Pakistan Atomic Research Reactor

Last updated

Pakistan Atomic Research Reactor
Pulstar2.jpg
Pakistan location map.svg
Red pog.svg
Location of Pakistan Atomic Research Reactor
Operating Institution Pakistan Institute of Nuclear Science and Technology (PINSTECH)
Location Nilore, Islamabad, Pakistan
Coordinates 33°39′13″N73°15′30″E / 33.65361°N 73.25833°E / 33.65361; 73.25833
Type Open pool reactor
Materials Test Reactor
Miniature neutron source reactor (MNSR)
SLOWPOKE reactor
Power10 MW (PARR-I)
30 Kw (PARR-II)
Construction and Upkeep
Construction CostUnknown
Construction Began8 July 1965;58 years ago (1965-07-08)
Time to Construct5 months
First Criticality21 December 1965;57 years ago (1965-12-21)
Shutdown dateN/A
Decommission dateN/A
StaffClassified
OperatorsClassified
Refuel FrequencyN/A
Technical Specifications
Max Thermal Flux 1.05E+13 n/cm^2-s
Max Fast Flux 1.70E+14 n/cm^2-s
Cooling light water
Neutron Moderator light water
Neutron Reflector heavy water, graphite, beryllium
Control Rods8 Rods
Cladding Material Aluminium Alloy

The Pakistan Atomic Research Reactor or (PARR) are two nuclear research reactors and two other experimental neutron sources located in the PINSTECH Laboratory, Nilore, Islamabad, Pakistan.

Contents

In addition a reprocessing facility referred to as New Labs also exists for nuclear weapons research and production.

The first nuclear reactor was supplied and financially constructed by the Government of United States of America in the mid 1960s. The other reactor and reprocessing facility are built and supplied by Pakistan Atomic Energy Commission (PAEC) in the 1970s and 1980s, respectively. Supervised by the United States and International Atomic Energy Agency (IAEA), the first two reactors are subject to IAEA safeguards and its inspections. [1]

History of PARR-Reactors

The PARR-I Reactor was supplied by the United States government in 1965 under the Atoms for Peace program. The PINSTECH institute was designed by American architect Edward Durrell Stone, when noted Pakistani scientists, Abdus Salam and Ishrat Hussain Usmani travelled to the United States of America in the early 1960s. The first reactor was supplied by the American Machine and Foundry as its contractors, and the first reactor was built by the American nuclear engineer Peter Karter. [2]

In the first stage, reactor building and ancillary facilities were completed with the reactor becoming critical on 21 December 1965. The second stage, consisting of various laboratories, workshop, library and auditorium, became operational in 1974. The facility was last upgraded by PAEC chairman and noted nuclear scientist, Mr. Munir Ahmad Khan in 1989.

PARR-I Reactor

The PARR-I Reactor was the first reactor that was supplied by American Machine and Foundry. Peter Karter had personally supervised the construction of the reactor. The PARR-I is a swimming pool-type and Materials Test Reactor (MTR) type research reactor. Originally based on a designed to use the Highly enriched uranium (HEU) fuel, the HEU fuel use the ~93% enriched in 235 U at a power level of 5 MW. [3] The first reactor went critical on 21 December 1965 under the supervision of Hafeez Qureshi, Dr. M. N. Qazi, Naeem Ahmad Khan and Saleem Rana.

The PARR-I Reactor attained its full power on 22 June 1966. In PARR-I, it is virtually impossible to adopt secure the fresh supplies of the HEU fuel. However, to ensure the continuity of the nuclear fuel, PARR-I was converted to use the ~20% Low-enriched uranium (LEU) from the 235 U in October 1991 The nuclear fuel conversion program was led by the PAEC chairman Mr. Munir Ahmad Khan. The reactor was also upgraded from the power level of 5 MW to 10 MW. [4]

The program was carried out to meet demands of higher neutron fluxes for experimental research purposes and the isotope production. The upgraded reactor was also made available to compensate for the decrease in neutron flux due to higher concentration of 238 U in the LEU fuel as compared to the HEU fuel. The reactor was made critical on 31 October 1991 under the supervision of Dr. Ishfaq Ahmad and Dr. Iqbal Hussain Qureshi, and attained power level of 10 MW on 7 May 1992. The core configuration attained its equilibrium configuration in February 1995. [5]

