The history of the South Island line and West Island line encompasses a number of proposals which were made for extending the Hong Kong MTR metro system to the south and west of Hong Kong Island, which were not serviced by any rail transport before 2014. The West Island line opened as an extension of the Island line on 28 December 2014. The South Island line has completed construction and commenced service on 28 December 2016. [1] The proposed South Island line (West) is still in the planning phase and is expected to begin in 2021. [2]
Date | Event |
---|---|
1960 | Stations of West Island line were proposed as part of Island line project |
1980 | West Island line stations were deferred due to ageing population of Western District and debts of MTRC |
2000 | West Island line was proposed in Railway Development Strategy |
2002 | MTRC submitted its first proposal to government for the South Island line and West Island line |
2003 | Executive Council modified to the South Island line plans, and took into account the parallel development of Route 4 highway |
Mid- to Late-2003 | MTRC began feasibility study to look for cost effective options. A modified proposal was submitted in November with three options of alignment in the South Island line |
2004 | MTRC submit a revised alignment scheme: Western part of South Island became Island Extension |
Mid-2004 | Legislative Council debate whether to build highway or South Island line. Government later announced to defer both rail line because of low ridership of the previous project West Rail line and its rail incidents |
2005 | MTRC submitted a revised scheme to Legislative Council. South Island line was separated into East and West section. |
2007 | Government officials confirmed the South Island line (East) would be one of the priority. Chief executive later announced to build in 2011, and open in 2015. Executive Council approved final scheme of South Island |
2009 | Executive Council approved final scheme of West Island line |
2011 | A resident filed suit against the government |
2014 | Commencement of West Island line South Island line (West) was readdressed on the Railway Development Strategy 2014, divided into two sections Apple Daily revealed commencement date of South Island line would be postponed by 1.5 years, MTRC confirmed |
2016 | Commencement of South Island line |
Consultant Freeman, Fox, Wilbur Smith & Associates, has been hired by Hong Kong government, studied possibilities of mass transport in Hong Kong. In September 1967, they proposed a mass transit railway network, which included the Island line from Kennedy Town to Chai Wan. [3] In 1980, only the Sheung Wan to Chai Wan section was approved due to debt of MTRC and ageing population of Western District. Yet, some of the ground-level-units within private buildings are reserved by government through public easement, in order to preserve for railway station entrances.
The West Island line was first proposed in the Railway Development Strategy 2000 by the Transport Bureau, aiming to connect the Tseung Kwan O line to part of the Island line to create a new railway corridor. [4]
The MTR Corporation Limited (MTRC) submitted its first proposal for the South Island line and West Island line in May 2002. The new lines were intended to promote tourism in Aberdeen. The West Island line would be an extension of the Island line.
In the proposal, the South Island line would be a semicircular line with nine stations, intended to serve the southern end of Hong Kong Island towards Aberdeen. It would interchange with the Island line at University and Wan Chai, which would also be its terminus stations. The stations in between would be, from University, Cyberport, Wah Fu, South Horizons, Lei Tung, Wong Chuk Hang, Ocean Park and Happy Valley.
The West Island line would be an extension of the Island line. Construction of the new West Island line would be divided into two phases. Phase one would begin at the already existing Sheung Wan station. A further two stations, Sai Ying Pun and University (near The University of Hong Kong) would be added to extend the length of the Island line. University would also serve as an interchange for the South Island line. Phase two would include an extension to Kennedy Town. The construction of phase two, which will include a depot near Kennedy Town station, is subject to the land availability of the western reclamation.
On 21 January 2003, the Executive Council of Hong Kong made modifications to the South Island line plans, to achieve a more cost-effective option and taking into account the parallel development of Route 4. [5] However, the first proposal had some major drawbacks. Specifically, construction of West Island line as heavy rail would not include Kennedy Town if there was no Western reclamation. There would also be environmental and traffic management challenges if the West Island line went under Des Voeux Road West. There would not be an Aberdeen station for serving the Aberdeen area, and a transfer station at Wan Chai would not cater well for the needs of cross-harbour trips (passengers would have to change to Island line trains for Admiralty and then change for cross-harbour trips on the Tsuen Wan line).
The Executive Council gave MTRC permission to proceed with further planning on Phase 1 of West Island line. However, the first proposal had some major drawbacks. Specifically, construction of West Island line as heavy railway type tunnels and stations would not include Kennedy Town if there is no Western reclamation. There would also be great environmental impact and traffic management challenge if West Island line goes under Des Voeux Road West.
