List of power stations in Indonesia

Last updated

The following lists some of the larger power stations in Indonesia. Data are not included for a large number of small isolated plants (mostly diesel) in the Outer Islands. In total, the PLN operated over 5,000 plants across Indonesia in 2010 of which over 4,500 were small diesel plants outside of Java. For further details about existing capacity and operations of the electricity sector, see information about the state-owned Indonesian electricity company Perusahaan Listrik Negara .

Contents

Non-renewable

Thermal

Thermal power is the largest source of power in Indonesia. There are different types of thermal power plants based on the fuel used to generate the steam such as coal, gas, diesel etc. About 85% of electricity consumed in Indonesia is generated by thermal power plants.

Bituminous coal or lignite

Existing

Note: IPP means independent power producer

Power stationLocationDistrictProvinceRegionCoordinatesCapacity per unit
(MW)
Installed capacity
(MW)
OperatorSectorNotesRefs
Bukit Asam coal-fired Tanjung Enim Muara Enim South Sumatra Sumatra4 x 65260 PT. PLN GovernmentBoiler from Stein, Turbines from Rateau and generators from GEC Alstom [1]
Paiton (PLN) coal-fired Paiton Probolinggo East Java Java-Bali 7°42′56″S113°35′06″E / 7.7155°S 113.5849°E / -7.7155; 113.5849 (Paiton (PLN)) 2 x 400800 PT. PLN GovernmentBoiler from ABB Combustion Engineering, Turbines and generators from Toshiba [2]
Ombilin coal-fired Ombilin Sawahlunto West Sumatra Sumatra2 x 100200 PT. PLN GovernmentBoiler from Stein, Turbines and generators from GEC Alstom [1]
Suralaya coal-firedSuralaya Cilegon Banten Java-Bali4 x 400
3 x 600
3,400 PT. Indonesia Power GovernmentBoiler from Babcock & Wilcox Canada, Turbines from MHI Japan; generators from Mitsubishi Electric Co.
Suralaya Baru coal-firedSuralaya Cilegon Banten Java-Bali 5°53′31″N106°01′48″E / 5.892°N 106.03°E / 5.892; 106.03 (Suralaya Power Station) 1 x 625625 PT. Indonesia Power GovernmentBoiler from Shanghai Co. Ltd, Turbines and generators from Shanghai Co. Ltd [3] [4]
Paiton Paiton Probolinggo East Java Java-Bali2 x 670
2 x 610
1 x 850
2,300 PT. Paiton Energy (IPP)PrivateBoiler supplied by ABB, Turbines and Generators supplied by GE [4]
Tanjung Jati-B I coal-fired Bangsri Jepara East Java Java-Bali2 x 6621,320 PT. Central Java Power (IPP)PrivateBoiler supplied by Babcock & Wilcox, Turbines and Generators supplied by Toshiba [4]
Tanjung Jati-B II coal-fired Bangsri Jepara East Java Java-Bali2 x 6621,320 PT. Central Java Power (IPP)PrivateBoiler supplied by Mitsubishi Heavy Industry, Turbines and Generators supplied by Toshiba [4]
Cirebon coal-fired Kanci Kulon Cirebon West Java Java-Bali 6°46′13″S108°36′54″E / 6.7704°S 108.6151°E / -6.7704; 108.6151 (Cirebon Steam Power Plant) 1 x 660660 PT. Cirebon Electric Power (IPP)PrivateBoiler, Turbines and Generators supplied by Doosan Heavy Industries and Construction Co., Ltd. [4]
Cilacap Karangkandri Cilacap Central Java Java-Bali 07°40′31.20″S109°05′47.40″E / 7.6753333°S 109.0965000°E / -7.6753333; 109.0965000 2 x 300600 PT. Sumber Segara Primadaya (IPP)GovernmentBoiler supplied by Dongfang Electric Corp. Ltd, Turbines and Generators supplied by Dongfang Electric Corp. Ltd
Cilacap Adipala coal-fired Adipala Cilacap Central Java Java-Bali1 x 660660 PT. Indonesia Power GovernmentBoiler supplied by Shanghai Electric Corp. Ltd, Turbines and Generators supplied by Shanghai Electric Corp. Ltd [4]
Indramayu coal-fired Sumur Adem Indramayu West Java Java-Bali3 x 330990 PT. PLN GovernmentBoiler supplied by Babcock & Wilcox Beijing Co., Turbines and Generators supplied by Beijing Beizhong [4]
