Crawshaw Woods Bridge | |
---|---|
Coordinates | 53°48′10″N1°24′48″W / 53.802684°N 1.413201°W |
OS grid reference | SE387341 |
Carries | Shippen Road |
Crosses | Leeds to Selby railway line |
Locale | Cross Gates, West Yorkshire, England |
Other name(s) | Shippen Lane Bridge |
Owner | Network Rail (NR) |
Heritage status | Grade II listed |
NR number | HUL 4/20 |
Characteristics | |
Material | Cast iron |
Total length | 50 feet (15 m) |
History | |
Designer | James Watson |
Engineering design by | Stanningley Ironworks |
Opened | 1834 |
Rebuilt | 1943 1999 2006 |
Crawshaw Woods Bridge (also known as Shippen Lane Bridge) [1] is a grade II listed cast iron overbridge which spans the Leeds to Selby railway line between Cross Gates and Garforth railway stations. It is notable for being the oldest railway associated iron bridge still in daily use on an operational railway. Due to an upgrade to the line which runs beneath it, the abutments of the bridge will be raised by 4 feet 7 inches (1.4 m), and then the iron arch re-installed at a new height to accommodate electric overhead wires underneath.
The bridge, which is between Cross Gates and Garforth railway stations, was designed by James Walker, and engineered by Stanningley Ironworks for the Leeds and Selby Railway in 1834. [2] Most of the other bridges on the line were constructed of stone, but Crawshaw Woods Bridge is a cast iron bridge set into stone abutments on either side of the line. [3] [note 1] It is thought that the ground underneath the bridge would not support the weight of an all stone structure, so a "single-span, segmental-arched bridge with wrought iron railing balustrades and curved mushroom-top stone piers" was placed there instead. [5] [3] [6] The bridge was renewed by the LNER in 1943 (when a timber deck was installed above the original surface, making the structure non-loadbearing) and it was also renovated by Railtrack in 1999. [6] It was strengthened in 2006 by Network Rail. [7] The bridge spans a gap of 50 feet (15 m) and has three segmental ribs, each 15 inches (380 mm) deep, and is largely cast iron, but the supporting materials are sandstone, wrought iron, steel and concrete. [8] [9] The added deck structure has metal panelling along its length, which one report describes as "unsympathetic". [10]
The overbridge was designed to stretch over four lines, but in the event, only two lines were built on the line and these are closer to one side of the bank with the other side being piled up with earth. [11] As the tracks are slewed to one side, the track in the middle is 16 feet 10 inches (5.13 m) below the arch, and the other track is 15 feet 4 inches (4.67 m) below the arch. [12] The bridge is too low to accommodate the overhead line equipment for the electrification of the line as part of the Transpennine Route Upgrade, so it will be raised by 4 feet 7 inches (1.4 m). [13] [14] The structure will be jacked up at a cost of £3.7 million (as opposed to an entirely new deck structure at £1.4 million), this is deemed to be a better financial alternative to the option of lowering the track, which is estimated to cost £14.6 million (2024 prices). [15] Work will also be undertaken on the road deck of the bridge, which sits atop the iron-arch structure. [16] This has solid-steel parapets which stand clear, and are structurally independent of, the bridge. [5]
The bridge was grade II listed in 2015, being hailed by Historic England as a "..testament to one of the "Victorian's greatest achievements" - railways." [17] The bridge carries a public bridleway over the railway, and is also used by agricultural traffic. During the First World War, it was used by workers to get to the Barnbow munitions factory on the north side of the line. Therefore, it is of historical interest due to its association with Barnbow, and it being the oldest cast iron bridge still in-situ over a working railway in the world. [18] [note 2] [20]
The bridge has the numbered designation of HUL 4/20 on the British railway's engineer's line reference system, being nearly 6 miles (9.7 km) east of Leeds railway station, and 14 miles 49 chains (23.5 km) west of Selby. [21] [22] [9]
The High Level Bridge is a road and railway bridge spanning the River Tyne between Newcastle upon Tyne and Gateshead in North East England. It was built by the Hawks family from 5,050 tons of iron. George Hawks, Mayor of Gateshead, drove in the last key of the structure on 7 June 1849, and the bridge was officially opened by Queen Victoria later that year.
Selby railway station is a Grade II listed station which serves the market town of Selby in North Yorkshire, England. The original terminus station was opened in 1834 for the Leeds and Selby Railway. The Hull and Selby Railway extended the line in 1840 and a new station was built, with the old station becoming a goods shed. The station was rebuilt in 1873 and 1891; the 1891 rebuilding was required due to the replacement of the swing bridge over the River Ouse at the same time.
Garforth railway station serves the town of Garforth in West Yorkshire, England. It is one of the two stations in Garforth, the other being East Garforth, which is situated about 0.5 miles (800 m) east from the main station. It lies on the Selby Line. Garforth is 7.1 miles (11.5 km) east of Leeds and 16 miles (26 km) south-west of York. The station is served by Northern and TransPennine Express services.
Micklefield railway station serves the village of Micklefield, near Garforth in West Yorkshire, England. It lies on the Selby and York Lines, operated by Northern, 9.75 miles (16 km) east of Leeds.
South Milford railway station serves the villages of South Milford and Sherburn in Elmet in North Yorkshire, England. It lies on the Selby Line 13 miles (21 km) east of Leeds.
