Energy in the Faroe Islands is produced primarily from imported fossil fuels, with further contributions from hydro and wind power. Oil products are the main energy source, mainly consumed by fishing vessels and sea transport. Electricity is produced by oil, hydropower and wind farms, mainly by SEV, which is owned by all the municipalities of the Faroe Islands. [1] The Faroe Islands are not connected by power lines with continental Europe, and thus the archipelago cannot import or export electricity.
Per capita annual consumption of primary energy in the Faroe Islands was 67 MWh in 2011, almost 60% above the comparable consumption in continental Denmark. [2] [3]
After taking a dip in the early 1990s the electricity production in the Faroe Islands has steadily been on the rise since then, going from 174 GWh in 1995 to 434 GWh in 2022, mostly from oil and hydropower. [4] [5] The energy sector employed 154 people or 0.6% of the islands' total workforce as of November 2015. [6]
The islands have 4 diesel plants (around 100 MW [7] [8] [9] [10] and supplying district heating), [11] 6 hydroelectric plants at 37 MW, [12] [13] and 43 MW in several wind power plants with a capacity factor above 40%. [14] In 2022, the main grid had 50 days where more than 80% of the power was renewable. [4]
The municipality-owned company SEV is the main electricity supplier in the Faroe Islands with 90% of the total production, and private producers supplying the rest. [15] [16] [4]
Wind power was introduced in 1993, producing as little as 423 MWh at first, but rising to 90 GWh by 2022. [4] In 2014, the DKK 180 million 12 MW Húsahagi wind farm with Enercon 900 kW turbines [17] became operational near Torshavn and increased wind capacity from 6.6 to 18.6MW; this decreased oil consumption by 8,000 ton (approximately 4M€) per year. [14]
Adjacent to Húsahagi is the 25 MW Gellingakletti wind farm with 6 Vestas 4.2 MW V117 wind turbines, which started in December 2022, producing 100 GWh/year [18] [19] at DKK 0.218 per kWh. [20] The difference between supply and demand was a source of conflict. [21] [22]
Also adjacent to Húsahagi and Gellingakletti is the Flatnahagan wind farm with 6 Enercon turbines, scheduled at 66 GWh per year when ready. [23] [19]
A €2 million 2.3MW [24] 700kWh lithium-ion battery at Húsahagi [25] [26] became operational in 2016, stabilizing the wind power output, [27] [28] and a further 12.5 MWh battery with a 15 MVAr syncron compensator is underway at the Sund powerplant. [29] [19] Wind power is expected to save consumers DKK 57 million. [30]
Six Enercon E82/3MW wind turbines (18MW combined) are to be installed at Eiði, at a cost of DKK 0.239 per kWh. [31] [32]
Planners also consider converting the existing hydropower [33] to pumped-storage hydroelectricity, [17] as rain and wind are high in winter and low in summer. [34] Tidal power, [35] [36] offshore wind power [37] [38] and thermal energy storage solutions are also being considered, [39] as the islands have a goal of 100% green electricity production by 2030. [17] [40] [41] This occasionally happens when rain and wind matches demand, and the diesel power plants are turned off. [42]
The main electricity grid on the Faroe Islands [43] has the highest voltage of 60 kiloVolt, of which there is 90 km overhead wire and 6 km cable. [44] [45] [46] The 20kV system is 460 km and reaches most towns in the main islands, [47] whereas the 10 kV system covers the connected outlying islands, and Torshavn. [48] [49] Due to extreme weather conditions and its lack of interconnections, the Faroe Islands experience one to three total blackouts annually, a ratio higher than that of continental Europe. [50] Most of the powerlines have therefore been buried underground as cables for better protection, improving grid stability. [51] [52] When SEV detects grid issues, automatic demand response at large consumers reduce consumption to increase grid stability. [53]
Demand (and thus, production) is up to 55 MW in 2019 (record was 62 MW in November 2019), [13] up from 40 MW at daytime peak previously (nighttime low is 15 MW). [54]
The islands have 42 thousand vehicles, of which 18 thousand are petrol cars, 14 thousand are diesel cars, and 1,800 electric cars. [55] There are several 50 kW electric vehicle charging stations on the islands, and a few 150 kW chargers. [56] [57] [58] [59]
External image | |
---|---|
Sumba solar diagrams |
Suðuroy has its own grid [43] with 20 [47] and 10 kV. [48] This grid is powered by the 13 MW diesel at Vágur, [60] [61] the 2 MW diesel at Trongisvágur, [62] 6.3 MW wind at Porkeri and the 3.3 MW hydro Botnur power plant.