To respond to the criticism directed towards the original proposal, the MTRC started a feasibility study of the lines in mid-2003 to look for cost effective options to improve the system. The study also evaluated the external benefits of the project and its impact on other modes of public transport. The company derived a modified proposal in November 2003, with three options of alignment in the South Island line part, to address the drawbacks in the initial scheme.
The western section of the South Island line was transferred to the West Island line, now a medium capacity rail line from Sheung Wan to Wong Chuk Hang interchanging with the Island line at Sheung Wan. The South Island line would also be a medium capacity system.
The corporation handed in the Revised Alignment Scheme in March 2004. South Island line runs from South Horizons to Admiralty in the scheme, still having three alignment options. West Island line in the previous proposal was separated into two parts: the northern part of which became an extension to Island line, and the southern part which remained a line of its own.
A short extension from Sheung Wan to Sai Ying Pun, in which the latter station provides a transfer to the West Island line.
On 28 May 2004, the Panel of Transport of Legislative Council held a meeting to consider the development of West and South Island lines along with the highway link (Route 4). [6]
Residential, environmental and some professional organisations support building the lines instead of highway. Rail links are more environmentally friendly and will help ease congestion of the Aberdeen Tunnel. The lines can also help sustainable development and will preserve the shoreline along western and southern Hong Kong Island.
Other transport operators and various organisations opposed the rail link, claiming that the rail link could lead to severe competition between different modes of transport, and that reduction of road transport might eventually cause job losses. Some panel members stated that the projected population growth in the south cannot support the new lines, and that the government should have a thorough plan on how to develop the Southern District before implementing the rail links.
However, some panel members suggested that the new lines could help promote tourism in the area. They asked the government to moderate the various modes of transport upon the new lines' inaugurations so as to relieve concerns from the transport operators.
Government officials stated that the low ridership of the West Rail line and its rail incidents warranted extra planning on the new rail lines to ensure enough ridership and appropriate, cost-effective system design. Therefore, the West Island line and South Island line project was deferred, and approval was given to the detailed planning of the highway.
On 25 February 2005, the Panel of Transport of Legislative Council had a meeting discussing West and South Island line. MTR has submitted a revised scheme on 22 February and an introduction to the scheme was conducted in the meeting.
The three alignment options of South Island line were:
It was separated from the West Island line in the last proposal, running from University to Wong Chuk Hang:
It runs on the same alignment of South Island line in Revised Scheme, and the three options stated before still exist. The line starts at South Horizons:
In the scheme, West Island line included only the extension to Island Line. The rest became the west section of South Island line. The new West Island line would run from Sheung Wan to Kennedy Town:
The MTR claimed that the latest scheme had the following advantages:
The officials from Environment, Transport and Works Bureau said that consideration of funding depends on the development of tourism in Southern District, especially after the submission of Ocean Park redevelopment project. [ citation needed ]
In February 2007, the government announced in a Southern District Council meeting that the South Island line was currently at a 4th priority when it came to future railway projects, much to the anger of the district councillors present. [7] This implied that the South Island line was unlikely to be opened to the public before 2015.
On 10 October 2007, Chief executive Donald Tsang announced in the policy address that the South Island line would start construction in around 2011, and will be opened in 2015. On 27 October 2007, MTR announced that stations will be built in Wong Chuk Hang and around Ocean Park, but MTR did not confirm whether the line will pass through Wan Chai and Happy Valley. [8]
On 18 December 2007, the Executive Council of Hong Kong approved the construction of the east section of South Island line. A total of five stations will be built, not including Wan Chai and Happy Valley from the 2005 proposal. The railway will be seven kilometres long, and it will take 10 minutes to travel from South Horizons station to Admiralty station. The railway will be a medium capacity system and cost HK$10 billion, which is 42% more than the original estimate of HK$7 billion of 2006.