Pacitan coal-fired Sukorejo Pacitan East Java Java-Bali2 x 315630 PT. PLN GovernmentBoiler supplied by Dongfang Electric Corp. Ltd, Turbines and Generators supplied by Dongfang Electric Corp. Ltd [4]
Tarahan coal-fired Tarahan South Lampung Lampung Sumatra2 x 100200 PT. PLN GovernmentBoiler supplied by Jinan Co. Ltd, Turbines and Generators supplied by Wuhan Co. Ltd
Labuan coal-fired Labuan Pandeglang Banten Java-Bali2 x 300600 PT. Indonesia Power GovernmentBoiler supplied by Dongfang Electric Corp. Ltd, Turbines and Generators supplied by Dongfang Electric Corp. Ltd
Labuhan Angin coal-fired Labuhan Angin Central Tapanuli North Sumatra Sumatra2 x 115230 PT. PLN GovernmentBoiler supplied by Foster Wheeler, Turbines and Generators supplied by Shanghai Turbine Co. Ltd. [5]
Lontar coal-fired Lontar, Teluk Naga Tangerang Banten Java-Bali3 x 315945 PT. Indonesia Power GovernmentBoiler supplied by Dongfang Electric Corp. Ltd, Turbines and Generators supplied by Dongfang Electric Corp. Ltd
Pelabuhan Ratu coal-fired Pelabuhan Ratu Sukabumi West Java Java-Bali3 x 3501050 PT. Indonesia Power GovernmentBoiler supplied by Shanghai Electric Corp. Ltd, Turbines and Generators supplied by Shanghai Electric Corp. Ltd [6]
Rembang coal-fired Sluke Rembang Central Java Java-Bali 06°38′18.21″S111°28′27.41″E / 6.6383917°S 111.4742806°E / -6.6383917; 111.4742806 2 x 315630 PT. PLN GovernmentBoiler supplied by Dongfang Electric Corp. Ltd, Turbines and Generators supplied by Dongfang Electric Corp. Ltd [4]
Bangka Belitung 3 coal-fired Air Anyir Bangka Bangka Belitung Sumatera2 x 3060 PT. BMP (IPP)Government
Total5018,630
Proposed or under construction
Power stationLocationDistrictProvinceRegionCapacity per Unit
(MW)
Installed Capacity
(MW)
OperatorSectorRemarks and Plant Coordinates
Java 4 coal-fired Tubanan, Kembang Jepara Central JavaJava-Bali2 x 10002,000 PT. Bhumi Jati Power Private [7]
Java 7 coal-fired Kramatwatu Serang BantenJava-Bali2 x 10002,000 PT. Shenhua Guohua Pembangkitan Jawa Bali Private [8]
Central Java coal-fired (by the end of 2016)Ujungnegoro Batang Central Java Java-Bali2 x 10002,000 PT. Bhimasena Power Indonesia Private [9]
Tanjung Awar-Awar coal-fired Kaliuntu Tuban East Java Java-Bali2 x 350700 PT. PLN GovernmentBoiler supplied by Babcock & Wilcox Beijing Co. Turbines and generators supplied by Beijing Beizhong
Madura coal-fired Pamekasan East Java Java-Bali2 x 100200 PT. PLN Government
Bojonegara coal-fired Bojonegara Cilegon Banten Java-Bali3 x 7402,220 PT. PLN Government
Tanjung Jati-A coal-fired Cirebon Cirebon West Java Java-Bali2 x 6601,320 PT. Bakrie Power Private
Nusa Penida coal-fired Nusa Penida Bali Java-Bali2 x 100200 PT. PLN Government
Anyer coal-fired Anyer Banten Java-Bali1 x 330330 PT. PLN Government
Kuala Tanjung coal-fired Kuala Tanjung South Sumatra Sumatra2 x 112224 PT. Ranyza Energi Private
Banjarsari coal-fired Banjarsari Lahat South Sumatra Sumatra2 x 100200 PT. Bukit Pembangkit Innovative Private
Banyuasin coal-fired Banyuasin Banyuasin South Sumatra Sumatra2 x 100200 PT. Banyuasin Power Energy Private
Baturaja coal-fired Baturaja Ogan Komering Ulu South Sumatra Sumatra2 x 100200 PT. Priamanaya Power Energi Private
Simpang Belimbing coal-fired Gunung Raja Muara Enim South Sumatra Sumatra2 x 150300 PT. GH EMMI Private
Arahan coal-fired Arahan Muara Enim South Sumatra Sumatra4 x 6002,400 PT. PLN Government
Central Bangko coal-fired Bangko Tengah Muara Enim South Sumatra Sumatra4 x 6202,480PT. BA & CHD (China)Private
West Kalimantan 1 coal-fired Tanjung Gundul Bengkayang West Kalimantan Kalimantan2 x 100200 PT. GCL Indotenaga Government - Private
Tanjung coal-fired Tanjung Tabalong South Kalimantan Kalimantan2 x 55110 PT. PLN Government
Total3417,264

