The Airports Commission was an independent commission established in September 2012 by the Government of the United Kingdom to consider how the UK could "maintain its status as an international hub for aviation and immediate actions to improve the use of existing runway capacity in the next 5 years". [1] Alongside the proposal to build HS2, the question of how to make best use of and expand airport capacity had become the UK's most significant infrastructure issue over the preceding few years.

Contents

The five person commission, which was chaired by the economist Sir Howard Davies and reported to the Department for Transport (DfT), produced an Interim Report in December 2013 and delivered a Final Report in July 2015. It unanimously concluded in favour of a new northwest runway at Heathrow Airport.

Background

Expansion of London's airports

London, with six commercial airports in its metropolitan area, has the world's busiest airports system. However the question of how to expand the capacity of the system to cope with growing air travel demand is an issue that successive governments have failed to address since the 1950s. [2] A previous commission – the Commission on the Third London Airport chaired by Eustace Roskill – sat between 1968 and 1971 and recommended that a site at Cublington in Buckinghamshire (to the north west of London) should be developed as London's third airport. A member of the commission, Colin Buchanan, wrote a dissenting report and recommended that an airport should be developed at Foulness (later known as Maplin Sands). The Government accepted Buchanan's report and an Act of Parliament was passed – the Maplin Development Act 1973 – that paved the way for a Thames Estuary Airport at Maplin. [3] However the project was cancelled in 1974 in the wake of the 1973 oil crisis and the existing airport at Stansted (which was not shortlisted by the Roskill Commission) was subsequently developed as London's third airport.

Since the 1980s finding solutions to address the shortage of airport capacity has become more difficult because of the growth and development of Heathrow Airport as the UK's only hub airport, as opposed to all other UK airports which are based on the point-to-point airport operating model. The provision of additional capacity at major point-to-point airports, such as Gatwick or Stansted, would not address the UK's shortage of hub airport capacity. In 1978 the Traffic Distribution Rules were introduced to try to encourage British Airways (BA) to make greater use of Gatwick Airport as a second hub. However, in 1991, having incurred significant financial losses, BA ceased most of its operations from the airport. [4] Today, Stansted—despite having very low landing charges—operates at less than 50% capacity and is home to a completely different set of low-cost airlines compared to the full-service airlines which operate at Heathrow.

Heathrow has been unable to expand to meet the rapid growth in demand for air travel and in particular from transfer passengers on which hub airports depend. This inability to expand has been due to a combination of:

  1. the airport's location to the west of London and the UK's prevailing southwesterly winds, meaning that aircraft mainly approach the airport over Central London; and
  2. the level of dense urban development surrounding the airport.

These factors result in significant noise and air quality impacts for local residents and pose a major safety risk. As a result, there is widespread local opposition to the expansion of the airport even though many local people benefit from it in terms of employment. In part due to this issue, there are also a large number of marginal Parliamentary constituencies located around the airport meaning that whenever one of the two main political parties (Labour or Conservatives) develop a proposal or project to expand the airport, it is guaranteed to be opposed by the other party.

A number of such proposals and projects have been proposed over the years, but these have all been cancelled at a later date due to a lack of national political consensus. Heathrow's inability to expand means that the airport has been operating its two runways at about 98% capacity since 2003.

Heathrow traffic statistics Heathrow Passenger Statistic Graph.jpg
Heathrow traffic statistics

As a result, its status as a global hub airport has been declining in terms of the growth in passenger numbers and number of destinations served, compared to its competitor hub airports in Europe (Schiphol, Paris and Frankfurt) and in relation to the recent rapid growth of Middle Eastern airports (Istanbul, Dubai, Abu Dhabi and Doha). [5]

Heathrow third runway

The Labour Government's 2003 Aviation White Paper The Future of Air Transport proposed that a third runway (R3) should be built at Heathrow, albeit with restrictions on the number of additional air traffic movements at the airport. [6] The publication of specific plans for the extra runway was delayed until 2009 because of the public inquiry into the construction of a fifth terminal. [7] However, by this time the 2010 general election was only a year away and the then opposition Conservative Party, eager to secure a political advantage, vigorously opposed R3 and vowed to cancel the project if they won the election.

