White House Reconstruction

Last updated

The gutted interior of the White House, May 1950 The Shell of the White House during the Renovation-05-17-1950.jpg
The gutted interior of the White House, May 1950

The White House Reconstruction, also known as the Truman Reconstruction, was a comprehensive dismantling and rebuilding of the interior of the White House from 1949 to 1952. A century and a half of wartime destruction and rebuilding, hurried renovations, additions of new services, technologies, the added third floor and inadequate foundations brought the Executive Residence portion of the White House Complex to near-imminent collapse.

Contents

In 1948, architectural and engineering investigations deemed it unsafe for occupancy. President Harry S. Truman, his family, and the entire residence staff were relocated across the street to Blair House. For over three years, the White House was gutted, expanded, and rebuilt.

Emerging problem

The Blue Room in 1945, with the chandelier that swayed White House Blue Room-11-13-1947.jpg
The Blue Room in 1945, with the chandelier that swayed

When the Trumans moved into the executive mansion in 1945, they found it badly in need of repair after twelve years of neglect during the Great Depression and World War II. In 1946, Congress authorized $780,000 ($11 million in 2020 dollars) for repairs. The mansion's heaving floors and mysterious sounds had been known by staff and first families for many years. [1] For the first two years of his presidency, according to White House photographer Abbie Rowe, President Truman heard "ghosts" roaming the halls of the second floor residence. [2] [3] Government agencies had expressed concern about the condition of the building, including a 1941 report from the Army Corps of Engineers warning of failing wood structure, crumbling masonry, and major fire hazards. The report was dismissed by President Franklin D. Roosevelt. [4]

In early 1946, during a formal reception in the Blue Room, the First Lady noticed the very large crystal chandelier overhead swaying and its crystals tinkling. The floor of the Oval Study above moved noticeably when walked on, and a valet was then attending the president while he was taking a bath. Truman described a potential scenario of him in his bathtub falling through the floor into the midst of a Daughters of the American Revolution tea "wearing nothing more than his reading glasses.". [5] In early 1947, a "stretching" chandelier in the East Room and another swaying in the Oval Study caused further alarm. [6] [7] "Floors no longer merely creaked; they swayed." [8]

Investigations

The Public Buildings Administration was asked to investigate the condition of the White House, but no action was taken until January 1948. After the commissioner of the Public Buildings Administration, which had responsibility for the White House, noticed the Blue Room chandelier swaying overhead during another crowded reception, he and the White House Architect conducted their own on-site investigation the next day. They discovered split and gouged-out beams supporting the ceiling and second floor above. He reported "that the beams are staying up there from force of habit only." [9] [10] The number of occupants in the second floor was restricted, temporary fixes were made to some of the beams, and scaffolding-type supports were erected throughout the first family's second floor living quarters.

On January 30, 1948, the president received a confidential report from the Commissioner of Public Buildings warning of the "imminent collapse" of the second floor of the mansion. [11] In February, the president invited the president of the American Institute of Architects, Douglas Orr, and the president of the American Society of Civil Engineers, Richard E. Dougherty, to "make a structural survey of the safety of the White House". Their one-day investigation concluded with a report issued that same day which said the second floor structure was a fire hazard and was in danger of collapse. [8]

They recommended that the second floor should be reconstructed as soon as possible, electricity use be cut to a minimum, and that further investigations be undertaken. [12] Congress provided $50,000 for a more thorough investigation. Additional engineers and other professionals were engaged from the private sector. Walls, ceilings, and floors were opened up to provide access to the investigators. [13]

Collapse

A split beam supporting the second floor under Margaret Truman's Sitting Room, 1949 Broken Beam under Margaret Truman's Sitting Room-ca.-1949.jpg
A split beam supporting the second floor under Margaret Truman's Sitting Room, 1949

In June 1948, a leg of Margaret Truman's piano crashed through the floor in her second floor sitting room and through the ceiling of the Family Dining Room below. Investigators found the floor boards had rotted, the main floor beam was split completely through, and the ceiling below had dropped 18 inches (46 cm). The investigators determined that the west end of the second floor was sinking. [14]

The first family was relocated from the west to the east end of the floor. [14] Steel bracing was added to support the second floor and ceilings throughout the residence. The investigation concluded that the problem was a collapsing building, not just a floor, and "heroic remedies" would be required. [15]

That year was an election year and the president feared that news of the collapsing White House would serve as an unflattering metaphor for his administration. On September 30, 1948, the White House Architect announced that the White House's "structural nerves" had been damaged, the second floor would need to be rebuilt, but that overall the building was in "good shape". He estimated the cost of repairs might be $1 million. [16]