The West Island line extension was given final authorisation in March 2009. [9] Construction of the 3-kilometre extension started on 10 August 2009, for completion in 2014. [9] The cost of the line is estimated to be HK$15.4 billion. [9]
The construction of South Island line (West) has not been confirmed yet. [10]
In June 2011 a resident of the South Horizons private residential estate at Ap Lei Chau filed suit against the government (including the chief executive, Transport Department, and Financial Services and the Treasury Bureau) in the High Court to block the construction of the South Island line. His suit alleged that the dust resulting from the construction of the line would cause harm to trees, and that the importation of large numbers of mainland and South Asian construction workers posed a threat to public safety. [11]
South Island line (West) readdress on the Railway Development Strategy 2014. During consultation stage, consultant AECOM and MVA suggested to divide South Island line into two sections:
They suggested that Aberdeen Section had higher traffic demand, as commuters would take a short alignment to Admiralty or CBD. Plus, Tin Wan was first taken into consideration and Queen Mary Hospital was re-proposal after 2004 scheme. [12] Yet, this divided scheme was opposed by some of the Southern District Councillors, Cyberport commuters and residents. [13] Some Southern District Councillors, like Lo Kin-hei and Henry Chai disagreed, especially after government has given MTRC topside development rights of Wong Chuk Hang Depot. The profit of topside housing is estimated to be fifty billion Hong Kong Dollars. [14]
In the final report of Railway Development Strategy 2014, it confirmed the need of South Island line (West), but it did not determine whether to build the whole line or not. The estimated cost is twenty-five billion dollars in 2013 price. The implementation window for planning purpose is between 2021 and 2026, but still depend on the progress of Wah Fu Estate redevelopment.
Project Agreements and Entrustment Agreement for MTR South Island line and the Kwun Tong line extension were signed by the Hong Kong government and MTR Corporation on 18 May 2011. South Island line (East) would be constructed in accordance to 2007 scheme. [15]
The opening of the South Island line was originally planned for 2015. On 21 May 2014, an informant told Apple Daily that the commencement date of the line would be postponed by one and a half years. MTR Corporation asserted it would be opened as expected. Yet, the Transport and Housing Bureau revealed the delay of construction work and demanded MTR to review the commencement. Members of the Legislative Council and District Council criticised MTR for hiding the project's progress from the public and demanded a progress report at the Council's meeting. [16] Eight days later at the South District Council meeting, MTRC announced the delay was caused by the expansion work of Admiralty station. High-density building, underground public facilities and the existing Admiralty station would prolong the work progress, as "safety comes first". However, the claimed 2015 opening date remained unchanged. [17] In November 2014, a revised opening date of December 2016 was announced. [18]
In October 2016, MTRC chairman Frederick Ma warned that the opening of the South Island line could be delayed by three more months. [19] However, on 10 November 2016, he announced the South Island line would open by the end of 2016, saying the engineering team overcame the many challenges in expanding Admiralty station. [20] Finally, MTRC chief executive Lincoln Leong officially declared the South Island line would begin operation on 28 December 2016. [1]
West Island line construction work began in 2009 and expected to completed in 2014. [9] Yet, MTRC revealed the deferral of construction in May 2014. Two entrances of Sai Ying Pun station, which are for Queen's Road West and First Street, had suffered unstable ground condition. The ground-freezing method was used, but it would delay the commencement of Sai Ying Pun. [21] [ non-primary source needed ] [22] In the same month, MTRC proposed to government that West Island line would be opened as schedule, but Sai Ying Pun would not be in service for public. Government acknowledged and agreed with the plan.
West Island line commenced on 28 December 2014 and its first Island line train departed at Kennedy Town at 0600. Trains had skipped Sai Ying Pun. This arrangement stopped when Sai Ying Pun station commenced operations on 29 March 2015. [23]
South Island line opened on 28 December 2016. First train was dispatched from South Horizons at 05:55. [24]
Hong Kong Island is an island in the southern part of Hong Kong and one of the three main parts of Hong Kong, with the other two being the Kowloon Peninsula and New Territories. The island was known originally and on road signs simply as "Hong Kong". It had a population of 1,289,500 and a population density of 16,390 per square kilometre (42,400/sq mi) in 2023. It is the second largest island in Hong Kong, with the largest being Lantau Island.
The Mass Transit Railway (MTR) is a major public transport network serving Hong Kong. Operated by the MTR Corporation (MTRCL), it consists of heavy rail, light rail, and feeder bus services, centred around a 10-line rapid transit network, serving the urbanised areas of Hong Kong Island, Kowloon, and the New Territories. The system encompasses 245.3 km (152.4 mi) of railways, as of December 2022, with 179 stations—including 99 heavy rail stations, 68 light rail stops and 1 high-speed rail terminus.
The Island line is one of ten lines of the MTR, the mass transit system in Hong Kong. It runs from Kennedy Town in the Western district to Chai Wan in the Eastern District on Hong Kong Island, passing through the territory's major business districts of Central, Wan Chai and Causeway Bay, and connecting them with built-up areas on the north shore of the island.
