German destroyer Z15 Erich Steinbrinck

Last updated

Paul Jakobi.jpg
Sister ship Z5 Paul Jakobi underway, c.1938
History
War ensign of Germany (1938-1945).svg Nazi Germany
NameZ15 Erich Steinbrinck
NamesakeErich Steinbrinck
Ordered9 January 1935
Builder Blohm & Voss, Hamburg
Yard numberB504
Laid down30 May 1935
Launched24 September 1936
Completed31 May 1938
Commissioned8 June 1938
FateAllocated as war reparations to Soviet Union
Naval Ensign of the Soviet Union (1950-1991).svg Soviet Union
NamePylky (Пылкий)
AcquiredNovember 1945
RenamedPK3-2
Stricken19 February 1958
FateSold for scrap, 18 April 1958, broken up
General characteristics (as built)
Class and type Type 1934A-class destroyer
Displacement
Length
  • 119 m (390 ft 5 in) (o/a)
  • 114 m (374 ft 0 in) (w/l)
Beam11.30 m (37 ft 1 in)
Draft4.23 m (13 ft 11 in)
Installed power
Propulsion2 shafts, 2 × geared steam turbines
Speed36 knots (67 km/h; 41 mph)
Range1,530  nmi (2,830 km; 1,760 mi) at 19 knots (35 km/h; 22 mph)
Complement325
Armament

Z15 Erich Steinbrinck was a Type 1934A-class destroyer built for Nazi Germany's Kriegsmarine in the mid-1930s. The ship was named after the First World War German naval officer Erich Steinbrinck. At the beginning of World War II on 1 September 1939, the ship was initially deployed to blockade the Polish coast, but she was quickly transferred to the North Sea to lay defensive minefields. In late 1939 and 1940 the ship laid multiple offensive minefields off the English coast that claimed 24 merchant ships and a destroyer. Steinbrinck was under repair for most of the Norwegian Campaign of early 1940 and was transferred to France later that year.

Contents

After a lengthy refit in Germany, she returned to France in early 1941 where she escorted returning warships, commerce raiders, and supply ships through the Bay of Biscay for several months. After her refit was completed, Steinbrinck was transferred to Northern Norway in 1942 where she participated in several minor operations before she was damaged running aground and forced to return to Germany for repairs. The ship returned to Norway in mid-1943 where she escorted German capital ships as they moved between Norway and Germany and participated in the German attack (Operation Zitronella) on the Norwegian island of Spitzbergen, well north of the Arctic Circle. Steinbrinck was ordered home in November to begin a lengthy refit, during which she was badly damaged by Allied bombs, and was unserviceable for the rest of the war. She was turned over to the Soviet Union after the war as war reparations and only served a few years before she was converted into a training ship and then a barracks ship before being sold for scrap in 1958.

Design and description

Erich Steinbrinck had an overall length of 119 meters (390 ft 5 in) and was 114 meters (374 ft) long at the waterline. The ship had a beam of 11.30 meters (37 ft 1 in), and a maximum draft of 4.23 meters (13 ft 11 in). She displaced 2,239 long tons (2,275  t ) at standard and 3,165 long tons (3,216 t) at deep load. The Wagner geared steam turbines were designed to produce 70,000 metric horsepower (51,485  kW ; 69,042  shp ) which would propel the ship at 36 knots (67  km/h ; 41  mph ). Steam was provided to the turbines by six high-pressure Benson boilers [1] with superheaters. Erich Steinbrinck carried a maximum of 752 metric tons (740 long tons) of fuel oil which was intended to give a range of 4,400 nautical miles (8,100 km; 5,100 mi) at 19 knots (35 km/h; 22 mph), but the ship proved top-heavy in service and 30% of the fuel had to be retained as ballast low in the ship. [2] The effective range proved to be only 1,530  nmi (2,830 km; 1,760 mi) at 19 knots (35 km/h; 22 mph). [3] The ship's crew consisted of 10 officers and 315 sailors. [1]

