The following page lists power stations in South Korea .
All power station lists are based on the 7th Basic Electricity Supply Plan(2015)
Station | Coordinates | Capacity (MW) | Units | Completion | Fuel type | Notes |
---|---|---|---|---|---|---|
Boryeong Power Station | 4,000 | 8 | BIT Coal | |||
Dangjin Power Station | 4,000 | 8 | BIT Coal | |||
Hadong Power Station | 4,000 | 8 | BIT Coal | |||
Samchonpo Power Station | 3,240 | 6 | BIT Coal | |||
Taean Power Station | 5,050 | 9 | BIT Coal | |||
Yeongheung Power Station | 6,820 | 8 | BIT Coal | |||
->Yeongheung unit 1 | 800 | 12 Jul 2004 | BIT Coal | |||
->Yeongheung unit 2 | 800 | 28 Nov 2004 | BIT Coal | |||
->Yeongheung unit 3 | 870 | 30 Jun 2008 | BIT Coal | |||
->Yeongheung unit 4 | 870 | 31 Dec 2008 | BIT Coal | |||
->Yeongheung unit 5 | 870 | 10 Jun 2014 | BIT Coal | |||
->Yeongheung unit 6 | 870 | 5 Nov 2014 | BIT Coal | |||
->Yeongheung unit 7 | 870 | BIT Coal | Construction | |||
->Yeongheung unit 8 | 870 | BIT Coal | Construction | |||
Yeosu Power Station | 328.6 | 1 | BIT Coal | |||
Yeongdong Power Station | 325 | 2 | ANTH Coal | |||
Donghae Power Station | 1100 | 2 | ANTH Coal | |||
Honam Power Station | 500 | 2 | BIT Coal | |||
Yeosu Power Station | 350 | 1 | BIT Coal | Under Construction | ||
Dangjin Power Station | 2,040 | 2 | BIT Coal | Under Construction | ||
Shin Boryung Power Station | 2,000 | 2 | BIT Coal | Under Construction | ||
Samcheok Green Power | 2,000 | 2 | BIT Coal | |||
Taean Power Station | 2,100 | 2 | BIT Coal | Under Construction | ||
Bukpyung Power Station | 1,190 | 2 | BIT Coal | Under Construction | ||
Goseong HI Power Station | 2,080 | 2 | 2021 | BIT Coal | Under Construction [1] | |
->Goseong HI unit 1 | 1,040 | 2021 | BIT Coal | Under Construction | ||
->Goseong HI unit 2 | 1,040 | Oct 2021 | BIT Coal | Under Construction | ||
Samcheok Pos Power | 2,100 | 2 | BIT Coal | Planned | ||
Gangneung Anin Station | 2,080 | 2 | 2022 | BIT Coal | Under Construction [1] | |
->Gangneung Ani unit 1 | 1,040 | Dec 2021 | BIT Coal | Under Construction | ||
->Gangneung Ani unit 2 | 1,040 | Jun 2022 | BIT Coal | Under Construction | ||
Dangjin Eco Station | 1,160 | 2 | BIT Coal | Planned | ||
Shin Seocheon Power Station | 1,000 | 1 | Mar 2020 | BIT Coal | Under Construction [1] | |
All power stations with at least 500 MW nameplate capacity are listed.
Station | Community | Coordinates | Capacity (MW) | Notes |
---|---|---|---|---|
Pyeongtaek Power Station | 1,400 | [2] | ||
Ulsan Power Station | 1,800 | [2] | ||
Yeosu Power Station | 528 | [2] | ||
All power stations with at least 1,000 MW nameplate capacity are listed.
Station | Community | Coordinates | Capacity (MW) | Type |
---|---|---|---|---|
Boryeong Power Station [3] | 1,200 | CCGT | ||
Busan Power Station [4] | 1,800 | CCGT | ||
Incheon Power Station [3] | 1,012 | CCGT | ||
Seoincheon Power Station [2] | 1,800 | CCGT | ||
Seoul Power Station [2] | 1,537 | |||
Shinincheon Power Station [4] | 1,800 | CCGT | ||
Seoincheon Power Station [2] | 1,800 | CCGT | ||
Ulsan Power Station [2] | 1,200 | CCGT | ||
All power stations are listed.