PARR-II Reactor

The PARR-II Reactor is an indigenously designed and constructed reactor owned by the Pakistan Atomic Energy Commission. The PARR-II Reactor's design is similar to Miniature neutron source reactor (MNSR) and SLOWPOKE reactor. The reactor was indigenously designed by the PAEC as the chairman Munir Ahmad Khan and his team of engineers and scientists also led the construction of the reactor. The PARR-II Reactor had gone critical and began operating on 21 January 1974. [6] The PARR-II Reactor is a tank-in-pool reactor with a rated power of 27–30 kW. Same as the first reactor, the reactor is designed to use the High Enrich Uranium (HEU) fuel. The HEU fuel use the ~90% 235 U at a power level of 30 kW. [7] The demineralised light water is used as a coolant moderator and the reactor core is reflected by metallic Be 4.

A PARR-II consists of a core reactor, control rod, and nuclear reflectors, and it is enclosed in a water-tight cylindrical Al 13 alloy vessel. The nuclear reactor core is an under-moderated array with 1 H to 235 U ratio of temperature of 20 °C (68 °F) and provides a strong Negative temperature coefficient and thermal volume coefficients of reactivity. [8] The PAEC scientists and engineers also built and constructed the nuclear accelerator on 9 April 1989. The particle accelerator is heavily used to conduct research in nuclear technology.

New Labs

Unlike the PARR-I and PARR-II the New Labs is not subject to IAEA inspections.[ citation needed ] and is completely different from its parent reactors. It is a plutonium-fuel reprocessing plant and works as a pilot 94 Pu reprocessing facility with a capability to use the ~7% 239Pu, to handle the isotopes and use the 86 Kr emissions and radiation. [9] It is also a reprocessing plant to change <~7% 239Pu into <~7% weapon-grade 240Pu fuel. [10] New Labs were designed and constructed indigenously by Pakistan Atomic Energy Commission (PAEC) under its chairman Munir Ahmad Khan whereas it project-director was a mechanical engineer, Chaudhry Abdul Majeed. The construction of the facility was led by NESPAK.

In the 1960s PAEC contracted the project with British Nuclear Fuels (BNFL), and Saint-Gobain Techniques Nouvelles (SGN).[ citation needed ] PAEC engineers and scientists led the initial design for a large-scale reprocessing plant with a capacity to re-process 100 tons of fuel per year, while BNFL and SGN provided funds, technical assistance, and nuclear fuel. However, after the India's Operation Smiling Buddha nuclear test, both British and French consumer companies immediately cancelled their contracts with PAEC.

The plant was completed in 1981 and cold reprocessing tests for producing plutonium took place at New Labs in 1986. The New Labs came into limelight when Pakistan had secretly tested its plutonium weapon-based nuclear device in Kirana Hills. [11] On 30 May 1998, the PAEC scientists, under renowned nuclear physicist Dr. Samar Mubarakmand, had tested a miniaturised nuclear device that is believed to be a Plutonium devices for which plutonium was most likely reprocessed by the Pakistani scientists into weapon-grade at the New Labs. The test yield of a nuclear devices was reported to be 12–40  kt.

Charged Particle Accelerator

In early 1983, Pakistani nuclear physicist Dr. Samar Mubarakmand developed and established a neutron particle and nuclear accelerator to conduct the research of explosions of nuclear elements and isotopes in a nuclear device. Known as a Charged Particle Accelerator (CPA), the nuclear accelerator is a 250 keV Ion accelerator which can deliver all Gaseous ions such as + H, + N, + O, + He, + Ne, + Ar, + Kr, + Xe or molecular ions. The accelerator's energy range is highly flexible and ions between 50 and 250 keV can be delivered to a target of dimensions ranging from few mm to many cm. [12]

The particle facility is designed to implantation of 42+ Mo, 51+ Sn, and 46+ Pb ions into steel, friction can be reduced by up to ~50%. During the process of ion implantation, the oxidation is inhibited by suitable ions such as 5+ B,20+ Ca into metals. The PINSTECH accelerator can be used by mutual arrangement between PINSTECH and industry or any other organisations. [12]