Erich Steinbrinck carried five 12.7 cm SK C/34 guns in single mounts with gun shields, two each superimposed, fore and aft. The fifth gun was carried on top of the rear deckhouse. Her anti-aircraft armament consisted of four 3.7 cm SK C/30 guns in two twin mounts abreast the rear funnel and six 2 cm C/30 guns in single mounts. The ship carried eight above-water 53.3-centimeter (21.0 in) torpedo tubes in two power-operated mounts. A pair of reload torpedoes were provided for each mount. [1] [4] Four depth charge throwers were mounted on the sides of the rear deckhouse and they were supplemented by six racks for individual depth charges on the sides of the stern. Sufficient depth charges were carried for either two or four patterns of sixteen charges each. [5] Mine rails could be fitted on the rear deck that had a maximum capacity of sixty mines. [1] 'GHG' (Gruppenhorchgerät) passive hydrophones were fitted to detect submarines and an active sonar system was installed by the end of 1940. [6]

During the war the ship's light anti-aircraft armament was augmented several times. In 1941, improved 2 cm C/38 guns replaced the original C/30 guns and three additional guns were added. The two guns on the aft shelter deck were replaced at some point by a single 2 cm quadruple Flakvierling mount, probably in 1942. Sometime in 1944–45, Steinbrinck received the "Barbara" anti-aircraft refit in which all of her existing 3.7 cm and most of her 2 cm guns were replaced. She retained her Flakvierling mount and the remainder of her anti-aircraft armament now consisted of seven twin 3.7 cm SK M/42 mounts and four twin 2 cm mounts on the forecastle and side of the bridge. [7]

Construction and career

Erich Steinbrinck, named after the commander of the torpedo boat SMS V-29 killed during the Battle of Jutland in 1916, was ordered on 19 January 1935 from Blohm & Voss. She was laid down at their shipyard in Hamburg on 30 May 1935 as yard number B504, launched on 24 September 1936 and completed on 31 May 1938. [8] She was commissioned under the command of Korvettenkapitän Rolf Johannesson, later promoted to Fregattenkapitän , who commanded her until January 1942. [9] The ship participated in the August 1938 Fleet Review as part of the 3rd Destroyer Division. She participated in the Spring fleet exercise in the western Mediterranean and made several visits to Spanish and Moroccan ports in April and May 1939. [10]

When World War II began, Erich Steinbrinck was initially deployed in the Baltic to operate against the Polish Navy and to enforce a blockade of Poland, [11] but she was soon transferred to the German Bight where she joined her sister ships in laying defensive minefields. [12] She also patrolled the Skagerrak to inspect neutral shipping for contraband goods in October. [11] On the night of 18/19 November, Steinbrinck was commander (Fregattenkapitän) Erich Bey's flagship for an offensive minelaying mission off the British coast when she led her sister ships Friedrich Eckoldt and Hans Lody [13] to the Humber Estuary that claimed seven ships of 38,710  gross register tons  (GRT), including the Polish ocean liner MS Piłsudski. [14]

On the night of 12/13 December, German destroyers sortied to lay minefields off the British coast. Under the command of Commodore ( Kommodore ) Friedrich Bonte [15] in his flagship Hermann Künne, Steinbrinck, Bruno Heinemann, Richard Beitzen, and Friedrich Ihn laid 240 mines off the mouth of the River Tyne, where the navigation lights were still lit. [16] The British were unaware of the minefield's existence and lost eleven ships totaling 18,979 GRT. [17] The destroyers were later ordered to escort the crippled light cruisers Leipzig and Nürnberg which had been torpedoed by the submarine HMS Salmon while covering the destroyers' withdrawal. Ihn and Steinbrinck had machinery problems en route and were forced to return to port before they reached the cruisers. Steinbrinck and her sisters Friedrich Eckoldt and Ihn sortied again on the night of 18 December, but the British had turned off the navigation lights off Orfordness and the German were forced to abandon the attempt because they could not locate themselves precisely enough to lay the minefield in the proper position. [18]