Gas or liquid fuel

Power stationLocationDistrictProvinceRegionCoordinatesCapacity per Unit
(MW)
Capacity (MW)OperatorSectorRefs
BekasiWest Java130
BetaraLampung70
Grati CCGT Grati Pasuruan East Java Java-Bali 7°39′06″S113°01′28″E / 7.6517°S 113.0244°E / -7.6517; 113.0244 (Grati CCGT) 3 x 100.75 GTPP; 3 x 100.75 SPP; 1 x 159.58 CCPP764 PT. Indonesia Power Government [10] [11]
Gresik CCGT Gresik Gresik East Java Java-Bali 7°09′48″S112°39′41″E / 7.1633°S 112.6615°E / -7.1633; 112.6615 (Gresik CCGT) 4 x GTPP; 4 x SPP; 3 x CCPP2,255 PT. Pembangkitan Jawa Bali Government [12]
Muara Tawar CCGT Tarumajaya Bekasi West Java Java-Bali 06°05′09.37″S106°59′48.15″E / 6.0859361°S 106.9967083°E / -6.0859361; 106.9967083 (Muara Tawar CCGT) 2 x GTPP; 3 x CCPP920 PT. Pembangkitan Jawa Bali Government
Muara Karang CCGT Muara Karang North Jakarta DKI Jakarta Java-Bali 6°06′31″S106°47′16″E / 6.1087°S 106.7877°E / -6.1087; 106.7877 (Muara Karang CCGT) 5 x STPP; 1 x CCPP1,208 PT. Pembangkitan Jawa Bali Government [13] [14]
Palembang TimurSouth Sumatra150
PLTG SenipahSenipahKutai KartanegaraEast KalimantanKalimantan2x 46 GTG92PT. Kertanegara Energi PerkasaIPP
PLTG/MG Kalbar PeakerParit Baru Mempawah West Kalimantan Kalimantan100100 PT. PLN Government2019
SengkangSouth Sulawesi150
Tambak Lorok CCGT Tambak Lorok Semarang Central Java Java-Bali6 x 109.65 GTPP; 2 x 50 SPP; 1 x 200 SPP; 2 x 188 CCPP1,334 PT. Indonesia Power Government
Tanjung Priok CCGT Tanjung Priok North Jakarta DKI Jakarta Java-Bali2 x 26 GTPP; 2 x 48.8 GTPP; 2 x 50 SPP; 6 x 130 CCGT; 2 x 200 CCGT1,430 PT. Indonesia Power Government
Senayan DieselSenayanJakartaDKI JakartaJava-Bali-6.2160361, 106.79532576 x 2.5215PT. Indonesia PowerGovernment
PLTU 400 MWCiwandanCilegonBantenJava-Bali5 x 80 STG400 MWPT. Krakatau Daya ListrikSOE
PLTGU 120 MWCiwandanCilegonBantenJava-Bali2 x 39 GTG; 1 x 43 STG120 MWPT. Krakatau Daya ListrikSOE
Total688,446