The on-site forensic investigations continued while the first family was away campaigning. In October, the ceiling of the East Room began to collapse and required wood supports. The structure under the Grand Staircase was found to be crumbling. The president's bathtub had begun sinking into the floor. The investigators discovered that the foundations of the interior walls supporting the upper floors and roof were all but non-existent. [17]

As they sank into the ground, the interior walls and floors were pulling away from the exterior walls leaving large gaps. They determined that the interior of the house was sinking and in danger of collapsing inward; the entire mansion was unsafe, except for the new Truman Balcony. [17]

Upon returning to the White House the day after winning the election, the president was informed by the Federal Works Agency to vacate the White House so critical repairs could be made. On November 7, 1948, the news was made public. [18] The Trumans departed town and within two weeks the White House was vacated. Furniture, staff, and the first family moved into Blair House, the President's guest house, across Pennsylvania Avenue.

Contributing factors

There were multiple contributing factors that led to the White House's pending collapse in 1948, including original and subsequent design flaws, improper materials, multiple small and major renovations carried out by many presidents to accommodate differing tastes, needs, and advances in technologies. [19] Collectively, they were described as a "slow murder" of the White House. [20]

Fire: In August 1814, the White House was gutted by a fire set by British troops during the Burning of Washington in the War of 1812. Only a heavy rainstorm prevented the entire structure from being destroyed. By 1817, the building had been rebuilt. Key portions of the scorched wooden structure were re-used. [18]

Services: Technological advances in heating, plumbing, lighting, communications, and elevators were all added into the White House during its first century-and-a-half. When the White House was constructed, it had no indoor plumbing, on-site running water, fire fighting systems, electricity, or communications systems. Many of these were cut through major structural supports, including reducing wooden beams from 14 to 2 inches thickness. [21] Earlier systems that became obsolete, such as old water pipes, gas pipes for lights, and forced-air heating ducts, were abandoned in place, adding significant weight to the building. [20]

1902 renovation: In 1902, President Theodore Roosevelt engaged architect Charles F. McKim of McKim, Mead, and White for a major renovation. In addition to adding a "temporary" West Wing and upgrading interior finishes, the work included adding bathrooms, removing the west stair, expanding the second floor West Sitting Hall, and expanding the State Dining Room. This involved removing a load-bearing wall which had supported the floor and walls above and then hanging them from the existing attic (later third floor) and roof structure. Many structural deficiencies were noted and partially addressed in what McKim termed a "nip and tuck". [22]

Third floor addition: In 1927, President Coolidge engaged architect William Adams Delano to design and add a concrete and steel third floor under a rebuilt roof. The original roof and attic floor were supported only on the heavy exterior walls. This renovation transferred much of their weight onto the interior walls which by 1948 began to fail. Bathrooms added to this new floor were outfitted with second-hand pipes that over the following years leaked and caused water damage on the floors below. [20]

Construction flaws: The interior supporting walls were made of brick without proper foundations, unlike the thick exterior sandstone walls supported on relatively deep and wide foundations. By 1948, the interior walls were settling significantly into the underlying clay soils and thin rubble base, causing them to pull away from the exterior walls. In time, the exterior walls would have been pulled in and collapsed. [20] The structural integrity of the marble grand staircase was found to be in 'imminent danger' during the 1948 Congressional survey. In the 1880s, secondhand bricks had been acquired for the staircase's supporting structure and were 'disintegrating' beneath it by 1948. This was a notable safety concern as the White House had only one small elevator at the time and the grand staircase supported significant human traffic. [23]

Schedule: A contributing factor common to most of this work was a rushed schedule. Presidents facing a four-year term didn't have the time, and in many cases, the patience, needed for proper design and construction. For the 1902 renovation, President Theodore Roosevelt allowed just four months. [22]

Project definition

By late 1948, three main options were considered for replacement of the White House:

During 1949, the investigations were completed, the architectural and engineering design was finalized, and cost estimates concluded that the early estimate of $1 million was inadequate. In addition to simply replacing the interior, the mansion was to be modernized, the third floor expanded, two basement levels added, and there would be a major expansion of underground spaces for air conditioning and other services. The total number of rooms was nearly doubled to 132. [24]

There was significant debate among Congressional committee members considering the project, including many in Congress who were outwardly hostile toward the president. Both Trumans lobbied in favor of preserving the exterior walls intact. Eleanor Roosevelt wrote a newspaper column advocating for its preservation, and the White House Architect also expressed his support. [25] [26]

The desire to seek the most economic solution was weighed against the costs of maintaining the White House's historic presence. In the autumn of 1949, Congress authorized funding of $5.4 million ($61.4 million in 2021 dollars) for the entire project to reconstruct the White House while keeping the exterior walls in place.