1940–1941

Another minefield of 170 magnetic mines was laid by Steinbrinck, Ihn and Eckoldt on the night of 6–7 January 1940 off the Thames Estuary. The destroyer HMS Grenville and six merchant ships totalling 21,617 GRT were lost to this minefield as well and another ship was damaged as well. [19] The ship was under repairs during Operation Weserübung in April and did not leave the dockyard until May when she began working up as part of the 5th Destroyer Flotilla. Her work up was cut short to escort the battleships Scharnhorst and Gneisenau, as well as the heavy cruiser Admiral Hipper participating in Operation Juno, a planned attack on Harstad, Norway, to relieve pressure on the German garrison at Narvik. The ships sortied on 8 June and sank the troop transport Orama, the oil tanker Oil Pioneer and the minesweeping trawler Juniper en route. The German commander, Admiral Wilhelm Marschall, then ordered the Admiral Hipper and all four destroyers to Trondheim because of the heavy weather, where they arrived in the morning of 9 June. The two battleships continued the sortie and sank the aircraft carrier Glorious and her two escorting destroyers, although Scharnhorst was badly damaged by a torpedo from the destroyer Acasta in the engagement. The battleship was escorted home by the destroyers Steinbrinck, Lody and Hermann Schoemann for repairs. Steinbrinck and Lody then returned to Trondheim to escort Gneisenau home, after she been torpedoed by a British submarine. [20]

The flotilla laid defensive minefields in the North Sea in August and early September before it was transferred to the Atlantic Coast of France in mid-September. Now based at Brest [21] the flotilla laid a minefield in Falmouth Bay during the night of 28/29 September. Five ships totalling only 2,026 GRT were sunk by this minefield. [22] Led by captain (Kapitän zur See) Erich Bey, Steinbrinck and four other destroyers sortied for the Southwest Approaches on 17 October and were intercepted by a British force of two light cruisers and five destroyers. The British opened fire at extreme range and were forced to disengage in the face of long-range torpedo volleys and attacks by Luftwaffe bombers without having hit any of the German ships. Steinbrinck returned home on 7 November for a refit in Stettin. [23]

Her refit was completed in late January 1941, but she was trapped by thick ice so that she could not reach Gotenhafen to work up until mid-February. [24] Steinbrinck returned to France in April where she was based at La Pallice. There she was primarily occupied with escorting returning commerce raiders, warships and supply ships through the Bay of Biscay to bases in France. These included the raider Thor on 22 April, the supply ship Nordland, and the fleet oiler Ermland in late May. The heavy cruiser Prinz Eugen was escorted to Brest in early June after separating from the battleship Bismarck during Operation Rheinübung. By the late summer, Steinbrinck was well overdue for a refit and was suffering from boiler problems but her refit was postponed to allow her to escort the raider Orion on 21 August. Her departure was delayed when she ran aground at the beginning of the next month and she did not depart for Germany until 6 September. [25] Sometime in 1941, the destroyer received a FuMO 21 [Note 1] search radar that was mounted above her bridge. [26]

1942–1943

Steinbrinck only briefly operated in northern Norway where she participated in Operation Wunderland in August, where she and her sisters Eckoldt and Beitzen escorted the pocket battleship Admiral Scheer at the beginning and end of its mission to attack Soviet shipping in the Kara Sea. They also escorted the minelayer Ulm as it departed to lay a minefield off Cape Zhelaniya in mid-August. Steinbrinck ran aground at the beginning of September and was sent home after temporary repairs were made at Trondheim. The ship returned to Norway in January 1943 where she was slightly damaged by a practice torpedo fired by the submarine U-703. In early March she escorted Scharnhorst through the Skaggerak to Trondheim in heavy weather that washed two men overboard. By mid-month, Steinbrinck was the flagship of Captain ( Kapitän zur See ), commander of the 5th Destroyer Flotilla. [27]

In September the ship participated in Operation Zitronella, ferrying troops of the 349th Grenadier Regiment to destroy Norwegian facilities on the island of Spitzbergen, together with the battleships Tirpitz and Scharnhorst, escorted by eight other destroyers. After unloading her troops, she bombarded targets on the island until her fire main broke from the shock of shooting and partially flooded one of her compartments. While successful, the operation was primarily intended to boost the morale of the ships stationed in the Arctic when fuel shortages limited their activities and the Allies reestablished the bases five weeks later. Steinbrinck and two other destroyers escorted the pocket battleship Lützow back to Germany in September and returned to Narvik. On 25 November she was ordered to return to Germany for an overhaul, but accidentally collided with a small Norwegian steamer en route later that night. The collision severely damaged her bow and she had to sail slowly to Trondheim for emergency repairs lest the forward bulkhead collapse. The ship then received temporary repairs in Oslo before departing for Germany on 18 December. [28]

