The electricity sector in Nigeria generates, transmits and distributes megawatts(MW) of electric power that is significantly less than what is needed to meet basic household and industrial needs. Nigeria has twenty-three (23) power-generating plants connected to the national grid with the capacity to generate 11,165.4 MW of electricity. [1] [2] These plants are managed by generation companies (GenCos), independent power providers, and Niger Delta Holding Company. In 2012, the industry labored to distribute 5,000 MW, very much less than the 40,000 MW needed to sustain the basic needs of the population. [3] This deficit is also exacerbated by unannounced load shedding, [4] [5] partial and total system collapse and power failure. [3] To meet demand, many households and businesses resort to purchasing generating sets to power their properties; [3] this source of energy provided 6,000 MW in 2008. [3] Nigeria has a chronic electricity shortage that has affected the country for many years. [6] [7] In 2022, its power grid collapsed twice in one week. [8] [9]
Electricity generation in Nigeria began in Lagos in 1886 with the use of generators to provide 60 kW. [10] In 1923, tin miners installed a 2 MW plant on the Kwali River; six years later, the Nigerian Electricity Supply Company, a private firm, was established near Jos to manage a hydroelectric plant at Kura to power the mining industry. Then, another private enterprise was established in Sapele by United Africa Company to power the activities of the African Timber and Plywood Company. [11] Between 1886 and 1945, electric power generation was relatively low, with power provided primarily to Lagos and other commercial centers such as mining industries in Jos and Enugu. [11] The colonial government created an electricity department within the Public Works Department, which then installed generating sets in many cities to serve government reservation areas and commercial centers. [3] In 1950, the Legislative Council of Nigeria began moves to integrate the electricity industry when it enacted a law to establish the Electricity Corporation of Nigeria (ECN) with the duties of developing and supplying electricity. [10] ECN took over the electricity sector activities within PWD and the generating sets of Native Authorities. In 1951, the firm managed 46 MW of electricity. [11] Between 1952 and 1960, the firm established coal-powered turbines at Oji and Ijora, Lagos. It began making preliminary plans for a transmission network to link the power-generating sites with other commercial centers. [11] In 1961, ECN completed a 132 kV transmission line linking Lagos to Ibadan via Shagamu; in 1965, this line was extended to Oshogbo, Benin, and Ughelli to form the Western System. [10]
In 1962, a statutory organization, the Niger Dams Authority (NDA), was formed to build and maintain dams along River Niger and Kaduna River, NDA went on to commission a 320 MW hydropower plant at Kainji in 1969, with the power generated sold to ECN. In 1972 NDA and ECN merged to form the National Electric Power Authority (NEPA). NEPA was the major electricity firm in Nigeria until power sector reforms resulted in the creation of the Power Holding Company of Nigeria (PHCN) and later the privatization of electricity generation and distribution. [10]
Electricity in Nigeria is generated through thermal and hydropower sources. The primary source of electricity generation comes from fossil fuels, especially gas, which accounts for 86% of the capacity in Nigeria, with the remainder generated from hydropower sources. [12] Before the beginning of the Fourth Nigerian republic, power generation was mainly the federal government's responsibility through NEPA. However, reforms started in 2005 with the Electric Power Sector Reform Act (EPSRA) signing, which opened up the industry to private investors. [12] In 2010, the Nigerian Bulk Electricity Trading Plc (NBET) was established as a credible off-taker of electric power generation companies. [13] In 2014, the sector was privatized with three groups having the responsibility of providing power. By November 2013, the privatization of all generation and 11 distribution companies was completed, with the Federal Government retaining the ownership of the transmission company. [14]
Month/Yr | Available capacity(MW) | Average daily generation |
---|---|---|
January 2018 | 7,457 | 3,744 [15] |
February 2018 | 7,515 | 4,005 |
March 2018 | 7,475 | 4,079 |
April 2018 | 7,250 | 3,999 |
May 2018 | 8,034 | 3,827 |
Nigeria has twenty-three (23) power-generating plants connected to the national grid with the capacity to generate 11,165.4 MW of electricity. [16] These plants are managed by generation companies (GenCos), independent power providers, and Niger Delta Holding Company. The primary independent power plants before the power sector reforms are Shell-owned Afam VI (642MW), Agip-built Okpai plant (480 MW), and AES (270 MW). The third sector is the Nigerian National Integrated Power Project, NIPP, a project that was initiated in 2004 to fast-track the development of new power plants in the country. The majority of the new proposed plants are gas-powered plants. In 2014, the proposed capacity of NIPP plants was 5,455 MW.
