million square feet (740,000 m2) of office space and have over 50,000 employees. [3]

Contents

As of November 2018, the campus holds 83 buildings. [4] [5] Additional offices in the Eastside suburbs of Seattle are located in Bellevue and Issaquah. Building 92 on the campus contains a visitor center (with interactive exhibits) and store that are open to the public.

History

Microsoft chose to move its headquarters from Bellevue to nearby Redmond in January 1985, selecting a 29-acre (12 ha) plot of land that would be developed by Wright Runstad & Company. [6] Construction began on August 9, and Microsoft moved into the $25 million facility on February 26, 1986, several weeks before the company's initial public offering. [7] [8] The move generated some concerns about increased traffic congestion on the unfinished State Route 520 freeway between Bellevue and Redmond; [9] a new freeway interchange at Northeast 40th Street would later be built in 2000 to service the campus, after lobbying and partial funding from Microsoft. [10] [11]

The initial campus was situated on a 30-acre (12 ha) lot with six buildings and was able to accommodate 800 employees, growing to 1,400 by 1988. [12] The site was once home to chicken farms in the 1920s that were ultimately demolished. [13] The campus was originally leased to Microsoft from the Teachers Insurance and Annuity Association, a pension fund manager, until it was bought back in 1992. [14] The original buildings were given sequential numbers, with the exception of 7 due to a delay in permitting that became indefinite. [13] A pond between the original buildings was nicknamed "Lake Bill" for Bill Gates and was used for post-project celebrations, namely managers being thrown in after a successful launch. [13]

The first major expansion of the campus came in 1992, bringing the total amount of office space to 1.7 million square feet (160,000 m2) across 260 acres (110 ha) of land. Microsoft also announced its intention to contain most of its future growth within Redmond, while retaining some offices in Downtown Bellevue and its Factoria district. [15] The Redmond campus was plagued by hundreds of rabbits who spread around the area in the late 1990s. [16]

In January 2006, Microsoft announced the purchase of Safeco's Redmond campus after the company had begun consolidating its offices at the Safeco Tower in Seattle's University District a year earlier. [17] The following month, Microsoft announced that it intended to expand its Redmond campus by 1,100,000 square feet (100,000 m2) at a cost of $1 billion and said that this would create space for between 7,000 and 15,000 new employees over the following three years. [18] The campus expansion also included more prominent branding and additional recreation areas. [19]

In 2009, a shopping mall called "The Commons" was completed on the campus, bringing 1.4 million square feet (130,000 m2) of retail space as well as restaurants, a soccer field and a pub, to the West Campus. [20]

Latest expansion

In September 2015, The Seattle Times reported that Microsoft had hired architecture firm Skidmore, Owings & Merrill to begin a multibillion-dollar redesign of the Redmond campus, using an additional 1.4 million square feet (130,000 m2) permitted by an agreement with the City of Redmond. [2] The City of Redmond had also approved a rezone in February that year to raise the height limit for buildings on the campus from six stories to ten. [21]

One of the two treehouses built by Pete Nelson, near Building 31. A small treehouse on Microsoft campus.jpg
One of the two treehouses built by Pete Nelson, near Building 31.

In 2017, Microsoft unveiled multiple initiatives to overhaul its Redmond campus. This included treehouses built by American treehouse builder Pete Nelson, as well as an elevated outdoor lounge named the Crow's Nest. [22] [23] The company also announced plans to demolish 12 buildings on the older East Campus and replace them with 18 new buildings, housing 8,000 additional employees and raising the total number of buildings on the campus to 131. [24] The newer buildings would be arranged like an urban neighborhood, centered around a 2-acre (0.81 ha) open space with sports fields (including a cricket pitch), retail space, and hiking trails. [25] [26] [27] Demolition of the original buildings, including all of the original X-shaped offices built in the 1980s, began in January 2019 and was completed that September. [28] [29]

The expanded campus, scheduled to open in 2023, will have 17 office buildings and four floors of underground parking with capacity for 6,500 vehicles. [30] A 1,100-foot (340 m) pedestrian bridge will connect the new campus buildings to the Redmond Technology light rail station and the West Campus site. [31] A set of 875 wells to harness geothermal energy will provide heating and cooling to buildings on the campus through 220 miles (350 km) of water pipes that comprise a geoexchange system. [32]

Transportation

The campus is located on both sides of the State Route 520 freeway, which connects it to the cities of Bellevue and Seattle as well as Redmond city center. Microsoft partially covered the cost for an overpass over the freeway at NE 36th Street to relieve congestion on other cross-streets in the area. [33]

Redmond Technology station, which replaces the old Overlake Transit Center, under construction in September 2019. Redmond Technology Station under construction, Sept. 2019.jpg
Redmond Technology station, which replaces the old Overlake Transit Center, under construction in September 2019.

