NZR KA class | |||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| |||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||
|
The NZR KA class of 1939 was a class of mixed traffic 4-8-4 steam locomotives that operated on New Zealand's railway network. They were built after the success of the K class to meet the increasing traffic demands of the New Zealand Railways Department. The locomotives first appeared with distinctive streamlining, mainly to hide their ACFI feedwater heater systems.
Following the success of the K class, there was a need for more similar locomotives in the North Island. The new locomotives incorporated a number of improvements, including a re-designed plate frame to eliminate the cracking issues the K class were experiencing; roller bearings on all wheels; hydrostatic lubrication throughout; and the inclusion of the ACFI feedwater heater system as pioneered by K 919. [1] As the ACFI equipment was criticised for its aesthetic appearance, it was obscured with shrouding fitted to both the KA class and contemporary KB class. [2]
Building of the locomotives commenced in 1939, just prior to the Second World War. Main construction and assembly took place at Hutt Workshops. Hillside Workshops largely constructed - but did not assemble - ten of the class (No.'s 940-944, 960-964) and built a further five KA boilers. The primary reason why the ten KAs were not assembled at Hillside was that there was no way of transporting complete locomotives between the North and South Islands at the time (the first inter-island rail ferry did not commence until 1962). Vulcan Foundry of the United Kingdom supplied parts for fifteen locomotives, including most chassis components, tender bogies, and boiler foundation rings. The General Casting Corporation of Pennsylvania, United States supplied trailing bogie and rear end framing. A company in Auckland also constructed up to 10 tenders for the class. While the imported components were intended for specific locomotives (and in some cases were stamped for the locomotives they were intended for) in practice, and due to wartime pressures, the imported components were used indiscriminately for any KA locomotives in the programme.
Nineteen locomotives were built between 1939 and 1941, but wartime circumstances meant construction of the remaining sixteen lasted from 1941 to 1950, a period much longer than NZR management anticipated. The first of the locomotives to be completed was KA 945. All but two members of the class were constructed by 1946. The final pair, numbers 958 and 959, differed somewhat from the rest of their class due to being fitted with the Baker valve gear instead of the Walschaerts valve gear fitted to all other members, and were oil burners from new. Like some of the other later KAs, they were not built with shrouding, although the front shrouding and many front-end components had been built for KA 959 for display at an exhibition. These were ultimately used on KA 939.
The KA class was solely based in the North Island, and upon entering service, the first members were placed on heavy freight and express passenger service. They saw extensive use on these tasks during wartime. The shrouding, while cleaning up the appearance of the locomotives, was open at the top and began gathering soot and dust that affected the working environment in the cab. After the war, a coal shortage also occurred and NZR decided to convert a large number of locomotives to oil burning. The KA class were a prime candidate due to the large size of the grate. Conversion to oil-burning occurred from 1947 and 1953, with nineteen of the class done at Otahuhu Workshops and sixteen at Hutt. The conversion coincided with the removal of the shrouding, and also the replacement of the ACFI feedwater system with an exhaust steam injector. Due to coal shortages, the locomotives were eventually all converted to oil firing between 1947 and 1950. As a result, the locomotives were able to obtain faster speeds, with speeds up to 121 kilometres per hour (75 mph) recorded. [1]
The locomotives became a mainstay of the North Island motive power fleet and were primarily seen on the North Island Main Trunk Railway, operating the overnight Express and Night Limited from 1940. When the North Island JA entered service in 1952 they took over the Express and Limited on the Taumaranui - Auckland section, but the KA continued to be used on the Paekakariki - Taumaranui section of the Limited and Express, until displaced by DA class diesel locomotives between 1963 and 1965. On the last day of the steam power on the Limited, in April 1963 and the Express in February 1965, KA locomotives, worked the train right through to Auckland. [3]
The last two KA were completed in 1950, and used Baker valve gear fitted to the NZR J and JA classes. KA 958 and KA 959 were regulars on the Limited in the 1950s and early 1960s out of Paekakariki to Taihape. The Baker valve gear altered their performance characteristics making them quite free running on passenger train duties, but less effective and powerful on freight trains compared to the rest of the class. KA locomotives also worked other lines, such as the Palmerston North - Gisborne Line as far as Napier and the Stratford–Okahukura Line. KA locomotives usually pulled the Rotorua express between Hamilton and Rotorua until it was replaced by railcars in 1959 and were used on relief expresses to New Plymouth and Napier until 1965. In the last period of KA use between 1959-1967, their freight use was mainly as bankers in the King Country and the steep banks on the Wanganui and Rotorua lines, as well as mixed trains in the King Country. They remained important for passenger use because of their superior performance in the Central North Island and the fact until 1958-59 and the introduction of real air competition with turboprop Friendships and Viscounts the Overnight Express, [4] Limited and summer Daylight limited, were the main public transport between Wellington and Auckland.