Renewable

Geothermal

Note: IPP means independent power producer

Power stationLocationDistrictProvinceRegionCapacity per Unit
(MW)
Installed Capacity
(MW)
OperatorSectorRemarks
Kamojang geothermal Kamojang Garut West Java Java-BaliUnit I = 30
Unit II = 55
Unit III = 55
Unit IV = 60
Unit V = 35
235 PT. Indonesia Power GovernmentUnit IV 63 MW turbine capacity and 80 MVA generator capacity both from Fuji Electric, Kawasaki, Japan [15]
Darajat geothermal Kamojang Garut West Java Java-BaliUnit I = 5555 PT. Indonesia Power Government
Darajat geothermal Kamojang Garut West Java Java-BaliUnit II = 90
Unit III = 110
200 PT. Pertamina, Chevron Geothermal Indonesia, Ltd,
(IPP)
PrivateTurbines Unit II = 81.3 MW & Unit III = 110 MW and Generators Unit II = 101.625 MVA & Unit III = 137.5 MVA both supplied by Fuji Electric, Kawasaki, Japan [16]
Gunung Salak geothermal Parung Kuda Sukabumi West Java Java-Bali3 x 60180 PT. Indonesia Power GovernmentTurbines @ 55 MW and Generators @ 55 MVA both supplied by Ansaldo Energia, Italy [17]
Gunung Salak geothermal Parung Kuda Sukabumi West Java Java-Bali3 x 55165 Chevron Geothermal Salak Ltd and Dayabumi Salak Pratama Ltd (IPP)PrivateTurbines @ 59.5 MW and Generators @ 74.375 MVA both from Fuji Electric, Kawasaki, Japan
Ulubelu Geothermal Power Station Ulubelu Tanggamus Lampung Sumatra2 x 55110 PT. PLN GovernmentTurbines 2 x 55 MW and Generators 2 x 55 MVA both from Fuji Electric, Kawasaki, Japan [18]
Wayang Windu geothermal Pengalengan Bandung West Java Java-Bali1 x 110
1 x 117
( 1 x 127 by mid-2013 )
227 PT. Pertamina and Magma Nusantara Ltd. (IPP)PrivateTurbines 110 MW & 117 MW and Generators 2 x 137.5 MVA both from Fuji Electric, Kawasaki, Japan [19]
Dieng geothermal Dieng Banjarnegara Central Java Java-Bali1 x 6060 PT. Geo Dipa Energi (IPP)Private
Lahendong geothermal Lahendong Minahasa North Sulawesi SulawesiUnit I = 20
Unit II = 20
Unit III = 20
Unit IV = 20
80 PT. PLN Government* Unit I: turbines = 20 MW and generator = 25 MVA both from Alstom [20]
* Unit II: turbines = 20 MW and generator = 25 MVA both from Fuji Electric, Kawasaki, Japan [21]
* Unit III: turbines = 20 MW and generator = 25 MVA both from Fuji Electric, Kawasaki, Japan [22]
* Unit IV: turbines = 20 MW and generator = 25 MVA both supplied by Fuji Electric, Kawasaki, Japan [23]
Sibayak geothermal Sibayak Karo North Sumatra Sumatra2 x 5.6511.3 PT. Dizamatara Powerindo
(IPP)
PrivateTurbines @ 5.85 MW and Generators @ 6 MVA, 5.65 MW at PF 0.94 [24]
Patuha geothermal Patuha Bandung West Java Java-BaliUnit 1 = 5555
(by-mid 2014)
PT. Geo Dipa Energi
(IPP)
PrivateTurbines Unit 1 = 60 MW and Generator Unit 1 = 75 MVA both supplied by Toshiba [25]
Total191,344