Key participants

Commission on the Renovation of the Executive Mansion

President Truman and the Committee for the Renovation of the Executive Mansion, 1949 President Harry S. Truman and the Committee for the Renovation of the White House-06-20-1949.jpg
President Truman and the Committee for the Renovation of the Executive Mansion, 1949

Congress created the Commission on the Renovation of the Executive Mansion following the March 1949 recommendation of the president. It was granted authority to act on behalf of the federal government in the execution of the project, including responsibility for the White House and its site. It was composed of six men: two each appointed by the president, the Senate, and the House of Representatives. [27]

The president appointed American Institute of Architects president Douglas Orr and American Society of Civil Engineers president Richard E. Dougherty. Additional members of the commission were Senator Kenneth D. McKellar (chairman), Senator Edward Martin, Representative J. Harry McGregor, and Representative Louis C. Rabaut. [27] Supporting them were a team of consulting architects, engineers, and contractors. It continued its work until October 1952.

Fine Arts Commission

The United States Commission of Fine Arts (CFA) had approving authority for most of the design work, including interiors. Advising the commission was architect William Adams Delano of the New York firm of Delano and Aldrich, former chair of the commission, and architect of the 1927 third floor addition and advisor for the 1946 Truman Balcony. The CFA was granted Congressional authority to review, but did not have formal authority. President Truman had all but ignored them after they rejected his balcony, but their opinion carried significant weight with public and Congressional opinion and so their approval was sought for major design decisions of the reconstruction project. [28]

Resident owner

The president was both the recent and future resident, and also the current occupant of the West Wing. While the commission was in overall charge of the project, President Truman was a highly influential participant from early design and throughout all stages of construction. From an early meeting he made known he had a history of watching over the general contractor, while a senator overseeing construction of the Pentagon. The president was also known to conduct tours, sometimes daily, of the worksite, including climbing scaffolding. Truman was a man of strong opinions relating to architecture and history, and in directing the work he made his presence felt.

Architect

Lorenzo Winslow, the White House Architect, was employed by the Public Works Administration. He had been in the position since it was created for him by President Franklin Roosevelt. In 1933 Winslow won a competition to design a White House swimming pool. [29] He maintained a close working relationship with President Truman throughout his administration.

Project manager

The Commission selected General Glen Edgar Edgerton as the overall manager of the project. His experience included selecting the route of the Panama Canal and constructing the Alaska Highway during World War II. He began work for the Commission in July 1949, just before they made the decision on reconstruction. [30]

Contractor

The general contractor was John McShain Inc., headed by John McShain, the "Builder of Washington" who had constructed (among other works) the Jefferson Memorial, the Pentagon, and the FDR Library at Hyde Park. [31] McShain's on-site construction manager was Paul Hauck, who had also been in charge of the Pentagon project.

Reconstruction

The scope of the project involved the complete removal of the interior of the White House, except for the third floor, and included salvage and storage of critical interior elements, excavation of new basement levels, and construction of new foundations, steel and concrete structure, masonry interior walls with plaster finish and wood paneling, custom plaster moldings, refurbished and replacement windows, and new heating, ventilation, air conditioning, plumbing, electrical, and communications systems. [32]

The bulk of the work was to be accomplished within the exterior stone walls which were to be kept in place and repainted. Landscaping around the house was to be replaced. All workers were subjected to security clearance by the Secret Service. The West Wing was to be kept fully operational and occupied by the president and his staff. All work was to be completed for a total cost of $5.4 million and completed by late 1951, in 660 days, approximately 22 months. [32]

Changes in design

The State Dining Room after the 1902 Roosevelt renovation with the pre-reconstruction paneling The State Dining Room by Detroit Photographic Company.jpg
The State Dining Room after the 1902 Roosevelt renovation with the pre-reconstruction paneling
The Grand Stair from the Cross Hall. During the reconstruction it was revised to open into the Entrance Hall with a landing at this end WHgrandstair'46.jpg
The Grand Stair from the Cross Hall. During the reconstruction it was revised to open into the Entrance Hall with a landing at this end

The rooms of the state floor were reconstructed with few significant changes. The second floor rooms were adjusted to provide built-in closets and additional bathrooms, but otherwise were rebuilt largely as they had been. The third floor was expanded and the rooftop solarium replaced. Two new basement levels were added under the ground floor.