The Daylight Limited offered a 13.45-hour service over the 425 miles (about 14.25 hours for a Limited, [5] or 16 hours for an Express Mail train) in steam days and sometimes ran the Daylight Limited as fast as 13.32 hours, with running time of only 11.21 hours and sustained speeds of 68/69 mph in the Shannon-Linton area. [6] The southern section of the NIMT from Otaki to Marton junction is almost as easy graded and fast as most of the Main North Line. The North Island JA were the usual power for the Daylight on the Taumaranui- Auckland section and while often at a mile a minute the Northern section of the NIMT did not offer the possibility for running faster than 60 mph. The KA class had higher fuel consumption and repair issues than the JA class.
At one stage, KA 944 was sent to the South Island for an overhaul at Hillside Workshops and for subsequent use on the Midland Line along with the KB class.
One member of the class, KA 949, was wrecked in the Tangiwai disaster on 24 December 1953, New Zealand's worst rail disaster. Although recovered from the Whangaehu River and taken to Hutt Workshops, it was never repaired and officially written off in 1955 as it was damaged beyond repair. Although KA 949 was ultimately scrapped, the NZR recovered quite a number of components from it and re-used these on other locomotives as the need arose.
Another member of the class, KA 951, was wrecked after being swept into the flooded Manawatū Gorge by a landslide. Both driver and fireman were killed. [7] The engine was winched out in sections days later.
With the commencement of mainline dieselisation in 1954, the class was slowly displaced from front line service, especially as the DA class was progressively introduced to service from 1955. Withdrawals began in 1964. The last locomotive in revenue service, KA 935, ran in 1967. KA 942 was held for a time at Hutt Workshops for possible use as a stationary boiler, but this did not proceed.
Three of the KA class have been preserved:
KA 935 was preserved by the Wellington Branch of the New Zealand Railway & Locomotive Society in 1967, and was initially stored at the Waikato Railway Museum in Te Awamutu until the site at Seaview, Lower Hutt where a railway was being established. Later KA 935 moved along with the rest of the collection to the new site at the Silver Stream Railway in 1984, being moved there in steam behind a diesel towing the rest of the items. Since that time KA 935 has remained at Silverstream and is currently out of service awaiting a 10-year overhaul. Due to the short nature of the Silver Stream Railway, 935 has been converted from superheating to a saturated state by removal of the superheater elements.
KA 942 was preserved by Ian Welch in 1972, after having been laid up at Hutt Workshops as a possible addition to three K class locomotives being used as a stationary boiler supply. It was moved to Steam Incorporated and some limited work was done on restoring it and by the mid-1980s it had been moved to Otaki for open-air storage. In 1989 it was moved to the Glenbrook Vintage Railway where it was restored to working order, and mainline certified - first running from 1990, wearing its former streamline shrouding, being used on an excursion in the South Island in 1992. [8] Initially based out of the Mainline Steam Heritage Trust's Parnell depot, it alternated between Parnell and Christchurch before being moved to Wellington in 2001 so that a comprehensive 10-year overhaul could be conducted. KA 942 returned to service in 2008.