The campus is served by Seattle-area buses that make stops along State Route 520—and, in the future, at Redmond Technology station—operated by Sound Transit and King County Metro. The RapidRide B Line also runs through the campus, connecting to downtown Bellevue and Redmond. [34] The transit center opened in 2002 and will be the eastern terminus of the East Link light rail extension, scheduled to open in 2023. [35] [36] Microsoft partnered with Sound Transit and the City of Redmond to fund a pedestrian bridge connecting the light rail station to both sides of its campus planned to open in 2020, providing $33.3 million of the cost. [37] [38]

For employees, Microsoft also operates a commuter bus service called "The Connector" that provides non-stop service from the Redmond campus to neighborhoods in Seattle, the Eastside, and Snohomish County. [39] The shuttles, which began operating in 2007, were targeted in early 2014 as a symbol of gentrification in similar fashion to the San Francisco tech bus protests that same year. [40] [41] [42] The company also runs a shuttle bus service, called the "Shuttle Connect", between buildings on the campus. [43]

Related Research Articles

<span class="mw-page-title-main">Redmond, Washington</span> City in Washington, United States

Redmond is a city in King County, Washington, United States, located 15 miles (24 km) east of Seattle. The population was 73,256 at the 2020 census, up from 54,144 in 2010.

<span class="mw-page-title-main">Bellevue, Washington</span> City in Washington, United States

Bellevue is a city in the Eastside region of King County, Washington, United States, located across Lake Washington from Seattle. It is the third-largest city in the Seattle metropolitan area and has variously been characterized as a satellite city, a suburb, a boomburb, or an edge city. Its population was 122,363 at the 2010 census and 151,854 in the 2020 census. The city's name is derived from the French term belle vue.

<span class="mw-page-title-main">Washington State Route 520</span> Freeway in Washington state

State Route 520 (SR 520) is a state highway and freeway in the Seattle metropolitan area, part of the U.S. state of Washington. It runs 13 miles (21 km) from Seattle in the west to Redmond in the east. The freeway connects Seattle to the Eastside region of King County via the Evergreen Point Floating Bridge on Lake Washington. SR 520 intersects several state highways, including Interstate 5 (I-5) in Seattle, I-405 in Bellevue, and SR 202 in Redmond.

<span class="mw-page-title-main">Sound Transit</span> Regional transit government agency for the Seattle metropolitan area

Sound Transit (ST), officially the Central Puget Sound Regional Transit Authority, is a public transit agency serving the Seattle metropolitan area in the U.S. state of Washington. It operates the Link light rail system in Seattle and Tacoma, regional Sounder commuter rail, and Sound Transit Express bus service. The agency also coordinates the regional ORCA fare card system, which is also used by local transit operators. In 2017, Sound Transit services carried a total of 47 million passengers and averaged 157,000 riders on weekdays.

<span class="mw-page-title-main">Transportation in Seattle</span> Overview of transportation modes and routes in Seattle, Washington, U.S.

Transportation in Seattle is largely focused on the automobile like many other cities in western North America; however, the city is just old enough for its layout to reflect the age when railways and trolleys predominated. These older modes of transportation were made for a relatively well-defined downtown area and strong neighborhoods at the end of several former streetcar lines, now mostly bus lines.

<span class="mw-page-title-main">Overlake, Washington</span> Region comprising parts of eastern Bellevue and southern Redmond, Washington

Overlake is the name for a region comprising parts of eastern Bellevue and southern Redmond, Washington. It is in the vicinity of Microsoft's main corporate campus and is officially defined as a neighborhood consisting of the parts of Redmond lying south of Northeast 60th Street and between 148th Avenue Northeast and Bellevue-Redmond Road. The Overlake area, so named because it is located across Lake Washington from Seattle, straddles the boundaries of Bellevue and Redmond and is considered to have its own identity distinct from those of both cities.

<span class="mw-page-title-main">Interstate 405 (Washington)</span> Interstate highway bypassing Seattle, Washington, U.S.

Interstate 405 (I-405) is a north–south auxiliary Interstate Highway serving the Seattle region of Washington, United States. It bypasses Seattle east of Lake Washington, traveling through the Eastside area of King and Snohomish counties, providing an alternate route to I-5. The 30-mile (48 km) freeway serves the cities of Renton, Bellevue, Kirkland, and Bothell. I-405 terminates at I-5 in Tukwila and Lynnwood, and also intersects several major highways, including SR 167, I-90, SR 520, and SR 522.

