Pothireddypadu Reservoir

Last updated

Velgodu Balancing Reservoir
India Andhra Pradesh relief map.svg
Red pog.svg
Velgodu Balancing Reservoir
Location Velgode, Nandyal district
Coordinates 15°43′28″N78°35′33″E / 15.72444°N 78.59250°E / 15.72444; 78.59250
Type Reservoir
Primary inflows canal from Srisailam reservoir
Primary outflows Galeru river
Catchment area Penna River
Basin  countriesIndia

Velugodu Reservoir is a balancing reservoir and located across the Galeru river, a tributary of Kundu River in Penner River basin, at Velugodu town in Nandyal district of Andhra Pradesh. [1] [2] [3] This reservoir is part of Telugu Ganga project and mainly fed by gravity canal from back waters of Srisailam Dam through Pothireddypadu head / flow regulator located across the feeder canal. Velugodu Reservoir has gross storage capacity of 16.95Tmcft at 265 m MSL full reservoir level.

This feeder canal called Srisailam right main canal (SRMC) also supplies water to Chennai city drinking water, Srisailam Right Bank Canal, K. C. Canal and Galeru Nagari Canal in addition to divert the Krishna river flood water to Penna river for storage in Somasila and Kandaleru reservoirs situated in Nellore district. The maximum flow capacity of the canal is 44,000 cusecs at full supply level of 267.92 metres (879 ft) MSL [4] [5] The sill/crest level of the SRMC at its starting point or Pothireddypadu head regulator is 848 feet (258 m) MSL.

As the canal water flow by gravity is not satisfactory when the Srisailam reservoir water level is below 264 metres (866 ft), a pump house to transfer 33,000 cusecs into the canal from the 830 feet (253 m) water level of the Srisailam reservoir is taken up on urgent basis.

Telangana and Andhra Pradesh issues

Telangana govt claims that Pothireddypadu head regulator, which has approval for 1500 cusecs originally, was modified over the years illegally in united Andhra Pradesh to increase the capacity to 80,000cusecs. Telangana state claims that Srisailam project is not an irrigation project and was designed for electricity generation; there are allocations of only 15TMC for Chennai drinking water to be taken thru Pothireddypadu; but in year 2020, Andhra Pradesh(AP) govt diverted 179TMC of water from Krishna river to Rayalaseema region of AP which is in Penna basin. Also Telangana govt complains that AP govt is planning to increase lift the water from 800ft level(currently it can take water only if water level is 840ft or higher) with which AP can divert even more water in future. [6] Grievances over irrigation water was one of the main reasons for Telangana movement which led to carving out Telangana state from Andhra Pradesh in 2014.

Related Research Articles

<span class="mw-page-title-main">Nagarjuna Sagar Dam</span> Dam in Andhra Pradesh & Nalgonda district, Telangana

Nagarjuna Sagar Dam is a masonry dam across the Krishna River at Nagarjuna Sagar which straddles the border between Palnadu district in Andhra Pradesh and Nalgonda district in Telangana. The dam provides irrigation water to the districts of Krishna, Guntur, Palnadu, Prakasam and parts of West Godavari districts of Andhra Pradesh and also Nalgonda, Suryapet, Khammam, Bhadradri Kothagudem districts of Telangana. It is also a source of electricity generation for the national grid.

<span class="mw-page-title-main">Srisailam Dam</span> Dam in Andhra Pradesh and Telangana, India

The Srisailam Dam is constructed across the Krishna River in Nandyal district, Andhra Pradesh and Nagarkurnool district, Telangana near Srisailam temple town and is the 2nd largest capacity working hydroelectric station in India.

<span class="mw-page-title-main">Budameru Rivulet</span> River

Budameru is a rivulet in NTR district which originates in the hills surrounding Mylavaram and empties itself into Kolleru Lake. Budameru is also known as The Sorrow of Vijayawada. In order to control the floods, the rivulet was controlled with the Velagaleru Regulator at Velagaleru village and a diversion channel named, Budameru Diversion Channel (BDC) was constructed from Velagaleru to join Krishna River upstream of Prakasam Barrage.

Velugodu is a village and capital of Velugodu mandal in Nandyal district, Andhra Pradesh, India.