KA 945 was preserved by Wellington businessman Len Southward, creator of the Southward Car Museum. Southward purchased the locomotive in 1968 and had the locomotive stored in Taumaranui at first, with the intention of displaying it at the car museum. [9] Other projects demanded most of Southward's time, so in 1973 he approached Steam Incorporated to see if they could house the locomotive at their facility in Paekakariki. [9] Later, in 1981, he gifted KA 945 to Steam Incorporated, and they began overhauling it to working order. [10] In late 1984, the pace of work accelerated to have it ready in time for the return of steam to the mainline in 1985, a goal which was achieved. [11] It then pulled the North Island Main Trunk Centennial in 1985 with Glenbrook Vingate Railway's JA 1250 "Diana". In the 10 years that followed KA 945 ran numerous excursions all over the country, including the Crunchie Train Tour of 1993. In 1995 it was withdrawn for overhaul and due to a number of constraints, it was not until 2014 that work on this locomotive could begin. The locomotive is currently undergoing a thorough overhaul back to mainline standard.
Railway preservation in New Zealand is the preservation of historically significant facets of New Zealand's rail transport history. The earliest recorded preservation attempt took place in 1925, although the movement itself did not start properly until 1960.
The NZR AB class was a class of 4-6-2 Pacific tender steam locomotive that operated on New Zealand's national railway system for New Zealand Railways (NZR). Originally an improvement on the 1906 A class, 141 were built between 1915 and 1927 by NZR's Addington Workshops, A & G Price of Thames, New Zealand, and North British Locomotive Company, making the AB class the largest class of steam locomotives ever to run in New Zealand. An additional eleven were rebuilt from the tank version of the AB – the WAB class – between 1947 and 1957. Two North British-made locomotives were lost in the wreck of the SS Wiltshire in May 1922.
The New Zealand DJ class locomotive is a type of diesel-electric locomotive in service on the New Zealand rail network. The class were built by Mitsubishi Heavy Industries and introduced from 1968 to 1969 for the New Zealand Railways Department (NZR) with a modernisation loan from the World Bank to replace steam locomotives in the South Island, where all of the class members worked most of their lives. Nine of the locomotives remain in use, mainly with Dunedin Railways.
The NZR C class consisted of twenty-four steam locomotives built to perform shunting duties on New Zealand's national rail network. It is sometimes known as the big C class to differentiate it from the C class of 1873.
The New Zealand Railways Department, NZR or NZGR and often known as the "Railways", was a government department charged with owning and maintaining New Zealand's railway infrastructure and operating the railway system. The Department was created in 1880 and was corporatised on 1 April 1982 into the New Zealand Railways Corporation. Originally, railway construction and operation took place under the auspices of the former provincial governments and some private railways, before all of the provincial operations came under the central Public Works Department. The role of operating the rail network was subsequently separated from that of the network's construction. From 1895 to 1993 there was a responsible Minister, the Minister of Railways. He was often also the Minister of Public Works.
The Glenbrook Vintage Railway (GVR) is a heritage steam railway in Glenbrook, New Zealand.
The NZR JA class was a class of fifty-one 4-8-2 steam locomotives operated by the New Zealand Railways Department (NZR). The locomotives were built in two batches; the first batch was constructed at the Hillside Workshops at Dunedin between 1946 and 1956, while the second batch was constructed by the North British Locomotive Company (NBL) of Glasgow, Scotland in 1951. To differentiate between the two batches, the locomotives were identified by their builder.
The New Zealand EW class locomotive was a type of electric locomotive used in Wellington, New Zealand. The classification "EW" was due to their being electric locomotives allocated to Wellington. For two decades until the advent of the DX class they were the most powerful locomotives in New Zealand.
The NZR K class of 1932 was a class of mixed traffic 4-8-4 steam locomotives built by the New Zealand Railways Department (NZR) that operated on New Zealand's railway network. The locomotives were developed following the failure of the G class Garratt locomotives. The class should not be confused with the much earlier K class of 1877-78, the first American-built engines to arrive in New Zealand.