<span class="mw-page-title-main">Link light rail</span> Light rail system the Seattle metropolitan area

Link light rail is a light rail rapid transit system serving the Seattle metropolitan area in the U.S. state of Washington. It is managed by Sound Transit in partnership with local transit providers, and consists of two non-connected lines: the 1 Line in King County, which travels for 25 miles (40 km) between Seattle and Seattle–Tacoma International Airport; and the T Line in Pierce County, which runs for under 2 miles (3.2 km) between Downtown Tacoma and Tacoma Dome Station. In 2022, the system had a ridership of 23,905,500, or about 75,000 per weekday as of the fourth quarter of 2022, primarily on the 1 Line, and runs trains at frequencies of 6 to 24 minutes.

<span class="mw-page-title-main">Redmond Town Center</span> Shopping mall in Washington, US

Redmond Town Center is a mixed-use development and shopping center located in downtown Redmond, Washington. Owned and managed by Fairbourne Properties, Redmond Town Center has more than 110 shops, restaurants, lodging, and entertainment venues in an outdoor environment. It opened in 1997 on the site of a defunct municipal golf course along the north side of State Route 520.

<span class="mw-page-title-main">2 Line (Sound Transit)</span> Light rail line under construction in the Seattle metropolitan area

The East Link Extension, also known as the 2 Line, is a future light rail line serving the Eastside region of the Seattle metropolitan area in the U.S. state of Washington. It will be part of Sound Transit's Link light rail system, running 14 miles (23 km) from west to east and serving 10 stations in Downtown Seattle, Mercer Island, Bellevue, and Redmond. The 2 Line is scheduled to open in 2024 and will continue into the Downtown Seattle Transit Tunnel and share stations with the 1 Line. A 3.7-mile-long (6.0 km) extension to Downtown Redmond with two additional stations is scheduled to open in 2025.

<span class="mw-page-title-main">Safeco Plaza</span> 50-story skyscraper in Downtown Seattle, Washington

Safeco Plaza is a 50-story skyscraper in Downtown Seattle, Washington, United States. Designed by the Naramore, Bain, Brady, and Johanson (NBBJ) firm, it was completed in 1969 by the Howard S. Wright Construction Company for Seattle First National Bank, which relocated from its previous headquarters at the nearby Dexter Horton Building.

<span class="mw-page-title-main">Downtown Bellevue</span> Central business district of Bellevue, Washington, U.S.

Downtown Bellevue is the central business district of Bellevue, Washington, United States. It is bounded by I-405 to the east, NE 12th Street to the north, 100th Ave NE to the west, and Main Street to the south, and covers an area of around 400 acres (160 ha). It is the second largest city center in Washington state, with more than 50,000 employees and 12,000 residents. Geographically centered near the heart of the Puget Sound region, downtown Bellevue is a regional growth center offering over 9 million square feet (840,000 m2) of Class A office space, various major retail and entertainment locations, more than 2,500 hotel rooms and almost 10,000 housing units.

<span class="mw-page-title-main">U District station</span> Light rail station in Seattle, Washington

U District station is a light rail station on the 1 Line of Sound Transit's Link light rail system in Seattle, Washington, United States. It is located in the University District neighborhood, near the University of Washington campus. The underground station has two entrances along Brooklyn Avenue Northeast at 43rd and 45th streets.

<span class="mw-page-title-main">Issaquah Highlands</span> Planned community in Issaquah, Washington, US

Issaquah Highlands is a planned community and mixed-use neighborhood in Issaquah, a suburb of Seattle, Washington, United States. The neighborhood, located northeast of downtown Issaquah at Grand Ridge on the Sammamish Plateau, was planned in the New Urbanism style and opened in 1998 after a decade of planning and construction.

<span class="mw-page-title-main">Eastside Rail Corridor</span>

The Eastside Rail Corridor, officially Eastrail, is a rail right of way where a rail trail has been under development in the Eastside suburbs of Seattle, Washington. The corridor follows the path of the former Woodinville Subdivision from Renton to the City of Snohomish at Snohomish Junction. As of 2017, the northern portion was still in operation by Eastside Freight Railroad.

<span class="mw-page-title-main">Redmond Technology station</span> Future light rail station in Redmond, Washington

Redmond Technology station, formerly Overlake Transit Center, is a bus station and future light rail station in Redmond, Washington, United States. The current bus station opened in 2002 and is located on the headquarters campus of Microsoft; it is served by Sound Transit Express and King County Metro.