Fast-Neutron Generator

In 1961, the United States Government led the establishment of ICF-based Fusion power experimental source near at Nilore, before the establishment of PINSTECH Institute. [13] The neutron generator was bought by the PAEC from Texas A&M Nuclear Science Center. [13] The facility is capable of producing mono-energetic neutrons at 3.5–14.7MeV from deuterium-tritium reaction generated by the Fusion power. [13] This fusion experimental devices has capability to capture the low neutron flux on the order of 105 to 108 neutrons per cm2 per second, resulting in nucleosynthesis by the s-process (slow-neutron-capture-process). [13] It is designed and planned to do fast neutron activation for elements such as oxygen and nitrogen as well as some rare earth isotopes. [13]

Related Research Articles

Enriched uranium is a type of uranium in which the percent composition of uranium-235 has been increased through the process of isotope separation. Naturally occurring uranium is composed of three major isotopes: uranium-238, uranium-235, and uranium-234. 235U is the only nuclide existing in nature that is fissile with thermal neutrons.

<span class="mw-page-title-main">Pakistan and weapons of mass destruction</span>

Pakistan is one of nine states that possess nuclear weapons. Pakistan began developing nuclear weapons in January 1972 under Prime Minister Zulfikar Ali Bhutto, who delegated the program to the Chairman of the Pakistan Atomic Energy Commission (PAEC) Munir Ahmad Khan with a commitment to having the device ready by the end of 1976. Since PAEC, which consisted of over twenty laboratories and projects under reactor physicist Munir Ahmad Khan, was falling behind schedule and having considerable difficulty producing fissile material, Abdul Qadeer Khan, a metallurgist working on centrifuge enrichment for Urenco, joined the program at the behest of the Bhutto administration by the end of 1974. As pointed out by Houston Wood, "The most difficult step in building a nuclear weapon is the production of fissile material"; as such, this work in producing fissile material as head of the Kahuta Project was pivotal to Pakistan developing the capability to detonate a nuclear weapon by the end of 1984.

In nuclear physics, an energy amplifier is a novel type of nuclear power reactor, a subcritical reactor, in which an energetic particle beam is used to stimulate a reaction, which in turn releases enough energy to power the particle accelerator and leave an energy profit for power generation. The concept has more recently been referred to as an accelerator-driven system (ADS) or accelerator-driven sub-critical reactor.

<span class="mw-page-title-main">Bhabha Atomic Research Centre</span> Nuclear research facility in Mumbai, India

The Bhabha Atomic Research Centre (BARC) is India's premier nuclear research facility, headquartered in Trombay, Mumbai, Maharashtra, India. It was founded by Homi Jehangir Bhabha as the Atomic Energy Establishment, Trombay (AEET) in January 1954 as a multidisciplinary research program essential for India's nuclear program. It operates under the Department of Atomic Energy (DAE), which is directly overseen by the Prime Minister of India.

<span class="mw-page-title-main">Pakistan Atomic Energy Commission</span> Pakistani governmental agency

Pakistan Atomic Energy Commission (PAEC) is a federally funded independent governmental agency, concerned with research and development of nuclear power, promotion of nuclear science, energy conservation and the peaceful usage of nuclear technology.

<span class="mw-page-title-main">Samar Mubarakmand</span> Pakistani physicist (born 1942)

Dr. Samar Mubarakmand is a Pakistani nuclear physicist known for his research in gamma spectroscopy and experimental development of the linear accelerator.

Khushab Nuclear Complex is a plutonium production nuclear reactor and heavy water complex situated 30 kilometres (19 mi) south of the town of Jauharabad in Khushab District, Punjab, Pakistan.

<span class="mw-page-title-main">Pakistan Institute of Nuclear Science & Technology</span> National research institute and national laboratory site

The Pakistan Institute of Nuclear Science & Technology (PINSTECH) is a federally funded multiprogram science and technology research institute managed for the Ministry of Energy by the Pakistan Institute of Engineering and Applied Sciences (PIEAS).