Company | Type | Capacity |
---|---|---|
Kainji Jebba Power Plc | Hydro | 1,330MW [1] |
Ughelli Power Plc | Gas | 942MW [16] |
Sapele Power Plc | Gas | 1,020 [16] |
Shiroro Power Plc | Hydro | 600MW [16] |
Afam Power Plc | Gas | 987.2MW [16] |
Niger Delta Power Holding Company | Gas | 5,455 [16] |
IPP's | Gas | 1,392 [16] |
Egbin Power Plc | Gas | 1,020MW [16] |
Current electricity generated in Nigeria needs to be improved to meet the demand needs of households and businesses; as a result, Nigeria has a low per capita consumption of electricity, 109 kWh in 2006. [17] Besides this deficit, between 1970 and 2009, available power plants operated below optimal levels, and electricity generated was lost in transmission. While electricity capacity was 5600 MW in 2001, the power generated fell as low as 1750 MW. The hydropower plants in Kainji, Shiroro, and Jebba tend to have higher capacity utilization rates, while the gas-powered plant was affected by infrastructural and maintenance issues. [17] Between 1980 and 1996, the country witnessed a significant gap in electricity generated and electricity billed, which indicates electricity loss in transmission and theft from unauthorized connections. Since the coming of democracy in 1999, the loss ratio has reduced from 46.9% in 1996 to 9.4% in 2008. Vandalism of equipment, lack of proper maintenance of transformers, poor management, and corruption are a few of the reasons Nigeria has produced suboptimal electricity. [17]
In Nigeria, electrical power generated by the GenCos is used to power the grid through the Transmission Company of Nigeria (TCN). Electricity is distributed through the transmission of electric power from TCN to the distribution companies (DisCos) primary substations, then to the secondary distribution system, and finally to the end consumers. [18] Alternating Current (AC) is used for the transmission of electric power; this is because AC can be easily changed from one voltage to another with a slight loss of energy with the use of a transformer. [19] The electric power is transmitted at high voltage (33kV) to the DisCos' primary substations in the six geopolitical zones based on the load allocation formula. The high voltage received is then stepped down to medium voltage (11kV) with the use of transformers. This medium voltage power is now transmitted to secondary distribution transformers near the consumer's residence. The secondary distribution transformers further step down the medium voltage to customers' consumption capacity (low voltage, usually 220 to 240V). However, some customers, for example, industries and commercial customers like Flour mills, Refineries, steel rolling mills, cement factories, rice mills, etc., may receive their power directly from the primary distribution line depending on their power utilization. [20]
Nigeria has eleven distribution companies. [21]
Distribution company | Districts |
---|---|
Kaduna Electricity Distribution Company Plc | Kaduna including the districts of Makera, Doka, Birnin Kebbi, Gusau, Sokoto, and Zaria |
Yola Electricity Distribution Company Plc | Yola, Maiduguri, Taraba, and Damaturu districts |
Enugu Electricity Distribution Company Plc | Aba, Abakaliki, Abakpa, Awka, Ogui, Onitsha, Owerri, Nnewi, and Umuahia |
Abuja Electricity Distribution Company Plc | Abuja, Minna, Suleja, Lokoja, and Lafia Districts |
Ibadan Electricity Distribution Company Plc | Abeokuta, Dugbe, Molete, Ijebu-Ode, Osogbo, Ilorin, Sango-Ota, and Oyo |
Jos Electricity Distribution Company Plc | Jos, Makurdi, Bauchi, and Gombe districts |
Eko Electricity Distribution Company Plc | Festac, Ijora, Lagos Island, Ajah, and Badagry |
Ikeja Electricity Distribution Company Plc | Ikeja, Shomolu, Akowonjo, Ikorodu, Oshodi and Abule-Egba |
Port Harcourt Electricity Distribution Company Plc | Calabar, Diobu, Ikom/Ogoja, Borikiri, Uyo and Yenegoa |
Benin Electricity Distribution Company Plc | Ado-Ekiti, Afenonesan, Akure, Asaba, Akpakpava, 'Ugbowo and Warri |
Kano Electricity Distribution Company Plc | Nassarawa, Dala, Katsina, Dutse, Kumbotso, Funtua, and Dakata districts |
DisCos are saddled with the following responsibilities; receiving energy from GenCos via TCN Plc, distributing energy to the end consumers, metering, billing of energy, revenue collection, revenue remittance to Nigeria Bulk Electricity Trading (NBET) Plc for energy received, remittance of revenue to TCN Plc for services provided, receiving complaints from customers, compliance to NERC's Service Level Agreements (SLAs), customers enlightenment ('Electricity Update') through local radio stations in the thirty-six (36) states and the Federal Capital Territory (FCT) Abuja and load demand forecast. [22]
Electric power transmission is the bulk movement of electrical energy from a generating site, such as a power plant, to an electrical substation. The interconnected lines that facilitate this movement form a transmission network. This is distinct from the local wiring between high-voltage substations and customers, which is typically referred to as electric power distribution. The combined transmission and distribution network is part of electricity delivery, known as the electrical grid.
