Trams in Bologna (2026) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Overview | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Locale | Bologna, Italy | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Transit type | Tram | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Number of lines | 2 under construction (as of 2024), [1] out of 4 foreseen [2] | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Number of stations | 50 (lines 1+2) [3] | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Operation | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Operation will start | 2026 [3] | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Technical | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
System length | 22.4 km (lines 1+2) [3] | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Track gauge | 1435 mm | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electrification | 700 V DC [3] | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
The Bologna tramway network (Italian : Rete tranviaria di Bologna) is a tramway network under construction in Bologna, Italy.
The reintroduction of a tram network in Bologna was foreseen by the local Piano Urbano della Mobilità Sostenibile (PUMS, Italian for Urban Sustainable Mobility Plan), adopted on 27 November 2018. [4] [2] Bologna's PUMS suggested the gradual replacement of the main urban bus and trolleybus lines by 4 tram lines: [5] [2]
On 7 March 2019, the mayor of Bologna officially announced plans to build a new citywide tramway network. [6]
As of June 2022, the tender for the executive design and construction of tramway line 1 (red line) has been awarded: the whole line is expected to be operational by 2026. [7] Funding for construction of line 2 (green line) was approved by the Italian Ministry of Infrastructure and Transport in November 2021; activation is also expected by 2026. [8] A further segment of line 2 (blue line) was announced on 11 December 2021, with completion to be expected at a later date than the first two lines. [9] Construction of the first line started on 26 April 2023, [10] [11] while construction of the second line started on 8 August 2024. [1]
As of August 2024, construction of the following tram lines is underway:
Line | Stations | Length | Opening foreseen | |
---|---|---|---|---|
1 | Borgo Panigale – Fiera/CAAB | 34 [12] | 16.5 km [12] | 2026 [12] |
2 | Via dei Mille – Corticella | 19 [13] | 7.4 km [13] | 2026 [13] |
Network | 50* | 22.4 km* | ||
* 4 stops and 1.5 km in common between lines 1 and 2. [13] |
Furthermore, the following tram lines (or sections) are in the planning stage:
Line | Stations | Length | Planning stage | |
---|---|---|---|---|
2 | Corticella – Castel Maggiore | A pre-feasibility study has been completed in January 2021 | ||
2 | Via dei Mille – Casalecchio Palasport railway station | Announced on 11 December 2021 [9] |
Line 1 will have its western terminus at Borgo Panigale Terminal, where a 400-car parking lot is planned, joined with an interchange terminal with intercity bus services. In the opposite direction there will be a double terminus, at the CAAB and at the Michelino parking lot. [3] The main attractors served by the line are Bologna Borgo Panigale railway station, the Maggiore Hospital, the city center, Bologna Centrale railway station, Bologna's Fiera District, the Pilastro district, the Faculty of Agriculture and the CAAB. [3]
Line 1 will feature 34 stops, for a total length of 16.5 km, of which 14.5 km with an overhead contact line; the 2-km tracks in the city center, from Porta San Felice to via Matteotti, won't feature any suspended power line, as the tram will be powered by batteries. [3]
The technical and economic feasibility study for the first line has been carried out by a temporary association of companies formed by Systra, Sotecni, Architecna, Studio Mattioli, Aegis and Cooperativa Archeologia. [14]
The definitive project was published on 25 November 2020. [15] The tender for the executive design and construction was launched on 6 August 2021 and closed on 1 December, receiving four bids. [16]
As of December 2021, the expected timetable is as follows: [16]
In May 2022, the tender for the executive design and construction of Line 1 was awarded to a temporary association of companies led by CMB - Cooperativa Muratori e Braccianti di Carpi and including Alstom Ferroviaria, Pavimental and Alstom Transport, for an amount of €320,517,902. [7]
Line 2 will have its southern terminus at Via dei Mille, in the city centre. In the opposite direction, the northern terminus will be at Via di Vittorio, in the municipality of Castel Maggiore, where a new parking lot and an interchange terminal for intercity bus services has been envisaged. The main attractors served by the line are Bologna Centrale railway station, the Bolognina district, the Corticella district and Bologna Corticella railway station. [13]
Line 2 will feature 19 stops, for a total length of 7.4 km, of which 4 stops and 1.5 km will be shared with Line 1. [13]
On 30 December 2020, the technical and economic feasibility study for the construction of the second tram line, the green line, was publicly presented to the Navile district mobility committee, with regard to the tram line stretch between the northern terminus (Corticella) and via dei Mille. [18] On 7 January 2021, the municipality of Castel Maggiore mandated the municipality of Bologna to submit a pre-feasibility study to the Italian Ministry of Transport for a further extension of the green line to the center of Castel Maggiore. [19] The joint request for funding, amounting to 222,142,224.26 euros, was sent to the Ministry of Infrastructure and Transport on 14 January 2021. [20]
On 3 November, the Ministry approved the full financing of the new line by Next Generation EU funds, which binds its construction by 2026. [21] [22]
Construction works started on 8 August 2024. [1]
Italy has a well developed transport infrastructure. The Italian rail network is extensive, especially in the north, and it includes a high-speed rail network that joins the major cities of Italy from Naples through northern cities such as Milan and Turin. The Florence–Rome high-speed railway was the first high-speed line opened in Europe when more than half of it opened in 1977. Italy has 2,507 people and 12.46 km2 per kilometer of rail track, giving Italy the world's 13th largest rail network. The Italian rail network is operated by state-owned Ferrovie dello Stato, while the rail tracks and infrastructure are managed by Rete Ferroviaria Italiana.