Hydroelectric

Note: IPP means independent power producer

Power stationLocationDistrictProvinceRegionCapacity per Unit
(MW)
Installed Capacity
(MW)
OperatorSectorRemarks
Agam hydro Batang Agam Agam West Sumatra Sumatra3 x 3.510 PT. PLN GovernmentTurbines @ 3.55 MW and Generators @ 3.95 MVA both supplied by Ebara
Maninjau hydro Maninjau Agam West Sumatra Sumatra4 x 1768 PT. PLN GovernmentTurbines @ 17.4 MW and Generators @ 20 MVA both supplied by Toshiba
Singkarak hydro Singkarak Solok West Sumatra Sumatra4 x 43.75175 PT. PLN GovernmentTurbines @ 43.75 MW supplied by VoestAlpine and Generators @ 52 MVA supplied by ELIN (now ANDRITZ Hydro)
Koto Panjang hydro Koto Panjang Kampar Riau Sumatra3 x 38114 PT. PLN GovernmentTurbines @ 39.4 MW supplied by Kvaerner Boving and Generators @ 45 MVA supplied by ELIN (now ANDRITZ Hydro)
Test I hydro Tes Rejang Lebong Bengkulu Sumatra4 x 416 PT. PLN GovernmentTurbines @ 4.7 MW supplied by Ansaldo Energia
Musi hydro Ujanmas Atas Kepahiang Bengkulu Sumatra3 x 70210 PT. PLN GovernmentTurbines @ 70 MW and Generators @ 86 MVA both supplied by VA Tech Hydro (now ANDRITZ Hydro)
Besai hydro Sumberjaya West Lampung Lampung Sumatra2 x 4590 PT. PLN GovernmentTurbines @ 46.4 MW and Generators @ 53 MVA both supplied by VA Tech Hydro (now ANDRITZ Hydro)
Batutegi hydro Tanggamus West Lampung Lampung Sumatra2 x 1428 PT. PLN GovernmentTurbines @ 14.2 MW and Generators @ 15.7 MVA both supplied by Toshiba
Lau Renun hydro Silalahi Dairi North Sumatra Sumatra2 x 4182 PT. PLN GovernmentTurbines @ 41 MW and Generators @ 47.5 MVA both supplied by VA Tech Hydro (now ANDRITZ Hydro)
Sipansihaporas hydro Sipansihaporas Central Tapanuli North Sumatra Sumatra1 x 33
1 x 17
50 PT. PLN GovernmentPower Station 1 = Turbines 34 MW by Meiden, Japan and Generator 39 MVA by Toshiba
Power Station 2 = 17.6 MW Meiden, Japan and Generator 20 MVA by Toshiba [26]
Asahan I hydro Parmaksian Toba Samosir North Sumatra Sumatra2 x 90180 PT. Bajradaya Sentranusa
(IPP)
PrivateTurbines and Generators supplied by Dongfang Electric Corp. Ltd
Asahan III hydro Pintu Pohan Meranti Toba Samosir North Sumatra Sumatra2 x 87174 PT. PLN Government
Sigura-gura hydro Simorea Asahan North Sumatra Sumatra4 x 71.50286 PT. Inalum PrivateTurbines @ 71.5 MW and Generators @ 80 MVA both supplied by Toshiba
Tangga hydro Tangga Asahan North Sumatra Sumatra4 x 79.25317 PT. Inalum PrivateTurbines @ 81.1 MW supplied by Hitachi Ltd. and Generators @ 90 MVA supplied by Mitsubishi Electric
Wampu hydro Kota Buluh Karo North Sumatra Sumatra3 x 1545 PT. Wampu Electric Power
(IPP)
Private
Kerinci hydro Batang Merangin Kerinci Jambi Sumatra6 x 30180 PT. PLN GovernmentTurbines @ 30 MW and Generators @ 33.33 MVA [27]
Saguling hydro Rajamandala Cimahi West Java Java-Bali4 x 175.18701 PT. Indonesia Power GovernmentTurbines @ 175.18 MW supplied by Toshiba and Generators @ 194? MVA supplied by Mitsubishi Electric Co,.
Cirata hydro Plered Purwakarta West Java Java-Bali8 x 1261,008 PT. Pembangkitan Jawa Bali GovernmentTurbines @ 129.6 MW supplied by VoestAlpine and Generators @ 140 MVA supplied by ELIN (now ANDRITZ Hydro)
Jatiluhur hydro Jatiluhur Purwakarta West Java Java-Bali6 x 31186 PT. Jasa Tirta II GovernmentTurbines @ 32.3 MW supplied by NEYRPIC and Generators @ 35 MVA supplied by GEC Alsthom Jeumont
PB. Sudirman hydro Mrica Banjarnegara Central Java Java-Bali3 x 60.3181 PT. Indonesia Power GovernmentTurbines supplied by Boving and Generators supplied by ASEA
Sutami hydro Karangkates Malang East Java Java-Bali3 x 35105 PT. Pembangkitan Jawa Bali Government
Wlingi hydro Wlingi Malang East Java Java-Bali2 x 2754 PT. Pembangkitan Jawa Bali Government
Tonsea Lama hydro Tondano Minahasa North Sulawesi Sulawesi1 x 4.44
1 x 4.50
1 x 5.44
14 PT. PLN Government
Tanggari I & II hydro Tondano Minahasa North Sulawesi Sulawesi1 x 17.20
1 x 19
36 PT. PLN Government
Bakaru I & II hydro Bakaru Pinrang South Sulawesi Sulawesi2 x 63
1 x 65
191 PT. PLN Government
Larona hydro Soroako East Luwu South Sulawesi Sulawesi3 x 65195 INCO PrivateTurbines @ 67.3 MW supplied by Sulzer & GE and Generators @ 85 MVA supplied by Hitachi & VA Tech Hydro
Balambano hydro Soroako East Luwu South Sulawesi Sulawesi2 x 70140 INCO PrivateTurbines @ 68.5 MW and Generators @ 80.6 MVA both supplied by Canadian General Electric
Karebbe hydro Soroako East Luwu South Sulawesi Sulawesi2 x 66132 INCO PrivateTurbines @ 63.7 MW and Generators @ 78 MVA both supplied by VA Tech Hydro (now ANDRITZ Hydro)
Pamona 2 hydro Pamona Utara Poso Central Sulawesi Sulawesi4 x 65260 PT. Poso Energi
(IPP)
PrivateTurbines @ 66.66 MW and Generators @ 72.2 MVA [27]
Riam Kanan hydro Aranio Martapura South Kalimantan Kalimantan3 x 1030 PT. PLN GovernmentTurbines @ 10.5 MW and Generators @ 11 MVA both supplied by Fuji Electric Co,. Ltd, Japan [28]
Total884,755