The most noticeable change to the state floor was revising the Grand Stair to discharge eastward into the Entrance Hall to provide a more ceremonial procession from the upstairs. The opening to the south was kept with a railing providing a balcony-type overview into the Cross Hall. On the second floor, the rooms above the East Room were lowered due to a thinner, yet stronger, steel floor structure. This allowed access from the Center Hall via a short ramp in a central passageway that was narrowed to accommodate an additional service stair and added closets. Additions to the ground floor included additional service elevators to service the upper floors, a bowling alley, expanded kitchen, broadcast studio, barber shop, medical and dental clinics, carpentry and upholstery shops, and large service and equipment spaces. [8]

The style Winslow selected for the interior finishes of the re-created main public rooms was the Federal style from the 1800-1820 period of President James Monroe's rebuilding. This was a reversal from the variety of styles added in the previous 120 years. Winslow incorporated more marble flooring and paneling for aesthetics and ease of maintenance. Some changes requested by the Trumans, such as brightening the State Dining Room by painting the dark wood paneling "Federalist" celadon green, were also popular in the mid-20th Century.

Bidding and delivery

In September, 1949 the Commission invited bids from interested general contractors. Screening for required experience and capacity was undertaken by each bidder having to complete a detailed questionnaire. The construction delivery method, or type of construction contract, was a "fixed-fee-cost-plus", meaning the work would be performed for the cost of the materials and labor plus a fixed fee for the general contractor's overhead and profit. On October 28, 1949, the General Services Administration received bids from 15 general contractors ranging up to $950,000 for fees. The low bid was for $100,000 from John McShain Inc.; by the end of the project, he had reportedly lost approximately $200,000, bringing his total costs for supervision, management, and other overhead to around $300,000. [31] [33]

Construction

Removing debris from the interior, February 1950 Removing Debris from the Renovation of the White House-02-27-1950.jpg
Removing debris from the interior, February 1950
Demolition of the Second Floor Oval Study and the Blue Room below, March 1950 Second Floor Oval Study above Blue Room during the White House Renovation-03-09-1950.jpg
Demolition of the Second Floor Oval Study and the Blue Room below, March 1950
Demolition on the second floor, January 1950 Second Floor Corridor of the White House-01-03-1950.jpg
Demolition on the second floor, January 1950
Construction of underground service and utility spaces by the northeast corner of the mansion, November 1950 View of the Northeast Corner of the White House during the Renovation-11-06-1950.jpg
Construction of underground service and utility spaces by the northeast corner of the mansion, November 1950

On December 13, 1949, construction work began on site. There was no groundbreaking or commencement ceremony. Security fencing went around the work area and a solid screen provided privacy for the West Wing. Temporary sheds and buildings were erected on the South Lawn. By March 20, 1950, the removal of historic material slated for salvage had been completed. New underpinning foundations extending down 20 feet (6 m) were hand dug under the existing exterior walls, to increase their load bearing capability. Interior steel shoring was added to brace the exterior walls and support the existing third floor and roof.

Demolition began with much of the material removed from the interior via chutes through window openings and by wheelbarrow. By mid-1950 the White House exterior was essentially a shell encompassing over one million cubic feet (28,000 m3) of mostly empty space. By October the new, permanent steel structure was in place and construction of suspended concrete floors to replace the former wood and masonry structure began. For the following year-and-a-half, the new interior walls, doors, windows, wiring, pipes, services, and finishes were constructed.

Key challenges

From the outset the reconstruction project faced significant challenges. Access to the area of work was highly restricted, both by security, the occupied West Wing, and by the exterior stone walls which had to remain in place. The logistics of construction were complex; it was described as needing to "balance a stone house in the sky" while new foundations were dug beneath its walls. [34]

The architect was often behind in providing key drawings, specifications, and reviews to the contractor, in part due to delays in obtaining numerous approvals from the commission. There were almost no record drawings showing the existing construction, which required added investigations and details to be developed during construction. In 1950, the Korean War brought inflation and shortages of key materials and labor.

