NZR G class (1928) | |||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| |||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||
|
NZR G class (1937) | |||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| |||||||||||||||||||||||
| |||||||||||||||||||||||
| |||||||||||||||||||||||
|
The NZR G class was a type of Garratt locomotives used in New Zealand, later rebuilt as Pacific type locomotives. They were the only Garratt type steam locomotives ever used by the New Zealand Railways (NZR). They were ordered to deal with traffic growth over the heavy gradients of the North Island Main Trunk (NIMT) and to do away with the use of banking engines on steep grades. [1] They were one of the few Garratt designs to employ six cylinders. A mechanical stoker was used to feed coal into the locomotive. [1] The locomotives lasted longer in rebuilt form as standard Pacific locomotives than they did as Garratts, but their numerous mechanical issues lead to their final withdrawal following a union ban on their use in 1956. [3]
About 1913, the General Manager E. H. Hiley considered the importing of ten articulated Garratt engines and ten Pacifics. With the success of the AB class and WAB class Pacifics no more was heard of Garratts. Then with the retirement in 1925 of the Chief Mechanical Engineer E E Gillon his successor G S Lynde invited Beyer, Peacock & Company of England to suggest a suitable Garrett for the NIMT, and they were then asked to quote for engines with either four or six cylinders. But the three six-cylinder engines were supplied "against their own better judgement. The influence of the London & North Eastern Railway three-cylinder enthusiasts (i.e. Lynde) was evident in this unwise decision." [4] These engines had three cylinders (16.5-by-24-inch or 419-by-610-millimetre) on each of the two set of engine frames, thus creating a 6-cylinder Garratt. The engines entered service in 1929.
Walschaerts valve gear operated the outside cylinders with the inner third cylinder operated by a Gresley-Holcroft mechanism. The locomotives proved a disaster on the light NZR tracks. [5] It has been suggested the most likely reason was that the engines were too powerful for the system and also the valve gear mechanisms were complicated. The design was most unusual in that the coal bunker was carried on an extension to the boiler frame rather than the normal Garratt positioning on the rear engine's frame. Unlike a Union Garratt the rear water tank was still mounted on the rear engine unit.
The engines operated at 200 psi (1,400 kPa) and delivered 51,580 lb (23,400 kg) of tractive effort which, on the lightly laid New Zealand tracks, proved to be too powerful for the drawbars on rolling stock and broken drawbars occurred wherever the engines ran. Further, the locomotives when hauling a full load, generated such intense heat in restricted tunnels, which are common in New Zealand, that crews disliked working them. [6] Their large size driving wheels also made them unsuitable for the NIMT.
The G class were mostly based at Ohakune and operated between Taihape and Ohakune on the NIMT. [7] The central section of the NIMT of 93 miles (153 km) from Taumarunui to Taihape had been relaid with heavier 70 lb/yd (34.8 kg/m) rather than 53 lb/yd (26.3 kg/m) rails in 1901 for the introduction of the heavier NZR X class locomotives. [8]
Trainloads were reduced and this defeated the purpose for which the Garratts were purchased – namely to operate heavy loads over a vital mainline section of the NIMT route, the central section including the Raurimu Spiral. [9] The trailing engine axle under the cab carried a heavier load than the leading engine trailing axle and experienced continual problems with overheating. Also, the coal bunker carried insufficient fuel in-service and this problem was never remedied because it would have increased the axle loads beyond the light track capabilities. [10]
One engine (G 99) was withdrawn from service in 1935, with G 98 and G 100 following in early 1936. [11] Their numerous design faults sealed the fate of these locomotives when the K class was introduced in 1932. [12]
Due to the troubles faced with the Garratts in their original form, a proposal was put forward in late 1935 for the three Garratts to be dismantled and the engine units used to build six new 4-6-2 tender locomotives. The three locomotives were dismantled at Hutt Workshops in 1936 and the engine units shipped to Hillside Workshops in Dunedin for eventual rebuilding. The engines as rebuilt were fitted with a new third cylinder, a modified AB class boiler, a new cab and trailing truck based on those used on the Baldwin AA class, and a new Vanderbilt tender based on those used on the AB class, but of welded construction and fitted with roller bearing bogies. [13] The original plate frames were retained as was the Gresley conjugated valve gear. [6]