The Italian railway system is one of the most important parts of the infrastructure of Italy, with a total length of 24,567 km (15,265 mi) of which active lines are 16,832 km (10,459 mi). The network has recently grown with the construction of the new high-speed rail network. Italy is a member of the International Union of Railways (UIC). The UIC Country Code for Italy is 83.
The Rome Metro is a rapid transit system that operates in Rome, Italy. It started operation in 1955, making it the oldest in the country.
Pianoro is a town and comune in the province of Bologna in the Emilia-Romagna region of Italy, in the hills of the Tusco-Emilian Apennines, 200 metres (660 ft) above sea level.
The Catania Metro is a rapid transit system serving the coastal city of Catania, Sicily, in Southern Italy. One of Italy’s seven metro systems, it is the only one in Sicily and Europe’s southernmost system. It was also the first metro on an island in the Mediterranean Sea, and is now one of two, with the Palma Metro becoming the second in 2007, although it was only the sixth in a city on the Mediterranean, after Athens (1904), Barcelona (1924), Marseille (1977), Valencia (1988) and Naples (1993).
Bologna Guglielmo Marconi Airport is an international airport serving the city of Bologna in Italy. It is approximately 6 km (3.7 mi) northwest of the city centre in the Emilia-Romagna region of Italy. The airport is named after Bologna native Guglielmo Marconi, an Italian electrical engineer and Nobel laureate.
The Naples Metro is a rapid transit system serving the city of Naples, Campania, Italy and some parts of the adjacent comuni of its metropolitan area through Line 11. The system comprises three underground rapid transit lines.
Line 6 is a 5.5-kilometre (3.4 mi) light metro line that forms part of the Naples Metro. The four-station first part of the line opened in 2007, but was then closed from 2013 to 2024. It was reopened for service and extended to eight stations on 17 July 2024.
The Rome tramway network composed of 6 tram lines operating in the city of Rome, Italy, part of the Rome’s public transport network. The current tram system in Rome, is a leftover from what once was the largest tram system in Italy. The system is owned and operated by Azienda Tranvie e Autobus del Comune di Roma.
Rome has an extensive internal transport system and is one of the most important road, rail and air hubs in Italy.
Rimini railway station is the main station serving the city and comune of Rimini, in the region of Emilia-Romagna, northern Italy. Opened in 1861, it forms part of the Bologna–Ancona railway, and is also a terminus of the Ferrara–Rimini railway.
The Milan tramway network is part of the public transport network of Milan, Italy, operated by Azienda Trasporti Milanesi (ATM).
The Bologna trolleybus system is part of the public transport network of the city and comune of Bologna, in the region of Emilia-Romagna, northern Italy. While being in operation since 1991, the current system comprises five urban routes: 13, 14, 15, 32 and 33. Additional routes are presently under construction.
The Rimini trolleybus system forms part of the public transport network of the Province of Rimini, in the region of Emilia-Romagna, Italy.
The Florence tramway network is an important part of the public transport network of Florence, Italy. It consists of two operational light rail lines.
The Rimini–San Marino railway was a 31.5-kilometre (19.6-mile) electrified narrow-gauge railway that connected Rimini, Italy, with the City of San Marino, Republic of San Marino.
The Bologna tramway network was an important part of the public transport network of Bologna, Italy. It was established in 1880 and discontinued in 1963.
Trasporto Passeggeri Emilia-Romagna is a public company overseeing public transportation in the Metropolitan City of Bologna, in the province of Ferrara and in parts of the provinces of Modena and Ravenna, Italy.
{{cite web}}
: CS1 maint: numeric names: authors list (link)Media related to Tram transport in Bologna at Wikimedia Commons