Electric power distribution is the final stage in the delivery of electricity. Electricity is carried from the transmission system to individual consumers. Distribution substations connect to the transmission system and lower the transmission voltage to medium voltage ranging between 2 kV and 33 kV with the use of transformers. Primary distribution lines carry this medium voltage power to distribution transformers located near the customer's premises. Distribution transformers again lower the voltage to the utilization voltage used by lighting, industrial equipment and household appliances. Often several customers are supplied from one transformer through secondary distribution lines. Commercial and residential customers are connected to the secondary distribution lines through service drops. Customers demanding a much larger amount of power may be connected directly to the primary distribution level or the subtransmission level.
The electric power industry covers the generation, transmission, distribution and sale of electric power to the general public and industry. The commercial distribution of electric power started in 1882 when electricity was produced for electric lighting. In the 1880s and 1890s, growing economic and safety concerns lead to the regulation of the industry. What was once an expensive novelty limited to the most densely populated areas, reliable and economical electric power has become an essential aspect for normal operation of all elements of developed economies.
The National Grid is the high-voltage electric power transmission network supporting the UK's electricity market, connecting power stations and major substations, and ensuring that electricity generated anywhere on the grid can be used to satisfy demand elsewhere. The network serves the majority of Great Britain and some of the surrounding islands. It does not cover Northern Ireland, which is part of the Irish single electricity market.
India is the third largest producer of electricity in the world. During the fiscal year (FY) 2023–24, the total electricity generation in the country was 1,949 TWh, of which 1,734 TWh was generated by utilities.
The electricity sector in Canada has played a significant role in the economic and political life of the country since the late 19th century. The sector is organized along provincial and territorial lines. In a majority of provinces, large government-owned integrated public utilities play a leading role in the generation, transmission, and distribution of electricity. Ontario and Alberta have created electricity markets in the last decade to increase investment and competition in this sector of the economy.
The Tanzania Electric Supply Company Limited (TANESCO) is a Tanzanian parastatal organisation established in 1964. It is wholly owned by the government of Tanzania. The Ministry of Energy and Minerals regulates the operations of TANESCO.
The Power Holding Company of Nigeria (PHCN), formerly the National Electric Power Authority (NEPA), was a power company owned by the government of Nigeria. It represented Nigeria in the West African Power Pool. During the era when it operated as NEPA, the company managed a football team, NEPA Lagos.
The electricity sector in Bolivia is dominated by the state-owned ENDE Corporation, although the private Bolivian Power Company is also a major producer of electricity. ENDE had been unbundled into generation, transmission and distribution and privatized in the 1990s, but most of the sector was re-nationalized in 2010 (generation) and 2012.
The electricity sector in Argentina constitutes the third largest power market in Latin America. It relies mostly on thermal generation and hydropower generation (36%). The prevailing natural gas-fired thermal generation is at risk due to the uncertainty about future gas supply.
As of August 2020 Chile had diverse sources of electric power: for the National Electric System, providing over 99% of the county's electric power, hydropower represented around 26.7% of its installed capacity, biomass 1.8%, wind power 8.8%, solar 12.1%, geothermal 0.2%, natural gas 18.9%, coal 20.3%, and petroleum-based capacity 11.3%. Prior to that time, faced with natural gas shortages, Chile began in 2007 to build its first liquefied natural gas terminal and re-gasification plant at Quintero near the capital city of Santiago to secure supply for its existing and upcoming gas-fired thermal plants. In addition, it had engaged in the construction of several new hydropower and coal-fired thermal plants. But by July 2020 91% of the new capacity under construction was of renewable power, 46.8% of the total solar and 25.6% wind, with most of the remainder hydro.
