Oesterdam | |
---|---|
Coordinates | 51°28′43.4″N4°13′11.6″E / 51.478722°N 4.219889°E |
Carries | N659 road |
Crosses | Eastern Scheldt Estuary |
Owner | Rijkswaterstaat |
Characteristics | |
Total length | 10.5 kilometres (6.5 mi) |
History | |
Engineering design by | Deltadienst |
Constructed by | Several contractors, including: Zanen Verstoep, Baggermaatschappij Holland bv, and Volker Stevin Baggeren |
Construction start | 1979 |
Construction end | 1986 |
Opened | 1989 (fully open with N569 road constructed over the dam) |
Location | |
The Oesterdam (English: Oyster Dam) is a compartmentalisation dam in The Netherlands, situated between Tholen and South Beveland in the eastern part of the Eastern Scheldt. The dam, with a length of 10.5 kilometres, is the longest structure built for the Delta Works. The Oesterdam was necessitated, like the Philipsdam, after the decision was taken to close off the Eastern Scheldt with a storm surge barrier, rather than a solid dam.
The dam contains a large sluice, the Bergse Diepsluis, and is located adjacent to a pair of sluices at Kreekrak, where about 80,000 ships pass every year.
The Oesterdam was not originally part of the planned Delta Works, but rather is one of the compartmentalisation dams which became necessary when it was decided not to close off the Eastern Scheldt, but to provide it with a permeable barrier. [1] [2]
The reduced tidal movement in the estuary associated with this decision meant that, to achieve sufficient tidal movement, the surface area of the Eastern Scheldt would have to be reduced. This was achieved by the construction of compartmentalisation dams: the Markiezaatskade, the Philipsdam, the Volkerakdam, and the Oesterdam. [3] [1] [4] [5]
With the construction of the compartmentalisation works, the freshwater Volkerak-Zoommeer was created, with benefits for agriculture. At the same time, a tide-free shipping route was created from the Volkerak locks to Antwerp. [3]
The Commissie Compartimentering Oosterschelde (English: Committee for Compartmentalisation of the Eastern Scheldt) was formed under the aegis of the Dutch Minister of Transport and Water Management. Its mandate included reporting to both the minister and the provincial authorities of Zeeland and North Brabant by 30 April 1975. This report was to cover the technical, planning, and financial considerations of various proposals for compartmentalising the Eastern Scheldt. [6]
The necessity of this committee arose from the need to maintain a substantial tidal difference at Yerseke and to ensure tide-independent inland navigation between Antwerp and Rotterdam, in accordance with an existing treaty with Belgium. The committee evaluated multiple alternatives, each suggesting a unique design for the dam. The chosen plan for the Oesterdam entailed a path from the Scheldt-Rhine Canal through the Bathse polders in a northerly direction, incorporating a separate spillway channel leading to a sluice in the Western Scheldt – the Bathse sluice – along with enhancements to the Canal through South Beveland. [1] [6] [4]
In the initial phases, the Bathse spillway channel's dam body was positioned west of the Kreekrak locks, intended to become operational concurrent with the completion of the Oesterdam. The proposed lock connecting the Zoommeer and the Eastern Scheldt was planned to be situated southwest of the Tholense Gap. This location was selected for its feasibility and its connection to an easily constructible section of the dam over the Speelmansplaten. This configuration resulted in two remaining gaps, the Marollegat and the Tholense Gap, that needed closure. [1]
Construction began after the completion of the Markiezaatskade dam (1981 - 1983), the tidal effects of the completed dam making the construction of the Oesterdam easier. The initial strategy for the Oesterdam's construction involved using a sand closure for the extensive southern segment up to the new Bergse Diepsluis, and completing the section from the Bergse Diepsluis to Tholen with a cable car and concrete blocks. Construction commenced in 1979 with the establishment of a work island on the Speelmansplaten, which was completed by 1980. [1] [7]
The geotechnical and engineering geology challenges during the construction of the Oesterdam were substantial. The Holocene strata, extending from N.A.P. -5 m to -16 metres, were irregular, consisting of sand, peat, and clay layers of varying thickness. Beneath these, Pleistocene layers included deposits of sand with interspersed clay and shell grit. Towards Speelmansplaten and the Marolle Gap, the Holocene layer's thickness decreased, indicating lesser erosion over time. [8]
In some areas, thick deposits of the Dunkirk clay formation were directly on top of peat, or beneath a sand covering. Significant erosion by the Scheldt river had previously formed a valley in the southernmost 100 metres of the works, which had later filled with a complex mix of clay and sand. [8]