The Kundu River also known as Kunderu, Kumudvathi is a tributary of the Penna River in the Rayalaseema region of Andhra Pradesh, India. Originating as a spring near the village of Uppalapadu in Orvakal Mandal of Kurnool District, it goes through many changes before merging with the Penna at kamalapuram of Kadapa District. It is known for frequent floods that bring heavy damage to the Nandyal and Koilkuntla areas, and hence it is popularly called the "Sorrow of Nandyal." But nowadays Nandyal town became a big town with huge population so that the drainage water is discharged to the Kundu river without prior treatment. Industrialists focused their vision at more and more profits and they polluted the river to the maximum extent. The villagers who are living at down flow of the river from Nandyala are suffering with different skin diseases. The pollution impacts even animals health too. In ancient times this river was known as the Kumudvathi. There is a saying in Rayalaseema that whoever drinks the water of the Kundu will gain enormous courage to face enemies. The valley of the Kundu is known as Renadu and is symbolic of the term "Renati Pourusham."

<span class="mw-page-title-main">Polavaram Project</span> Dam in Eluru district, Andhra Pradesh, India

The Polavaram Project is an under construction multi-purpose irrigation project on the Godavari River in the Eluru District and East Godavari District in Andhra Pradesh. The project has been accorded National project status by the Central Government of India. Its reservoir back water spreads up to the Dummugudem Anicut and approx 115 km on Sabari River side. Thus back water spreads into parts of Chhattisgarh and Odisha States. It gives major boost to tourism sector in Godavari Districts as the reservoir covers the famous Papikonda National Park, Polavaram hydro electric project (HEP) and National Waterway 4 are under construction on left side of the river. It is located 40 km to the upstream of Sir Arthur Cotton Barrage in Rajamahendravaram City and 25 km from Rajahmundry Airport.

The Pranahita Chevella Lift Irrigation Project is a lift irrigation project to harness the water of Pranahita tributary of Godavari River for use in the Telangana state of India. The river water diversion barrage across the Pranahita River is located at Thammidihatti village in Komaram Bheem district of Telangana. This lift canal is an inter river basin transfer link by feeding Godavari River water to Krishna River basin. The chief ministers of Telangana and Maharashtra states reached an agreement in 2016 to limit the full reservoir level (FRL) of the barrage at 148 m msl with 1.85 tmcft storage capacity. In the year 2016, this project is divided into two parts. The scheme with diversion canal from the Thammmidihatti barrage to connect to existing Yellampalli reservoir across the Godavari River is presently called Pranahita barrage lift irrigation project. This scheme is confined to providing irrigation facility to nearly 2,00,000 acres in Adilabad district using 44 tmcft water.

The Pulichintala Project is a multi-purpose water management project for irrigation, hydropower generation, and flood control in the state of Andhra Pradesh, India. It is a crucial irrigation facility for farmers in four coastal districts: West Godavari, Krishna, Guntur, Palanadu, and Prakasam, covering over 13 lakh acres. It has 24 gates and a balancing reservoir with a capacity of 46 Tmcft at 175 feet (53 m) MSL full reservoir level (FRL).

<span class="mw-page-title-main">Rajiv Dummugudem Lift Irrigation Scheme</span>

Rajiv Dummugudem Lift Irrigation Scheme is a lift irrigation scheme under execution which are located near Dummugudem, Khammam district in Telangana, India. There are three lift irrigation schemes by names Rajiv Dummugudem lift irrigation scheme, Indirasagar Rudrammakota Dummugudem lift irrigation scheme and Dummugudem to Sagar tail pond canal project. Rajiv Dummugudem lift irrigation scheme starting at 17°54′05″N80°52′45″E is planned to supply irrigation water for 200,000 acres in Khammam and Warangal districts drawing Godavari River water from the Dummugudem pond. Indira Dummugudem lift irrigation scheme starting at 17°33′49″N81°14′49″E is planned to supply irrigation water for 200,000 acres in Khammam, Krishna and West Godavari districts drawing Godavari River water from the back waters of Polavaram reservoir.

<span class="mw-page-title-main">Galeru Nagari Sujala Sravanthi Project</span> Dam in Srisailam dam right main canal - Bhanakacherla

Galeru Nagari Sujala Sravanthi Project or GNSS project is an irrigation project in Kadapa and Chitoor districts of Andhra Pradesh.

<span class="mw-page-title-main">Tungabhadra Dam</span> Dam in Karnataka, India

The Tungabhadra Dam, also known as Pampa Sagar, is a water reservoir constructed across the Tungabhadra River in the Hosapete-Koppal confluence in Karnataka, India. It is a multipurpose dam serving irrigation, electricity generation, flood control, etc. for the state. It is India's largest stone masonry dam and one of the only two non-cement dams in the country, the other being the Mullaperiyar Dam in Kerala. The dam is built of surki mortar, a combination of mud and limestone, commonly used at the time of its construction.