<span class="mw-page-title-main">Spring District</span> Mixed-use development in Bellevue, Washington, U.S.

The Spring District is a transit-oriented development and neighborhood that is under construction in Bellevue, Washington. The 16-block, 36-acre (15 ha) development is centered around the Spring District/120th station on the East Link Extension, a light rail line scheduled to open in 2023. It is located in the Bel-Red area between Downtown Bellevue and Redmond, currently used for light industry, roughly bounded on the west by 120th Avenue NE and the Eastside Rail Corridor rail trail, on the north by a King County Metro bus base, on the east by 124th Avenue NE, and on the south by NE 12th Street.

<span class="mw-page-title-main">Marymoor Village station</span> Future light rail station in Redmond, Washington

Marymoor Village station is a future Link light rail station near Marymoor Park in Redmond, Washington. The station is located along the south side of State Route 520 southwest of its interchange with State Route 202 near Downtown Redmond. It also includes a 1,400-stall park and ride in a garage built on the site.

Esterra Park is a transit-oriented development under construction in the Overlake area of Redmond, Washington. The 28-acre (11 ha), 3.0 million square feet (280,000 m2) project is near major regional shopping and employment centers and multiple modes of transportation, including the future Overlake Village light rail station scheduled to open in 2023. The Esterra Park campus is expected to be home to a combined 8,000 residents and workers.

<span class="mw-page-title-main">Bellevue 600</span> Proposed high-rise office building in Bellevue, Washington, United States

Bellevue 600 is a future high-rise office building developed by Amazon in Bellevue, Washington, United States. It began construction in 2021 and is scheduled to be completed in 2024. The 43-story, 600-foot-tall (180 m) building would join 555 Tower as the tallest building in Bellevue. The project is located in Downtown Bellevue at the intersection of Northeast 6th Street and 110th Avenue Northeast, adjacent to the Bellevue Transit Center and a future Link light rail station. A second phase would construct a 27-story tower to the west, replacing an existing office building.