Geotechnical investigations had revealed poor subsoil quality at the Speelmansplaten and Marolle Gap dike sections. To minimise instability risks during construction, various solutions were explored, such as supporting berms, vertical drainage, soil improvement, and phased construction with specific profiles to ensure stability. [8]
For the construction of the dam body, particular attention was paid to the soil structure. The design followed the top of the load-bearing Pleistocene sand. A uniformly wide base width of 76 metres was adopted for simplicity, widened to 110 metres near the last closing gap of the Marolle Gap to minimise instability risks. In the South dike section, the subsoil allowed for direct construction on the existing ground over 100 metres. The termination of the excavation work was strategically planned to ensure stability. Specific requirements were set for dam body construction in transition areas, focusing on maintaining stability and integrity. [8]
The dam was then constructed in stages. Owing to delays and advancements in dredging technology, which offered increased capacities at relatively lower costs, it was later decided to execute the Tholense Gat closure also with sand. This approach necessitated creating an extended tidal curve for several days, by partially closing the Oosterscheldekering. An assessment of the environmental impact of this method deemed it acceptable. [8] [9]
The dredging vessels used on the project included the Aquarius, the Sliedrecht 27, the Zuiderklip, and the Mercurius. [10] [8] The production data of some of the dredgers, showing the increase in output from the originally planned sand closure volumes, is presented in the table below: [8]
Dredger | Planned Output (m³/h) | Achieved Output (m³/h) |
---|---|---|
Aquarius [11] | 4800 | 6500 |
Sliedrecht 27 [12] | 4200 | 5300 |
Zuiderklip [13] | 3000 | 4400 |
In 1986, the dam's closure was executed using sand as the primary material. The construction of the road (N659) across the dam was completed in 1989. This new route was inaugurated by the Commissioner of the King, Kees Boertien, marking its official opening to the public. [8]
The Bergse Diepsluis, situated at the northern extremity of the dam, stands on the historical site of the submerged city of Reimerswaal. The city was destroyed by repeated floods, and the last citizens left in 1632. Recognising the historical significance of the area, an information centre was established at the Bergse Diepsluis in July 2022. This centre serves as a memorial and educational point, detailing the history of approximately 250 villages in Zeeland that were submerged in Reimerswaal (in the period 1550-1650) and elsewhere in the province. [14] [15]
Zeeland is the westernmost and least populous province of the Netherlands. The province, located in the southwest of the country, borders North Brabant to the east, South Holland to the north, as well as the country of Belgium to the south and west. It consists of a number of islands and peninsulas and a strip bordering the Flemish provinces of East and West Flanders. Its capital is Middelburg with a population of 48,544 as of November 2019, although the largest municipality in Zeeland is Terneuzen. Zeeland has two seaports: Vlissingen and Terneuzen. Its area is 2,934 square kilometres (1,130 sq mi), of which 1,151 square kilometres (440 sq mi) is water; it has a population of 383,689.
The Delta Works is a series of construction projects in the southwest of the Netherlands to protect a large area of land around the Rhine–Meuse–Scheldt delta from the sea. Constructed between 1954 and 1997, the works consist of dams, sluices, locks, dykes, levees, and storm surge barriers located in the provinces of South Holland and Zeeland.
The Eastern Scheldt is a former estuary in the province of Zeeland, Netherlands, between Schouwen-Duiveland and Tholen on the north and Noord-Beveland and Zuid-Beveland on the south. It also features the largest national park in the Netherlands, founded in 2002.
Goeree-Overflakkee is the southernmost delta island of the province of South Holland, Netherlands. It is separated from Voorne-Putten and Hoeksche Waard by the Haringvliet, from the mainland of North Brabant by the Volkerak, and from Schouwen-Duiveland by Lake Grevelingen.
The Haringvliet is a large inlet of the North Sea, in the province of South Holland in the Netherlands. It is an important estuary of the Rhine-Meuse delta.
The Scheldt–Rhine Canal (Schelde-Rijnkanaal) in Belgium and the Netherlands connects Antwerp with the Volkerak, and thereby the Scheldt with the Rhine.
Dredging is the excavation of material from a water environment. Possible reasons for dredging include improving existing water features; reshaping land and water features to alter drainage, navigability, and commercial use; constructing dams, dikes, and other controls for streams and shorelines; and recovering valuable mineral deposits or marine life having commercial value. In all but a few situations the excavation is undertaken by a specialist floating plant, known as a dredger.