Church Fenton railway station serves the village of Church Fenton in North Yorkshire, England. It is situated where the Cross Country Route from Leeds to York meets the Dearne Valley line from Sheffield to York, just under 10.75 miles (17 km) from York.
Ulleskelf railway station in Ulleskelf, North Yorkshire, England, is 8.75 miles (14 km) south of York.
Barnes Railway Bridge is a Grade II listed railway bridge in the London Borough of Richmond upon Thames and the London Borough of Hounslow. It crosses the River Thames in London in a northwest to southeast direction at Barnes. It carries the South Western Railway's Hounslow Loop Line, and lies between Barnes Bridge and Chiswick stations. It can also be crossed on foot, and is one of only three bridges in London to combine pedestrian and rail use; the others being Hungerford Bridge and Golden Jubilee Bridges and Fulham Railway Bridge.
The Leeds and Selby Railway was an early British railway company and first mainline railway within Yorkshire. It was opened in 1834.
The Hull and Selby Railway is a railway line between Kingston upon Hull and Selby in the United Kingdom which was authorised by an act of 1836 and opened in 1840. As built the line connected with the Leeds and Selby Railway at Selby, with a Hull terminus adjacent to the Humber Dock.
The York and North Midland Railway (Y&NMR) was an English railway company that opened in 1839 connecting York with the Leeds and Selby Railway, and in 1840 extended this line to meet the North Midland Railway at Normanton near Leeds. Its first chairman was the railway financier George Hudson, who had been called the railway king.
The Leeds and York Railway was a proposed railway line, promoted in the mid 1840s, intended to connect York and Leeds. The line lost a significant promoter, the Manchester and Leeds Railway in 1845/6 as a result of a non-competition arrangement between that company and the York and North Midland Railway.
Main Range Railway is a heritage-listed railway from the end of Murphys Creek railway station, Murphys Creek to the Ruthven Street overbridge, Harlaxton, Queensland, Australia. It forms part of the Main Line railway and was built from 1865 to 1867 by railway builders Peto, Brassey and Betts. It was added to the Queensland Heritage Register on 5 February 2009.
The Selby Line is a secondary railway line in Yorkshire, England, linking Leeds to Selby via Micklefield and then on to Kingston upon Hull (Hull). Hull Trains, London North Eastern Railway, and Northern and TransPennine Express operate passenger trains on the line.
The Castleford–Garforth line was a single-track railway line in West Yorkshire, England, connecting Castleford with Garforth east of Leeds. The route was developed to allow coal to be transported from the area, though a passenger service was operated between 1878 and 1951. Initially promoted by Leeds, Castleford and Pontefract Junction Railway, it was taken over by the North Eastern Railway before the line was completed.
The York and Selby lines are railway lines in West and North Yorkshire. They provide a frequent service between Leeds, York, and Selby and intermediate stations. Metrocards of West Yorkshire Metro can be used between Leeds and Micklefield. Train operating companies are Northern for stopping trains, and CrossCountry, London North Eastern Railway and TransPennine Express for long-distance trains which continue beyond the termini of the local routes to and from Hull, Liverpool, Manchester, Newcastle upon Tyne and Scotland. The Leeds bound trains continue to Manchester, Liverpool, Reading, Plymouth, Penzance and Bristol.
The Ultimo Road railway underbridge is a heritage-listed former railway bridge located on the former Darling Harbour goods railway line in the inner city Sydney suburb of Ultimo in the City of Sydney local government area of New South Wales, Australia. It was designed by engineering staff in the Existing Lines branch of the New South Wales Public Works Department and built in 1879. The property is owned by Transport Asset Holding Entity, an agency of the Government of New South Wales. It was added to the New South Wales State Heritage Register on 2 April 1999.
The Transpennine Route Upgrade (TRU) is a major investment being made in the railway between York and Manchester via Leeds and Huddersfield in the north of England. It is the 76 miles (122 km) northern route over the Pennines, most of which is also known as the Huddersfield line. As of 2024, the line is heavily used but is slow and lacks capacity. It has Victorian infrastructure, covers difficult terrain including the 3-mile (4.8 km) Standedge Tunnel, and has poor access roads.
Scarborough Bridge carries the railway line to Scarborough over the River Ouse in York, England. The first bridge was built in 1845, and has been renovated and rebuilt at least twice since its initial opening. A new bridge was installed in 2015 at a cost of £6 million. The first bridge had a pedestrian walkway which was located between the two running lines on the deck of the bridge, this was later moved to the east side of the bridge, and finally, in the 2010s rebuild, the walkway became a separate wider bridge. The bridge is still in daily use carrying Trans-Pennine services between Scarborough and either York, or Manchester and Liverpool.
Huddersfield Viaduct is a railway bridge to the north-east of Huddersfield railway station in West Yorkshire, England. The viaduct carries the Huddersfield Line connecting Huddersfield with Dewsbury, Leeds, and York eastwards, and Manchester and Liverpool westwards. The viaduct was built to carry two lines, but was widened in the 1880s to take four tracks, and then reduced to two tracks in 1970. Huddersfield Viaduct is less well-known than other viaducts in the Kirklees area as they are higher, but Huddersfield Viaduct is the longest in the Kirklees district.