References

  1. "Facts About Microsoft".
  2. 1 2 Yu, Hui-yong; Bass, Dina (September 4, 2015). "Microsoft considers multibillion-dollar overhaul to Redmond campus". The Seattle Times. Retrieved September 8, 2015.
  3. "Facts About Microsoft". Microsoft . Retrieved July 21, 2015.
  4. "Microsoft Redmond Campus Fact Sheet" (PDF). Microsoft. November 2018. Retrieved December 10, 2019.
  5. "Microsoft Redmond Main Campus Map & Buildings". Microsoft. Retrieved December 10, 2019.
  6. "Microsoft Corp. to move its headquarters to Redmond". The Seattle Times . January 15, 1985. p. B2.
  7. Buck, Richard (March 9, 1986). "Computer Memory Explored Conference reveals just how many are interested in the technology". The Seattle Times. p. D6.
  8. Summerford, Tina (April 16, 2009). "The History of Microsoft - 1985". Channel 9 . Microsoft. Retrieved July 11, 2016.
  9. Casey, Carolyn (November 28, 1984). "Firm appears headed for site in Redmond". The Seattle Times. p. F1.
  10. Whitely, Peyton (October 5, 2000). "Hwy. 520 ramps expected to ease Redmond commute". The Seattle Times. p. B1.
  11. Ervin, Keith (March 7, 1996). "And now...the Microsoft Inerchange: Company uses clout to determine 520 exit". The Seattle Times. p. B1.
  12. Lalonde, James E. (January 28, 1988). "Microsoft deals with pressure: Heavy demand, not enough room". The Seattle Times. p. E2.
  13. 1 2 3 Lerman, Rachel (November 30, 2017). "Microsoft's campus redevelopment: What's staying, what's being torn down". The Seattle Times. Retrieved November 10, 2018.
  14. Williams, Scott (January 8, 1992). "4 original headquarters buildings and land repurchased by Microsoft". The Seattle Times. Retrieved July 15, 2016.
  15. "Microsoft will not expand beyond Redmond campus". The Seattle Times. December 2, 1992. Retrieved July 15, 2016.
  16. "Bunny roundup completed". Kitsap Sun . Associated Press. April 3, 1999. Retrieved March 31, 2019.
  17. Bishop, Todd (January 19, 2006). "Microsoft agrees to buy former Safeco site in Redmond". Business Journals. Retrieved January 15, 2008.{{cite news}}: CS1 maint: url-status (link)
  18. Dudley, Brier (February 9, 2006). "Microsoft speeding up plans for huge campus redevelopment". The Seattle Times. Retrieved January 15, 2008.
  19. Romano, Benjamin (November 11, 2007). "Microsoft campus expands, transforms, inside and out". The Seattle Times. Archived from the original on November 12, 2007. Retrieved May 7, 2020.
  20. Chan, Sharon Pian (April 20, 2009). "Microsoft workers get their very own mall, The Commons, on corporate campus". The Seattle Times. Retrieved July 21, 2015.
  21. Day, Matt (December 28, 2015). "Microsoft's next Redmond expansion expected to go vertical". The Seattle Times. Retrieved December 28, 2015.
  22. Schlosser, Kurt (2017-10-16). "Microsoft's new treehouse meeting spaces take advantage of nature around its sprawling campus". Geekwire. Archived from the original on 2017-10-18. Retrieved 2023-05-07.
  23. Singer-Velush, Natalie. "Meet me in the trees: new outdoor meeting spaces help employees reap the benefits of nature". Microsoft. Archived from the original on 2023-04-28. Retrieved 2023-05-07.
  24. Jenkins, Aric (November 29, 2017). "Microsoft Will Demolish Its Campus to Build a Mini-City". Fortune . Retrieved November 29, 2017.
  25. Soper, Taylor (December 8, 2017). "Microsoft plans world-class cricket pitch at Redmond HQ, in first for major U.S. tech campus". GeekWire. Retrieved August 17, 2019.
  26. Wingfield, Nick (November 29, 2017). "Microsoft to Expand Campus, as Amazon Looks Elsewhere". The New York Times . Retrieved November 29, 2017.
  27. Bass, Dina (November 28, 2017). "Microsoft Plans Multibillion-Dollar Campus Overhaul, Adding Open Spaces". Bloomberg News . Retrieved November 29, 2017.
  28. Lerman, Rachel (November 10, 2018). "Microsoft alumni play one last game of hallway putt-putt before demolition". The Seattle Times. Retrieved November 10, 2018.
  29. Novet, Jordan (January 8, 2019). "Microsoft begins demolishing buildings in Redmond campus remodel". CNBC. Retrieved January 9, 2019.
  30. Merten, Paxtyn (October 1, 2019). "Microsoft HQ adds underground parking, self-driving car drop-offs and transit-connected pedestrian bridge" . Puget Sound Business Journal. Retrieved October 2, 2019.
  31. Miller, Brian (March 19, 2021). "Microsoft reports progress on sustainable Redmond HQ makeover" . Seattle Daily Journal of Commerce. Retrieved March 20, 2021.
  32. Lystra, Tony (March 19, 2021). "Microsoft's new Redmond utility plant to use earth's heat to slash energy use". Puget Sound Business Journal. Retrieved March 20, 2021.
  33. "Stimulus money goes for a bridge to Microsoft". The Seattle Times. March 14, 2009. Retrieved July 21, 2015.
  34. "Overlake Transit Center Boarding Locations". King County Metro . Retrieved July 21, 2015.
  35. Lindblom, Mike; Brooks, Diane (February 2, 2002). "Modern transit centers for riders in Everett, Redmond to debut Monday". The Seattle Times. Retrieved July 15, 2016.
  36. "Sound Transit kicks off East Link light rail construction" (Press release). Sound Transit. April 22, 2016. Retrieved July 15, 2016.
  37. Ervin, Keith (November 26, 2013). "Microsoft pitches in on bridge over Overlake Transit Center". The Seattle Times. Retrieved July 21, 2015.
  38. "City of Redmond, Sound Transit team up for new pedestrian-bicycle bridge" (Press release). Sound Transit. August 28, 2014. Retrieved July 21, 2015.
  39. "The Connector Fact Sheet". Microsoft. September 6, 2007. Retrieved December 12, 2015.
  40. Bishop, Todd (February 10, 2014). "Activists block Microsoft shuttles in Seattle, in anti-gentrification protest". GeekWire . Retrieved December 12, 2015.
  41. Grande, Alison (February 10, 2014). "Microsoft Connector shuttles targeted by protestors". KIRO-TV . Retrieved December 12, 2015.
  42. Wingfield, Nick (February 10, 2014). "Seattle Gets Its Own Tech Bus Protest". The New York Times . Retrieved December 12, 2015.
  43. "Fostering Alternative Ways to Commute at Microsoft". Microsoft. Archived from the original on May 1, 2008. Retrieved July 21, 2015.