1944–1945

After her refit was completed on 18 January 1944, Steinbrinck and her sister Theodor Riedel spent the first half of the year laying minefields at the entrance to the Skaggerak and escorting convoys to and from Norway. Sometime in 1944, the ship had her radar replaced by a FuMO 24 search radar and her foremast was rebuilt in a goal-post shape to allow the 6-by-2-meter (19.7 ft × 6.6 ft) antenna to fully rotate. A FuMO 63 K Hohentwiel radar replaced the searchlight on its platform abaft the rear funnel. On 3 May the ship passed through the Kiel Canal en route to Hamburg for a lengthy refit. While in the dockyard, she was struck by a bomb in the diesel generator room on 18 June. Despite the extent of the damage, the dockyard reported that her refit would be completed as scheduled on 20 November. On 4 November another bomb detonated alongside Steinbrinck and caused extensive flooding and shock damage from the explosion. The ship was patched up and towed to Wesermünde for more thorough repairs, but her completion was seriously delayed. By 1 April 1945, only a single engine was operable and the Kriegsmarine made the decision to strip her crew for combat duties ashore after she was moved to Cuxhaven. She was still there in May when the Germans surrendered. [29]

Post-war

The ship was moved to Wilhelmshaven over the summer under British control while the division of the surviving warships was decided among the victorious Allies. While this was being argued the ships were overhauled with a small maintenance crew aboard to preserve their value. The Allied Tripartite Commission allocated Steinbrinck to the Soviet Union at the end of 1945 and she sailed for Libau on 2 January 1946. [30] She was commissioned into the Soviet Navy under the name Pylky (Russian : Пылкий) and assigned to the Soviet 4th Fleet, based at Rostock, through 1948. Renamed PK3-2, she served as a barracks ship until 19 February 1958, when she was struck from the list. On 18 April 1958, she was sold for scrap and broken up afterwards. [31]

Notes

  1. Funkmess-Ortung (Radio-direction finder, active ranging)

Citations

  1. 1 2 3 4 Gröner, p. 199
  2. Whitley, p. 18
  3. Koop & Schmolke, p. 26
  4. Whitley, p. 68
  5. Whitley, p. 215
  6. Whitley, p. 72
  7. Whitley, pp. 73–74
  8. Whitley, p. 205
  9. Dörr, pp. 284–85.
  10. Whitley, p. 81
  11. 1 2 Koop & Schmolke, p. 97
  12. Rohwer, p. 2
  13. Whitley, p. 89
  14. Hervieux, p. 112
  15. Hervieux, p. 113
  16. Whitley, p. 91
  17. Rohwer, p. 11
  18. Whitley, pp. 91–92
  19. Rohwer, p. 13
  20. Rohwer, p. 26; Whitley, pp. 105–106
  21. Whitley, p. 106
  22. Hervieux, p. 115
  23. Whitley, pp. 107–110
  24. Whitley, p. 115
  25. Whitley, pp. 115–116
  26. Gröner, p. 200
  27. Whitley, pp. 142, 164–165
  28. Whitley, pp. 167–169
  29. Koop & Schmolke, p. 40; Whitley, pp. 169–170
  30. Whitley, pp. 191–192, 198, 205
  31. Patjanin, S.V. (2004). "Эсминцы типа Леберехт Мааcс. Эскадренные миноносцы серий 34, 34А, 36" [Destroyer Type "Leberecht Maass". Destroyer series 34, 34A, 36.]. Morskaya Kollektsia (in Russian) (5): 32.

Related Research Articles

German cruiser <i>Admiral Hipper</i> Lead ship of titular class of heavy cruisers

Admiral Hipper was the lead ship of the Admiral Hipper class of heavy cruisers which served with Nazi Germany's Kriegsmarine during World War II. The ship was laid down at the Blohm & Voss shipyard in Hamburg in July 1935 and launched in February 1937; Admiral Hipper entered service shortly before the outbreak of war, in April 1939. The ship was named after Admiral Franz von Hipper, commander of the German battlecruiser squadron during the Battle of Jutland in 1916 and later commander-in-chief of the German High Seas Fleet. She was armed with a main battery of eight 20.3 cm (8 in) guns and, although nominally under the 10,000-long-ton (10,160 t) limit set by the Anglo-German Naval Agreement, actually displaced over 16,000 long tons (16,260 t).

