| Station | Site | Coordinates | Capacity (MW) |
|---|---|---|---|
| Kastraki Dam | Kastraki | 38°44′30.69″N21°21′51.05″E / 38.7418583°N 21.3641806°E | 320 |
| Kremasta Dam | Kremasta Sykias | 38°53′02″N21°29′38″E / 38.8839511°N 21.4937961°E | 437 |
| Ladon Dam | Arcadia | 37°45′28″N21°58′18″E / 37.7577°N 21.9716°E | 50 |
| Mesochora Dam | Mesochora | 39°27′51.86″N21°18′15.08″E / 39.4644056°N 21.3041889°E | |
| Plastiras Dam | Karditsa | 39°14′08″N21°44′47″E / 39.235556°N 21.746389°E | 130 |
| Stratos Dam | Stratos | 38°40′33″N21°19′33″E / 38.6758027°N 21.3258898°E | 150 |
| Sykia Dam | Karditsa/Arta | 39°18′47.98″N 21°24′46.67″E | |
| Thisavros Dam | Drama | 41°21′16″N24°22′01″E / 41.354444°N 24.366944°E | 384 |
| Location | Capacity | Description | Constructed |
|---|---|---|---|
| Kozani | 204 MW | Park of Kozani [3] | 2022 |
| Naoussa | 7+7 MW | Photovoltaic plants cluster | 2013 |
| Florina | 4.3 MW | Florina industrial zone | 2009 |
| Volos | 2 MW | Photovoltaic power plant Volos | 2009 |
| Thebes | 2 MW | Photovoltaic power plant Thebes | 2009 |
| Koutsopodi | 1.997 MW | 2009 | |
| Tripoli | 1.99 MW | 2009 | |
| Pournari | 1.25 MW | 2009 | |
| Iliopenditiki | 1 MW | 2009 | |
| Pontoiraklia | 944 kW | 2009 | |
| Kythnos | 100 kW | 2009 | |
| Sifnos | 60 kW | 1998 | |
| Tavros, ILPAP Building | 20 kW | 2009 | |
| Ethel Station | 20 kW | 2009 | |
| Maroussi, Eirini metro station | 20 kW | 2009 |
| Location | Capacity | Description | Constructed |
|---|---|---|---|
| Ptolemaida | 550MW | Lignite Centre of Western Macedonia | To commence operation in 2025 |
| Amyntaio | 450MW | Western Macedonia | To commence operation in 2025 |
| Thessaly | 390MW | Park of Argyromylos | - |
| Megalopoli | 50 MW | Park of Megalopoli | - |
| Crete | 0.48 MW | Park of Atherinolakos | - |