The City of Victoria, often called Victoria City or simply Victoria, was the de facto capital of Hong Kong during its time as a British dependent territory. It was initially named Queenstown but was soon known as Victoria. It was one of the first urban settlements in Hong Kong and its boundaries are recorded in the Laws of Hong Kong. All government bureaux and many key departments still have their head offices located within its limit.
Central is an MTR station located in the Central area of Hong Kong Island. The station's livery is firebrick red but brown on the Tsuen Wan line platforms. The station is the southern terminus of the Tsuen Wan line, a stop on the Island line, and connects to Hong Kong station, which serves the Tung Chung line and the Airport Express.
Admiralty is a station of the MTR rapid transit system in Admiralty, Hong Kong.
Sai Ying Pun is a station on the MTR network. The station is located between HKU and Sheung Wan on the Island line. It serves the neighbourhood of Sai Ying Pun and the western part of Mid-Levels in northwestern Hong Kong Island, Hong Kong. Sai Ying Pun station was opened on 29 March 2015, completing the West Island line extension of the Island line.
Sheung Wan is a station on the Island line of the Hong Kong MTR network. The station serves the neighbourhood of Sheung Wan and the western part of Central District. The livery colour of this station is khaki.
Causeway Bay is an underground metro station on the MTR network in Hong Kong. It is located between Wan Chai and Tin Hau stations on the Island line, and sits underneath Great George Street near Hennessy Road and Yee Wo Street. Named for the Causeway Bay area and its abundant shopping centres, the station serves various malls including Hysan Place, Sino Plaza, Sogo, and the nearby Victoria Park.
Chai Wan is the eastern terminus of the MTR Island line on Hong Kong Island, Hong Kong. It is the only station on the Island line that is elevated. The station is located at the junction of Chai Wan Road and Island Eastern Corridor, and serves Siu Sai Wan and Chai Wan, a primarily residential and industrial town. The bus terminus nearby has bus and minibus routes to Siu Sai Wan and Stanley, as well as the nearby residential developments. Chai Wan was also the southernmost railway station in Hong Kong, prior to the opening of Lei Tung station on the South Island line on 28 December 2016.
The South Island line, is a rapid transit line of Hong Kong's MTR metro system. This line connects the Hong Kong business district from Admiralty station to the Southern District of Hong Kong Island and the island of Ap Lei Chau, which was not served by any rail transport prior to the opening of the line. Approved by the Executive Council in 2007, the line commenced service on 28 December 2016. The line is identified by light green on the MTR route map. The rolling stock of the South Island line is purpose-built for driverless operation, with trains being remotely controlled from the Operations Control Centre in Tsing Yi.
The Extension of Island line to Western District is a three-station western extension of the Hong Kong MTR's Island line. Construction of the line began on 10 August 2009, and the two westernmost stations on line opened on 28 December 2014; the intermediary Sai Ying Pun station opened on 29 March 2015. The first train went into service that day at 6:00 a.m. Hong Kong time.
Several future projects on the MTR have been put forward by the MTR Corporation to the Hong Kong Government. Some of these are still in planning stage.
Articles related to Hong Kong include:
Wong Chuk Hang is an elevated MTR rapid transit station in Hong Kong on the eastern section of the South Island line, built on the Staunton Creek Nullah and off the old site of Wong Chuk Hang Estate in Staunton Creek. It is named after the locality of the same name further east and serves residents in that area, as well as connects to a public transport interchange on a widened section of Heung Yip Road. A network of footbridges serves future commercial and residential areas, and the station exists as a hub to the Shum Wan area as a whole. The station opened on 28 December 2016 with the rest of the South Island line. The South Island line depot is located to the south.
Urban Route No.4 is a bus route on Hong Kong Island operated by Citybus. It runs between Wong Chuk Hang and Central Bus Terminus, via Aberdeen, Wah Fu Estate, Pok Fu Lam Road and Sai Ying Pun.
The Central and Western District located on northwestern part of Hong Kong Island is one of the 18 administrative districts of Hong Kong. It had a population of 243,266 in 2016. The district has the most educated residents with the second highest income and the third lowest population due to its relatively small size.
The South Island line (West) is a proposed extension of the Hong Kong MTR metro system. The new line would serve the southwestern coast of Hong Kong Island, between Shek Tong Tsui and Wong Chuk Hang. Plans for the South Island line (West) are mentioned and revised in the government's Railway Development Strategy 2014 (RDS-2014) report. and construction was planned to begin in 2021–2026 in the report.