Station | Community | Coordinates | Capacity (MW) | Unit | Commissioning | Notes |
---|---|---|---|---|---|---|
Kori Nuclear Power Plant | 35°19′12″N129°17′24″E / 35.319904°N 129.290053°E | 6,537 | ||||
-> Kori #1 | 587 | 1 | 29 April 1978 | |||
-> Kori #2 | 650 | 2 | 25 July 1983 | |||
-> Kori #3 | 950 | 3 | 30 September 1985 | |||
-> Kori #4 | 950 | 4 | 29 April 1986 | |||
-> Shin Kori #1 | 1,000 | 5 | 28 February 2011 | |||
-> Shin Kori #2 | 1,000 | 6 | 20 July 2012 | |||
-> Shin Kori #3 | 1,400 | 7 | 20 December 2016 | |||
-> Shin Kori #4 | 1,400 | 8 | September 2019 | |||
Hanul Nuclear Power Plant | 37°05′34″N129°23′01″E / 37.09278°N 129.38361°E | 5,928 | ||||
-> Hanul #1 | 950 | 1 | 10 September 1988 | |||
-> Hanul #2 | 950 | 2 | 30 September 1989 | |||
-> Hanul #3 | 1000 | 3 | 11 August 1998 | |||
-> Hanul #4 | 1000 | 4 | 31 December 1999 | |||
-> Hanul #5 | 1000 | 5 | 29 July 2004 | |||
-> Hanul #6 | 1000 | 6 | 22 April 2005 | |||
-> Shin Hanul #1 | 1,340 | 7 | November 2018 exp. | Construction | ||
-> Shin Hanul #2 | 1,340 | 8 | November 2019 exp. | Construction | ||
-> Shin Hanul #3 | 1,340 | 9 | December 2022 exp. | Construction | ||
-> Shin Hanul #4 | 1,340 | 10 | December 2023 exp. | Construction | ||
Hanbit Nuclear Power Plant | 35°24′54″N126°25′26″E / 35.41500°N 126.42389°E | 5,875 | ||||
-> Hanbit #1 | 950 | 1 | 25 August 1986 | |||
-> Hanbit #2 | 950 | 2 | 10 June 1987 | |||
-> Hanbit #3 | 1,000 | 3 | 31 March 1995 | |||
-> Hanbit #4 | 1,000 | 4 | 1 January 1996 | |||
-> Hanbit #5 | 1,000 | 5 | 21 May 2002 | |||
-> Hanbit #6 | 1,000 | 6 | 24 December 2002 | |||
Wolseong Nuclear Power Plant | 35°43′0″N129°28′40″E / 35.71667°N 129.47778°E | 4,598 | ||||
-> Wolseong #1 | 657 | 1 | 22 April 1983 | |||
-> Wolseong #2 | 647 | 2 | 1 July 1997 | |||
-> Wolseong #3 | 651 | 3 | 1 July 1998 | |||
-> Wolseong #4 | 653 | 4 | 1 October 1999 | |||
-> Shin wolseong #1 | 997 | 5 | 31 July 2012 | |||
-> Shin wolseong #2 | 993 | 6 | 24 July 2015 | |||
Power stations with at least 50 MW nameplate capacity are listed.