The Faroe Islands' first solar park was installed with 250 kW capacity in Sumba in late 2019, expected to produce 160 MWh/year (i.e. a capacity factor of 7.3% and equivalent to 35 tons of oil), from diffuse light for 1,000 hours per year; mainly in the summer when rain and wind are low. [63] [64] [65] [66] For the month of January 2020, the solar plant produced 672 kWh, [67] and 35.8 MWh in June 2023. [68]
Seven Enercon wind turbines at a combined 6.3 MW were installed at Porkeri Mountains in 2020. [69] Production is expected to be 20 GWh per year, reducing oil consumption by 4,300 tonnes. [70] [71] For the month of October 2022, the wind turbines supplied 60% of the power. Combined with the Botni hydroplant, they supplied 84% while the oil motors supplied the remaining 16%. [72] In 2022, the Suðuroy grid had 56 days with 100% renewable power. [4] A syncron compensator started in late 2022, and 6.25 MW / 7.5 MWh grid battery started in early 2023, increasing grid stability and utilisation of wind turbines. [73] [74]
Like Suðuroy, the islands of Fugloy, Hestur, Mykines, Skúvoy and Stóra Dímun are also not part of the main grid or connected to other islands. They are each electrified through their own separate fossil fuel powerplants. [43] [50]
External image | |
---|---|
Diagrams of grid production |
In 2020, SEV spent DKK 165 million on fuel oil. [75] In 2018 the main electricity was 352 GWh, with 51.2% from oil engines, 30.7% from hydropower, and 18.1% from wind. [76] [77] [9] [41]
In 2014 50.8% of the electricity production of SEV in the Faroe Islands came from green energy like hydro (mostly Eiði and Vestmanna) [43] and wind, while 49.2% was produced by the thermal power plants, which was 12.4% less than in 2013. [78]
Total annual production: 305.4 GWh (2014) of which the production of thermal, hydropower and wind power was:
The main source is imported oil, costing DKK 0.70-0.80 per KWh. Wind power costs DKK 0.52/kWh as most of it will go unused until pumped-storage is installed to store it. If all wind power is then used, it would cost DKK 0.23/kWh. [22] Power prices increased from 0.64 per kWh in 2007, to DKK 1.31 per kWh in 2019. [79] [80]
Oil consumption peaked at over 300,000 tonnes in 2020, at a value of DKK 1 billion. [81] Of this, 30% was for fishing vessels. [82] In 2014, 217,547 tonnes of oil products were consumed in the Faroe Islands. [83] Of these, 31.58% was consumed by fishing vessels, 14.73% was used by SEV for electricity production, 23.23% was consumed in air, sea or land transport, 9.6% was used in the industry, and the rest was used by public or private buildings. [84]
Oil and gas exploration has been taking place around the Faroe Islands since 2001, with the expectation that significant oil reserves will be found. [85]
There are coal reserves on Suðuroy, which were considered for energy production. [16] The reserves are between 10 and 15 million tonnes and they could replace oil in the Sund power-station for 100 years. [16] [43]
The Faroe Islands have set a goal of producing their entire electrical energy needs from renewable energy sources by 2030. [40] [86] Since energy consumption has been rising steadily during the last few decades, [5] the Ministry of Trade and Industry has conducted a study for the future development of electricity production projects. [16] Apart from the development of new hydropower plants and wind farms, the study proposes the investigation of the possibility to produce electricity from LNG and biogas. [16] The University of the Faroe Islands has undertaken research into the feasibility of tidal power at several sites which have a high energy potential, [87] leading the Ministry of Trade and Industry to consider tidal power as a possibility. [16] The privatisation of electricity production was not promoted, although consideration was given to introducing competition and transparency into electricity production. [16] [43]
The economy of the Faroe Islands was the 166th largest in the world in 2014, having a nominal gross domestic product (GDP) of $2.613 billion per annum. GDP increased from DKK 8 billion in 1999, to 21 billion in 2019. The vast majority of Faroese exports, around 90%, consists of fishery products.
The electricity sector in Norway relies predominantly on hydroelectricity. A significant share of the total electrical production is consumed by national industry.
Hov is a village located on Suduroy's east coast, in the Faroe Islands; it is frequently mentioned in the country's history.
Suðuroy is the southernmost of the Faroe Islands. The island covers 163.7 square kilometres (63.2 sq mi). In 2018 the population was 4,601. Suðuroy region (sýsla) comprises this island and Lítla Dímun, the next isle northward in the Faroes, which is uninhabited.
The Botnur power plant is a hydroelectric power station supplying the Faroe Islands' southernmost island of Suðuroy with electricity. It is located to the north of Vágur. Botnur was the first hydroelectric plant built in the Faroes.