Analysis proves the outcome of the 2010 election was influenced by the rejection of Heathrow's 3rd runway. Conservatives formed a Coalition Government with the Liberal Democrats, who opposed all airport expansion, and R3 was immediately cancelled. Current research has revealed various reasons to further reduce flights at Heathrow, such as study undertaken in 2012 by MIT who presented evidence in a feasibility study on the fatal impacts of pollution across a wide spread area over London. The evidence suggests that another runway would increase fatalities by pollution 3 times the current amount.

Recent global connectivity concerns

Since 2010 there have been growing concerns that the lack of UK hub airport runway capacity is preventing the UK from establishing additional air connections to fast growing emerging economies and is harming the economy. [8] London Mayor Boris Johnson – who strongly opposes expansion of Heathrow and was at the time widely[ who? ] tipped to succeed David Cameron as Conservative Party leader – and leading architect Norman Foster has proposed a landbased estuarine scheme on the Isle of Grain, as well as a consortium of professionals TESTRAD proposing a new airport in the Thames Estuary. In addition the management of Heathrow and business groups have started to campaign for additional runway capacity, whether at Heathrow or elsewhere. [9]

Purpose of the commission

The government hoped that by establishing an independent commission it would be able to secure cross-party political consensus over the issue of how to expand London's airports. In particular it hoped that the commission's recommendations would be accepted by all political parties and as a result could be implemented by the newly elected government when the commission publishes its final report in Summer 2015.

Terms of reference and commissioners

On 2 November 2012 Secretary of State for Transport Patrick McLoughlin announced in a written statement to Parliament the terms of reference for the commission and the names of six commissioners who had been appointed by the government: [10]

Terms of reference

  • its assessment of the evidence on the nature, scale and timing of the steps needed to maintain the UK’s global hub status
  • its recommendation(s) for immediate actions to improve the use of existing runway capacity in the next five years – consistent with credible long term options
  • its assessment of the options for meeting the UK’s international connectivity needs, including their economic, social and environmental impact
  • its recommendation(s) for the optimum approach to meeting any needs
  • its recommendation(s) for ensuring that the need is met as expeditiously as practicable within the required timescale

Commissioners

Programme of work

Proposals

On 1 February 2013 the commission invited submissions for proposals to make best use of existing capacity in the short and medium term (proposals that could be implemented within five years) and to provide additional capacity in the longer term. [11] Proponents had to confirm their intention to submit proposals by 28 February 2013. Short and medium term proposals had to be submitted to the commission by 17 May 2013. Longer term proposals, of no more than 40 pages, had to be submitted by 19 July 2013. In addition the commission requested suggestions for sifting criteria to be used in developing the Interim Report by 15 March 2013.

In May 2013 the commission published its sift criteria against which longer term capacity proposals would be assessed. [12] The commission envisaged that a small number of preferred proposals would be short listed for further study during 2014 and 2015 in its Interim Report in December 2013. The outcome of those studies would enable the commission to recommend a preferred location for additional hub airport capacity.

The commission has received and published 70 short/medium term proposals and 58 long term proposals from existing airports, architects, developers, engineers, other organisations and members of the public. [13] [14]

Sir Howard has acknowledged that the number of proposals received was more than the commission had envisaged. [15]

Discussion papers

To inform its work, the commission has published discussion papers on:

The commission sought stakeholder comments on these papers and has published the technical and non-technical responses that it has received. [16] [17]

The Commission published a sixth discussion paper calling for evidence on the Utilisation of the UK's Existing Airport Capacity in June 2014. [18]

The Commission published its seventh discussion paper on the Delivery of New Runway Capacity on 1 July 2014. [19]

Evidence sessions

The commission held evidence sessions in London and Manchester in July 2013 and published the transcripts and other documents presented in those sessions. [20]

Meetings and Visits

The Commission has had meetings with a wide range of stakeholders [21] and has held briefings with Members of Parliament and Local Authorities. The Commission has also undertaken a programme of visits to UK and international airports, to the Isle of Grain and to the Heathrow and Gatwick areas to meet local political representation and residents groups. [22]

Emerging thinking

On 7 October 2013 Sir Howard gave a speech in which he set out the emerging thinking of the commission. [23] Their main findings to date were that additional runway capacity would be needed in the longer term and that it should be provided within the South East of England. Whilst regional airports have an important role of play in the UK's airports system, they would be unable to provide the capacity that is needed in the South East.