Station | Community | Coordinates | Capacity (MW) | PS | Notes |
---|---|---|---|---|---|
Andong Dam | Andong | 36°35′05″N128°46′26″E / 36.58472°N 128.77389°E | 80 | Yes | |
Cheongpyong PS | 400 | Yes | [2] | ||
Cheongsong PS | 600 | Yes | [2] | ||
Chungju Dam | Chungju | 37°00′22″N127°59′33″E / 37.00611°N 127.99250°E | 400 | No | [2] |
Daecheong Dam | Daejeon | 36°28′39″N127°28′51″E / 36.47750°N 127.48083°E | 90 | No | |
Hapcheon HPS | 100 | No | [2] | ||
Hwacheon Dam | Hwacheon | 38°07′02″N127°46′44″E / 38.11722°N 127.77889°E | 108 | No | [2] |
Imha Dam | Andong | 36°32′15″N128°53′00″E / 36.53750°N 128.88333°E | 50 | No | [2] |
Muju PS | 600 | Yes | [5] | ||
Paldang HPS | 120 | No | [2] | ||
Sancheong PS | 700 | Yes | [5] | ||
Samnangjin PS | 600 | Yes | [2] | ||
Soyanggang Dam | Chuncheon | 37°56′44″N128°48′52″E / 37.94556°N 128.81444°E | 200 | No | [2] |
Yangyang PS | Yangyang | 38°00′37″N128°32′34″E / 38.01028°N 128.54278°E | 1,000 | Yes | [2] |
Yecheon PS | 800 | Yes | Under construction [2] |
Station | Community | Coordinates | Capacity (MW) | Notes |
---|---|---|---|---|
Garorim Bay Tidal Power Station | 520 | Proposed | ||
Incheon Tidal Power Station | 37°29′30″N126°20′15″E / 37.49167°N 126.33750°E | 1,320 | Under Construction (2017) | |
Sihwa Lake Tidal Power Station | 254 | |||
Uldolmok Tidal Power Station | Uldolmok | 34°34′06″N126°18′28″E / 34.56833°N 126.30778°E | 1.5 | |
Power stations with at least 10 MW nameplate capacity are listed.
Station | Community | Coordinates | Capacity (MW) | Turbines |
---|---|---|---|---|
Hankyeong Wind Farm [4] | 21 | 9 | ||
Kangwon Wind Farm [2] | 98 | |||
Seongsan Wind Farm [4] | 12 | 6 | ||
Youngduk Wind Farm [6] | 39.6 | 24 | ||
AES Indiana, formerly known as Indianapolis Power & Light Company, is an American utility company providing electric service to the city of Indianapolis. It is a subsidiary and largest utility of AES Corporation, which acquired it in 2001. AES Indiana provides electric service to more than 500,000 customers in a 528-square-mile (1,370 km2) service territory.
The net capacity factor is the unitless ratio of actual electrical energy output over a given period of time to the theoretical maximum electrical energy output over that period. The theoretical maximum energy output of a given installation is defined as that due to its continuous operation at full nameplate capacity over the relevant period. The capacity factor can be calculated for any electricity producing installation, such as a fuel consuming power plant or one using renewable energy, such as wind, the sun or hydro-electric installations. The average capacity factor can also be defined for any class of such installations, and can be used to compare different types of electricity production.
Ekibastuz GRES-1 is a 4,000 MW coal-fired thermal power station (GRES) at Ekibastusz, Kazakhstan. It is located by lake Zhyngyldy. GRES-1 has two 330-metre (1,083 ft) tall chimneys. As of June 2010, the Ekibastuz GRES-1 power station was the largest power station in Kazakhstan, and generated 13% of the nation's electricity.
Nameplate capacity, also known as the rated capacity, nominal capacity, installed capacity, maximum effect or Gross Capacity, is the intended full-load sustained output of a facility such as a power station, electric generator, a chemical plant, fuel plant, mine, metal refinery, and many others. Nameplate capacity is the theoretical output registered with authorities for classifying the unit. For intermittent power sources, such as wind and solar, nameplate power is the source's output under ideal conditions, such as maximum usable wind or high sun on a clear summer day.
The DeSoto Next Generation Solar Energy Center is a photovoltaic power station in Arcadia, DeSoto County, in the U.S. state of Florida, owned by Florida Power & Light (FPL). President Barack Obama attended the plant's commissioning on October 27, 2009. It has a nameplate capacity of 25 megawatts (MW), and produces an estimated 42,000 megawatt hours (MW·h) of electricity per year.
In 2016, Arizona had 268 megawatts (MW) of wind powered electricity generating capacity, producing 0.5% of in-state generated electricity.
As of the end of 2021, New Mexico had 4,001 megawatts (MW) of wind powered electricity generating capacity, responsible for 30% of electricity produced that year. Wind power in New Mexico has the potential to generate more than all of the electricity consumed in the state.
The Sojitz Kelanitissa Power Station, is privately owned 172 MW diesel-fired combined cycle power station located in Kelanitissa, in the city of Colombo, Sri Lanka. It is owned by Sojitz Kelanitissa Private Limited, a subsidiary of Sojitz Corporation. The power station is located adjacent to the Kelanitissa Power Station, which is a separate government-owned power station.