Protective measures

The biggest change during construction was announced on August 1, 1950, when the president authorized a separate and highly secret project. Project 9 was officially described as "certain protective measures" to be added to the new basement: an underground shelter to resist attack from an atomic bomb. It was designed by the same architect and contractor as the main project and installed under the East Terrace and the garden to the south, between the mansion and the East Wing. [35] [36]

Access was through the northeast corner of the new basement level. This additional construction included major excavation, heavy concrete reinforcement of the mansion's basement, upgrading the existing air raid shelter, and dismantling much of the East Terrace and colonnade. Inside the mansion a heavily reinforced concrete tunnel to connect the West and East Wings was added through the middle of the new basement, which complicated and delayed the main construction. [35] [36]

Preservation

Historic preservation of buildings during this time was not as strict or defined as it became later. For its time, simply not demolishing the entire structure was deemed "preservation". Winslow envisioned many of the interior items – from doors, trim, woodwork, and ornamental plaster – would be reused. Most were carefully dismantled, labelled, catalogued, and stored. Much of the paneling was reinstalled in the main public rooms, but other historic elements were simply copied to accommodate increasing cost and time constraints. Many of the original materials that were not deemed of significantly identifiable historic value, such as marble fireplace mantels, or not deemed to be readily reused, such as pipes, were sent to landfills.

To avoid profiteering from the millions of items being carted away from the work site, the project ran a highly publicized souvenir program. Prior to its establishment in January 1951, over 20,000 requests were made for everything from nails to charred wood. Under the program, people could request an order form. From a warehouse, pre-assembled kits were distributed for as little as 25 cents. The kits included items such as an individual brick, nearly a ton of stone, or special paperweights. The program ended in October 1951 and reported a profit of over $10,000.

Interior finishes and furnishings

During the very hasty move-out from the White House in late 1948, the B. Altman and Company department store offered to move and store the more valuable White House furnishings in their climate-controlled warehouses, for a nominal sum. The government deemed it to be "in the interests of the United States" and therefore not subject to public bidding requirements. [37] The store later offered their interior design, decorating, and furniture supply services at true cost with no profit or ability to advertise the work. The government also deemed this to be in the public interest.

Budget and schedule

Cost escalations due to labor shortages and wartime inflation caused an expected cost overrun of $321,000. Congress agreed to fund $261,000, bringing the total cost of the project to $5.7 million. [38] The difference was made by cutting into other areas, including the budget for furniture and interiors. The secret bomb shelter cost $881,000 but was funded out of a separate fund controlled by the president. [36]

The original schedule called for the work to be finished in late 1951. By the end of 1950 the contractor estimated it would take until 1952. John McShain encountered the president at a football game on January 1, 1951, and jokingly told the president he would be in the White House that summer. The president took him seriously, announced it publicly, and invited Princess Elizabeth to visit in the autumn. The state visit occurred, but not in the (unfinished) White House. In early 1952 the president directed that the work needed to be complete by early April in time for a state visit by Queen Juliana of The Netherlands. Soon afterwards he announced he would be returning to the White House two weeks earlier than previously stated.

Completion and aftermath

The Blue Room after the reconstruction, 1952 Blue Room at the White House, Post-Renovation-07-15-1952.jpg
The Blue Room after the reconstruction, 1952

The first family returned to the White House on the evening of March 27, 1952. It was ready for its residents, but the work was not complete. Deficiencies included the main kitchen not being operable in time for a state visit; some rooms without electrical outlets; drafty fireplaces rendering rooms unfit to sleep in; and kitchen sinks found to be too small for the dinner service. [39]

The project had to suit the needs of the modern Presidency while retaining the symbolism of the nation's pre-eminent historic home, adhering to a historical style or period, and working on a very tight budget. Prior to the reconstruction, the greatest historical link was through the house itself; the furnishings and most artwork were from recent decades. The reconstruction retained the historic exterior but removed most of the interior's link to the past. One columnist observed, "When those floors creaked, you knew Lincoln had been walking there before you." [40] The reconstructed interiors were described as "stark", reminding Eleanor Roosevelt of a hotel. [41]

The Trumans both lobbied Congress to preserve the exterior of the White House and, like the Eisenhowers and Kennedys who followed them, were not pleased with the lack of historical furniture. Before departing office, President Truman attempted to obtain an additional $50,000 from Congress for more suitable furniture, but was unsuccessful. [42] Jacqueline Kennedy's restoration a decade later sought to restore this link through the return of historic furnishings, artwork, and interior details. Bess Truman was responsible for creating the Lincoln Bedroom by compiling into one room Lincoln's famous bed and other furniture from the time of his administration that had been discovered and restored by the Trumans. [43]

To bring the White House's history closer to the people, President Truman conducted the first television tour of the White House on April 22, 1952, and opened the mansion to public tours; previously tours were only by way of Congressional appointments. [44]

Presidential families and staff benefited greatly from the installation of air conditioning. Previously, the operations of the White House and West Wing were significantly reduced in summertime as first families and official staff fled the heat and humidity of the capital for cooler climates. After the reconstruction, the White House could operate year-round without regard for summer heat. [45]