Denmark was a pioneer in developing commercial wind power during the 1970s, and today a substantial share of the wind turbines around the world are produced by Danish manufacturers such as Vestas—the world's largest wind-turbine manufacturer—along with many component suppliers. Furthermore, Denmark has - as of 2022 - the 2nd highest amount in the world of wind power generation capacity installed per capita, behind only neighboring Sweden.
SEV is a power producer and distributor on the Faroe Islands. The company name is derived from the names of islands Streymoy, Eysturoy and Vágar, which established the company on 1 October 1946. All municipalities in Vágar, all in Eysturoy except for Sjóvar municipality and all municipalities in Streymoy except for Tórshavn, Kvívík and Kollafjørður met at the first establishing meeting. Later all municipalities in the Faroe Islands joined SEV. In 2015 60% of the produced electricity of SEV came from green energy sources, 17,8% came from the windmills in Neshagi and Húsahagi, 42,3% came was hydropower.
The electricity sector of Uruguay has traditionally been based on domestic hydropower along with thermal power plants, and reliant on imports from Argentina and Brazil at times of peak demand. Over the last 10 years, investments in renewable energy sources such as wind power and solar power allowed the country to cover in early 2016 94.5% of its electricity needs with renewable energy sources.
Energy in Croatia describes energy and electricity production, consumption and import in Croatia.
Vágsfjørður is a fjord on the island of Suðuroy in the Faroe Islands. The fjord is located in the southern part and on the eastern side of the island. The distance between the east and the west coast of Suðuroy is very short from Vágsfjørður to Vágseiði. Between the fjord and Vágseiði is a lake which is called Vatnið. There are five villages around the fjord. In the bottom of the fjord is Vágur, which is one of the largest of the villages in Suðuroy. Further east on the northern side of the fjord is Porkeri, in between Vágur and Porkeri is the small village Nes, where a famous artist Ruth Smith lived. She drowned while swimming in Vágsfjørður at the age of 45.
The electricity sector in Iceland is 99.98% reliant on renewable energy: hydro power, geothermal energy and wind energy.
Denmark's western electrical grid is part of the Synchronous grid of Continental Europe whereas the eastern part is connected to the Synchronous grid of Northern Europe via Sweden.
The electricity sector in France is dominated by its nuclear power, which accounted for 71.7% of total production in 2018, while renewables and fossil fuels accounted for 21.3% and 7.1%, respectively. France has the largest share of nuclear electricity in the world, and together with renewable energy supplies, this has helped its grid achieve very low carbon intensity.
Sandoyartunnilin is an undersea road tunnel in the Faroe Islands. It connects the main island of Streymoy with Sandoy to the south. The length of the tunnel is 10.8 kilometres (6.7 mi) and the estimated cost is 860 million DKK. The tunnel opened for traffic on 21 December 2023, after which the ferry Teistin ceased its route between Gamlarætt on Streymoy and Skopun on Sandoy. The tunnel crosses the Skopunarfjørður and runs from Gamlarætt to Traðardalur in central Sandoy, near the Inni í Dal stadium.
The Eiði Hydroelectric Power Station is the largest hydroelectric power station in the Faroe Islands. It stands below a dam on Lake Eiði on the island of Eysturoy.
By the end of 2016 Austria already fulfilled their EU Renewables Directive goal for the year 2020. By 2016 renewable energies accounted to 33.5% of the final energy consumption in all sectors. The renewable energy sector is also accountable for hosting 41,591 jobs and creating a revenue of 7,219 million euros in 2016.
The COVID-19 pandemic was confirmed to have reached the Faroe Islands, an autonomous territory of Denmark, in March 2020. The confirmed infection rate was 1 case per 280 inhabitants, one of the highest rates in the world, but the archipelago also tested at a very high frequency, with the number of tests equaling c. 34 per cent of the population. As of 28 February 2022, there have been 34648 confirmed cases. Among these, 31 persons have died with COVID-19.
The Suðuroyartunnilin is a proposed submerged fixed-link in the Faroe Islands, linking the island of Suðuroy to Sandoy. As of 2023, all vehicles and cargo, and virtually all passenger traffic must use the ferry service.
Precipitation and wind speeds decrease as we enter the summer period + diagram
2025
The generation capacity is 102 MW of thermal power using fuel oil (FO) and gas oil (GO), 41 MW of hydro power (HP) with reservoirs, 18 MW of wind power (WP), 0.25 MW of photovoltaic (PV) power and 1.5 MW of biogas (BG) power. 42 MW of new WP and a pilot project with 0.2 MW of tidal power (TP) are committed. The generation in 2019 was 387 GWh of which 14% was wind energy and 27% hydro. Demand ranges between 22 MW and 60 MW.