<span class="mw-page-title-main">Ishfaq Ahmad Khan</span> Pakistani nuclear physicist (1930–2018)

Ishfaq Ahmad KhanSI, HI, NI, FPAS, was a Pakistani nuclear physicist, emeritus professor of high-energy physics at the National Centre for Physics, and former science advisor to the Government of Pakistan.

As of 2022, nuclear power is provided by six commercial nuclear power plants in Pakistan. Pakistan is the first Muslim majority country in the world to construct and operate civil nuclear power plants. The Pakistan Atomic Energy Commission (PAEC), the scientific and nuclear governmental agency, is solely responsible for operating these power plants. As of 2018, the electricity generated by commercial nuclear power plants constitutes roughly 7.5% of electricity generated in Pakistan, Pakistan is not a party to the Nuclear Non-Proliferation Treaty but is a member of the International Atomic Energy Agency. Pakistan plans on constructing 32 nuclear power plants by 2050 and envisions 40,000 MW of nuclear power generation.

The Pakistan Nuclear Power Fuel Complex (PNPFC), also known as Chemical Reprocessing Plant (CrP), is a nuclear energy and reprocessing industrial complex for the PWR-type reactors. The NPFC-I is a dual purpose nuclear power plant, with a net capacity of 1000 MWe, located 175 km south of Islamabad. The reactor is designed for converting U3O8 to natural UF6, and enriched UF6 into UO2 powder, then converted depleted UF6 into depleted uranium metal and produced zircon ingot. The PNPFC is ingeniously constructed by the Pakistan Atomic Energy Commission (PAEC) under the IAEA terms, as IAEA is funding this megaproject.

<span class="mw-page-title-main">Munir Ahmad Khan</span> Pakistani physicist (1926–1999)

Munir Ahmad Khan, NI, HI, FPAS, was a Pakistani nuclear reactor physicist who is credited, among others, with being the "father of the atomic bomb program" of Pakistan for their leading role in developing their nation's nuclear weapons during the successive years after the war with India in 1971.

Muhammad Masud Ahmad, best known as Masood Ahmad, was a Pakistani theoretical physicist and ICTP laureate known for his work in dual resonance and Veneziano model, a strings sting mathematically described the fundamental forces and forms of matter in quantum state.

Muhammad Hafeez Qureshi, SI, HI, known as Hafeez Qureshi, was a Pakistani nuclear scientist and a mechanical engineer, known for his classified work at WGS at the Pakistan Atomic Energy Commission (PAEC).

Chaudhry Abdul Majeed was a Pakistani nuclear chemist, nuclear weapon and reactor expert. He is known as one of the pioneers of Pakistan's nuclear weapon programme, and has worked closely with former Pakistan Atomic Energy Commission (PAEC) Chairman Munir Ahmad Khan's plutonium reprocessing project. He rose to prominence when he was apprehended by Pakistan's intelligence agencies in a joint operation in late October 2001. Majeed was also one of the founding members of Sultan Bashiruddin Mahmood's Ummah Tameer-e-Nau organisation; an NGO which caused an international embarrassment for Pakistan.

<span class="mw-page-title-main">Project-706</span> Code name for Pakistans Nuclear Bomb Program

Project-706, also known as Project-786 was the codename of a research and development program to develop Pakistan's first nuclear weapons. The program was initiated by Prime Minister Zulfiqar Ali Bhutto in 1974 in response to the Indian nuclear tests conducted in May 1974. During the course of this program, Pakistani nuclear scientists and engineers developed the requisite nuclear infrastructure and gained expertise in the extraction, refining, processing and handling of fissile material with the ultimate goal of designing a nuclear device. These objectives were achieved by the early 1980s with the first successful cold test of a Pakistani nuclear device in 1983. The two institutions responsible for the execution of the program were the Pakistan Atomic Energy Commission and the Kahuta Research Laboratories, led by Munir Ahmed Khan and Abdul Qadeer Khan respectively. In 1976 an organization called Special Development Works (SDW) was created within the Pakistan Army, directly under the Chief of the Army Staff (Pakistan) (COAS). This organization worked closely with PAEC and KRL to secretly prepare the nuclear test sites in Baluchistan and other required civil infrastructure.