Neither the Commission nor the president were satisfied with the work of the general contractor. When the Commission published its official account of the project, it described the work of nearly everyone of significance to the project, except the general contractor, whose name was all but omitted. [46] President Truman publicly expressed praise for the completed work, but the night of his return to the White House he wrote in his private diary: "With all the trouble and worry it is worth it – but not 5½ million dollars! if I could have had charge of the construction it would have been done for half the money and in half the time!" [47]

Related Research Articles

<span class="mw-page-title-main">White House</span> Official residence and workplace of the US president

The White House is the official residence and workplace of the president of the United States. Located at 1600 Pennsylvania Avenue NW in Washington, D.C., it has served as the residence of every U.S. president since John Adams in 1800 when the national capital was moved from Philadelphia. The "White House" is also used as a metonym to refer to the Executive Office of the President of the United States.

<span class="mw-page-title-main">Minnesota State Capitol</span> State capitol building of the U.S. state of Minnesota

The Minnesota State Capitol is the seat of government for the U.S. state of Minnesota, in its capital city of Saint Paul. It houses the Minnesota Senate, Minnesota House of Representatives, the office of the Attorney General and the office of the Governor. The building also includes a chamber for the Minnesota Supreme Court, although court activities usually take place in the neighboring Minnesota Judicial Center.

<span class="mw-page-title-main">Utah State Capitol</span> State capitol building of the U.S. state of Utah

The Utah State Capitol is the house of government for the U.S. state of Utah. The building houses the chambers and offices of the Utah State Legislature, the offices of the Governor, Lieutenant Governor, Attorney General, the State Auditor and their staffs. The capitol is the main building of the Utah State Capitol Complex, which is located on Capitol Hill, overlooking downtown Salt Lake City.

<span class="mw-page-title-main">Blue Room (White House)</span> Room in the White House in Washington, D.C., United States

The Blue Room is one of three state parlors on the first floor in the White House, the residence of the president of the United States. It is distinctive for its oval shape. The room is used for receptions and receiving lines and is occasionally set for small dinners. President Grover Cleveland married Frances Folsom in the room on June 2, 1886, the only wedding of a President and First Lady in the White House. The room is traditionally decorated in shades of blue. With the Yellow Oval Room above it and the Diplomatic Reception Room below it, the Blue Room is one of three oval rooms in James Hoban's original design for the White House.

<span class="mw-page-title-main">East Room</span> Event and reception room in the Executive Residence

The East Room is an event and reception room in the Executive Residence, which is a building of the White House complex, the home of the president of the United States. The East Room is the largest room in the Executive Residence; it is used for dances, receptions, press conferences, ceremonies, concerts, and banquets. The East Room was one of the last rooms to be finished and decorated, and it has undergone substantial redecoration over the past two centuries. Since 1964, the Committee for the Preservation of the White House has, by executive order, advised the president of the United States and first lady on the decor, preservation, and conservation of the East Room and other public rooms at the White House.

<span class="mw-page-title-main">State Dining Room of the White House</span>

The State Dining Room is the larger of two dining rooms on the State Floor of the Executive Residence of the White House, the home of the president of the United States in Washington, D.C. It is used for receptions, luncheons, larger formal dinners, and state dinners for visiting heads of state on state visits. The room seats 140 and measures approximately 48 by 36 feet.

<span class="mw-page-title-main">Vermeil Room</span> Room in the White House

The Vermeil Room is located on the ground floor of the White House, the official residence of the president of the United States. The room houses a collection of silver-gilt or vermeil tableware, a 1956 bequest to the White House by Margaret Thompson Biddle. Portraits of American First Ladies hang in the room.

<span class="mw-page-title-main">China Room</span>

The China Room is one of the rooms on the Ground Floor of the White House, the home of the president of the United States. The White House's collection of state china is displayed there. The collection ranges from George Washington's Chinese export china to Barack Obama's blue and white themed collection. Almost all administrations are represented with a collection; however, a few are not - most recently, the Trump administration did not have a collection created and instead mainly used the china designed by Hillary Clinton during her time as First Lady. The room is primarily used by the first lady for teas, meetings, and smaller receptions.

<span class="mw-page-title-main">Lincoln Bedroom</span> Room on the White Houses second floor

The Lincoln Bedroom is a bedroom which is part of a guest suite in the southeast corner of the second floor of the White House in Washington, D.C. The Lincoln Sitting Room makes up the other part of the suite. The room is named for President Abraham Lincoln, who used the rooms for his office.