Sir Howard also said that: [24]

Sir Howard invited the public to submit responses to the commission about these findings.

Interim Report

The Commission published its Interim Report and associated appendices, and consultants reports on 17 December 2013. [25] A transcript of the stakeholder briefing on the Interim Report held at the Institute of Civil Engineers on the morning of publication and chaired by Sir Howard was later published alongside the other documents.

The report sets out the Commission's assessment of the UK's future aviation capacity need and concluded that one net new additional runway would be required in London and south east England by 2030.

The Commission shortlisted three proposals to deliver additional capacity: A proposal from Heathrow Airport Ltd for an additional runway to the NW of the existing runways; a proposal from Heathrow Hub Ltd for a new runway to the west of the existing northern runway; and a proposal from Gatwick Airport Ltd for a second runway to the south of the existing runway. The Interim Report committed the Commission to publish an Appraisal Framework setting out how it will assess each of the short listed options.

The report contained a package of recommendations to the UK Government to make the best use of existing airport capacity:

In this report the Commission said it would undertake further work before deciding whether to add an airport in the inner Thames Estuary to its shortlist.

Inner Thames Estuary Studies

On 27 March 2014, after consultation, the Commission published the terms of reference [26] for the additional work it would undertake on an inner Thames Estuary proposal.

The additional work comprises four studies:

Between 4 and 10 July 2014 the Commission published the reports from each of the four studies for public comment. [28]

On 2 July 2014 the Commission announced that it would not add a proposal for an airport in the inner Thames Estuary to its shortlist of options for additional capacity. [29] Alongside the announcement the Commission published a Summary and Decision paper setting out the reasons for its decision and the work it had undertaken to reach its decision. [30]

Appraisal Framework

On 2 April 2014, after consultation, the Commission published its Appraisal Framework [31] for assessing the three options for additional capacity shortlisted in the Interim Report.

The Appraisal Framework explains how the Commission expects scheme designs to be developed, and how it will appraise the schemes. The framework incorporates four elements:

Annex B of the Appraisal Framework sets out how scheme promoters might present updated scheme designs of the shortlisted proposal to the Airports Commission.

Consultation

In its Interim Report the Commission committed to consult on its appraisal of the shortlisted options in autumn 2014.

The Commission published its consultation [32] on 11 November 2014, to run for 12 weeks until midnight on 3 February 2015.

The consultation consists of a Consultation Document, outlining the high-level summary of the commission's appraisal of the three shortlisted schemes, with more detailed documentation below it including individual business cases and sustainability assessments, consultants' reports and technical analysis produced by the Commission.

As part of the consultation the Commission said it will hold two public evidence sessions, in the Heathrow area, and the other in the Gatwick area.

Reaction

The Conservative, Labour and Liberal Democratic parties have welcomed the establishment of the commission, although none of the parties has said unequivocally that it will fully accept and implement the commission's findings if it wins the 2015 general election. Labour's Shadow Transport Secretary Mary Creagh told the Financial Times that the party "is reserving the right to reject the recommendations of the Davies review of aviation." [33]

The commission has also been welcomed by the UK aviation industry and business organisations, although there has been frustration at the length of time the commission will take to produce its Final Report.