Peter Finke is a German theoretical physicist who participated in Project-706, Pakistan's clandestine nuclear research project. A close associate and friend of the famous Pakistani nuclear engineer Munir Ahmad Khan (late), he is citizen of both Pakistan and Germany. He is one of the European scientists who participated in Project-706 in the 1970s.

<span class="mw-page-title-main">Rafi Muhammad Chaudhry</span> Pakistani physicist (1903–1988)

Rafi Muhammad Chaudhry FPAS HI, NI, SI, Skdt best known as R. M. Chaudhry, was a Pakistani nuclear physicist and a professor of particle physics at the Government College University. His teaching and instructions on modern physics influenced many of his student to pursue career in physics who regard him as one of the key architects of having been the pioneer of experimental nuclear physics research in Pakistan and, along with Abdus Salam and Ishrat Hussain Usmani, one of the main creators of Pakistan's nuclear weapons research program in the 1970s. Chaudhry, who served as professor of nuclear physics at Government College University, was later referred to by Dr. Samar Mubarakmand, one of his students, as "the true father of the nuclear weapons program of Pakistan".

Naeem Ahmad Khan, FPAS, was a Pakistani nuclear physicist and a professor of physics who was known for his work in developing techniques using the solid-state nuclear track detector and solid-state nuclear magnetic resonance. Although he worked with the Government of Pakistan for most of his career, he also taught physics at a number of Pakistani universities and was the civilian scientist of the Pakistan Air Force (PAF) until his death.

Iqbal Hussain Qureshi 27 September 1937 – 8 December 2012) SI, FPAS, best known as I.H. Qureshi, was a Pakistani nuclear chemist and an Emeritus professor of chemistry at the University of Karachi. Qureshi was the principal contributor of scientific understanding of various chemical elements: bismuth, cobalt, strontium, thallium, tritium, iron, rubidium, and zinc.

References

  1. Unknown. "See:Pakistan's Nuclear Infrastructure" (google docs).
  2. Mastermind of the MRF Logsdon, Gene. BioCycle. Emmaus: April 1993. Vol. 34, Iss. 4; pg. 49, ff.
  3. Pakistan Institute of Nuclear Science and Technology (PINSTECH); Higher Education Commission of Pakistan; Pakistan Atomic Energy Commission. "Pakistan Research Reactor-I" (PDF). PINSTECH, HEC, PAEC. HEC. Archived from the original (PDF) on 3 March 2016.
  4. "PERFORMANCE OF PARR-1 WITH LEU FUEL". www.rertr.anl.gov. Retrieved 6 April 2022.
  5. "PARR-I Program Crticallity" (PDF). 1995. Archived from the original (PDF) on 3 March 2016.
  6. "History -- PINSTECH". Archived from the original on 31 January 2009. Retrieved 6 November 2009.
  7. Pakistan Institute of Nuclear Science and Technology (PINSTECH); Higher Education Commission of Pakistan. "Chapter 2: Description of Reactors" (google docs). PINSTECH and HEC. Higher Education Commission.
  8. Wasim, M.; Zaidi, J. H.; Arif, M.; Fatima, I. (1 September 2008). "Development and implementation of k0-INAA standardization at PINSTECH". Journal of Radioanalytical and Nuclear Chemistry. 277 (3): 525–529. doi:10.1007/s10967-007-7100-8. ISSN   1588-2780. S2CID   99794444.
  9. Albright, David (1 June 1998), Technical Assessment: Pakistan's Efforts to Obtain Unsafeguarded Plutonium are Nearing Fruition
  10. "Rawalpindi New Labs - Pakistan Special Weapons Facilities". nuke.fas.org. Retrieved 6 April 2022.
  11. How Pakistan Made Nuclear Fuel" by Munir Ahmad Khan, former chairperson of the Pakistan Atomic Energy Commission: Islamabad The Nation 7 February 1998, page 7
  12. 1 2 "-- Facilities -- PINSTECH". Archived from the original on 30 October 2009. Retrieved 3 July 2010.
  13. 1 2 3 4 5 Fast Neutron Physics Group (FNPG). "Fast Neutron Generator". PINSTECH Institute's Media Research Cell (Note: For more information click on Physics Research Division.). Atomic and Nuclear Radiation Group (ANR Group). Archived from the original on 19 June 2006.