The NZR G class was a type of Garratt locomotives used in New Zealand, later rebuilt as Pacific type locomotives. They were the only Garratt type steam locomotives ever used by the New Zealand Railways (NZR). They were ordered to deal with traffic growth over the heavy gradients of the North Island Main Trunk (NIMT) and to do away with the use of banking engines on steep grades. They were one of the few Garratt designs to employ six cylinders. A mechanical stoker was used to feed coal into the locomotive. The locomotives lasted longer in rebuilt form as standard Pacific locomotives than they did as Garratts, but their numerous mechanical issues lead to their final withdrawal following a union ban on their use in 1956.
The New Zealand DA class locomotive is a class of diesel-electric mainline locomotives operated on the New Zealand railway system between 1955 and 1989. Consisting of 146 locomotives, it is the most numerous class to ever operate in New Zealand, with five more than the AB class steam locomotive.
The NZR J class was a class of forty 4-8-2 steam locomotives operated by the New Zealand Railways Department (NZR). Although designed to work on the lighter secondary lines, the class was frequently used on mainline express passenger trains as well as freight. When first introduced, the class boasted distinctive streamlining, which was later removed from 1947 onwards for maintenance reasons. Three of this class remained in service until the end of steam operation on 26 October 1971, when they were withdrawn and entered into preservation. This class should not be confused with the earlier J class from 1874.
The New Zealand DB class and DBR class locomotive is a type of diesel-electric locomotive built for service on New Zealand's rail network. They were built by General Motors Diesel (GMD) of Canada as a narrow-gauge version of the EMD G8 model, with seventeen locomotives constructed. Ten of these were later rebuilt into the DBR class.
The NZR WF class were steam locomotives designed, built and used by New Zealand Railways (NZR). Their wheel arrangement is described by the Whyte notation 2-6-4T and the first members of the class entered service in 1904. The locomotives were tank engines designed by the Railways Department's Chief Mechanical Engineer A. L. Beattie, and were mainly built for suburban duties such as those between Christchurch and Lyttelton. They also saw main-line service in the Taranaki region, but most of the class members were assigned to branch line and local services throughout the country. Two were experimentally converted to oil burners in 1909-1910. The tests were satisfactory, but as coal was much cheaper than oil at the time, no further conversions took place.
The NZR KB class of 1939 was a class of six mixed traffic steam locomotives built for New Zealand Railways Department (NZR), that operated on New Zealand's railway network. After the success of the K class, the KB class were built to meet the increasing traffic demands on the Midland Line in the South Island. The locomotives had a wheel arrangement of 4-8-4 and first appeared with distinctive streamlining, mainly to hide their ACFI feedwater systems.
The NZR RM class Standard railcars were a class of railcar operated by the New Zealand Railways Department (NZR) in the North Island of New Zealand. Officially classified as RM like all other railcar classes in New Zealand, they acquired the designation of "Standard" to differentiate them from other railcar classes. They were introduced in 1938 and withdrawn in 1972.
The New Zealand DSC class locomotive is a heavy shunting locomotive used throughout New Zealand. The class was built in seven batches, the first 18 locomotives being built by British Thomson-Houston of the United Kingdom, with the further 52 locomotives being built by New Zealand Railways (NZR).
Steam Incorporated, often abbreviated to Steam Inc., is a railway heritage and preservation society based at the Paekākāriki railway station, Paekākāriki at the southern end of the Kāpiti Coast, approximately 50 minutes north of Wellington on the west coast of New Zealand's North Island. Unlike some societies who operate on preserved sections of closed branch lines, Steam Incorporated owns a depot beside one of the country's most important railway lines, the North Island Main Trunk railway, and restores heritage locomotives and rolling stock for use on excursions on the regular national rail network.
The NZR ED class locomotive was a type of electric locomotive used in Wellington, New Zealand. They were built by English Electric and the New Zealand Railways Department (NZR) between 1938 and 1940, and hauled mainly passenger trains on the Wellington region's 1500 V DC electrification, and banked freight trains on the steep section between Paekākāriki and Pukerua Bay.
The NZR WW class was a class of 4-6-4T tank locomotives that operated on the New Zealand national railway network. They were built for New Zealand Railways Department (NZR), and were the final development of the six-coupled tank engine in New Zealand, the penultimate class of tank locomotives to be built for NZR, and the first class of tank locomotives to be built with superheaters.