German destroyer <i>Z4 Richard Beitzen</i> Type 1934 class destroyer

The German destroyer Z4 Richard Beitzen was one of four Type 1934 destroyers built for the German Navy (Kriegsmarine) during the mid-1930s. Completed in 1937, the ship spent most of her time training although she did participate in the occupation of Memel in early 1939. At the beginning of World War II in September 1939, the ship was initially deployed to blockade the Polish coast, but was soon transferred to the Kattegat where she inspected neutral shipping for contraband goods. In late 1939 and early 1940, the ship laid two offensive minefields off the English coast that claimed 17 merchant ships. Z4 Richard Beitzen was in reserve during the Norwegian Campaign of early 1940 and was transferred to France later that year, where she made several attacks on British shipping.

Z5 Paul Jacobi was a Type 1934A destroyer built for the Kriegsmarine in the mid-1930s. The ship was being refitted when World War II began on 1 September 1939 and was tasked to inspect neutral shipping for contraband goods in the Kattegat until early 1940. She participated in the early stages of the Norwegian Campaign by transporting troops to the Trondheim area in early April 1940 and was transferred to France later that year where she made several attacks on British shipping. Paul Jacobi spent most of 1941 under repair and returned to France in early 1942 to successfully escort two German battleships and a heavy cruiser home through the English Channel. The following month, the ship helped to escort another German battleship to northern Norway and returned in May to begin another lengthy refit.

German destroyer <i>Z6 Theodor Riedel</i> Type 1934A-class destroyer

The German destroyer Z6 Theodor Riedel was a Type 1934A-class destroyer built for the Kriegsmarine during the mid-1930s. At the beginning of World War II in September 1939, the ship laid defensive minefields to the North Sea. She covered her sister ships over the next few months as they laid offensive minefields in English waters in late 1939–early 1940. She participated in the early stages of the Norwegian Campaign by transporting troops to the Trondheim area in early April 1940 and was transferred to France later that year where the ship covered another minelaying sortie before engine problems caused her to return to Germany in November for repairs. Theodor Riedel was badly damaged when she ran aground three days after her repairs were completed and was out of action until May 1942.

German destroyer <i>Z7 Hermann Schoemann</i> Type 1934A-class destroyer

Z7 Hermann Schoemann was a Type 1934A-class destroyer built for Nazi Germany's Kriegsmarine in the mid-1930s. The ship was plagued by machinery problems for most of her life and was under repair when the Second World War began in September 1939. She covered her sister ships over the next few months as they laid offensive minefields in English waters in late 1939 – early 1940. Hermann Schoemann played a minor role in the Norwegian Campaign as engine problems limited her availability throughout 1940 and for most of 1941.

Z8 Bruno Heinemann was a Type 1934A-class destroyer built for Nazi Germany's Kriegsmarine in the mid-1930s. After the start of World War II in September 1939, she blockaded the Polish coast and searched neutral shipping for contraband. In late 1939 and early 1940 the ship made three successful minelaying sorties off the English coast that claimed 17 merchant ships. Bruno Heinemann participated in the early stages of the Norwegian Campaign by transporting troops to the Trondheim area in early April 1940. The ship was transferred to France a year later to escort German ships that used the French ports on the Atlantic coast. She was returning to France in early 1942 when she struck two mines and sank off the coast of Belgium.

German destroyer <i>Z10 Hans Lody</i> Type 1934A-class destroyer

Z10 Hans Lody was a Type 1934A-class destroyer built for Nazi Germany's Kriegsmarine in the mid-1930s. At the beginning of World War II on 1 September 1939, the ship was initially deployed to blockade the Polish coast, but she was quickly transferred to the North Sea to lay defensive minefields. In late 1939 the ship laid multiple offensive minefields off the English coast that claimed nine merchant ships and she crippled a British destroyer during one of these missions.