<span class="mw-page-title-main">Family Dining Room</span> Dining room located on the State Floor of the White House

The Family Dining Room is a dining room located on the State Floor of the White House, the official residence of the president of the United States. The room is used for smaller, more private meals than those served in the State Dining Room. Used in the 1800s as a space for the First Family to have their meals, the Family Dining Room was used less for family meals and more for working lunches and small dinners in the 20th and 21st centuries.

<span class="mw-page-title-main">Executive Residence</span> Central building of the White House complex

The Executive Residence is the central building of the White House complex located between the East Wing and West Wing. It is the most recognizable part of the complex, being the actual "house" part of the White House. This central building, first constructed from 1792 to 1800, is home to the president of the United States and the first family. The Executive Residence primarily occupies four floors: the ground floor, the state floor, the second floor, and the third floor. A sub-basement with a mezzanine, created during the 1948–1952 Truman reconstruction, is used for HVAC and mechanical systems, storage, and service areas.

<span class="mw-page-title-main">West Virginia Governor's Mansion</span> United States historic place

The West Virginia Governor's Mansion is a historic residence located next to the Kanawha River in Charleston, West Virginia and is the official residence of the governor of West Virginia.

<span class="mw-page-title-main">Entrance Hall</span> Primary and formal entrance to the White House

The Entrance Hall is the primary and formal entrance to the White House, the official residence of the president of the United States. The room is rectilinear in shape and measures approximately 31 by 44 feet. Located on the State Floor, the room is entered from outdoors through the North Portico, which faces the North Lawn and Pennsylvania Avenue. The south side of the room opens to the Cross Hall through a screen of paired Roman Doric columns. The east wall opens to the Grand Staircase.

<span class="mw-page-title-main">Grand Staircase (White House)</span> Staircase in the White House

The Grand Staircase is the chief stairway connecting the State Floor and the Second Floor of the White House, the official home of the president of the United States. The stairway is primarily used for a ceremony called the Presidential Entrance March. The present Grand Staircase, the fourth staircase occupying the same general space, was completed in 1952 as a part of the Truman White House reconstruction. The Grand Staircase is entered on the State Floor from the Entrance Hall.

<span class="mw-page-title-main">Portland City Hall (Oregon)</span> Historic building in Portland, Oregon, U.S.

Portland City Hall is the headquarters of city government of Portland, Oregon, United States. The four-story Italian Renaissance-style building houses the offices of the City Council, which consists of the mayor and four commissioners, and several other offices. City Hall is also home to the City Council chambers, located in the rotunda on the east side of the structure. Completed in 1895, the building was added to the National Register of Historic Places on November 21, 1974. City Hall has gone through several renovations, with the most recent overhaul gutting the interior to upgrade it to modern seismic and safety standards. The original was built for $600,000, while the 1996 to 1998 renovation cost $29 million.

<span class="mw-page-title-main">West Sitting Hall</span> Room in the White House

The West Sitting Hall is located on the second floor of the White House, home of the president of the United States. The room is entered from the second floor Center Hall on the east side of the room. The room features a large lunette window on the west wall looks out upon the West Colonnade, the West Wing, and the Old Executive Office Building. The room is used by first families as a less formal living room than the Yellow Oval Room.

<span class="mw-page-title-main">Federal Building and Post Office (Brooklyn)</span> United States historic place

The Federal Building and Post Office is a historic main post office, courthouse, and Federal office building at 271-301 Cadman Plaza East in the Downtown Brooklyn neighborhood of Brooklyn in New York City. The original building was the Brooklyn General Post Office, and is now the Downtown Brooklyn Station, and the north addition is the courthouse for the United States Bankruptcy Court for the Eastern District of New York, and is across the street from and in the jurisdiction of the main courthouse of the United States District Court for the Eastern District of New York, the Theodore Roosevelt United States Courthouse. It also houses offices for the United States Attorney, In 2009, the United States Congress renamed the building the Conrad B. Duberstein United States Bankruptcy Courthouse, after chief bankruptcy judge Conrad B. Duberstein.

<span class="mw-page-title-main">Meridian City Hall</span> United States historic place

City Hall in Meridian, Mississippi in the United States is located at 601 24th Avenue. Originally designed by architect P.J. Krouse in 1915, the building underwent several renovations during the 1950s that diminished the historic quality of the building. City Hall was listed on the National Register of Historic Places in 1979 and as a Mississippi Landmark in 1988. After complaints of a faulty HVAC system, the building underwent a restoration to its original 1915 appearance beginning in September 2006. The project was originally estimated to cost $7–8 million and last two years. Because of several factors including the building's listings on historic registers, a lawsuit filed by a subcontractor, and unforeseen structural problems, the final cost and duration of the renovation far exceeded original estimates. The renovation was completed in January 2012 at a total cost projected to reach around $25 million after interest on debt.