Pumped-storage hydroelectric

Currently under construction or planned: [29]

Power stationLocationDistrictProvinceRegionCapacity per Unit
(MW)
Installed Capacity
(MW)
OperatorSectorRemarks
Upper Cisokan pumped storage hydro (COD 2015)Cianjur
Cisokan river and Cirumamis river
Cianjur and
Bandung Barat
West Java Java-Bali4 x 260 MW pump turbine or
4 x 275 MVA motor generator
1,040 MW pump turbine or
1,100 MVA motor generator
PT. PLN Government
Matenggeng pumped storage hydro (COD 2020)Majenang
Cijolang river and Cimancing river
Ciamis West Java Java-Bali2 x 443 MW pump turbine or
2 x 460 MVA motor generator
886 MW pump turbine or
920 MVA motor generator
PT. PLN Government
Grindulu pumped storage hydro (COD 2021)Tegalombo Pacitan East Java Java4 x 260 MW pump turbine or
4 x 75 MVA motor generator
1,040 MW pump turbine or
1,100 MVA motor generator
PT. PLN Government [30]
Kali Konto pumped storage hydro (COD 2027)Bandar Kedungmulyo Jombang East Java Java-Bali4 x 260 MW pump turbine or
4 x 275 MVA motor generator
1,040 MW pump turbine or
1,100 MVA motor generator
PT. PLN Government
Lake Toba pumped storage hydro (COD 2020)Toba Toba Samosir North Sumatera Sumatera4 x 110 MW pump turbine or
4 x 125 MVA motor generator
490 MW pump turbine or
500 MVA motor generator
PT. PLN Government
Total18 Units1364 MW pump turbine or
4,720 MVA motor generator

Wind

Power stationLocationDistrictProvinceRegionCapacity per Unit
(MW)
Installed Capacity
(MW)
OperatorSectorRemarks
Sidrap Sidenreng South Sulawesi Sulawesi75 [31]
Jeneponto Jeneponto South Sulawesi Sulawesi72 [32]

Solar

Power stationLocationDistrictProvinceRegionInstalled Capacity
(MW)
OperatorSectorRemarks
Cirata floating solar Cirata Dam Sidenreng West Java Java-Bali192In development [33] [34]
Batam floating solarDuriangkang Reservoir Batam Riau Islands Riau Islands 2200In development [35] [36]

See also

Related Research Articles

<span class="mw-page-title-main">Perusahaan Listrik Negara</span> Indonesian state-owned electricity distribution company

PT Perusahaan Listrik Negara (Persero) (lit.'State Electricity Company', abbreviated as PLN) is an Indonesian government-owned corporation which has a monopoly on electric power distribution in Indonesia and generates the majority of the country's electrical power, producing 176.4 TWh in 2015. It was included in the Fortune Global 500 lists of 2014 and 2015. It has large debts due to expensive coal power contracts.