Z14 Friedrich Ihn was a Type 1934A-class destroyer built for Nazi Germany's Kriegsmarine in the mid-1930s. The ship was named after the First World War German naval officer Friedrich Ihn. At the beginning of World War II, the ship was initially deployed to blockade the Polish coast, but she was quickly transferred to the German Bight to lay defensive minefields in German waters. In late 1939 and early 1940, the ship laid multiple offensive minefields off the English coast that claimed 18 merchant ships and a destroyer. Ihn was under repair during the Norwegian Campaign of early 1940 and was transferred to France later that year.

German destroyer Z16 <i>Friedrich Eckoldt</i> Z5-class destroyer of the Kriegsmarine

Z16 Friedrich Eckoldt was a Type 1934A-class destroyer built for Nazi Germany's Kriegsmarine in the late 1930s. It was named after Kapitänleutnant Friedrich Eckoldt (1887–1916), the commander of torpedo boat V 48, who was killed when his boat was sunk during the Battle of Jutland on 31 May 1916.

German destroyer <i>Z19 Hermann Künne</i> Type 1936-class destroyer

Z19 Hermann Künne was one of six Type 1936 destroyers built for the Kriegsmarine in the late 1930s. Completed at the beginning of 1939, the ship spent most of her time training although she did participate in the occupation of Memel a few months later. At the beginning of World War II in September, she was initially deployed to lay minefields off the German coast, but was soon transferred to the Skagerrak where she inspected neutral shipping for contraband goods. In late 1939, Z18 Hans Lüdemann helped to laid four offensive minefields off the English coast that claimed two British destroyers and thirty-eight merchant ships.

German destroyer <i>Z20 Karl Galster</i> Type 1936-class destroyer

Z20 Karl Galster was one of six Type 1936 destroyers built for the Kriegsmarine in the late 1930s. Completed in early 1939, the ship spent most of her time training. At the beginning of World War II in September, she was initially deployed to lay minefields off the German coast, but was soon transferred to the Skagerrak where she inspected neutral shipping for contraband goods. In late 1939 and early 1940, Z20 Karl Galster helped to laid three offensive minefields off the English coast that claimed one British destroyer, a fishing trawler, and twenty merchant ships. After a refit that prevented her from participating in the German invasion of Norway in April, the ship was sent to Norway for escort duties. Later that year Z20 Karl Galster was transferred to France, where she made several attacks on British shipping.

German destroyer <i>Z21 Wilhelm Heidkamp</i> German destroyer

Z21 Wilhelm Heidkamp was one of six Type 1936 destroyers built for the Kriegsmarine in the late 1930s. Completed a few months before the start of World War II in September 1939, the ship served as a flagship throughout her career. She briefly patrolled the Skagerrak where she inspected neutral shipping for contraband goods. Z21 Wilhelm Heidkamp later helped to lay four offensive minefields off the English coast that claimed two British destroyers, 2 fishing trawlers, and twenty-seven merchant ships. During the German invasion of Norway in April 1940, she sank a Norwegian coastal defense ship off Narvik and was crippled with the opening shots of the First Naval Battle of Narvik on 10 April, with the loss of 81 crewmen. The ship sank the following day.

German destroyer <i>Z23</i> German Navy Type 1936A destroyer (1940–44)

Z23 was one of fifteen Type 1936A destroyers built for the Kriegsmarine during World War II. Completed in 1940, the ship spent the war in Norwegian and French waters, escorting German ships and occasionally engaging Allied warships. In early 1941 she escorted ships between the Baltic and southern Norway before spending four months protecting ships as they transited through the Bay of Biscay. A few months after the Operation Barbarossa began in June, Z23 was transferred to northern Norway where she attempted to intercept one of the Arctic convoys returning from the Soviet Union and helped to lay several minefields.

German destroyer <i>Z25</i> German World War II destroyer

Z25 was one of fifteen Type 1936A destroyers built for the Kriegsmarine during World War II. Completed in 1940, the ship spent most of the war in Norwegian waters, escorting German ships and laying minefields, despite venturing to France in early 1942 for the Channel Dash, escorting two battleships and a heavy cruiser home through the English Channel. She was active in attacking the Arctic convoys ferrying war materials to the Soviet Union in 1941–1942 but only helped to sink one Allied ship.