The first rebuilt locomotive, G 96, was outshopped on 8 September 1937 and dispatched north after initial tests to Christchurch for use on the Midland line. Some minor adjustments were required although the performance of the initial rebuild was deemed satisfactory and the other five engine units were subsequently rebuilt with the last locomotive, G 100, outshopped on 4 March 1938. The rebuilt locomotives were largely used between the Arthur's Pass and Christchurch section of the Midland line on heavy coal haulage during the Second World War and the immediate post-war years. The G class worked alongside the six KB class locomotives and were able to move tonnage which would have required fourteen J class or JA class locomotives. [14] Only 9 trains in each direction could be run, each way, through the steep 45 miles (72 km) section from Arthur's Pass to Springfield, [15] six regular freight, an extra run as required freight in both directions, the West Coast express three times a week and the overnight perishables mixed train 205/220. The express and perishables were hauled by AB class locomotives, and the remaining freight trains usually by KB class and one or two G class, or sometimes up to three G class. [14] While difficult engines disliked by engine crews, the G class moved huge tonnage in these hard vital years, running more mileage, at lower operating costs than the A or AA classes and in ton-miles were outperformed only by the J, JA, AB and KA. [16]
After the introduction in 1939 of the new KB class both the G class and the KB class were trialled on the South Island Limited and mail express on the Main South Line, during the Second World War as far south as Timaru and sometimes Oamaru and Dunedin, once certain bridges had been strengthened to accept the 14-ton axle loading of the rebuilt G and KB class locomotives. The G class after their first full A grade overhaul in late 1941 were prepared and tuned for the trial on the summer SIMT expresses, part of the rebuilt G class purpose being an assessment of a planned new class of larger 3-cylinder Pacifics for SIMT fast Express services. The G class were cleared to operate all traffic classes on the Christchurch-Timaru on 1 Dec 1941 section including express trains. [17] Over this demanding summer with wartime peak traffic, increased by the start of the Pacific war on 7 December 1941, the G class were extensively employed on the SIMT and West Coast express trains, until major failure on northbound train 174, the South Island Express to Christchurch on 16 January 1942 terminated their use on passenger express service. [18] The run of the South Island expresses between Christchurch and Timaru was fast but with only a few stops, with restarts downhill on 1/100 grades. The northbound SIMT express trains faced a largely uphill fast run over the 160km from Timaru to Christchurch with difficult, uphill 1/100 grade starts with heavy wartime loads, often 14-16 carriages out of the plains with stops at Temuka, Winchester, Orari, Hinds, Ashburton, Rakaia and Burnham.
Often running late to meet the overnight steamer express from Lyttelton to meet tighter schedules than the, the fast timetable of 2hrs 54 min (express) and 3hrs 15min (mail) timetable to Christchurch, were beyond the G class, only once did a G manage the return leg of the express run back to Christchurch without major delays or failure. [18] Tests proved the G and KB with their high axle loads, unique complexities as booster or three-cylinder systems more efficiently deployed moving heavy coal trains on the Midland line. [19]
The G class could often not generate enough steam to build up speed for timekeeping and being complex and rather too light, were prone to valve and motion link failure, [16] the cylinder blocks should have been held by 1.5-inch plates as in the KA class locomotive rather 0.75 plates, and the link guidances were fragile, thin and insufficient in number. The KA tenders specified by the class designer, NZR Chief Mechanical Engineer, Angus would have had the same 14-ton axle load as the G locomotive. To save 2000 pounds of weight on each G class locomotive, improved light AB tenders were fitted with only 9.75-ton axle loads. The tenders were completely inadequate for water and coal requirements for fast 160km, NZR runs leading to time losing extra refuelling stops.