The electricity sector in New Zealand uses mainly renewable energy, such as hydropower, geothermal power and increasingly wind energy. As of 2021, the country generated 81.2% of its electricity from renewable sources. The strategy of electrification is being pursued to enhance the penetration of renewable energy sources and to reduce greenhouse gas (GHG) emissions across all sectors of the economy. In 2021, electricity consumption reached 40 terawatt-hours (TW⋅h), representing a 0.2% increase compared to the consumption levels in 2010.
Nigerian Electricity Regulatory Commission(NERC) is an independent regulatory body with authority for the regulation of the electric power industry in Nigeria. NERC was formed in 2005 under the Obasanjo administration’s economic reform agenda through the Electric Power Sector Reform Act, 2005 for formation and review of electricity tariffs, transparent policies regarding subsidies, promotion of policies that are efficient and environmentally friendly, and also including forming and enforcing of standards in the creation and use of electricity in Nigeria. NERC was instituted primarily to regulate the tariff of Power Generating companies owned or controlled by the government, and any other generating company which has a licence for power generation and transmission of energy, and distribution of electricity.
Electricity sector in Hong Kong ranges from generation, transmission, distribution and sales of electricity covering Hong Kong. The combustion of coal, natural gas and oil are the main sources of electricity in Hong Kong. The electricity sector contributes 60.4% of Hong Kong's total greenhouse gas emissions.
The Nigerian energy supply crisis refers to the ongoing failure of the Nigerian power sector to provide adequate electricity supply to domestic households and industrial producers despite a rapidly growing economy, some of the world's largest deposits of coal, oil, and gas and the country's status as Africa's largest oil producer. Currently, only 45% of Nigeria's population is connected to the energy grid whilst power supply difficulties are experienced around 85% of the time and almost nonexistent in certain regions. At best, average daily power supply is estimated at four hours, although several days can go by without any power at all. Neither power cuts nor restorations are announced, leading to calls for a load shedding schedule during the COVID-19 lockdowns to aid fair distribution and predictability.
Turkey uses more electricity per person than the global average, but less than the European average, with demand peaking in summer due to air conditioning. Most electricity is generated from coal, gas and hydropower, with hydroelectricity from the east transmitted to big cities in the west. Electricity prices are state-controlled, but wholesale prices are heavily influenced by the cost of imported gas.
The electricity sector in the Philippines provides electricity through power generation, transmission, and distribution to many parts of the country. The Philippines is divided into three electrical grids, one each for Luzon, the Visayas and Mindanao. As of June 2016, the total installed capacity in the Philippines was 20,055 megawatts (MW), of which 14,348 MW was on the Luzon grid. As of June, 2016, the all-time peak demand on Luzon was 9,726 MW at 2:00 P.M. on May 2, 2016; on Visayas was 1,878 MW at 2:00 P.M. on May 11, 2016; and on Mindanao was 1,593 MW at 1:35 P.M. on June 8, 2016. However, about 12% of Filipinos have no access to electricity. The Philippines is also one of the countries in the world that has a fully functioning electricity market since 2006 called the Philippine Wholesale Electricity Spot Market(WESM) and is operated by an independent market operator.
Transcorp Power Limited's Ughelli Power Plant is a gas-fired thermal plant located in Ughelli, Delta State in the Niger Delta region of Nigeria. It is the largest fossil-fuel based power-generating station in the country. The plant has an installed capacity of 972 MW and is capable of generating 2,500 GWh of electricity annually.
The electrical power grid that powers Northern America is not a single grid, but is instead divided into multiple wide area synchronous grids. The Eastern Interconnection and the Western Interconnection are the largest. Three other regions include the Texas Interconnection, the Quebec Interconnection, and the Alaska Interconnection. Each region delivers power at a nominal 60 Hz frequency.
The Transmission Company of Nigeria (TCN) is a federal government owned electric utility company in Nigeria established in 2005. It is headquartered in the Federal Capital Territory in Abuja. It is a member of the West African Power Pool, an agency committed to improving energy flow across ECOWAS member states through joint financing between member countries for better sustainability of power projects within the region. It is in furtherance of this collective objective that the TCN provides bulk power supplies to Republic of Niger, Republic of Benin and Togo.