<span class="mw-page-title-main">Patterson Mansion</span> Historic house in Washington, D.C., United States

The Patterson Mansion is a historic Neoclassical-style mansion located at 15 Dupont Circle NW in Washington, D.C., in the United States.

<span class="mw-page-title-main">White House to Treasury Building tunnel</span> Tunnel between the White House and the Treasury Building

The White House to Treasury Building tunnel is a 761-foot (232 m) subterranean structure in Washington, D.C. that connects a sub-basement of the East Wing of the White House to the areaway which surrounds the United States Treasury Building. It was initially constructed in 1941 to allow the evacuation of the president from the White House to underground vaults inside the Treasury in an emergency.

References

  1. Klara (2013), p. 6.
  2. Truman 1983, p. 535.
  3. "The White House Revealed: Photos of the White House Renovation by Abbie Rowe". Harry S. Truman Library and Museum. 2001. Archived from the original on July 6, 2015. Retrieved May 2, 2015.
  4. Klara (2013), p. 43.
  5. "How 2 New England Architects Saved the White House, Part I". New England Historical Society. October 9, 2016.
  6. Klara (2013), pp. 5–7.
  7. Klara (2013), pp. 45–46.
  8. 1 2 3 "Truman Reconstruction : 1948-1952". White House Museum. Retrieved May 2, 2015.
  9. Klara (2013), p. 51.
  10. McCullough, David (2011). American Presidents. New York City: Simon & Schuster. ISBN   978-1-45165-815-6 . Retrieved May 2, 2015 via Google Books.
  11. Klara (2013), p. 41.
  12. Klara (2013), p. 58.
  13. Klara (2013), p. 59.
  14. 1 2 Klara (2013), pp. 63–64.
  15. Klara (2013), p. 68.
  16. Klara (2013), p. 69.
  17. 1 2 Klara (2013), p. 71.
  18. 1 2 Resnick, Brian (February 26, 2013). "What the White House Looks Like Completely Gutted". National Journal . Archived from the original on January 6, 2015.
  19. Klara (2013), p. 227.
  20. 1 2 3 4 Gutheim, Frederick (June 1949). "Rebuilding The White House". Architectural Record .
  21. Klara (2013), p. 79.
  22. 1 2 Klara (2013), p. 82.
  23. Furman, Bess (November 7, 1948). "White House Is Closing as Unsafe". The New York Times. Retrieved March 5, 2021.
  24. Klara (2013), p. 246.
  25. Truman (1983), p. 534.
  26. Klara (2013), pp. 100–103.
  27. 1 2 "Records of Temporary Committees, Commissions and Boards: Records of the Commission on the Renovation of the Executive Mansion (Record Group 220)". Harry S. Truman Library and Museum. Retrieved June 14, 2020.
  28. Klara (2013), p. 28.
  29. Klara (2013), p. 30.
  30. Klara (2013), p. 110.
  31. 1 2 "White House Man". TIME . November 14, 1949.
  32. 1 2 Klara (2013), p. 135.
  33. Klara (2013), p. 233.
  34. Klara (2013), p. 119.
  35. 1 2 Klara (2013), p. 159.
  36. 1 2 3 Krugler, David F. (2006). This Is Only a Test: How Washington D.C. Prepared for Nuclear War. London, UK: Palgrave MacMillan. pp. 71–73. ISBN   978-1-40398-306-0 . Retrieved April 28, 2015 via Google Books.
  37. Klara (2013), p. 89.
  38. Klara (2013), p. 212.
  39. Klara (2013), pp. 247–252.
  40. Nilsson, Jeff (February 16, 2011). "Destroying and Saving The White House". Saturday Evening Post . Retrieved April 28, 2015.
  41. Klara (2013), p. 249.
  42. Klara (2013), p. 257.
  43. Phillips-Schrock, Patrick (2013). The White House - An Illustrated Architectural History. Jefferson, North Carolina: McFarland & Company, Inc. p. 72. ISBN   978-0-7864-7152-2.
  44. McCullough, David (1992). Truman. New York City: Simon & Schuster. p. 886. ISBN   0-671-86920-5.
  45. West & Kotz (1973), p. 123.
  46. Klara (2013), p. 253-254.
  47. Truman, Margaret (1987). Bess W. Truman. New York City: Jove Books. p. 385. ISBN   978-0-515-08973-8.