Controversies

Establishment of the commission

Although the commission mirrors the Third London Airport Commission, chaired by Eustace Roskill between 1968 and 1971, in recent years the UK Government has normally used independent commissions to address complex or technical issues, where specialist expertise is required, rather than policy issues such as the choice of where to provide more hub runway capacity. As a result, the government's decision to use a panel of unelected people to make a recommendation about such a wide-ranging and political decision has been criticised. [34]

Date of final report

The government's terms of reference for the commission state that the commission's final report will be produced in Summer 2015 after the next general election. Many people have questioned this date because, without the commission's Final Report, the political parties contesting the election will be unable to state their policies to the electorate about the proposed expansion of airports in the South East of England.

In a House of Commons debate on the Transport Select Committee's Aviation Strategy report [35] on 24 October 2013, John McDonnell the Labour Member of Parliament for Hayes and Harlington – an area adjacent to the airport – called the Commission's timetable undemocratic and asked for the date of its Final Report to be brought forward to a date before the election. [36] In response to McDonnell, Transport Minister Robert Goodwill said that the commission needed time to do its work and the government will not ask the commission to bring forward the date of its Final Report.

In a speech to the Confederation of British Industry, Labour's Shadow Chancellor Ed Balls said that it is Labour's view that the commission "should report before the general election and not after". [37]

Geoff Muirhead

Following pressure from the campaign group Stop Stansted Expansion (SSE) during Summer 2013, Geoff Muirhead, the only member of the commission with experience of working in the aviation sector, resigned from the commission in September 2013 because of a perceived conflict of interest with his former role at MAG. [38] [39]

Muirhead resigned because although he had stepped down as CEO of MAG in 2010, he remained in an ambassadorial role (and paid £75,000 per year) at the company until January 2013 – two months after he had been appointed as a member of the commission. In February 2013 MAG subsequently bought Stansted Airport and in July 2013 MAG submitted two long term proposals to the Commission – one for a second runway and the second for a four runway hub airport.

The DfT said that although there was no evidence whatsoever of bias, it was considered prudent for Muirhead to step aside and that no decision had been taken as to whether Muirhead will be replaced.

In October 2013 SSE launched a legal action for a Judicial Review in the High Court against the commission alleging bias because Muirhead had been involved in the development of the sift criteria that the commission will use to shortlist runway capacity options in December 2013. [40] SSE's barrister Paul Stinchcombe QC argued that Muirhead's resignation was too late to "save the sift criteria proceedings" and that Muirhead had "tainted .... the Commission's activities by reason of apparent bias".

In a statement the Airports Commission said it "firmly rejects the claims made by Stop Stansted Expansion, and considers its processes to date to have been appropriate and robust. The commission’s sift criteria were informed by public consultation and incorporate a wide range of environmental, economic and social factors – including local environmental issues such as impacts on landscape and the built heritage. The sift criteria demonstrate the openness of the commission’s process, and the importance it has placed on an integrated and evidence-based approach to reaching its recommendations." [41]

On 2 December Mrs Justice Patterson in the High Court ruled that there was no basis for a Judicial Review. [42] While the Judge found that it was not wise for Muirhead to have remained as a Commissioner while still working for MAG, she said that there was no real possibility of apparent bias in the sift criteria. This was because:

The Judge ordered SSE to pay the Commission's legal costs, but was critical of the Commission for not being more transparent about Muirhead's work for MAG.

In response, SSE said that the legal action had achieved its main objective of removing Muirhead from the Commission and that it would consider whether to appeal the decision.

Howard Davies

In 2009, Sir Howard Davies had been appointed as advisor to the Investment Strategy Committee of GIC Private Limited, formerly known as Government Investment Corporation of Singapore, and in 2011 he had joined its International Advisory Board. Davies resigned from both positions in September 2012, on his appointment to chair the Airports Commission (as GIC Private Limited was, at the time, as it still is, one of Heathrow's principal owners and cheerleaders for Heathrow's expansion). Davies recorded neither of these remunerated interests, when invited to complete the Airports Commission's Register of Interests.[ citation needed ]

Final report

The Commission published its final report on 1 July 2015. It unanimously concluded that the proposal for a new northwest runway at Heathrow Airport, combined with a package of measures to address its environmental and community impacts, presented the strongest case and offered the greatest strategic and economic benefits – providing around 40 new destinations from the airport and more than 70,000 new jobs by 2050. [43]