After their first 1941, A grade overhaul, the G class were only leakproof for top link express service for the first 4000 miles, and each locomotive was only used for 120 days in 1941-42 to allow their express trial to be in top link condition which was only possible for each G locomotive for approximately, 20 return runs Christchurch-Arthur's Pass or Christchurch to Timaru. [19]
While the G class were partly redesigned with express work in mind, they were incapable of the sustained 60-65mph running on the 160km northbound Timaru-Christchurch run, recovering time on heavy fast expresses over the Canterbury plains. As a result, no G class were used on express passenger trains from 1942 onwards. [19] The G class continued to be used on regular Christchurch-Timaru express freight and stopping freight services until 1955, [20] and were often employed on regional stopping passenger trains, such as Christchurch - Burnham and Christchurch- Springfield trains. [21]
Although powerful, the G class had a low adhesive factor and had issues notably with steam blows created by excessive movement of the thin plate frames. [22] The steam leaks were of particular concern to the Engine drivers, Firemen and Cleaners' Association (EFCA), as was the lack of power-reversing gear, the latter being remediated in 1941 when Ragonnet power-reversing gear was installed. Although said to run well if kept in good repair, the G class were highly unpopular and the EFCA resolved that the class could not be used in regular service after 31 March 1956 due to visibility concerns created by the steam blows. [6]
In 1954, with the locomotives requiring substantial work, and complaints from the EFCA mounting, NZR decided to stop overhauls of the locomotives. [23]
The decision was made to retire the now badly worn-out G-class locomotives after reaching a certain mileage. Both G 96 and G 97 were withdrawn in November 1955, [23] as having reached their allotted mileage. The EFCA then placed a ban on operating the G-class locomotives in March 1956. [24] As a result, the remaining four locomotives remained in service but saw little use until the end of May 1956, when they were officially withdrawn. [24] Despite their deteriorating condition, owing to the lack of available replacement locomotives, the G class did see some further use, with the final service hauled by G 100 operating on 10 May 1956. [25] By 31 March 1957 it was reported that the G class had been supplanted by five JA class locomotives reallocated from Otago to make up for their withdrawal. [25]
The locomotives were then stored on "rotten row" at Linwood locomotive depot. [26] The G class locomotives were not scrapped straight away but remained at Linwood locomotive depot in Christchurch until the early 1960s when they were broken up for scrap. [27] Three of their tenders were used for WAB class tank locomotives being converted to AB class tender locomotives, with the other three G class tenders being used for AB class locomotives. [28] Other components, such as the steam injectors, were also removed from the locomotives for reuse on other locomotives. [26] Boilers from the locomotives were reused as stationary boilers for generating steam, the last being in use at Whanganui's Easttown Workshops in the 1980s. [28] One of these boilers was acquired by Tony Batchelor and transferred to the Mainline Steam Heritage Trust's Parnell, Auckland depot as a spare for AB 663. It was later scrapped in 2018 when the Trust relocated from the Parnell depot. [28]
Under the Whyte notation for the classification of steam locomotives, 4-8-4 represents the wheel arrangement of four leading wheels on two axles, eight powered and coupled driving wheels on four axles and four trailing wheels on two axles. The type was first used by the Northern Pacific Railway, and initially named the Northern Pacific, but railfans and railroad employees have shortened the name since its introduction. It is most-commonly known as a Northern.
The New Zealand F class was the first important class of steam locomotive built to operate on New Zealand's railway network after the national gauge of 3 ft 6 in was adopted. The first locomotives built for the new gauge railways were two E class double Fairlies for the Dunedin and Port Chalmers Railway Company. The F class was the first class ordered by the central government, and between 1872 and 1888, a total of eighty-eight members of the class were constructed.
The NZR A class were a class of steam locomotives built in 1906 with a 4-6-2 wheel arrangement for the New Zealand Railways Department (NZR). The class should not be confused with the older and more obscure A class of 1873. They were designed by the NZR's Chief Mechanical Engineer, A. L. Beattie and his Chief Draughtsman, G. A. Pearson to replace less powerful locomotives struggling with increasing loads on the South Island Main Trunk Railway, and in anticipation of the traffic volumes that would be created upon the completion of the North Island Main Trunk railway.
The NZR AB class was a class of 4-6-2 Pacific tender steam locomotive that operated on New Zealand's national railway system for New Zealand Railways (NZR). Originally an improvement on the 1906 A class, 141 were built between 1915 and 1927 by NZR's Addington Workshops, A & G Price of Thames, New Zealand, and North British Locomotive Company, making the AB class the largest class of steam locomotives ever to run in New Zealand. An additional eleven were rebuilt from the tank version of the AB – the WAB class – between 1947 and 1957. Two North British-made locomotives were lost in the wreck of the SS Wiltshire in May 1922.
Locomotives of New Zealand is a complete list of all locomotive classes that operate or have operated in New Zealand's railway network. It does not include locomotives used on bush tramways.
The New Zealand DJ class locomotive is a type of diesel-electric locomotive in service on the New Zealand rail network. The class were built by Mitsubishi Heavy Industries and introduced from 1968 to 1969 for the New Zealand Railways Department (NZR) with a modernisation loan from the World Bank to replace steam locomotives in the South Island, where all of the class members worked most of their lives. Nine of the locomotives remain in use, mainly with Dunedin Railways.