The Cirebon Steam Power Plant is a 660 MW coal-fired power plant developed by PT Cirebon Electric Power (CEP) in the Kanci area to the southeast of Cirebon, Indonesia. The first unit of the plant was launched in mid October 2012. The reported cost of the plant was around $US 850 million. Construction began in 2008 and was substantially completed, a little behind time, in mid-2012. Sales from the plant to the Indonesian state-owned electricity company Perusahaan Listrik Negara (PLN) began on 27 July 2012.

<span class="mw-page-title-main">Geothermal power in Indonesia</span> Overview of geothermal power in Indonesia

Geothermal power in Indonesia is an increasingly significant source of renewable energy. As a result of its volcanic geology, it is often reported that Indonesia has 40% of the world's potential geothermal resources, estimated at 28,000 megawatts (MW).

<span class="mw-page-title-main">Energy in Indonesia</span> Overview of the production, consumption, import and export of energy and electricity in Indonesia

In 2019, the total energy production in Indonesia is 450.79 Mtoe, with a total primary energy supply is 231.14 Mtoe and electricity final consumption is 263.32 TWh. Energy use in Indonesia has been long dominated by fossil resources. Once a major oil exporter in the world and joined OPEC in 1962, the country has since become a net oil importer despite still joined OPEC until 2016, making it the only net oil importer member in the organization. Indonesia is also the fourth-largest biggest coal producer and one of the biggest coal exporter in the world, with 24,910 million tons of proven coal reserves as of 2016, making it the 11th country with the most coal reserves in the world. In addition, Indonesia has abundant renewable energy potential, reaching almost 417,8 gigawatt (GW) which consisted of solar, wind, hydro, geothermal energy, ocean current, and bioenergy, although only 2,5% have been utilized. Furthermore, Indonesia along with Malaysia, have two-thirds of ASEAN's gas reserves with total annual gas production of more than 200 billion cubic meters in 2016.

<span class="mw-page-title-main">Paiton Power Station</span> Power plant in Indonesia

Paiton Power Station is a large thermal power station located around 35 km to the east of the town of Probolinggo in East Java in Indonesia, about half way between Probolinggo and Situbondo. The extensive complex has a maximum generating capacity of 4,710 megawatts. It is the largest power station in Indonesia and the 10th largest coal-fired power station in the world.

Independent Power Producer (IPP) projects have had a significant presence in British Columbia since the 1980s. Their relationship with BC Hydro grew from the province's need to supply growing energy demands and implementation of the 2002 Energy Strategy, which mandated that BC Hydro would purchase its energy supply from IPPs rather than generating the supply itself. There are a variety of power projects in BC, with the most popular being hydroelectricity and biomass projects. In recent years, more attention has been placed on the environmental effects of IPP projects and the social implications it has to residents living around the project development sites. Despite the decline in demand for new IPP projects, in 2016 they supplied 20,000 GWh, one-third of BC Hydro's total.

ACEN Corporation, formerly AC Energy, is the energy firm under the Ayala Group. The company has over 4,000 MW of attributable capacity in the Philippines, Vietnam, Indonesia, India, and Australia, with a renewable share of 98% which is among the highest in the region.