Related Research Articles

<span class="mw-page-title-main">Heathrow Airport</span> Main airport serving London, England, United Kingdom

Heathrow Airport, called London Airport until 1966, is the main international airport serving London, the capital and most populous city of England and the United Kingdom. It is the largest of the six international airports in the London airport system. The airport is owned and operated by Heathrow Airport Holdings. In 2023, Heathrow was the busiest airport in Europe, the fourth-busiest airport in the world by passenger traffic and the second-busiest airport in the world by international passenger traffic. As of 2023, Heathrow is the airport with the most international connections in the world.

<span class="mw-page-title-main">London Stansted Airport</span> Tertiary international airport serving London, England, United Kingdom

London Stansted Airport is the tertiary international airport serving London, the capital of England and the United Kingdom. It is located near Stansted Mountfitchet, Uttlesford, Essex, 42 mi (68 km) northeast of Central London.

<span class="mw-page-title-main">Thames Gateway</span> Area around the Thames Estuary

Thames Gateway is a term applied to an area around the Thames Estuary in the context of discourse around regeneration and further urbanisation. The term was first coined by the UK government and applies to an area of land stretching 70 kilometres (43 mi) east from inner east and south-east London on both sides of the River Thames and the Thames Estuary. It stretches from Westferry in Tower Hamlets to the Isle of Sheppey/Southend-on-Sea and extends across three ceremonial counties.

<span class="mw-page-title-main">Isle of Grain</span> Village in Kent, England

Isle of Grain is a village and the easternmost point of the Hoo Peninsula within the district of Medway in Kent, south-east England. No longer an island and now forming part of the peninsula, the area is almost all marshland and is a major habitat for diverse wetland birds. The village constitutes a civil parish, which at the 2011 census had a population of 1,648, a net decrease of 83 people in 10 years.

Heathrow Airport Holdings is a company that operates and manages Heathrow Airport based in London, England. It was formed by the privatisation of the British Airports Authority as BAA plc as part of Margaret Thatcher's privatisation of government-owned assets, and was once a constituent of the FTSE 100 Index.

<span class="mw-page-title-main">Air transport in the United Kingdom</span>

Air transport in the United Kingdom is the commercial carriage of passengers, freight and mail by aircraft, both within the United Kingdom (UK) and between the UK and the rest of the world. In the past 25 years the industry has seen continuous growth, and the demand for passenger air travel in particular is forecast to increase from the current level of 236 million passengers to 465 million in 2030. One airport, Heathrow Airport, is amongst the top ten busiest airports in the world. More than half of all passengers travelling by air in the UK currently travel via the six London area airports. Outside London, Manchester Airport is by far the largest and busiest of the remaining airports, acting as a hub for the 20 million or so people who live within a two-hour drive. Regional airports have experienced the most growth in recent years, due to the success of low-cost carrier airlines over the last decade.

<span class="mw-page-title-main">Environmental impact of aviation in the United Kingdom</span>

The environmental impact of aviation in the United Kingdom are increasing due to the increasing demand for air travel in the country. In the past 25 years the UK air transport industry has seen sustained growth, and the demand for passenger air travel in particular is forecast to increase more than twofold, to 465 million passengers, by 2030. Two airports; London Heathrow and London Gatwick, are amongst the top ten busiest airports in the world for international passenger traffic. Whilst more than half of all passengers travelling by air in the UK currently travel via the five London area airports, regional airports have experienced the most growth in recent years, due to the success of 'no-frills' airlines over the last decade.

The expansion of Heathrow Airport is a series of proposals to add to the runways at London's busiest airport beyond its two long runways which are intensively used to serve four terminals and a large cargo operation. The plans are those presented by Heathrow Airport Holdings and an independent proposal by Heathrow Hub with the main object of increasing capacity.