The New Zealand E class locomotive comprised a single Mallet steam locomotive operated by New Zealand Railways (NZR) from 1906 until 1917. Classified as E 66 and nicknamed Pearson's Dream after its designer, it was an experimental Mallet locomotive designed to work on the Rimutaka Incline. The "E" classification was previously used by the Double Fairlie E class of 1872-75, but the classification was free as they had all been withdrawn by the time E 66 entered service. After the withdrawal of E 66, "E" was again re-used on the battery-electric E class of 1922. It was the only Mallet locomotive to operate for the NZR
The NZR B class of 1899 was a class of steam locomotives that operated on New Zealand's national rail network. An earlier B class of Double Fairlies had entered service in 1874, but as they had departed from the ownership of the New Zealand Railways (NZR) by the end of 1896, the B classification was free to be re-used. Despite early difficulties, they were amongst NZR's most influential designs.
The NZR C class consisted of twenty-four steam locomotives built to perform shunting duties on New Zealand's national rail network. It is sometimes known as the big C class to differentiate it from the C class of 1873.
Under the Whyte notation for the classification of steam locomotives by wheel arrangement, a 4-6-2+2-6-4 is a Garratt or Union Garratt articulated locomotive using a pair of 4-6-2 engine units back to back, with the boiler and cab suspended between them. The 4-6-2 wheel arrangement of each engine unit has four leading wheels on two axles, usually in a leading bogie, six powered and coupled driving wheels on three axles, and two trailing wheels on one axle, usually in a trailing truck.
The New Zealand Railways Department, NZR or NZGR and often known as the "Railways", was a government department charged with owning and maintaining New Zealand's railway infrastructure and operating the railway system. The Department was created in 1880 and was corporatised on 1 April 1982 into the New Zealand Railways Corporation. Originally, railway construction and operation took place under the auspices of the former provincial governments and some private railways, before all of the provincial operations came under the central Public Works Department. The role of operating the rail network was subsequently separated from that of the network's construction. From 1895 to 1993 there was a responsible Minister, the Minister of Railways. He was often also the Minister of Public Works.
The NZR JA class was a class of fifty-one 4-8-2 steam locomotives operated by the New Zealand Railways Department (NZR). The locomotives were built in two batches; the first batch was constructed in-home at the Hillside Workshops at Dunedin between 1946 and 1956, while the second batch was produced by the North British Locomotive Company (NBL) of Glasgow, Scotland in 1951. To differentiate between the two batches, the locomotives were identified by their builder.
The NZR K class of 1932 was a class of mixed traffic 4-8-4 steam locomotives built by the New Zealand Railways Department (NZR) that operated on New Zealand's railway network. The locomotives were developed following the failure of the G class Garratt locomotives. The class should not be confused with the much earlier K class of 1877-78, the first American-built engines to arrive in New Zealand.
The NZR KA class of 1939 was a class of mixed traffic 4-8-4 steam locomotives that operated on New Zealand's railway network. They were built after the success of the K class to meet the increasing traffic demands of the New Zealand Railways Department. The locomotives first appeared with distinctive streamlining, mainly to hide their ACFI feedwater heater systems.
The Midland line is a 212 km section of railway between Rolleston and Greymouth in the South Island of New Zealand. The line features five major bridges, five viaducts and 17 tunnels, the longest of which is the Otira tunnel. It is the route of the popular TranzAlpine passenger train.
The New Zealand DX class locomotive is a type of 49 Co-Co diesel-electric locomotives that currently operate on New Zealand's national railway network. All locomotives are owned by KiwiRail.
The New Zealand DA class locomotive were a class of diesel-electric mainline locomotives operated on the New Zealand railway system between 1955 and 1989. Consisting of 146 locomotives, it was the most numerous class to ever operate in New Zealand, with five more than the AB class steam locomotive.
The NZR J class was a class of forty 4-8-2 steam locomotives operated by the New Zealand Railways Department (NZR). Although designed to work on the lighter secondary lines, the class was frequently used on mainline express passenger trains as well as freight. When first introduced, the class boasted distinctive streamlining, which was later removed from 1947 onwards for maintenance reasons. Three of this class remained in service until the end of steam operation on 26 October 1971, when they were withdrawn and entered into preservation. This class should not be confused with the earlier J class from 1874.
The South Island Limited was a passenger express train operated by the New Zealand Railways Department (NZR) between 1949 and 1970. It operated over the almost 590 kilometres (370 mi) route between Christchurch and Invercargill. It was replaced by the Southerner.
The New Plymouth Express was a passenger express train operated by the New Zealand Railways Department (NZR) between Wellington and New Plymouth. It ran from 1886 until 1955 and was sometimes known as the New Plymouth Mail due to the Railway Travelling Post Office carriages included in its consist. The Express was notable amongst NZR's provincial expresses as being both the first and, until the commencement of the Gisborne Express in 1942, the longest in distance travelled.
{{cite book}}
: CS1 maint: date and year (link)