References

  1. Large Scale Hydropower Plants in Indonesia by Indonesia Hydro Consult (http://www.arcgis.com/apps/OnePane/basicviewer/index.html?appid=65ed8bc862bd4af09c375d49f9d389d4)
  2. Small Scale Hydropower Plants in Indonesia by Indonesia Hydro Consult (http://www.arcgis.com/apps/OnePane/basicviewer/index.html?appid=2dffb753a63142b0bf7075389414daae)
  1. 1 2 "Coal-Fired Power Plants in Indonesia - other islands". Gallery. Power Plants Around The World. 25 January 2014. Archived from the original on 6 December 2012. Retrieved 9 March 2014.
  2. "Paiton PLN Coal Power Plant Indonesia - GEO". Global Energy Observatory. Retrieved 9 March 2014.
  3. "Suralaya Coal Power Plant". Global Energy Observatory. Retrieved 9 March 2014.
  4. 1 2 3 4 5 6 7 8 9 "Coal-Fired Power Plants in Indonesia - Java". Gallery. Power Plants Around The World. 25 January 2014. Archived from the original on 31 January 2014. Retrieved 9 March 2014.
  5. Introduction to Indonesia Labuhan Angin 2X115MW CFB Power Plant Project
  6. Shanghai Electric Suppliers of power plant equipment in Indonesia
  7. Java 4 Coal Power Station Will Operate In 2021
  8. Java 7 Coal Power Station Will Finish Faster
  9. Consortium J-Power, Ithocu and Adaro is the bid winner of PLTU Central Java 2x1000 MW Archived 2012-04-16 at the Wayback Machine
  10. "CCGT Plants in Indonesia". Gallery. Power Plants Around The World. 17 October 2012. Retrieved 9 March 2014.
  11. "Grati CCGT Power Plant". Global Energy Observatory. Retrieved 9 March 2014.
  12. "Gresik CCGT Power Plant". Global Energy Observatory. Retrieved 9 March 2014.
  13. "Muara Karang CCGT Power Plant". Global Energy Observatory. Retrieved 9 June 2014.
  14. "Muara Karang Gas Power Plant Project" (PDF). Project Fact Sheet. Tebeton. Archived from the original (PDF) on 14 July 2015. Retrieved 9 June 2014.
  15. The geothermal steam turbine generator is produced by Fuji Japan Ltd [ permanent dead link ]
  16. Yokogawa Receives Control System Order for Geothermal Power Plant from Fuji Electric Systems
  17. http://www.ansaldoenergia.com/PDF/Ref-Therm.pdf [ permanent dead link ]
  18. "Home". fujielectric.com.
  19. http://www.fujielectric.com/company/tech_archives/pdf/47-04/FER-47-04-102-2001.pdf [ bare URL PDF ]
  20. Lahendong (Indonesia) 20 MW geothermal power plant [ permanent dead link ]
  21. Lahendong II-20 MW Geothermal Project [ permanent dead link ]
  22. Yokogawa has won an order from Fuji Electric Systems to supply a CENTUM CS 3000 distributed control system for the Lahendong III
  23. Table 1 Recent geothermal power generation projects
  24. PT Dizamatara Powerindo (DP) propose to set up a geothermal power project in the North Sumatera [ permanent dead link ]
  25. Marubeni and Toshiba Win FTK Order for Indonesia's Patuha Unit 1 Geothermal Power Plant
  26. Sipansihaporas hydro (E/S) - JICA
  27. 1 2 "Archived copy" (PDF). Archived from the original (PDF) on 2016-03-03. Retrieved 2012-03-11.{{cite web}}: CS1 maint: archived copy as title (link)
  28. The description on Riam Kanan Hydro Electric Project in Kalimantan (Indonesia)
  29. Rencana Usaha Penyediaan Tenaga Listrik PT. PLN (Persero)2011 - 2020
  30. "Acceleration and Expansion of Indonesian Economic Development 2011-2025" (PDF). Master Plan. Retrieved 22 January 2012.[ permanent dead link ]
  31. Andi, Hajramurni (2018-07-02). "Jokowi inaugurates first Indonesian wind farm in Sulawesi". The Jakarta Post. Retrieved 2020-02-19.
  32. Tampubolon, Agus Praditya (2019-07-17). Simamora, Pamela (ed.). "Wind Farm is Coming to Indonesia, and The Power Sector isn't Ready". IESR. Archived from the original on 30 August 2021. Retrieved 2021-08-30.
  33. Garanovic, Amir (2023-03-07). "Chinese company to supply floating system for Indonesia's 192MW floating solar farm". Offshore Energy. Retrieved 2023-07-15.
  34. "Cirata Floating Solar Photovoltaic". masdar.ae. Retrieved 2023-07-15.
  35. Correspondent, Wahyudi SoeriaatmadjaIndonesia (2023-07-07). "Work on Indonesia-Singapore floating solar farm in Batam to start next year". The Straits Times. ISSN   0585-3923 . Retrieved 2023-07-15.
  36. "Sunseap signs MoU to build floating solar farm in Batam". Data Centre Dynamics.