<span class="mw-page-title-main">Thames Estuary Airport</span> Proposed airport near London

A potential Thames Estuary Airport has been proposed at various times since the 1940s. London's existing principal airports, Heathrow, Gatwick, Stansted, and Luton are each sub-optimally located in various ways, such as being too close to built-up areas or requiring aircraft to fly low over London. In the case of Heathrow, the growth of air traffic has meant that the airport is operating at 98% capacity. Several locations for a new airport have been proposed in the Thames Estuary, to the east of London. These include Maplin Sands off Foulness on the north side of the estuary; Cliffe and the Isle of Grain in Kent on the south side; and artificial islands located off the Isle of Sheppey such as the "Boris Island" proposal championed by Boris Johnson, the then Mayor of London. Economic considerations have so far ruled out a new coastal airport, while political considerations have ruled out a new inland airport, leaving planners with an as-yet-unresolved dilemma.

In its early years what is now Heathrow Airport was the Great West Aerodrome, sometimes known as Heathrow Aerodrome.

<span class="mw-page-title-main">Heathwick</span> 2011 high-speed rail link proposal

Heathwick is an informal name for a 2011 proposal to create a high-speed rail link between London's Heathrow and Gatwick airports, in effect to combine them into a single aviation travel hub. Proponents argue this would balance their capacity and so reduce the need to add more runways to Heathrow, or more airports in the south-east of England. In 2018 the similar project HS4Air was proposed.

The Thames Hub is a proposal for a new approach to integrated infrastructure development that combines rail, intermodal freight logistics, aviation, tidal renewable energy and its transmission, flood protection and regional development in the Thames Estuary and connects this infrastructure to a trade and utilities spine that runs the length of the UK. It was developed by architects Foster + Partners, infrastructure consultants Halcrow and economists Volterra and launched by Lord Foster at the Institution of Civil Engineers in London on 2 November 2011.

The metropolitan area of London, England, United Kingdom, is served by six international airports and several smaller airports. Together, these airports constitute the busiest airport system in the world by passenger numbers and the second-busiest by aircraft movements. In 2018, the six airports handled a total of 177,054,819 passengers. The London airports handle over 60% of all the UK's air traffic. The airports serve a total of 14 domestic destinations and 396 international destinations.

Thames Hub Airport was a proposed platform-based hub airport located on the Isle of Grain in the Thames Estuary in Kent, whose development has been led by the architect Lord Foster. The idea for the airport was originally included within the Thames Hub integrated infrastructure vision, and the idea of some kind of airport in the Thames Estuary has been discussed since the 1970s.

<span class="mw-page-title-main">Heathrow Hub</span>

Heathrow Hub is an independent proposal to expand capacity at London's Heathrow Airport, put forward by Jock Lowe, a former Concorde pilot, and Mark Bostock, an ex-director at Arup Group.

<span class="mw-page-title-main">Western Rail Approach to Heathrow</span> Proposed rail link in England

The Western Rail Approach to Heathrow is a proposed bi-directional link westward from London's Heathrow Airport to the Great Western Main Line. It would thus run, in council areas, from Greater London under Iver, South Bucks, Buckinghamshire to Langley, Slough. Beginning at Heathrow Terminal 5 station, it would run via a tunnel to a junction east of Langley station, therefore allowing trains to run to and from destinations in the west: Slough, Reading and beyond. When completed, it would improve rail connections to Heathrow from the Thames Valley as well as from South West England, South Wales and The Midlands. It would also reduce congestion at London Paddington station by removing the need, which presently exists, for passengers from Heathrow who are bound for those regions, to travel to Hayes and Harlington and then change at Reading or to make their interchange at Paddington, central London. Paddington would remain an interchange for services to/from Euston, Saint Pancras and London generally and a little of the Great Western Main Line would gain rail capacity as many services would take the resultant side loop via Heathrow.

The expansion of Gatwick Airport has involved several proposals aimed at increasing airport capacity in south east England and relieving congestion at the main hub airport Heathrow.

<span class="mw-page-title-main">Daniel Moylan, Baron Moylan</span> British politician (born 1956)

Daniel Michael Gerald Moylan, Baron Moylan is an English Conservative politician and a member of the House of Lords.