The Oosterscheldekering, between the islands Schouwen-Duiveland and Noord-Beveland, is the largest of the Delta Works, a series of dams and storm surge barriers, designed to protect the Netherlands from flooding from the North Sea. The construction of the Delta Works was a response to the widespread damage and loss of life in the North Sea flood of 1953.
Yerseke is a village situated on the southern shore of the Oosterschelde estuary in the Dutch province of Zeeland. A separate municipality until 1970, it today forms part of the municipality of Reimerswaal. As of 2010 Yerseke had a recorded population of 6,695 inhabitants, living in 2,680 households.
The Rhine–Meuse–Scheldt delta is a river delta in the Netherlands formed by the confluence of the Rhine, the Meuse and the Scheldt rivers. In some cases, the Scheldt delta is considered a separate delta to the Rhine–Meuse delta. The result is a multitude of islands, branches and branch names, in which a waterway that appears to be one continuous stream may have numerous separate names for different sections, e.g. Rhine → Bijlands Kanaal → Pannerdens Kanaal → Nederrijn → Lek → Nieuwe Maas → Het Scheur → Nieuwe Waterweg. Since the Rhine contributes most of the water, the term "Rhine Delta" is commonly used, although this name is also used for the delta where the Alpine Rhine flows into Lake Constance. By some calculations, the Rhine–Meuse–Scheldt delta covers 25,347 km2 (9,787 sq mi), making it the largest in Europe.
The Philipsdam is a dam constructed as part of the Delta Works in the Netherlands. It separates water of the lakes Krammer and Volkerak from the Oosterschelde. The dam connects the Grevelingendam to Sint Philipsland.
The Markiezaatskade is a compartmentalisation dam in The Netherlands, situated between South Beveland and Molenplaat, near Bergen op Zoom. The dam was constructed as part of the Delta Works, and has a length of 4 kilometres.
The Volkerakdam or Volkerakwerken is the name given to a group of hydraulic engineering structures located between Goeree-Overflakkee and North Brabant in The Netherlands. The works are not a single dam, but are composed of three distinct structures: a dam between Goeree-Overflakkee and Hellegatsplein, a series of locks from Hellegatsplein to North Brabant, and a bridge from Hellegatsplein to Hoekse Waard. The works cross three separate bodies of water: the Haringvliet, Hollands Diep and Volkerak. The works together comprise the fifth project of the Delta Works.
The Grevelingendam is a dam located in the Grevelingen sea inlet between Schouwen-Duiveland and Goeree-Overflakkee in The Netherlands. The Grevelingendam was the fourth structure constructed as part of the Delta Works.
The Stormvloedkering Hollandse IJssel, Hollandse IJsselkering or Algerakering is a storm surge barrier located on the Hollandse IJssel, at the municipal boundary of Capelle aan den IJssel and Krimpen aan den IJssel, east of Rotterdam in The Netherlands. The construction of the works comprised the first project of the Delta Works, undertaken in response to the disastrous effects of the North Sea flood of 1953. Prior to 1954, the spelling Hollandsche was used in the official name.
The Zandkreekdam is a compartmentalisation dam located approximately 3 kilometres north of the city of Goes in The Netherlands, which connects Zuid-Beveland with Noord-Beveland, and separates the Oosterschelde from the Veerse Meer.
Frank Spaargaren was a Dutch hydraulic engineer who was one of the main designers of the Oosterscheldekering and served as a director of the Waterloopkundig Laboratorium in Delft.
Pieter Philippus Jansen was a Dutch civil engineer and hydraulic engineer who made significant contributions to hydraulic engineering in The Netherlands. He spent the majority of his career with Rijkswaterstaat, working on several major projects including the first phase of the Delta Works and leading the reclamation and repair efforts following the inundation of Walcheren.
Jan Fokke Agema was a Dutch Hydraulic Engineer and Professor at Delft University of Technology. He is notable for his design of the harbour entrance at Hoek van Holland and involvement in the construction of the Oosterscheldekering. The prof. dr.ir. J.F. Agemaprijs is named for him, and has been awarded every five years since 2000.
A compartmentalisation dam is a dam that divides a body of water into two parts. Such a dam is constructed, for instance, to regulate water levels separately in different sections of a basin. A notable application of a compartmentalisation dam is when it's built to enable closures with multiple tidal inlets, such as in the case of the Delta Works.