Handri-Neeva Sujala Sravanthi project is the longest water canal project in the region of Rayalaseema, Andhra Pradesh, India. The project was conceived to provide a reliable irrigation and drinking water supply for the region through drawing flood waters from the Srisailam reservoir.

<span class="mw-page-title-main">R. Vidyasagar Rao Dindi Lift Irrigation Scheme</span> Dam in Telangana, India

R. Vidyasagar Rao Dindi Lift Irrigation Scheme is a lift irrigation project in Nalgonda, Telangana, India. It serves Nalgonda, Mahbubnagar and Khammam areas. It was named after R. Vidyasagar Rao, a foremost irrigation expert in Telangana.

<span class="mw-page-title-main">K. C. Canal</span>

Kurnool Cuddappah Canal popularly known as K.C. Canal is an irrigation canal located in Kurnool and Kadapa districts in Andhra Pradesh, India.

<span class="mw-page-title-main">Nagarjuna Sagar tail pond</span> Reservoir in India

Nagarjuna Sagar tail pond is a multipurpose reservoir located 21 km downstream from the Nagarjuna Sagar Dam across the Krishna River near Satrasala in Nalgonda district, India. Its gross water storage capacity is 6 Tmcft. The reservoir water spread area extends up to the toe of the Nagarjuna Sagar dam. The project was completed by July 2014.


The Veligonda Project is an irrigation project located in Markapur, Prakasam district in Andhra Pradesh, India. When completed, the project will provide irrigational facilities to 447,000 acres and drinking water to 1.5 million people in 30 Mandals of fluoride and drought affected areas in Prakasam district, Nellore district and Kadapa district by diverting 43.5 TMC of floodwater from the Krishna River from foreshore of Srisailam Reservoir near Kollamvagu and proposed to store in Nallamalasagar Reservoir. The water for the project is drawn through two 18.8 km long tunnels across Nallamala hills. The project has been renamed to the "Poola Subbaiah Irrigation Project". It displaces around 20,946 families. The oustees have protested for enhanced compensation over the years and many have not received the compensation promised to them.

Poondi Reservoir or Sathyamoorthy reservoir is the reservoir across Kotralai River in Tiruvallur district of Tamil Nadu state in India. It acts as the important water source for Chennai city which is 60 km away.

<span class="mw-page-title-main">Pattiseema Lift Irrigation Project</span> Dam in Between Godavari River and Polavaram Project

Pattiseema Lift Irrigation Project is a river interlinking project which connects Godavari River to Krishna River. This project has thereby become the first of such irrigation type projects in the country to be completed in time without any budget enhancements. It also holds a record in Limca Book of Records. The project was Inaugurated by the Chief Minister of Andhra Pradesh Nara Chandrababu Naidu in March 2016 while the project was completed in one year record of time.

Vykuntapuram Barrage is an Indian barrage and water storage project. It is under construction on Krishna River 23 kilometers upstream of existing Prakasam Barrage with FRL 25M. It is designed to store 10 TMC of flood water coming from the Vyra and Munneru rivers. The backwater of this dam will extend beyond Pokkunuru to the toe of Pulichintala dam. Andhra Pradesh Chief Minister Nara chandrababu Naidu laid the foundation stone for this project on 13 February 2019.

Jogulamba Barrage is a proposed barrage across Krishna River with full pond level (FPL) 274m. It would be located at Veltoor village, Peddamandadi mandal, Wanaparthy district, Telangana, India. This barrage is proposed to divert 3 TMC of water via lift to Yedula Reservoir being built as part of Palamuru-Rangareddy Lift Irrigation Scheme. This would also provide water for Dindi Lift Irrigation Project and Mahatma Gandhi Kalwakurthy Lift Irrigation Scheme.

References

  1. "Archive News". The Hindu . 7 May 2007. Archived from the original on 9 May 2007.
  2. "Archive News". The Hindu . 28 August 2009. Archived from the original on 1 September 2009.
  3. "Archive News". The Hindu . 19 January 2007. Archived from the original on 25 January 2013.
  4. "Telugu Ganga project" . Retrieved 22 September 2015.
  5. "Seema irrigation projects see tardy progress" . Retrieved 22 March 2016.
  6. "Pothireddypadu may siphon out 80,000 cusecs per day". 6 October 2020. Retrieved 9 July 2021.