The Roskill Commission was a UK Government Commission charged with looking into finding a site for a new airport for London. Chaired by High Court judge Eustace Roskill, it sat from 1968 to 1970 and published its report in January 1971.

References

  1. "Airports Commission: Responsibilities". UK Government 2012.
  2. "Aviation: proposals for an airport in the Thames estuary, 1945–2012" (PDF). House of Commons 2012.
  3. "Maplin Development Act 1973". Parliamentary Debates (Hansard) .
  4. "Waiving the rules". FlightGlobal 1991.
  5. "Why London needs a new hub airport". Transport for London. Archived from the original on 3 November 2013.
  6. "The Future of Air Transport". Department for Transport 2003. Archived from the original on 19 May 2010.
  7. "Britain's Transport Infrastructure - Adding Capacity at Heathrow: Decisions Following Consultation" (PDF). Department for Transport 2009.
  8. "Connecting for growth: the role of Britain's hub airport in economic recovery: A report prepared for Heathrow". Frontier Economics 2011. Archived from the original on 19 June 2013.
  9. "One hub or none: The case for a single UK hub airport". Heathrow Airport Limited 2012. Archived from the original on 2 November 2013.
  10. "Airports Commission membership". UK Government 2012.
  11. "Guidance Document 01: Submitting evidence and proposals to the Airports Commission" (PDF). UK Government 2013.
  12. "Guidance Document 02: Long Term Capacity Options: Sift Criteria" (PDF). UK Government 2013.
  13. "Short and medium term options: proposals for making the best use of existing airport capacity". UK Government 2013.
  14. "Long term options: proposals received by the Airports Commission". UK Government 2013.
  15. "Sir Howard Davies expects parties to follow findings". ITN Productions 2013.
  16. "Airports Commission discussion papers". UK Government 2013.
  17. "Stakeholder responses to Airports Commission discussion papers". UK Government 2013.
  18. "Airports Commission discussion paper 06" (PDF).
  19. "Airports Commission discussion paper 07".
  20. "Public evidence sessions transcripts: Airports Commission discussion papers". UK Government 2013.
  21. "Airports Commission meetings with stakeholders".
  22. "Thames Estuary airport: Howard Davies Commission visiting Medway today". Kent Online 2013.
  23. "Emerging thinking: aviation capacity in the UK". UK Government 2013.
  24. "Airports Commission: Emerging thinking". The Airport Operator. Airports Operators Association. Autumn 2013.
  25. "Airports Commission: Interim Report". UK Government 2013.
  26. "Inner Thames Estuary feasibility studies: terms of reference'". UK Government 2013.
  27. "Natura 2000".
  28. "Inner Thames Estuary studies'". UK Government 2013.
  29. "Airports Commission announces inner Thames estuary decision'". UK Government 2013.
  30. "Inner Thames estuary airport: summary and decision'". UK Government 2013.
  31. "Appraisal Framework". UK Government 2013.
  32. "'AIncreasing the UK's long term aviation capacity'". UK Government 2014.
  33. "Labour hedges bets on aviation review". Financial Times 2013.
  34. "Hansard 24th October 2013". UK Parliament 2013.
  35. House of Commons
  36. "Hansard 24th October 2013". UK Parliament 2013.
  37. "Labour hedges bets on aviation review". Financial Times 2013.
  38. "Airports Commission member faces calls for resignation". The Telegraph 2013.
  39. "Geoff Muirhead quits Airports Commission". The Telegraph 2013.
  40. "Stop Stansted Expansion lodged papers at High Court alleging Airports Commission criteria "infected by apparent bias" due to Geoff Muirhead". Airport Watch 2013.
  41. "Airports Commission rejects claims made by Stop Stansted Expansion". Airports Commission 2013.
  42. "High Court refuses to order Stansted Airport expansion rethink". Herts and Essex Observer 2013. Archived from the original on 15 December 2013. Retrieved 6 December 2013.
  43. Airports Commission releases final report