German destroyer <i>Z28</i> Warship

Z28 was one of fifteen Type 1936A destroyers built for the Kriegsmarine during World War II. Built as a flotilla leader with fewer guns than her sister ships, she was completed in 1941. The ship spent most of the first few years of her service in Norwegian waters, escorting convoys and laying minefields. Z28 ran aground in early 1943 and spent the rest of the year under repair. The ship briefly returned to Norway at the beginning of 1944, but was transferred to the Baltic shortly afterwards to support minelaying operations in the Gulf of Finland. That was her primary focus through July and then she began escorting German cruisers as they bombarded Soviet troops ashore in addition to German convoys evacuating people from Finland and the Baltic States.

German destroyer <i>Z29</i> Destroyer

Z29 was one of fifteen Type 1936A destroyers built for the Kriegsmarine during World War II. Completed in 1941, she took part in the Channel Dash in early 1942 as flagship of the escort force. Despite this venture to France, the ship spent most of the war in Norwegian waters, escorting German ships and laying minefields. Z29 participated in the indecisive Battle of the Barents Sea at the end of the year, during which she helped to sink a British minesweeper. The ship was damaged during the raid on the island of Spitsbergen in September 1943. Z29 was damaged by British aircraft attacking the battleship Tirpitz in July 1944. The ship escorted troop convoys from northern Norway when the Germans began evacuating the area beginning in October until she began an extensive refit in December.

German destroyer <i>Z30</i> Destroyer

Z30 was one of fifteen Type 1936A destroyers built for the Kriegsmarine during World War II. Completed in 1941, the ship was transferred to Norwegian waters in early 1942 where she remained for most of the rest of her career, escorting convoys and laying minefields. She played a minor role in the indecisive Battle of the Barents Sea at the end of the year and was damaged during the raid on the island of Spitsbergen in September 1943.

German destroyer <i>Z31</i> Destroyer

Z31 was a German Type 1936A (Mob) destroyer, which was completed in 1942 and served with the Kriegsmarine during the Second World War. She was constructed in Germany as part of Plan Z, and commissioned 11 April 1942. She spent much of the war in Arctic and Norwegian waters, taking part in the Battle of the Barents Sea on 31 December 1942. She survived the war, and was passed on to the French Navy as a war prize, serving under the name Marceau until 1958.

German torpedo boat <i>Iltis</i> Type 24 torpedo boat

Iltis was the lead ship of her class of six torpedo boats built for the German Navy during the 1920s. The boat made multiple non-intervention patrols during the Spanish Civil War in the late 1930s. During World War II, she did not participate in the Norwegian Campaign of 1940 as she was under repair after having accidentally rammed and sunk a U-boat. Iltis spent the next couple of years escorting minelayers as they laid minefields and laying minefields herself. She also spent the latter half of 1941 escorting convoys through the Skaggerak. The boat returned to France in 1942 and was one of the escorts for the capital ships sailing from France to Germany through the English Channel in the Channel Dash. Iltis then helped to escort one commerce raider through the Channel and was sunk by British forces while escorting another blockade runner in May.

German torpedo boat <i>Jaguar</i>

Jaguar was the sixth and last Type 24 torpedo boat built for the German Navy during the 1920s. The boat made multiple non-intervention patrols during the Spanish Civil War in the late 1930s. During World War II, she played a minor role in the Norwegian Campaign of 1940. Jaguar spent the next several months escorting minelayers as they laid minefields and damaged heavy ships back to Germany before she was transferred to France around September. She started laying minefields herself that month and continued to do so for the rest of the war. After a refit in early 1941, the boat was transferred to the Skaggerak where she was assigned escort duties. Jaguar returned to France in 1942 and was one of the escorts for the capital ships sailing from France to Germany through the English Channel in the Channel Dash. She helped to escort blockade runners, commerce raiders and submarines through the Channel and the Bay of Biscay, as well as Norwegian waters, for the next several years. The boat attacked Allied ships during the Invasion of Normandy in June 1944, but was sunk by British bombers that same month.

References